Need a New Driveway?

Tell us the length and whether the crossover is included, and we'll put you in touch with concreters in your area.

Get Free Driveway Quotes
Free · No obligation · WA-wide

Typical Concrete Driveway Costs WA

Plain grey, broom finish$85-$120/sqm
Exposed aggregate$120-$200/sqm
Typical 40sqm driveway$3,400-$7,200
Crossover section$1,200-$3,500
Council crossover application$0-$300
Removing old driveway$45-$90/sqm

Indicative 2026 Western Australian estimates only. Rates vary with area, finish, slab thickness and reinforcement, site access, ground conditions and whether an existing driveway is being removed. Crossover specifications, application fees, bonds and any subsidy differ between local governments, so confirm the requirements with your council before relying on any figure.

Concrete Driveway Cost WA 2026 - Get Free Quotes

A concrete driveway in Western Australia runs $85 to $120 a square metre in plain grey and $120 to $180 in exposed aggregate, putting a typical forty square metre job between $3,400 and $7,200. What most people miss is that a driveway is two separate jobs under two different rulebooks: the section inside your boundary is yours to specify, and the crossover between your boundary and the road is council infrastructure built to their standard, approved by them and inspected by them. Getting that second part wrong can mean rebuilding it at your cost. The crossover alone runs $1,200 to $3,500 depending on the finish, and a number of WA councils contribute toward a first one. A number of WA councils also restrict the finish on that section, so an exposed aggregate driveway can be required to meet plain concrete at the boundary. This guide covers both halves, including how the approval works across Perth councils. Thickness is the other decision to settle at quoting stage. A hundred millimetres with mesh handles ordinary cars, while a caravan or a loaded work ute needs more, and adding it later means breaking out and starting again. Post your job on The Quote Yard to reach Western Australian concreters.

Concrete Driveways Across Western Australia

Practical pricing guidance for concrete driveways anywhere in Western Australia, covering the difference between the driveway and the crossover, local government approval and inspection, widths, gradients and transitions, thickness and reinforcement for vehicle loads, finishes from broom to exposed aggregate, verge and street tree considerations, drainage and where the water goes, removal and reinstatement of an existing driveway, and sealing, whether you are in Perth, Mandurah, Bunbury, Busselton, Geraldton, Kalgoorlie, Albany or regional Western Australia.

Get Free Quotes

At a Glance - Concrete Driveway Costs WA 2026

Item Cost What Drives It
Plain grey, broom finish$85-$120/sqmSimplest finish
Coloured oxide$100-$140/sqmOxide through the mix
Exposed aggregate$120-$180/sqmStone and the wash
Crossover, plain$1,200-$2,200Council spec and kerb work
Crossover, decorative$1,800-$3,500Finish plus spec compliance
Kerb alteration or new laydown$400-$1,500Cutting and reforming kerb
Removing existing driveway$45-$90/sqmThickness, mesh, cartage

Worked Example: Where the Money Actually Goes

Take a common Perth job: a 12 metre by 3.5 metre driveway, so 42 square metres inside the boundary, plus a 5 metre wide crossover out to the kerb. At $95 a square metre in plain grey the driveway itself is around $3,990. The crossover is quoted separately at roughly $1,600 for a plain finish, and removing the old slab at $60 a square metre adds about $2,520.

That is $8,110 in total, and only $3,990 of it is the part most people picture when they ask what a driveway costs. A quote showing $3,990 and a quote showing $8,110 can describe the same job.

What a Concrete Driveway Costs in WA

Plain grey with a broom finish runs $85 to $120 a square metre supplied and laid, which puts a forty square metre driveway at $3,400 to $4,800. Exposed aggregate takes the same driveway to $4,800 to $7,200. Those figures cover the section inside your boundary and generally exclude the crossover. Every finish is priced side by side at concreting costs.

The crossover is priced separately and it is not cheap. A plain crossover runs $1,200 to $2,200 and a decorative one $1,800 to $3,500, reflecting the tighter specification, the kerb work and the inspection requirement, and on a short suburban driveway the crossover can be a third of the total spend. It is a small area doing expensive work. Households routinely leave it out of their budget entirely. Three quotes on the same written scope is the only comparison that tells you anything.

Removing an existing driveway adds $45 to $90 a square metre. Thickness, whether the old slab was reinforced and how easily a machine can reach it all move that figure, and reinforced concrete is significantly slower to break out than plain. Weight determines the tip fee, and a slab weighs a great deal. Two driveways of the same area can cost very differently to demolish. Holcim, Boral, Hanson and BGC batch most residential concrete across the Perth basin, and a concreter's supplier relationship affects scheduling more than price.

Area works in your favour more than on most concrete jobs. A driveway is a large single pour with simple formwork, so the per square metre rate at sixty square metres is meaningfully better than at twenty-five, and adding a path or a parking bay to the same pour improves it further. Find out what adding the path does to the square metre figure before you rule it out.

The Driveway and the Crossover

Your driveway is two pieces of concrete with two different owners. Everything from your garage to the front boundary is your property and yours to specify, while the strip from that boundary across the verge to the road is the crossover, which sits on land the local government controls and forms part of the road network. From the street the concrete looks like one continuous surface. The rules governing each half are not. Two quotes on the same frontage can differ by a third purely on whether the crossover is in.

Because the crossover connects to a public road, the council specifies it and not you. Width, levels, the transition to the kerb, materials, thickness and sometimes even the permitted finishes are set out in that council's technical specification, and the work is approved before it starts and inspected after it finishes. You are building on their asset. That is the whole reason the process exists.

Responsibility afterwards is a question worth understanding. In most Western Australian local governments the property owner remains responsible for maintaining the crossover even though it sits on council land, so a cracked or sunken crossover is generally yours to repair, not the council's. Check the position with your own council. It differs enough between them to be worth asking. Corner properties and battleaxe blocks frequently have additional siting requirements.

The practical consequence is that quotes need to be explicit. A concreter quoting a driveway may or may not have included the crossover, the application, the kerb work and the inspection, and two quotes differing by two thousand dollars are frequently just describing different scopes. Ask directly whether the crossover is in or out. This is the single most common misunderstanding on the job. Corner properties frequently face tighter siting rules than mid block ones.

Some councils offer a subsidy toward a first crossover. Where a property has never had one, a contribution toward the standard specification is available in a number of Western Australian local governments, usually as a fixed amount and usually only for the first crossover to a property. It rarely applies to a replacement. Ask your council whether anything is available before you commit.

The Approval Process

Crossover approval is an application to your local government and it is straightforward when done in the right order. You or your concreter submit a form with a site plan showing the proposed location, width and levels, the council assesses it against their specification and any sight line or verge requirements, and approval is issued before work starts. Fees range from nothing to a few hundred dollars. Turnaround is usually weeks, not months.

The application asks about things people do not expect. Distance from the corner, distance from street trees, distance from services pits and light poles, sight lines for vehicles leaving the property, and the position relative to a neighbour's crossover can all affect whether a location is approved. A council may require the crossover to shift. Finding that out before the formwork goes up matters.

Some councils require a bond or a deposit before work begins. The bond covers damage to the kerb, footpath, verge or services during construction and is refunded after a satisfactory inspection, which is entirely reasonable given the work happens on public infrastructure. Bond amounts differ from one council to the next. Factor it into your cash flow even though you expect it back. A concreter who works your council regularly will know the specification without looking it up.

A council inspection closes the process out. The council inspects the completed crossover against the approved plan and their specification, and work that does not comply can be required to be removed and rebuilt at your cost, which is the outcome the whole process exists to prevent. Hold on to the approval paperwork once the job is done. It is what protects you if a question arises later.

A frontage onto a state controlled road brings a second approval into the picture. Access onto a state road has its own requirements administered by mainroads.wa.gov.au, and this affects a small number of properties on major routes. Sort it out well before the formwork goes up. Your council will usually tell you if it applies to your address.

How Perth Councils Differ

Every local government publishes its own crossover specification and they are not the same. Minimum and maximum widths, the required thickness and reinforcement, the transition detail at the kerb, whether a particular finish is permitted and whether a bond applies all vary, which is why a concreter who works across several councils asks which one you are in before quoting. No single specification applies across the metropolitan area. Assuming otherwise is how non-compliant work happens. Deeper cover over the steel is specified on coastal blocks to protect it from salt, which is a design detail rather than an optional extra.

Width limits are the most common point of difference. Some councils cap a residential crossover at a set width, others allow wider access for double garages or corner properties, and a few require a splay or taper at the kerb that adds area to the job. Wanting a wider driveway does not make it permissible. The maximum width is worth knowing before you design the layout.

Finish restrictions catch people out on decorative jobs. A number of councils require the crossover to be plain concrete or to match a nominated standard, which means the exposed aggregate driveway inside your boundary may have to meet a plain crossover at the boundary line. That transition looks deliberate when planned. It looks like a mistake when discovered late. Sight lines matter most on corners and near intersections, where councils are strictest.

Verge treatment rules sit alongside the crossover specification. Councils have policies covering what may be placed on a verge, how much of it may be hard surfaced, and what happens to street trees and reticulation, and those policies have tightened in several metropolitan councils in recent years. Paving the whole verge is generally not permitted. Your council's verge policy governs what parking you can add.

Finding your council's requirements is quick. Local governments publish crossover specifications, application forms and fee schedules on their websites, and a phone call to the technical services or engineering team resolves anything ambiguous. General guidance on WA government services sits at wa.gov.au. Doing this before you get quotes saves rework.

Width and Turning

Width decisions are easy to get wrong and expensive to fix. Three metres suits a single car, three and a half is comfortable for opening doors, and a double garage needs enough width at the garage to serve both bays even where the crossover is narrower, which is why many Perth driveways taper from a wide apron to a narrower crossover. Picture the way you will actually drive in and out. The formwork is the last cheap moment to change your mind.

Turning and manoeuvring need thinking through on a narrow block. Backing out onto a busy street is unpleasant and sometimes unsafe, so a turning bay or a wider apron that lets you drive out forwards is worth the extra area on the right property, and it is far cheaper poured at the same time than added later. A corner block usually offers more layout options. A sloping block offers considerably fewer. Application forms and fee schedules are published on every council website.

Caravans, boats and trailers change the geometry entirely. Longer vehicles need wider transitions, gentler gradient changes and more clearance at the kerb, and a driveway that works perfectly for a sedan can be unusable for a caravan on the same block. Say what will use it when you request quotes. It affects the layout as much as the thickness.

Side access to a rear yard is worth resolving at the same time. Where a shed, boat or caravan needs to reach the back, extending the concrete down the side while the crew and the truck are already there costs far less than a separate job later. Gate widths and structures need coordinating. Building the shed itself is quoted at shed and garage construction. Some councils publish a standard drawing that shows exactly what they expect.

Gradients, Transitions and Scraping

Scraping happens at changes in gradient, not on steep sections. A car bottoms out where the slope changes abruptly, typically at the kerb, at the garage threshold or where a steep driveway flattens, and the fix is a longer transition, not a gentler overall grade. Getting the transitions right is a set-out exercise. It is one of the clearest markers of an experienced concreter.

The kerb transition is the most common problem area in Perth. Where a driveway rises steeply from a laydown kerb, low vehicles catch on the lip, and the solution is either a longer approach within the crossover or a modified kerb detail if the council permits one. Both need agreeing before the pour. A scraping driveway is very difficult to fix afterwards.

Garage thresholds need a similar transition. The finished level at the garage door must work with the slab inside, must sit below the damp proof course, and must not create an abrupt change that catches a low bumper, which means the last two metres of a driveway often need careful set-out. The levels at that threshold leave no margin. Water finding its way into a garage is the usual consequence of getting them wrong.

Steep blocks need more thought and sometimes retaining. A driveway rising sharply from the street may need cut and fill, retaining along one side, and a stepped design to keep the gradient usable, all of which sits well beyond a standard slab. The Perth Hills is where this arises most. Wall pricing by height and material sits at retaining wall costs. Councils assess the proposed location against sight lines and neighbouring crossovers.

Thickness and Reinforcement for Vehicles

A driveway carries far more load than a path and the specification follows. A hundred millimetres with mesh reinforcement is the standard for domestic cars, a hundred and twenty-five where a caravan, boat, work truck or occasional delivery vehicle uses it, and anything carrying regular heavy vehicles needs engineering instead of a rule of thumb. Under-specifying is invisible on the day. It shows up as cracking within a few years. A double garage generally needs a wider apron than the crossover the council will approve.

Reinforcement placement matters as much as its presence. Steel mesh sized to the application must sit on bar chairs within the slab so it can do its job of holding the concrete together once it cracks, and mesh lying on the base is the most common defect in cheap driveway work. Once the concrete is down nobody can verify it. Where the steel sits is worth watching on the day if you are around.

Site classification determines what is appropriate for your ground. AS 2870 covers residential slabs and footings and classifies sites by their reactivity, with most sandy Perth sites at the stable end and clay or filled sites requiring more, and the standard is published through standards.org.au. Sand is a genuine advantage here. It does not remove the need to specify properly.

The base under the slab carries the load before the concrete does. Excavation to depth, removal of unsuitable material, and compacted crushed limestone or road base laid in layers is what stops a driveway settling under vehicle weight, and a base tipped in and raked flat will move regardless of what sits on top. Skimping here is invisible and saves the contractor real money. Slab specification generally is covered at concreting services. Wide aprons narrowing to a compliant crossover is the standard Perth solution.

Drainage and Where the Water Goes

A driveway is a large impermeable surface and the water it sheds has to go somewhere sensible. Falls are set so water runs away from the house and the garage, and discharging it in an uncontrolled way onto the road or a neighbouring property causes problems that are difficult to resolve afterwards. Most crews aim for a one per cent fall across the surface, and the free draining Spearwood and Bassendean sands under much of Perth absorb what runs off it. Flat is never the right answer.

Perth sand helps more than most people realise. Free draining Spearwood and Bassendean sands absorb runoff readily, which is why many Perth driveways manage without a drainage grate where an equivalent clay site would need one, though a driveway falling toward a garage on any soil needs a proper solution. Soakwells are the usual answer across Perth. Their sizing depends on the area being drained. Low sports cars and long caravans are the two vehicles that expose a bad transition.

Grates and channel drains appear where levels leave no alternative. A driveway that must fall toward a garage or a lower point needs a channel across it discharging to a soakwell, the perforated well sunk into the sand that lets runoff drain away underground, or to the stormwater system, and the grate has to be rated for vehicle loading, not pedestrian. Cheap grates fail under a car. Specify the load rating instead of accepting whatever is on the truck. Quindalup dune sand along the coast is looser than the Spearwood and Bassendean profiles further inland and frequently needs imported fill.

Discharge onto council land is regulated. Water cannot simply be directed across the footpath or into the gutter in an uncontrolled way in most local governments, and stormwater management obligations sit within a broader environmental framework administered by epa.wa.gov.au. Your council specifies what is acceptable locally. Raise it with the council at application stage.

Verges, Street Trees and Services

The verge is council land and what happens on it is governed by council policy. Hard surfacing limits, permitted materials, planting requirements and the treatment around a crossover are all covered, and several metropolitan councils have tightened verge policies to preserve permeability and tree canopy in recent years. Hard surfacing the full verge for extra parking is rarely approved. Local policy differs enough that assuming is unwise.

Street trees complicate crossover placement more than anything else. Councils protect street trees, minimum clearances from the trunk apply, root damage during excavation can attract penalties, and a crossover may need to shift to avoid one, which is exactly the kind of issue the approval process is designed to catch early. Removing a street tree is rarely approved. Designing around it is the realistic path.

Services under the verge need locating before excavation. Water, sewer, gas, power and telecommunications all run through Perth verges at shallow depth, and striking one is expensive, disruptive and occasionally dangerous, which is why a competent contractor uses a location service before breaking ground. Pit lids and meter boxes must remain accessible. Concreting over one creates a problem for someone later. Sheets of mesh need overlapping correctly where they meet.

Reticulation and irrigation frequently run through the work area. Verge and front garden reticulation is almost universal in Perth, and lines cut during excavation need reinstating, which is straightforward when planned and annoying when discovered mid-job. Raise the reticulation when you request quotes. Landscape reinstatement is covered at landscaping.

Choosing a Finish for a Driveway

Broom finish remains the sensible default for a driveway. The texture grips when wet, it costs the least, it hides minor imperfection and it needs the least maintenance of any finish, which is why it is still the most common choice across Perth. The only argument against it is how it looks. Nothing about its performance argues against it.

Exposed aggregate is the popular decorative choice and it suits driveways well. The stone provides grip, hides the sand and dust that settle on everything in Perth, and disguises oil marks far better than plain grey, though it carries an ongoing sealing commitment that plain concrete does not. Stone and exposure depth set the appearance. Full detail sits at exposed aggregate concrete costs. Vehicle loads concentrate at the wheel tracks rather than spreading evenly across the slab.

Coloured concrete is the cheaper way to move away from plain grey. Oxide through the mix adds $15 to $25 a square metre and the colour runs through the slab rather than sitting on the surface, so it will not wear off, though it does lighten gradually under WA ultraviolet. Continuous pours matter for colour consistency. A joint between deliveries can show as a faint band.

Polished and honed finishes are generally wrong for a driveway. They are designed for interior and covered areas, can be slippery when wet, and the smooth surface shows tyre marks and wear that a textured finish hides, which is why they belong on alfresco and garage floors instead. Interior slab finishes are compared at garage flooring. A driveway wants a textured surface.

Replacing an Existing Driveway

Deciding between repair and replacement comes down to what is wrong underneath. Surface wear, minor cracking and staining are cosmetic and can often be resurfaced, whereas a driveway that has settled, cracked with vertical displacement or broken up at the edges has a base problem that no surface treatment fixes. Look at whether the cracks line up in level. Checking whether the crack edges sit level is the quickest test. Soakwell sizing depends on the area draining into it and is worth confirming.

Removal is a substantial part of the cost of a replacement. Breaking out, loading and carting old concrete runs $45 to $90 a square metre, and a reinforced slab takes considerably longer than a plain one, which is why the removal line on a quote deserves as much attention as the pour. How a machine reaches the slab decides the method. A machine on an open driveway is far cheaper than jackhammers and barrows.

Replacing the crossover triggers the approval process again. A new crossover, or a substantial reconstruction of an existing one, generally needs a fresh application and inspection even where one has been there for decades, since the council is approving work on its asset, not the fact of having a driveway. Subsidies usually do not apply to replacements. Ring the council and confirm rather than assuming. Falls are set during the base preparation, long before the concrete is ordered.

Old concrete is recyclable and that can reduce disposal cost. Crushed concrete becomes road base and aggregate, so clean loads free of timber, plastic and soil are cheaper to dispose of than mixed material, and some operators separate on site for that reason. Ask where the old slab goes. Demolition rates by slab type sit at concreting costs.

Sealing and Upkeep

How much maintenance a driveway needs depends almost entirely on its finish. Plain grey needs the least and can go unsealed indefinitely without real harm, coloured concrete benefits from sealing to slow ultraviolet fading, and exposed aggregate needs it on a two to three year cycle to resist staining and hold its colour. Work the upkeep into the budget from the outset. The finish decision carries a maintenance decision with it.

Perth conditions are harder on sealers than most of the country. Sun, heat and blown sand wear a sealer film down faster here than anywhere in the south, and a driveway facing due west copes worst of all. Reseal intervals shorten accordingly in Perth. Rates for that upkeep appear at driveway cleaning and sealing. Verge policies in several metropolitan councils have tightened noticeably in recent years.

Oil stains are the most common complaint and the easiest to prevent. Fresh spills lift readily from a sealed surface with a degreaser, whereas the same spill left for months penetrates and becomes permanent, so keeping something absorbent on hand is worth the minor effort. Iron from bore water is the other stain peculiar to Perth. Moving a sprinkler is free; removing the orange marks it leaves is not.

Control joints are the straight lines cut or tooled into a slab to decide where the inevitable shrinkage crack appears, and they need occasional attention as the slab ages. Joint sealant degrades over time, and open joints let water and sand into the slab, so resealing them during a routine clean and seal keeps the driveway performing as designed. It is a small job done alongside the sealing. Neglected joints eventually become the point where damage starts. Street tree root zones are protected and excavation near them needs care.

Choosing a Contractor and Your Rights

Concreting is not a separately licensed trade in Western Australia, so the practical checks are a current ABN, evidence of public liability cover, and demonstrated crossover experience in your particular council. That last point matters more than people expect, because a concreter who regularly lodges applications with your local government knows the specification and the inspector. Ask which councils they work in. What a business must hold to trade is searchable at ablis.business.gov.au.

Once building work passes a certain value, registration and written contract obligations attach to it, which a driveway on its own seldom triggers. Where the driveway forms part of a larger residential building contract, home indemnity insurance and written contract requirements apply to the whole of the work rather than to the concrete specifically. A driveway added to a new build sits inside that contract. One replaced on an existing home usually does not.

Your consumer rights hold regardless of what a quote says. Work must be carried out with due care and skill and be fit for the purpose described, which covers a driveway that scrapes because transitions were never set out, or one that cracks early because the base was inadequate, and the framework is explained by the ACCC. Put anything that troubles you in writing early. Dated photographs from the first weeks are the most useful evidence. Broom direction is usually run across the driveway rather than along it for grip.

Cutting and grinding concrete releases respirable crystalline silica and the controls have tightened considerably. Wet cutting, on-tool extraction and appropriate respiratory protection are the expected practice when joints are sawn or an old driveway is broken out, with workplace obligations administered by worksafe.wa.gov.au. A crew using water on the saw is doing the right thing. One cutting dry on a suburban street is not. Reinforcement mesh is specified to AS 4671 and the slab design itself follows AS 2870.

Payment structure is worth agreeing before the job starts. A deposit covering materials is normal, progress payments on a larger job are reasonable, and full payment before any concrete arrives is not, particularly where a council inspection still has to be passed. Hold something back until the crossover is signed off. That is the point at which the work is genuinely complete.

Timing and Living Without a Driveway

A driveway replacement takes your access away for longer than the pour itself. Breaking out the old slab, preparing the base, pouring and then curing before any vehicle can use it typically means the better part of a week without driving in, and the concrete needs several days before it will carry a car even though it looks finished after one. Work out in advance where the cars will sit. Street parking is usually the answer.

The waiting period after the pour is not negotiable. Foot traffic is generally acceptable after a day or two and vehicles after about a week, with full strength arriving over the following month, and driving on a slab too early causes damage that shows up months later as cracking. Your concreter will nominate the times. Take them seriously rather than testing them.

Weather governs the schedule more than anything else. Rain on a fresh pour damages the surface, a wet base cannot be compacted properly, and a hot windy day risks plastic shrinkage cracking, so crews watch the forecast and postpone where necessary. A cancelled pour is a good decision. Leave a couple of spare days in the plan for weather. Textured finishes hide tyre marks and general wear better than smooth ones.

Coordinating with other work saves money and disruption. Where a shed slab, path or alfresco is planned, pouring everything in one delivery spreads the mobilisation and the minimum load charge across a larger area, and doing the driveway last avoids heavy vehicles tracking across new concrete. Sequence matters on a bigger project. Bobcat hire and spoil cartage have their own rates at excavation and earthmoving. Edges break up first on an under-thickness driveway, which is a useful diagnostic.

Bin collection and deliveries need thinking about for the week. Wheelie bins have to reach the kerb across a work site, and any delivery expecting driveway access will not get it, which is a minor issue when anticipated and an irritating one when not. Give the neighbours some warning as well. Concrete trucks and pumps take up considerable street frontage.

Perth Metro Costs

Perth driveway rates are competitive by national standards, and the sandy ground under much of the metropolitan area is the main reason. Excavation is easier, compaction is straightforward and drainage is rarely a problem, all of which shows in the price. What separates one Perth quote from another is generally the crossover scope, the finish and whether an existing driveway needs removing, not the suburb itself. Access matters more in the older established areas than anywhere else. Broom texture across the direction of travel gives the best grip on a slope.

AreaPlain Grey, Per SqmMain Consideration
Northern and southern corridors$85-$115Sandy sites, new estates
Western suburbs and coastal$95-$130Access, street trees, verges
Eastern suburbs and Swan Valley$90-$125Clay pockets in places
Perth Hills$110-$170Gradient, rock, retaining
Mandurah and Peel$85-$120Straightforward sites

Growth corridor estates are the most straightforward driveways in the state. Level sand, generous verges, simple crossovers and repeated setbacks mean a crew can be in and out quickly, and the volume of new housing keeps them practised. Estate covenants sometimes specify the finish. Read your own covenant before settling on a finish.

The established western suburbs price higher for a cluster of reasons instead of one. Narrow streets, mature street trees needing protection, tighter verge policies, older crossovers requiring removal and a preference for decorative finishes all add cost, and the councils there tend to have more detailed specifications. A site visit is essential in these suburbs. A price given over the phone will not hold in those streets.

Hills driveways are a different job again. Gradient means transitions and sometimes stepped design, rock means excavation a bobcat cannot simply scrape, and access on winding roads limits truck size, which is why the rate sits well above the metropolitan average. Retaining walls come with the territory on a Hills driveway. Budget a contingency on any sloping block. Joint sealant is cheap to renew and expensive to ignore over a decade.

Regional WA Costs

Country jobs price above the metropolitan figure, and getting concrete to site is the reason. A site more than about ninety minutes from a batching plant faces real constraints on delivery, and in some areas a smaller local supplier or a mobile plant is the only option, which affects both the price and the scheduling. Ask where the concrete is coming from. That answer shapes the rest of the quote.

RegionVariation on Perth MetroMain Consideration
Mandurah and PeelBaseline to 10% aboveMetro supply reach
South West and Bunbury10-20% aboveLocal plants, wetter ground
Great Southern and Albany15-30% aboveDistance and clay soils
Mid West and Geraldton15-30% aboveSupply and travel
Goldfields and remote30-60% abovePlant distance, heat

Rural driveways are frequently far longer than suburban ones and that changes the economics. A two hundred metre approach from a country road is a different project from a suburban apron, and many rural properties use gravel for the length with concrete only at the house and the road connection. Concrete the sections that need it. Gravel handles the rest at a fraction of the cost. A slab that has settled will keep settling until the base underneath is dealt with.

Shire crossover requirements apply outside the metropolitan area too. Country local governments have their own specifications and approval processes, and where a property fronts a state road the Main Roads requirement applies regardless of how remote the location is. Rural verges are wider but not unregulated. Country shires apply their own specifications too.

Combining pours is the reliable regional saving. An hour of driving each way is worth spreading across the driveway, the shed slab and the paths in one go instead of paying it three times over. Map out everything you want poured before you ring anyone. Site works and access are covered at excavation and earthmoving.

What to Look Out For

Ask directly whether the crossover is included in the quote, because it is the most common misunderstanding on this job. A plain crossover runs $1,200 to $2,200 and a decorative one $1,800 to $3,500, and two quotes differing by two thousand dollars are frequently just describing different scopes, not different quality. The application, the kerb work, any bond and the inspection all sit within that scope. Get it stated as a separate line so you can compare like with like.

Sort the council approval before the formwork goes up, not after. The crossover sits on council land and is built to a council specification, and work that does not comply can be required to be removed and rebuilt at your cost. Councils assess sight lines, street tree clearances, services and the position relative to neighbouring crossovers, so a proposed location can be refused or required to shift. Ask too whether a first crossover subsidy applies, since a number of WA councils offer one. Concreters working infill blocks daily are used to tight access and price it accurately.

Confirm the thickness and reinforcement for what will actually use the driveway. A hundred millimetres with mesh suits domestic cars, a hundred and twenty-five is needed where a caravan, boat or work vehicle will park, and the mesh must sit on bar chairs within the slab and not on the ground beneath it. Steel sitting on the sand is doing no work whatsoever, and you will never see it. The concreter needs to know what vehicles will use it before quoting.

Get the gradient transitions set out properly, since scraping happens at changes in slope, not on steep sections. The kerb approach and the garage threshold are the two points where low vehicles catch, and the fix is a longer transition agreed before the pour instead of a gentler overall grade. Once poured, a driveway that scrapes is expensive to put right. Walk the levels with the concreter if you drive anything low or long. Older crossovers frequently sit below current specification and need rebuilding anyway.

Establish where the water will go and what happens to the verge. Falls should carry water away from the house and garage, uncontrolled discharge onto the road or a neighbour is not acceptable to most councils, and any grate needs a load rating suitable for vehicles. Street trees, reticulation and service pits all sit in the work area and need locating before excavation. Confirm what your council permits on the verge before planning any additional hard surface.

What to Look for in a Quote in WA

A driveway quote should state the area, the slab thickness, the mesh size and how it will be supported, the concrete strength, the finish, and the crossover as a separate line including whether the application and any bond are handled. Excavation, base build and demolition of the old slab each want their own line, with the joint layout shown. Ask who lodges the council application. Where two rates match per square metre, look at the crossover scope and the groundwork before anything else.

Brief every concreter identically or you are comparing different jobs. The area and rough dimensions, what is there now, the vehicles that will use it, the finish you want, whether the crossover is in scope, access for a truck and any known service locations all shape the figure. Send images of the frontage and the verge with the brief. Two quotes assuming different crossover scopes will never reconcile.

Get an address nearby that they finished a few summers ago. Fresh concrete looks good regardless of who laid it, whereas an older driveway shows whether the base was built properly, whether the transitions work for a normal car and how the finish has weathered through several Perth summers. Drive up to the kerb and feel whether it scrapes. A minute in the car tells you more than a folder of images. Country shires frequently have fewer restrictions on width but the same approval process.

Settle the crossover, the specification, the levels and the drainage before anyone books a truck. Confirm what the council requires and who is lodging it, agree thickness and reinforcement for your vehicles, walk the gradient transitions, and establish where the water goes. Where the finish is still open, exposed aggregate concrete costs compares the decorative option. With those four agreed, a driveway is a thirty year surface.

Concrete Driveways Across Western Australia

We connect Western Australian property owners with concreters for driveways and crossovers, covering local government approval and inspection, widths and turning, gradient transitions, thickness and reinforcement for cars, caravans and work vehicles, drainage and soakwells, verge and street tree requirements, finishes from broom to exposed aggregate, and removal of existing driveways, whether you are in Perth, Mandurah, Bunbury, Busselton, Geraldton, Kalgoorlie, Albany or regional Western Australia.

▶ Perth Inner City 17 areas

CBD & Surrounds

Perth CBD Northbridge East Perth West Perth

Inner North

Subiaco Leederville Mount Lawley Highgate

Inner South

South Perth Victoria Park Como

Western Suburbs

Cottesloe Nedlands Crawley Dalkeith Applecross
▶ Greater Perth 26 areas

Northern Suburbs

Joondalup Wanneroo Ellenbrook Butler Morley Scarborough Karrinyup

Southern Suburbs

Fremantle Rockingham Baldivis Cannington Canning Vale Willetton

Eastern Suburbs

Midland Armadale Bassendean Byford Claremont

Perth Hills

Kalamunda Mundaring Gooseberry Hill Lesmurdie Helena Valley Darlington Glen Forrest Parkerville
▶ South West 25 areas

Peel

Mandurah Pinjarra Waroona Dwellingup Warnbro Safety Bay Secret Harbour

Bunbury Region

Bunbury Busselton Australind Harvey Collie Capel Donnybrook

Margaret River Region

Margaret River Dunsborough Augusta Cowaramup Yallingup

Great Southern

Albany Denmark Manjimup Pemberton Bridgetown Walpole Mount Barker
▶ Regional Western Australia 30 areas

Pilbara

Karratha Port Hedland Newman Tom Price Dampier Paraburdoo Marble Bar

Kimberley

Broome Kununurra Derby Halls Creek Fitzroy Crossing

Goldfields

Kalgoorlie Esperance Coolgardie Norseman Laverton Leonora

Mid West

Geraldton Carnarvon Meekatharra Kalbarri Exmouth Coral Bay

Wheatbelt

Northam Narrogin Merredin Moora York Toodyay

Concrete Driveway FAQs - WA 2026

How much does a concrete driveway cost in WA?
Plain grey with a broom finish runs $85 to $120 a square metre, which puts a typical forty square metre driveway at $3,400 to $4,800, while exposed aggregate takes the same job to $4,800 to $7,200. Those figures cover the section inside your boundary and usually exclude the crossover, which is priced separately at $1,200 to $2,200 plain or $1,800 to $3,500 decorative. Removing an existing driveway adds $45 to $90 a square metre depending on thickness, reinforcement and access.
What is a crossover and why is it priced separately?
The crossover is the strip between your property boundary and the road, and it sits on land the local government controls as part of the road network. Because it connects to a public road, the council specifies its width, levels, thickness, kerb transition and sometimes the permitted finish, and the work is approved beforehand and inspected afterwards. It is a small area doing expensive work under a tighter specification, which is why it is quoted on its own. In most WA councils the property owner remains responsible for maintaining it despite it sitting on council land.
Do I need council approval for a driveway?
For the crossover portion, yes, and it needs sorting before work starts. You or your concreter lodge an application with a site plan showing location, width and levels, the council assesses it against their specification, and approval is issued before construction. Fees range from nothing to a few hundred dollars, some councils require a refundable bond, and the finished work is inspected. Non-compliant work can be required to be removed and rebuilt at your cost. The slab inside your boundary is generally exempt from a building permit.
Do all Perth councils have the same crossover rules?
No, and assuming they do is how non-compliant work happens. Minimum and maximum widths, required thickness and reinforcement, the transition detail at the kerb, whether a bond applies and whether decorative finishes are permitted all vary between local governments. Several councils require the crossover to be plain concrete even where the driveway inside the boundary is exposed aggregate. Verge policies differ too, with a number of metropolitan councils tightening rules on hard surfacing in recent years. Check your own council's published specification before designing the layout.
Is there a subsidy for a new crossover?
A number of Western Australian local governments contribute toward a first crossover to a property, usually as a fixed amount toward the standard specification. It generally applies only where a property has never had a crossover, so replacements and upgrades are typically excluded, and the contribution covers the standard finish rather than a decorative upgrade. Amounts and eligibility differ between councils. Ask your local government before committing, since the application process is usually the same regardless of whether a contribution applies.
How thick should a driveway be?
A hundred millimetres with mesh reinforcement is standard for domestic cars, and a hundred and twenty-five where a caravan, boat, work truck or regular delivery vehicle will use it. Anything carrying heavy vehicles regularly should be engineered rather than assumed. Reinforcement placement matters as much as thickness, since mesh must sit on bar chairs within the slab to do its job, and mesh lying on the base does nothing at all. It is the most common defect in cheap driveway work and completely invisible once poured.
Why does my car scrape on the driveway?
Because of a change in gradient rather than the steepness itself. Vehicles bottom out where the slope changes abruptly, most commonly at the kerb where a driveway rises from the laydown, at the garage threshold, or where a steep section flattens out. The fix is a longer transition through those points rather than a gentler overall grade, and it has to be set out before the pour. Correcting a scraping driveway afterwards is difficult and expensive, so walk the levels with your concreter beforehand if you drive anything low or long.
Can I pave or concrete the whole verge?
Generally not. The verge is council land and local governments have policies covering how much may be hard surfaced, what materials are permitted, and what happens to street trees and reticulation, with several metropolitan councils tightening these rules to preserve permeability and canopy. Street trees are protected, minimum clearances from the trunk apply, and root damage during excavation can attract penalties. A crossover may need to shift to avoid a tree. Check your council's verge policy before planning any additional parking area.
Should I repair or replace an old driveway?
It depends on what is wrong underneath. Surface wear, fine cracking and staining are cosmetic and can often be resurfaced or cleaned and sealed, whereas a driveway that has settled, cracked with vertical displacement between the two sides, or broken up at the edges has a base problem that no surface treatment will fix. Whether the cracks line up in level is the quickest indicator. Bear in mind that replacing the crossover generally triggers a fresh council application and inspection, even where one has been in place for decades.
Does a concrete driveway need sealing?
It depends entirely on the finish. Plain grey needs the least and can go unsealed indefinitely without real harm, coloured concrete benefits from sealing to slow ultraviolet fading, and exposed aggregate needs it on roughly a two to three year cycle to resist staining and hold its colour. Perth conditions shorten those intervals, since strong ultraviolet, high surface temperatures and windblown sand degrade sealer faster than in cooler states, and a west facing driveway takes noticeably more punishment than a shaded one.

Concreting Specialists - WA

For Trades & Contractors - WA

Browse current driveway and crossover leads on the WA job leads board or see concreter jobs in WA.

Planning a Driveway in WA?

Post your job and connect with concreters servicing Western Australia, in Perth, Mandurah, Bunbury, Geraldton, Kalgoorlie, Albany and regional Western Australia.

Get Free Driveway Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 17 September 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

Service availability may vary in regional WA. Verify licences at WA Building and Energy.
Indicative 2026 Western Australian estimates only. Rates vary with area, finish, slab thickness and reinforcement, site access, ground conditions and whether an existing driveway is being removed. The crossover between the property boundary and the road is built to local government specification and requires approval and inspection, with widths, thickness, permitted finishes, application fees, bonds and any first crossover contribution differing between councils. Confirm requirements with your local government before relying on any figure.
Need work done? Get free quotes. Post a Job – It's Free