Cladding Damaged or Lifting?

Tell us what the cladding is made of and roughly how much of it is affected, and we will put you in touch with cladding repairers servicing your area.

Get Free Cladding Repair Quotes

Typical Cladding Repair Costs

Reseal and reflash joints, per metre$35-$85
Refix loose or lifting cladding, per square metre$45-$110
Replace weatherboards, per linear metre$55-$130
Replace a Colorbond wall sheet$160-$420
Replace a damaged fibre cement sheet$280-$650
Asbestos cement cladding removal, per square metre$55-$140
Recladding a wall, per square metre$130-$320

Costs move with cladding material, how much comes off to reach the damage, whether asbestos is present, whether the frame or sarking behind it is wet, and wind region requirements.

Cladding Repair Service Cost WA 2026 - Complete Pricing Guide

Cladding sits in an odd position in Western Australia, because most houses here do not have much of it. The standard Perth house is two leaves of brick with no cladding at all, so when somebody in this state talks about cladding repairs they usually mean one of five things: the upper storey of a two-storey home, an addition or granny flat built in timber or steel frame, a gable end or a parapet infill, the walls of a patio or alfresco enclosure, or a pre-1990 house sheeted in asbestos cement. That last one is the reason cladding work here needs care that it does not need in Melbourne. Prices in 2026 run $35 to $85 a metre to reseal and reflash joints, $45 to $110 a square metre to refix cladding that has worked loose, $55 to $130 a linear metre for weatherboard replacement, $160 to $420 for a Colorbond wall sheet, $280 to $650 for a damaged fibre cement sheet, and $130 to $320 a square metre to reclad a wall to a sound standard. Removing asbestos cement cladding is $55 to $140 a square metre with disposal. Two things decide whether a cladding quote is realistic. The first is whether anybody has looked behind the cladding, because wet sarking, rusted battens and rotten studs turn a sheet replacement into a wall rebuild. The second is whether the material has been identified, since 1970s fibre cement and 2010 fibre cement look alike from three metres and are completely different jobs.

Cladding Repair Services Across Western Australia

Pricing for fibre cement and weatherboard repairs, asbestos cement sheet identification and removal, Colorbond and metal wall cladding, combustible cladding rectification, fixings and salt corrosion on coastal blocks, cyclonic region fixing requirements in the north west, bushfire prone area compliance, water ingress and flashing failures, rendered foam cladding. We can connect you with cladding installers across Western Australia and get three comparable prices.

Get Free Quotes

At a Glance - Cladding Repair Costs WA 2026

Job Cost Time on Site Permit Likely? Trade
Reseal and reflash joints, per metre $35-$85 1 day No Carpenter or roof plumber
Refix loose cladding, per square metre $45-$110 1-2 days No Carpenter
Replace weatherboards, per linear metre $55-$130 1-3 days No Carpenter
Replace a Colorbond wall sheet $160-$420 each 1 day No Metal roofer
Replace a damaged fibre cement sheet $280-$650 each 1 day No Carpenter
Asbestos cement removal, per square metre $55-$140 2-5 days Notification Licensed removalist
Reclad a wall, per square metre $130-$320 3-7 days Often Builder or carpenter
Combustible cladding replacement, per square metre $350-$900 Weeks Yes Registered builder

Cost Depth: The Sheet or the Wall Behind It

Cladding is a weather barrier, so by the time it has failed visibly, water has usually had a run at what is behind it. That is why cladding quotes split so widely. Replacing one damaged fibre cement sheet at $280 to $650 is a fair price for a sheet that was hit by something. The same sheet replaced because water has been tracking behind it for three years is the cheap part of a job that also includes sarking, framing and insulation.

The honest sequence is to open a small area and look before pricing the whole wall. A competent contractor will remove one or two sheets, photograph the frame, the sarking and the bottom plate, and quote from what is actually there. A quote written from the outside with no sheet removed is an estimate dressed as a price, and the variation lands once the wall is open and you have no alternative.

Costs reflect cladding material and profile, how much has to be removed to reach the damage, asbestos content in pre-1990 sheeting, the condition of the frame, sarking and insulation behind the cladding, wind region and bushfire attack level requirements, access and working height, and location within Western Australia.

Cladding Repair Costs in Western Australia for 2026

Cladding repair pricing in this state turns on two questions before it turns on any measurement: what the material is, and what condition the wall behind it is in. The maintenance end of the range is cheap. Resealing and reflashing joints runs $35 to $85 a metre and is the most valuable preventative job on any clad wall. Refixing cladding that has worked loose is $45 to $110 a square metre. Replacing weatherboards comes in at $55 to $130 a linear metre, a Colorbond wall sheet at $160 to $420 and a damaged fibre cement sheet at $280 to $650.

The larger end of the range is recladding. Taking a wall back and recladding it properly, with new sarking, corrected flashings and compliant fixings, is $130 to $320 a square metre. Removing asbestos cement sheeting adds $55 to $140 a square metre with disposal, and that work has to be done by somebody licensed for it once the area passes the homeowner limit. Licensed work is asbestos removal and identification is asbestos testing and inspection.

Western Australia has less cladding than the eastern states and that shapes the market. Double brick cavity construction dominates Perth housing, so clad walls here are concentrated in upper storeys of two-storey homes, framed additions and granny flats, gable and parapet infills, patio and alfresco enclosures, and the older housing stock sheeted in asbestos cement before 1990. Finding a contractor who works on cladding every week is harder here than finding a bricklayer.

Three local conditions then decide what tends to fail. Airborne salt from the Indian Ocean attacks fixings and coatings on coastal blocks. The north west sits in cyclonic wind regions with fixing requirements that metropolitan practice does not meet. And severe termite pressure across the Perth metropolitan area means timber framing behind cladding is at genuine risk, which brings in termite inspection before any wall is closed back up.

Where Cladding Actually Is on a WA House

Working out what you have is the first job, and in Western Australia the answer is usually narrower than people expect. A typical Perth house built between the 1960s and today is double brick, meaning two leaves of brickwork with a cavity between them, on a concrete slab. There is no cladding on it at all. The brick is the weather barrier, the structure and the finish, so WA has a deep bricklaying trade and a thin cladding one. Any cladding on such a house is on something added to it.

Five situations cover almost all residential cladding here. Upper storeys on two-storey homes are frequently framed and clad to save weight and cost over a second leaf of brick. Additions, granny flats and ancillary dwellings are commonly timber or steel framed. Gable ends, parapet infills and the triangular section above a wall plate are often sheeted. Patio, alfresco and carport enclosures are clad almost by definition. And a substantial slice of the pre-1990 stock, particularly state housing and country housing, is sheeted in asbestos cement.

Each of those has a different failure pattern. Upper storey cladding fails at flashings and at the junction with the brickwork below. Additions fail where the new work meets the old. Gable sheeting fails from behind, because nobody looks at it. Patio enclosures fail at the bottom edge where water splashes up. Asbestos cement fails by cracking at fixings and at corners.

Identifying the material matters as much as finding the fault. Modern fibre cement from manufacturers such as James Hardie carries product markings on the back of the sheet. Older asbestos cement sheet generally carries no such marking. Thickness, the pattern of the fixings, the feel of a cut edge and the age of the building all contribute, but none of them is proof, so a sample test is the only honest answer on a pre-1990 building.

Where It Is Common Material Typical Failure Repair Cost
Upper storey of a two-storey home Fibre cement or Colorbond Flashing failure at the brick junction $45-$320 per sq m
Addition or granny flat Fibre cement, weatherboard, Colorbond Junction with the original building $55-$320 per sq m
Gable end or parapet infill Fibre cement sheet Water entry from behind, unnoticed $280-$650 per sheet
Patio or alfresco enclosure Colorbond or fibre cement Bottom edge splash damage $45-$110 per sq m
Pre-1990 house sheeting Asbestos cement Cracking at fixings and corners $55-$140 per sq m to remove
Multi-residential facade Composite panel or render over foam Audit and rectification $350-$900 per sq m
Shed, workshop or outbuilding Corrugated steel Fixing corrosion and sheet rattle $160-$420 per sheet

How to Work Out What Your Cladding Is

Start with the year the house was built or the section was added, because that narrows the field more than anything you can see. Then look at an edge: a cut end, a corner, the bottom of a sheet behind a gutter, or the back of a sheet visible inside a roof space. Modern fibre cement carries printed product markings and a date on the reverse. Metal cladding usually has a profile name rolled into it.

What you must not do is cut, sand, drill or break a piece off to look at it if the building predates 1990. Photograph what you can see instead, including the fixing pattern and a close shot of any existing crack, and have a sample taken by somebody set up for it. A laboratory test costs $60 to $150 and settles the single question that changes the price and the method of the whole job.

Start from the build year, look at an exposed edge and the back of a sheet, and never cut a sample yourself on a pre-1990 building.

Fibre Cement and Weatherboard

Modern fibre cement is the default cladding on new framed work in Western Australia and it fails in predictable, cheap-to-fix ways when it is caught early. The material is cement reinforced with cellulose fibre, pressed and cured, and it is dimensionally stable, termite resistant and non-combustible. What it is not is waterproof at its edges. A cut edge that has not been sealed and painted wicks moisture, swells and then delaminates in layers, so damage almost always starts at the bottom of a sheet, at a window reveal, or at a cut around a service penetration.

Fixing is the other failure that turns up constantly. Fibre cement needs the right fastener at the right spacing and the right distance from the edge, and a nail driven too close to an edge or over-driven through the surface starts a crack that opens with the first season of movement. On a wall where multiple sheets show cracking radiating from the fixings, the problem is the fixing specification rather than the material.

Timber weatherboard appears on older and architect-designed houses and in the South West where the look suits the setting. It fails by paint breakdown first and then rot, concentrated at the bottom board, at end grain where a board meets a stop, and anywhere a downpipe or a garden bed keeps it wet. Replacing individual boards is $55 to $130 a linear metre and the main cost driver is matching a discontinued profile. Both materials reward maintenance out of all proportion to its cost. Keeping the paint film intact, keeping cut edges sealed, keeping garden beds and reticulation away from the bottom edge and keeping a clear gap between the cladding and the ground will roughly double the service life. That is exterior painting work and it is far cheaper than carpentry services replacing boards.

Problem Cause Repair Cost
Swollen, delaminating bottom edge Unsealed cut edge wicking moisture Replace sheet or board, seal edges $280-$650 per sheet
Cracks radiating from fixings Fastener too close to edge or over-driven Refix correctly, patch or replace $45-$110 per sq m
Open vertical joints Jointer or sealant failed Reseal and reflash $35-$85 per m
Rot at the bottom weatherboard Ground contact, garden bed, splash Replace board, correct ground clearance $55-$130 per linear m
Rot at board ends Unsealed end grain Replace and seal $55-$130 per linear m
Paint peeling in sheets Coating failure or moisture behind Strip, prime, recoat $28-$55 per sq m
Discontinued profile, no match Product range changed Reclad the elevation $130-$320 per sq m

Asbestos Cement Sheeting and the WA Legacy

Western Australia carries a heavier asbestos legacy than any other state and it changes how cladding work is approached on any older building here. Asbestos cement sheet was used extensively as external wall cladding, as eaves lining, as wet area lining and as roofing across Australia until the late 1980s, with manufacture of asbestos products ending in 1987 and a national ban on use taking effect at the end of 2003. In this state the material appears right through the suburban stock built before 1990, through country housing, and through sheds and outbuildings of every description.

In its bonded form the sheet is not dangerous while it is intact, painted and undisturbed. The fibres are locked in a cement matrix and nothing is released. The hazard begins when somebody drills it, cuts it, breaks it to fit a bin, water blasts it or sands the paint off it. That is exactly what ordinary cladding repair involves, so identification has to come before anybody picks up a tool.

Western Australian rules on this are specific and sit with WorkSafe. A homeowner may remove up to 10 square metres of non-friable asbestos themselves, although WorkSafe recommends using a licensed removalist regardless of the area. Above 10 square metres, or for any friable asbestos, licensed removal is mandatory. Three licence categories exist: a Class A removalist for all asbestos including friable material, a Class B removalist for non-friable only, and a licensed assessor who does air monitoring and issues clearance certificates. Licensed removal must be notified to WorkSafe at least five days before it starts.

Removal runs $55 to $140 a square metre including disposal at a licensed facility, and the figure varies with access, height, how brittle the sheet is and travel to the nearest disposal site, which in regional WA can be hundreds of kilometres. Encapsulation, meaning painting and sealing the sheet in place, is a legitimate option on sound cladding and far cheaper at $22 to $45 a square metre, but it defers the problem instead of resolving it. Requirements are published by WorkSafe Western Australia with national guidance from Safe Work Australia.

What Not to Do With Old Cladding

Do not water blast it, do not sand or wire brush the paint off it, do not drill or cut it, and do not break sheets to fit them in a bin or a trailer. Each of those releases fibres from a material that is harmless while it stays intact. Do not let a general handyman remove it because the area looks small, and do not accept a verbal assurance that it is only fibro, since that word covers both the safe modern material and the hazardous old one. Do get a sample tested at $60 to $150 before any work is quoted, because the answer changes the method and the price of everything that follows. Do keep the clearance certificate after any licensed removal, since it belongs with the house and a future buyer will ask. And do remember the 10 square metre homeowner limit for non-friable material, and the five day notification required before licensed removal begins.

Never blast, sand, cut or snap old sheeting. Test first, keep the clearance certificate, and respect the 10 square metre limit.

Colorbond and Metal Wall Cladding

Metal wall cladding is common on WA patios, sheds, additions and contemporary homes, and its failures are mostly about the fixings and the edges rather than the sheet. Prepainted steel sheet, sold under the Colorbond name and manufactured by BlueScope, with roll-formed profiles from Lysaght and Stramit widely available in Perth, has a zinc or zinc-aluminium coating under a baked paint finish. It performs very well while that coating system is intact. Every cut edge, every screw penetration and every scratch to the substrate is a point where corrosion can start, and in a coastal environment it will.

The failure pattern on a WA coastal block is distinctive. Rust blooms appear first at cut ends, at the bottom edge where sheets sit closest to splash and salt, and around fasteners where the sealing washer has perished and let moisture under the head. On a sheltered inland wall the same cladding can look new at thirty years. On a west-facing wall two streets from the beach it can be streaking at twelve.

Galvanic corrosion is the mistake that catches people doing their own repairs. Putting a plain galvanised or a copper fastener into a zinc-aluminium coated sheet, or letting an aluminium gutter bracket sit against steel, sets up a reaction that eats one of the two metals. Replacement fasteners have to match the sheet system, and near the coast that means a Class 4 corrosion rated fastener as a minimum. Individual sheet replacement is $160 to $420 depending on length, profile and access. The practical problem is profile matching, because roll-formed profiles and colour ranges change, so a twenty year old wall may need a whole elevation redone to look right. Where the whole wall is going anyway, that is render repair territory if the finish is changing, or a metal re-sheet with the roofing trade through roof repairs.

Location Salt Exposure Minimum Fastener Rating Expected Service Life
Within 100 m of breaking surf Severe marine Class 5 or stainless 10-15 years, rinse regularly
100 m to 1 km from the coast Marine Class 4 minimum 15-25 years
1 km to 5 km from the coast Moderate marine Class 4 25-35 years
Perth inland suburbs Low Class 3 30-40 years
Wheatbelt and Goldfields Low, but saline soils Class 3, Class 4 near salt lakes 30-40 years
Pilbara and Kimberley coast Severe marine plus cyclonic Class 5 and cyclone washers 10-20 years
Industrial or near a pool plant room Chemical Class 4 or stainless 15-25 years

Combustible Cladding and the State-Wide Audit

This section concerns apartment and commercial buildings, not houses, and the Western Australian picture turned out better than many expected. After the Grenfell Tower fire in London in 2017, Western Australia ran a state-wide cladding audit from July 2017 to June 2019. It covered Building Code of Australia Class 2, 3, 4 and 9 buildings of three storeys or more, built or refurbished after 1 January 2000. Class 1 buildings, which means ordinary houses, were not included at all, so a standard Perth home was never in scope.

The results are worth knowing if you own in a strata scheme. Across 1,795 privately owned buildings that were physically inspected, 475 showed suspected combustible cladding. Preliminary risk assessment reduced that to 258 still under review, and detailed assessment concluded with 14 high-risk and 38 moderate-risk buildings and no buildings in the extreme-risk category. Separately, 1,914 public and university buildings were assessed, 1,783 were cleared and 38 required remedial action.

The materials at issue are aluminium composite panel with a polyethylene core and expanded polystyrene rendered systems, both of which look like solid cladding or render from the ground. Identification needs a core sample or product documentation, not a visual assessment, and a strata scheme should have this on record from the audit period. Rectification is $350 to $900 a square metre and is a registered builder job with a building permit, fire engineering input and usually scaffolding. If you are buying into an apartment building constructed or refurbished after 2000, the questions to ask are whether the building was assessed in the audit, what the outcome was, whether any rectification was required and whether it has been completed. The department has continued publishing status updates on rectification progress. Current information is held by Building and Energy, at the Government of Western Australia.

Stage Private Buildings Public and University Buildings Notes
Audit period July 2017 to June 2019 July 2017 to June 2019 Prompted by Grenfell Tower, 2017
Buildings in scope Class 2, 3, 4 and 9, three storeys or more Same classes Built or refurbished after 1 Jan 2000
Class 1 houses Not included Not included Ordinary homes were never in scope
Physically inspected 1,795 1,914 Coordinated with departments and universities
Suspected combustible cladding 475 Not reported separately Visual and documentary assessment
Remaining under review after triage 258 131 Preliminary risk assessment applied
Final high risk 14 Part of 38 requiring remediation No buildings rated extreme risk
Final moderate risk 38 Part of 38 requiring remediation Rectification progressing since

Questions for a Strata Scheme or an Apartment Purchase

Ask whether the building was assessed in the state-wide cladding audit, and ask to see the outcome itself instead of a summary. Ask whether any rectification was required, whether it has been completed and whether it was signed off. Ask whether the cladding was identified by core sample or product documentation, because a visual assessment of aluminium composite panel or rendered polystyrene proves nothing from the ground.

Then look at how the money is provided for. Ask what the scheme has in its reserve fund against any outstanding cladding work, and whether a special levy has been raised or is contemplated. Rectification at $350 to $900 a square metre across a facade is a substantial number, and a buyer who does not ask inherits a share of it. Minutes of general meetings from the audit period onward are where this usually surfaces.

Audit outcome in writing, rectification status and sign-off, how the cladding was identified, and what the scheme has set aside for it.

Fixings, Salt and the Coastal Problem

On a Western Australian coastal block the cladding usually outlasts the things holding it up, and that is the repair most often mispriced. Salt arrives as aerosol on the sea breeze, settles on every surface and is hygroscopic, meaning it draws moisture out of the air and keeps a thin wet film on metal long after rain has stopped. The Fremantle Doctor delivers it inland every afternoon through summer. That is why corrosion rates in Cottesloe, Scarborough, Trigg, City Beach and Hillarys are in a different category from Midland or Armadale, even though the distance is only twenty kilometres.

Fixings therefore fail long before the sheet does. Screws rust from the shank out, the sealing washer under the head perishes under ultraviolet, and the fixing loses both its seal and its holding power. The cladding then rattles in wind, water gets in around the fastener, and a wall that looks sound from the street is actually loose. Refixing an elevation with correctly rated fasteners is $45 to $110 a square metre and is often all that is needed.

Specification matters a great deal more than brand. Near the coast, fasteners need a corrosion class appropriate to the exposure, and stainless is the sensible answer within a few hundred metres of breaking surf. Even then, stainless will tea-stain in this environment, and that is cosmetic, not structural. Buildex and Hilti fasteners are widely stocked in Perth across the relevant classes, and a roof plumber or metal cladding contractor will know the rating to specify.

Rinsing is the free maintenance that nobody ever does. Washing down coastal cladding and fixings with fresh water two or three times a year removes the salt before it does its work, and it extends fastener life measurably. It matters most on surfaces not reached by rain, which means under eaves, behind downpipes, on the lee side of parapets and anywhere a verandah roof shelters the wall.

Cyclonic Regions and the North West

Cladding in the north of Western Australia is engineered for a wind event, and a repair that does not restore that engineering has made the building less safe than it was. Design wind speeds come from AS/NZS 1170.2 and the state is not uniform. Perth and the south west sit in the non-cyclonic region. The north west coast sits in the cyclonic regions, and Western Australia applies its own state variation for the most severe category, Region D, which the department describes as a band roughly 50 kilometres wide along the north west coast from approximately Port Hedland in the Pilbara to Carnarvon in the Gascoyne, with the variation applying north of the Tropic of Capricorn. That variation took effect on 1 September 2022 with the adoption of the National Construction Code 2022.

What that means for cladding is a different fixing regime entirely. Cyclonic design has to resist repeated pressure reversals over hours, not a single peak gust, so fixings use cyclone washers that spread load and resist fatigue, spacings are closer, and the load path has to run continuously from the cladding through the battens and framing to the footings. A sheet refixed with metropolitan screw spacing in Karratha is a sheet that will leave the building.

That has a direct effect on who should do the work. A cladding repair in the Pilbara or the Kimberley needs somebody who works in cyclone rated construction and can tell you the fixing specification they are working to. Engineering documentation for the original build should be found before the repair, because matching the original specification is the standard to meet. Emergency preparation and cyclone material for the region comes from the Department of Fire and Emergency Services.

Cost reflects every part of what that involves. Rates in the north west sit 50 to 100 per cent above metropolitan ones once freight, travel, the small contractor pool and the heavier specification are priced in. The wet season also closes the practical working window from roughly November to April, so planning a cladding repair for May gets it done and planning it for January generally does not.

Area Wind Region Fixing Approach Cost Effect
Perth metro and Peel Non-cyclonic Standard fasteners to manufacturer spacing Base rate
South West and Great Southern Non-cyclonic, high exposure coastal Standard, closer spacing on exposed walls 0-15 per cent
Geraldton and Mid West Non-cyclonic to intermediate Check the site classification 15-35 per cent
Carnarvon to Port Hedland coastal band Region D, severe cyclonic Cyclone washers, close spacing, continuous load path 60-110 per cent
Broader Pilbara and Kimberley Cyclonic Cyclone washers and engineered load path 50-100 per cent
Goldfields and inland Wheatbelt Non-cyclonic Standard fasteners 30-55 per cent for travel
Any site, after a cyclone As originally engineered Restore original specification, not generic Insurance assessed

Bushfire Prone Areas and Cladding

If your property is in a designated bushfire prone area, cladding is a fire performance element and not simply a weather barrier. Western Australia has mapped bushfire prone areas and a property inside one is subject to construction requirements based on its Bushfire Attack Level, or BAL, assessed under AS 3959. The level runs from BAL-LOW through BAL-12.5, 19, 29, 40 and up to BAL-FZ for the flame zone, and the cladding requirements tighten at each step. In the Perth hills, the South West, the Great Southern and much of the peri-urban fringe, a great many properties sit inside the mapping.

The relevant point for a repair is that material substitution can breach compliance without anybody noticing. Replacing a non-combustible fibre cement sheet with a timber board, or infilling a gable with a lightweight product that has no tested fire performance, can take a compliant wall out of compliance. The same applies to the small details: gaps that need to be sealed against ember entry, vents that need mesh of a specified aperture, and the junction between cladding and subfloor.

Ember attack rather than flame contact destroys most houses in a bushfire, and embers find gaps. On a clad wall the vulnerable points are the open bottom edge of cladding, unsealed vertical joints, weep holes, penetrations for services and the junction where cladding meets a roof or a verandah. A repair is a good opportunity to close those off, and it costs very little extra while the wall is open. Practically, if the property is in the mapping, ask the contractor to confirm the replacement material and detailing meet the assessed BAL, and keep whatever documentation came with the original build. Where no assessment exists, a BAL assessment costs a few hundred dollars and is better done before you choose materials rather than after. Construction provisions sit with the Australian Building Codes Board and the standards with Standards Australia.

Cladding Repairs in a Bushfire Prone Area

Find out whether the property is inside the bushfire prone area mapping and whether a Bushfire Attack Level was assessed for the build. Those two answers decide what you may use. Then ask the contractor to confirm in writing that the replacement cladding and its detailing meet that level, since swapping a non-combustible sheet for a timber board is an easy and invisible way to lose compliance. While the wall is open, close the ember paths. Seal the bottom edge of the cladding, seal vertical joints, mesh any vents to the specified aperture, and attend to the junction where cladding meets the roof or a verandah. Embers rather than flames destroy most houses, and these details cost very little during a repair and a great deal to retrofit later.

Confirm the mapping and the assessed level, get the material confirmation in writing, and close the ember paths while the wall is open.

Water Ingress, Flashings and the Weather Barrier

Cladding is one part of a weather barrier and not the whole of it, and most cladding failures are really failures of the parts nobody photographs.

A properly built clad wall works in layers. The cladding itself takes the weather first. Behind it a drainage cavity or a batten space lets any water that gets past run down and out. Behind that, sarking, which is the pliable membrane wrapped over the frame, stops water reaching the timber and lets vapour escape. At every opening, every junction and every termination, a flashing directs water back out. Remove or compromise any one of those and the wall leaks even though the cladding is intact.

Flashings cause a great deal more trouble than cladding does. The junction where an upper storey clad wall meets the brickwork below is the classic Perth failure point, because a flashing there has to be built into the brickwork and lapped correctly under the cladding, and a shortcut is invisible for years. Window and door head and sill flashings are next. Where cladding meets a roof, a verandah or a parapet, the flashing has to turn up behind the cladding and not merely be sealed against the face of it.

Sealant is where most of the shortcuts live. A bead of silicone across the top of a flashing instead of a correct lap will work for three to five years and then fail, and by then the water has been inside the wall for one or two of those. A quote that lists sealant where a flashing belongs is quoting the wrong repair. The giveaway is a leak that recurs at the same spot after being sealed twice.

Symptoms show up inside the house before they show outside. Staining or blistering on the internal lining at the base of a wall, a skirting that has lifted, a musty smell in a built-in robe, a swollen architrave, or paint peeling in a band at one height. Where that appears on an internal wall below an upper storey clad elevation, the flashing at the junction is the first suspect. Internal making good falls to plastering and gyprock repairs and building inspection is the way to get it diagnosed independently.

Finding Out Where the Water Is Getting In

Note when it appears. A leak that shows only during driving rain from one direction is wind-driven water entering at a joint or a flashing on that elevation. A leak that shows after any rain points to something more open. A damp patch that is there all year with no relationship to rain is more likely rising damp, plumbing or condensation, and that is a different investigation.

Then note the height at which it shows. Staining at the base of an internal wall under a clad upper storey points at the junction flashing between the cladding and the brickwork. Staining in a band at window head height points at a head flashing. Staining around one opening points at that opening. Photograph the pattern and the weather conditions each time, because two or three dated observations narrow this far more effectively than opening a wall at random.

When it appears relative to rain and wind direction, and at what height it shows inside, together identify the entry point most of the time.

Rendered and Foam Cladding Systems

Rendered lightweight cladding looks like a masonry wall from the footpath and behaves nothing like one, and that is the source of most of the confusion around it. Two systems account for most of what is out there. Autoclaved aerated concrete panel, sold in Australia under the Hebel name, is a genuine lightweight concrete product, non-combustible, and it renders well. Expanded polystyrene systems use a foam board with a reinforced render coat over it, and these are light, cheap, fast and thermally efficient, but the foam itself is combustible and the render coat is the only thing protecting it. Knowing which of the two you have decides the method and the price of a repair.

Failures are mostly in the render coat and the detailing. Cracking at panel joints, at window corners and where the system meets a different material. Impact damage, which on a foam system leaves a dent that water then sits in. Debonding of the render from the substrate, which sounds hollow when tapped in exactly the way a drummy tile does. And failure at the bottom termination, where the system has to be stopped clear of the ground with a bead that lets water out.

Repairs run $85 to $220 a square metre for render work on a sound substrate, and more where the substrate itself has to be replaced. Patch repairs are visible on textured finishes, so the usual approach is to repair and then recoat the whole elevation to a natural break so the patch is not framed by old coating. Repairs of that kind fall under render and texture coating work.

One Western Australian point is worth adding to that. Reticulation spraying onto a rendered foam wall day after day is remarkably destructive, because bore water carries dissolved minerals and iron that stain the coating and salts that break the render bond from behind. Before repairing a rendered wall at ground level, look at where the sprinklers throw, because repairing it without moving them buys you a repeat in three years. Finishes specific to limestone substrates come under limestone rendering work.

Termite Damage Behind Cladding

Perth sits in one of the higher termite pressure zones in the country, and a clad wall is the ideal place for termites to work undetected. Subterranean termites need moisture and concealment and a clad timber-framed wall provides both. They enter from the soil, travel up inside the cavity behind the cladding where nothing disturbs them, and eat the framing from the inside out. The cladding stays in place and looks normal, so the damage is usually found during unrelated work rather than during an inspection.

The things that make it easy for them are all preventable. Cladding that extends down to or below ground level, a garden bed or mulch built up against the wall, a reticulation head keeping the base of the wall permanently damp, a paved area with no clearance, and timber stored against the cladding. Any cladding repair is an opportunity to correct the ground clearance, and it is the single most useful thing you can do.

Signs worth taking seriously include a hollow sound in framing when tapped through the lining, a skirting that gives under a thumb, mud tubes or shelter tubes on brickwork or a slab edge, a section of cladding that has gone slightly soft, and swarming alates in spring. None of those is proof on its own and all of them justify an inspection at $280 to $550. Where framing has been eaten, the repair is structural work and not cosmetic. Replacing affected studs, plates and noggings before recladding runs $120 to $340 a square metre of wall depending on how much has gone, and on a loadbearing wall it needs temporary support and sometimes an engineer. That is structural repairs work, and the inspection side is termite inspection.

While the Cladding Is Off, Fix These Four Things

Get the ground clearance right. Cladding should stop clear of the finished ground level rather than disappear into soil, paving or mulch, because buried cladding is both a termite entry and a permanent damp path. Pull garden beds and mulch back from the wall. Move or adjust any reticulation head that throws water onto the base of the cladding, since that one change removes the moisture termites need.

Then check the termite barrier itself while you are there. A physical or chemical termite management system should be visible at the slab edge or the bearer line, and if it has been bridged by paving, a path, a deck or a garden bed, it is doing nothing. Photograph the frame while it is exposed, because that record is genuinely useful at the next inspection and a future owner will want it.

Ground clearance restored, garden beds pulled back, reticulation redirected, and the termite barrier checked for bridging.

Repainting and Recoating Cladding

Coating costs least of all the cladding maintenance, and it decides how long everything else lasts. On fibre cement and timber, the paint film is the waterproofing. Once it has cracked, chalked or lost adhesion, water reaches the substrate and the countdown starts. Recoating an exterior wall runs $28 to $55 a square metre including preparation, and doing it on schedule instead of waiting until the cladding is already swelling is the difference between a paint job and a replacement job.

Perth conditions are hard on coatings in a specific way. Ultraviolet levels here are high and summer surface temperatures on a north or west facing wall are extreme, which breaks down binders and fades pigments faster than in the southern states. Expect 7 to 10 years from a good exterior acrylic system on a sheltered elevation and 5 to 7 on a west-facing one. Dark colours absorb more heat and fail sooner, which is worth knowing before choosing one.

Preparation determines the outcome and it is where cheap quotes save money. Chalked and failing coating has to come off, not be painted over. Cut edges need sealing before anything is coated. Bare fibre cement needs a sealer before the topcoat. On metal cladding, recoating needs the correct etch or adhesion primer, because an acrylic rolled straight onto a prepainted steel surface will peel in sheets. Dulux and Haymes systems are widely specified across the Perth market for exterior work.

One thing to settle before any recoating of a pre-1990 building. Preparation on old paint means sanding or pressure washing, and on asbestos cement cladding neither is acceptable. Establish the material first, and if it is asbestos cement, the coating approach is gentle cleaning and painting without abrasion, a legitimate form of encapsulation. Trade work sits under exterior painting and painting services.

Licensing, Permits and WA Thresholds

Cladding work can be a handyman job or a registered builder job depending on value and on whether it is structural, so knowing where the lines sit protects you. The regulator for building work here is Building and Energy, which sits inside the Department of Local Government, Industry Regulation and Safety and is headed by a Building Commissioner alongside a Director of Energy Safety. Contractors sometimes name a regulator that no longer exists, so verify any registration number on the current register instead of accepting a letterhead.

Three thresholds shape the paperwork on cladding work. Any fixed-price residential job from $7,500 to $500,000 belongs under a written home building contract. Permitted work above $20,000 brings home indemnity insurance with it, covering deposit loss to $40,000. Deposits are capped at 6.5 per cent of the contract price. All three numbers are specific to Western Australia and differ from the eastern states.

Permits are the part that people most often get wrong. Replacing like-for-like cladding on a small area is usually maintenance and needs no permit. Recladding an elevation in a different material, altering the structure, working on a building in a bushfire prone area where the requirements change, or rectifying combustible cladding on a multi-residential building generally does need a permit from your local government. Ask the question before work starts, because a permit obtained afterwards is harder and more expensive.

Asbestos sits under a separate regime entirely, administered by WorkSafe and not by Building and Energy, with the 10 square metre homeowner limit for non-friable material, mandatory licensing above it and five days notification for licensed removal. The two sets of obligations run in parallel on the same job. Consumer guarantees cover the workmanship regardless of any warranty document, and are enforced by the Australian Competition and Consumer Commission, while building and construction sits among the matters heard by the State Administrative Tribunal, with the underlying regulations at Western Australian Legislation.

Perth Metropolitan Pricing

The thin cladding trade in Perth is the main thing that shapes pricing here, and it cuts both ways. Because double brick dominates, there are fewer contractors who do cladding as their main work than there would be in Melbourne or Brisbane, so quotes vary more widely and some carpenters price cladding defensively because they do little of it. The flip side is that specialists exist and are worth finding, particularly for metal cladding, where roof plumbers handle wall sheeting competently because the material and fixings are the same ones they use daily.

Geography splits the metropolitan market into three. The coastal strip from Fremantle north through Scarborough and Hillarys and south through Rockingham carries severe salt exposure, so refixing with properly rated fasteners is routine and specification matters more than price. The eastern and northern corridors have the newest framed construction and the most straightforward sheet replacement. The hills and the peri-urban fringe bring bushfire requirements into almost every job.

Height and access drive cost as much as material. Cladding on the upper storey of a two-storey house needs scaffolding or a hired work platform, and that is $450 to $1,600 for the hire and set-up before any cladding is touched. Where several jobs on the upper level can be done during one scaffold hire, including painting, gutters and window work, the saving is real, so ask what else is worth doing while it is up. For larger projects, renovation services cover the work cladding forms part of, and gutter replacement is the job most worth bundling with any upper storey cladding access.

Job Coastal Strip Eastern and Northern Corridors Hills and Fringe
Reseal and reflash joints, per metre $45-$85 $35-$70 $40-$80
Refix loose cladding, per square metre $60-$110 $45-$90 $50-$100
Replace weatherboards, per linear metre $70-$130 $55-$110 $65-$125
Replace a Colorbond wall sheet $190-$420 $160-$360 $175-$400
Replace a fibre cement sheet $320-$650 $280-$560 $300-$620
Reclad a wall, per square metre $160-$320 $130-$270 $150-$310
Asbestos cement removal, per square metre $65-$140 $55-$120 $60-$135
Scaffold or platform hire for upper storey $600-$1,600 $450-$1,200 $550-$1,500

Regional Western Australia Pricing

Regional cladding pricing is driven by three things that have nothing to do with the cladding: travel, freight and where the nearest licensed asbestos disposal site is. Building trades cover Mandurah and Peel, and the South West from Bunbury through Busselton to Margaret River, at modest loadings, and the South West actually has proportionally more clad housing than Perth because timber and weatherboard construction suits the setting. Carpenters and roof plumbers are available through Albany, the Great Southern and Geraldton, though anything beyond a standard profile needs freighting in. Asbestos disposal is the regional cost that surprises people. Bonded asbestos has to go to a facility licensed to accept it, and in parts of the Wheatbelt, the Goldfields and the Gascoyne that can mean a long haul with a covered and sealed load. On a small job the transport can exceed the removal labour, so batching asbestos work across a property, or across neighbouring properties, is worth organising.

In the Pilbara, the Kimberley and the Goldfields, loadings of 45 to 90 per cent are normal. The cyclonic fixing specification in the north adds materials and labour on top of travel. Heat affects the work too, since sealants and coatings have application temperature ranges and a Pilbara summer is outside them for much of the day, which pushes work to early mornings or to the cooler months. The practical advice for regional owners is the same as for pools and tiles: batch everything into one mobilisation and plan around the season instead of reacting to a problem. Simple maintenance such as resealing a joint, rinsing coastal cladding and keeping garden beds back from the wall is within reach locally, and carpentry services can usually cover it between specialist visits.

Region Local Trade Material Supply Loading on Metro Rates
Perth metro Adequate, specialists exist Full range locally Base rate
Mandurah and Peel Good Good 0-15 per cent
South West and Margaret River Good, more clad housing Reasonable 10-25 per cent
Albany and Great Southern Adequate Freight non-standard profiles 20-40 per cent
Geraldton and Mid West Adequate Freight non-standard profiles 25-45 per cent
Wheatbelt and Goldfields Limited Freight most things 35-65 per cent
Pilbara and Gascoyne Limited, cyclonic spec needed Freight everything 50-90 per cent
Kimberley Thin Freight everything, wet season closes work 55-90 per cent

What to Look Out For in a Cladding Quote

Cladding quotes go wrong in one dominant way, and it comes down to the part of the wall nobody opened. The first and biggest warning sign is a quote written without a sheet being removed. Cladding hides the frame, the sarking and the insulation, and a price given from the outside is an estimate. Ask for one or two sheets to be lifted and photographed before the quote is finalised, and expect to pay a small inspection fee for that, because it is the cheapest money on the whole job.

Second, on any building that predates 1990, ask what the asbestos plan is before anything is quoted. A contractor who shrugs at this is a contractor to avoid, because the answer changes the method, the licensing, the disposal and the price. Get a test result instead of an opinion, and remember the 10 square metre homeowner limit and the five day notification for licensed removal. Third, look for flashings in the written scope. A quote that proposes sealant where a flashing belongs is quoting a repair that will fail in three to five years, and the recurring leak at the same spot is the proof. Where an upper storey clad wall meets brickwork below, ask specifically how that junction will be detailed, because it is where water most commonly enters a Perth two-storey house.

Fourth, pin the specification down in writing before work starts. Which fastener and what corrosion class, for a property this far from the coast. What cladding product and profile, and is it still available or is a whole elevation being matched. In a bushfire prone area, does the material meet the assessed level. In the north west, what fixing specification applies for the wind region. Vague answers here mean the contractor has not thought it through.

Last, work through the paperwork side. Registration number verified against the Building and Energy register rather than a business card, a written contract where the value crosses $7,500, home indemnity insurance where a permit is needed and the value exceeds $20,000, and a deposit no higher than 6.5 per cent of the contract price. Ask as well who is obtaining any building permit. Independent assessment is available through building inspection and structural questions through structural repairs.

The Questions That Keep a Cladding Job Honest

Have you removed a sheet and looked at the frame, the sarking and the insulation, and may I see the photographs. What is the asbestos position on this building and do we have a test result. Which flashings are in the scope, and how will the junction between the clad wall and the brickwork below be detailed. What fastener and corrosion class, given the distance to the coast. Is the replacement product still available in this profile.

Then five on the paperwork and the aftermath. Is a building permit required and who is obtaining it. Does the material meet the assessed bushfire attack level if this property is in the mapping. What rate applies if the frame turns out to be damaged once the wall is open. What warranty covers the work and does it cover water ingress recurring at the same point. Then there is the deposit, capped in Western Australia at 6.5 per cent of the contract price.

A sheet lifted and photographed, the asbestos position settled, flashings in the scope, fasteners specified, and a deposit no higher than 6.5 per cent.

Cladding Repair Services Across Western Australia

We connect you with cladding repairers, carpenters, metal roofers and licensed asbestos removalists throughout Western Australia for fibre cement, weatherboard, Colorbond and asbestos cement cladding work.

▶ Perth Inner City 17 areas

CBD & Surrounds

Perth CBD Northbridge East Perth West Perth

Inner North

Subiaco Leederville Mount Lawley Highgate

Inner South

South Perth Victoria Park Como

Western Suburbs

Cottesloe Nedlands Crawley Dalkeith Applecross
▶ Greater Perth 26 areas

Northern Suburbs

Joondalup Wanneroo Ellenbrook Butler Morley Scarborough Karrinyup

Southern Suburbs

Fremantle Rockingham Baldivis Cannington Canning Vale Willetton

Eastern Suburbs

Midland Armadale Bassendean Byford Claremont

Perth Hills

Kalamunda Mundaring Gooseberry Hill Lesmurdie Helena Valley Darlington Glen Forrest Parkerville
▶ South West 25 areas

Peel

Mandurah Pinjarra Waroona Dwellingup Warnbro Safety Bay Secret Harbour

Bunbury Region

Bunbury Busselton Australind Harvey Collie Capel Donnybrook

Margaret River Region

Margaret River Dunsborough Augusta Cowaramup Yallingup

Great Southern

Albany Denmark Manjimup Pemberton Bridgetown Walpole Mount Barker
▶ Regional Western Australia 30 areas

Pilbara

Karratha Port Hedland Newman Tom Price Dampier Paraburdoo Marble Bar

Kimberley

Broome Kununurra Derby Halls Creek Fitzroy Crossing

Goldfields

Kalgoorlie Esperance Coolgardie Norseman Laverton Leonora

Mid West

Geraldton Carnarvon Meekatharra Kalbarri Exmouth Coral Bay

Wheatbelt

Northam Narrogin Merredin Moora York Toodyay

Cladding Repair FAQs

How much do cladding repairs cost in Western Australia?
Resealing and reflashing joints runs $35 to $85 a metre, refixing loose cladding $45 to $110 a square metre, weatherboard replacement $55 to $130 a linear metre, a Colorbond wall sheet $160 to $420, and a damaged fibre cement sheet $280 to $650. Recladding a wall properly is $130 to $320 a square metre. Asbestos cement removal adds $55 to $140 a square metre with disposal, and scaffold hire for an upper storey is $450 to $1,600 before any cladding is touched.
Why does my Perth house have so little cladding?
Because the standard construction here is double brick, meaning two leaves of brickwork with a cavity between them, usually on a concrete slab. The brick is the structure, the weather barrier and the finish all at once, so there is nothing to clad. Cladding in this state is concentrated on upper storeys of two-storey homes, framed additions and granny flats, gable and parapet infills, patio enclosures and pre-1990 housing sheeted in asbestos cement.
Is my old fibro cladding asbestos?
If the building predates 1990, treat it as asbestos containing until a test says otherwise. The word fibro is used for both the hazardous old asbestos cement sheet and the safe modern fibre cement, and they look similar from a few metres away. A laboratory test on a sample costs $60 to $150. Do not cut, drill, sand or water blast it to investigate, because that is exactly what releases fibres.
Can I remove asbestos cladding myself in WA?
A homeowner may remove up to 10 square metres of non-friable asbestos, though WorkSafe strongly recommends using a licensed removalist regardless. Above that area, or for any friable asbestos, licensed removal is mandatory. Western Australia has three licence categories: Class A for all asbestos including friable, Class B for non-friable only, and licensed assessors for air monitoring and clearance certificates. Licensed work must be notified to WorkSafe at least five days beforehand.
Was my house part of the WA combustible cladding audit?
Almost certainly not if it is an ordinary house. The state-wide audit ran from July 2017 to June 2019 and covered Class 2, 3, 4 and 9 buildings of three storeys or more, built or refurbished after 1 January 2000. Class 1 buildings, which means houses, were never in scope. Of 1,795 private buildings physically inspected, the final assessment identified 14 high-risk and 38 moderate-risk buildings and none rated extreme risk.
Why do my cladding screws rust but the sheets look fine?
Because salt arrives as aerosol on the sea breeze and keeps a thin wet film on metal long after rain stops, and fixings have far less coating thickness than a sheet does. Near the coast fasteners need a corrosion class suited to the exposure, with stainless the sensible answer within a few hundred metres of breaking surf. Refixing an elevation with correctly rated fasteners is $45 to $110 a square metre and is often all that is needed.
Are cladding repairs different in the Pilbara and Kimberley?
Substantially. The north west sits in cyclonic wind regions, and Western Australia applies its own state variation for Region D, described as a band roughly 50 kilometres wide along the north west coast from around Port Hedland to Carnarvon, applying north of the Tropic of Capricorn and effective from 1 September 2022. Cladding there needs cyclone washers, closer fixing spacing and a continuous load path. Expect 50 to 100 per cent above metropolitan rates.
Water is getting in but the cladding looks undamaged. Why?
Because cladding is only one layer of the weather barrier. Behind it there should be a drainage cavity, sarking and correctly lapped flashings at every junction and opening, and a failure in any of those leaks while the cladding stays intact. The most common Perth failure point is the flashing where an upper storey clad wall meets the brickwork below. A leak that recurs after being sealed twice is a flashing problem, not a sealant problem.
Do I need a building permit to reclad a wall?
Replacing like-for-like cladding over a small area is usually maintenance and needs no permit. Recladding an elevation in a different material, altering structure, working on a building in a bushfire prone area where requirements change, or rectifying combustible cladding on a multi-residential building generally does, and the permit comes from your local government. Ask before work starts, because obtaining one afterwards is harder and dearer.
Could there be termite damage behind my cladding?
In the Perth metropolitan area it is a genuine risk, because a clad timber-framed wall gives subterranean termites the moisture and concealment they need and the cladding hides the damage completely. The things that invite them are cladding running into soil, paving or mulch, garden beds against the wall and reticulation keeping the base damp. An inspection is $280 to $550, and any cladding repair is the right moment to correct the ground clearance.

More Wall and Exterior Cost Guides

For Trades & Contractors - SA

Are you a carpenter, metal roofer or asbestos removalist? Browse current job leads on the WA job leads board, with related work including carpenter jobs in WA and builder jobs in WA.

Cladding Problems in Western Australia?

Post your job and connect with cladding repairers and registered builders across WA for sheet repairs and recladding.

Get Free Cladding Repair Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 6 October 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

Service availability may vary in regional WA. Verify licences at WA Building and Energy.
Prices are estimates based on typical Western Australian rates in 2026. Quotes move with cladding material, how much has to come off to reach the damage, whether asbestos is present, whether the frame or sarking behind it is wet or damaged, and wind region requirements.
Need work done? Get free quotes. Post a Job – It's Free