Need Footings or Foundations?

Tell us what you are building and whether you have an engineer's design yet, and we'll put you in touch with concreters in your area.

Get Free Footing Quotes
Free · No obligation · SA-wide

Typical Footing & Foundation Costs SA

Strip footing (per lineal metre)$180-$350/lm
Isolated pad footing (per footing)$350-$900
Pier footing (bored, per pier)$400-$1,200
Screw pile installation (per pile)$350-$800
Raft slab including footings (per m2)$110-$185/m2
Engineer's design and certification$1,500-$4,500

Costs reflect Adelaide metropolitan rates for April 2026. Footing type, AS 2870 soil classification, required depth, number of elements, site access, excavation difficulty, and reinforcement specification all affect total cost. Regional SA carries a travel premium. An engineer's design is mandatory for most SA building footings on Class H1, H2, and E sites and for all commercial structures.

Concrete Footings and Foundations SA 2026 - Costs, AS 2870 Design, and Getting the Right Footing for SA Soils

Concrete footings and foundations in South Australia cost from $180 per lineal metre for a basic strip footing through to $1,200 or more per pier for deep bored footings on highly reactive clay sites. SA's reactive clay soil profile makes footing design more consequential here than in most other Australian states: a footing that is too shallow or under-reinforced for the site's AS 2870 soil classification will fail, and the failure shows up in the building above it as cracking, differential settlement, and in severe cases structural movement that requires demolition or full underpinning. This guide covers the footing types used across SA's soil profile from strip and pad footings through to bored piers and screw piles, when an engineer's design is mandatory rather than optional, how Adelaide's reactive clay conditions drive footing depth and reinforcement requirements, the approval and inspection process for SA footings, costs across different SA soil classifications, and what to confirm in any footing contractor quote before work begins. Post your job on The Quote Yard to receive quotes from experienced footing contractors across Adelaide and regional SA.

Concrete Footings and Foundations Across SA

Pricing and specification guidance for concrete footings and foundations across Adelaide metropolitan suburbs, the Adelaide Hills, Barossa Valley, Fleurieu Peninsula, Yorke Peninsula, and regional South Australia.

Get Free Quotes

Concrete Footing Types - SA Cost and Specification Guide 2026

Footing TypeTypical SA CostAS 2870 SuitabilityEngineer Required?
Strip footing (continuous wall)$180-$350/lmClass A, S, MPrescriptive for A/S/M
Isolated pad footing (post/column)$350-$900 eachClass A, S, M, H1Recommended for H1+
Bored pier (concrete filled)$400-$1,200 eachClass H1, H2, EYes - always
Screw pile (helical)$350-$800 eachClass H1, H2, fillYes - always
Continuous deep strip (reactive)$250-$450/lmClass H1, H2Yes for H2+
Contiguous bored pile wall$1,500-$4,000/lmRetaining, Class EAlways

Why Adelaide Footing Depth Matters More Than in Most Australian Cities

The reactive clay soils across Adelaide's northern and southern suburbs shrink during the dry summer and expand after winter rainfall, and this movement is most pronounced in the upper 600 to 1,200mm of the soil profile. A footing that terminates within this active zone is subject to the full magnitude of seasonal soil movement. A footing that extends below the active zone rests on soil that changes moisture content slowly and to a much smaller degree, providing a stable bearing level regardless of what the surface soil is doing. This is why AS 2870 footing designs for Class H1 and H2 sites in Adelaide specify edge beam depths of 400 to 600mm and internal beam depths of 300mm or more, and why bored pier designs on highly reactive sites specify pier depths of 1,500 to 3,000mm: the footing must reach below the level where seasonal soil movement is significant. A quote for a SA building footing that does not reference the AS 2870 soil classification for the specific site and does not specify footing depths appropriate for that classification is not designed for the actual conditions at the location.

Building footing work in SA requires a Building Work Contractor licence under the Building Work Contractors Act 1995. Verify at CBS SA. An engineer's design is mandatory for most SA reactive soil footing applications.

Concrete Footings and Foundations in South Australia

Concrete footings are the structural elements that transfer the load of a building through the soil to a stable bearing level below. In most of South Australia, the critical design challenge is not the load from the building above but the behaviour of the soil below: specifically, the seasonal shrink-swell movement of the reactive clay soils that underlie much of Adelaide's metropolitan footprint. A footing designed without regard to the specific reactive soil conditions of the SA site will perform poorly at best and fail structurally at worst, with the consequences appearing in the building above as cracking, differential settlement, and door and window frames that rack and stick across seasons. When SA footings have failed and foundation movement has occurred, our concrete underpinning SA guide covers the mass concrete, screw pile, and resin injection methods available. For SA structures showing cracking from footing-related reactive clay movement, our concrete repairs SA guide covers diagnosis and repair options.

The footing is among the most consequential decisions in any SA building project. It cannot be changed without demolishing the structure above it, which is why getting it right before the pour is worth every dollar spent on investigation and engineering. Our shed and garage slabs SA guide covers the isolation joint detail between garage slabs and adjacent footings on SA reactive clay sites. Our concreting services SA guide covers the full range of SA concrete work that depends on correctly specified footings for structural performance.

The footing is the invisible part of the building. Once it is concreted in place and the construction proceeds above it, no further inspection or adjustment is possible without demolishing the structure down to the footing level. This invisibility makes getting the footing specification right before the concrete is poured the single most important quality decision in the entire building process. An SA builder or concreter who says "we'll see how the soil is when we excavate and adjust the design then" is not applying the correct process: the soil classification must precede the design, and the design must be suitable for the classification before any excavation begins. For SA buildings with coloured concrete paths or driveways, the footing isolation joints that separate these slabs from the building must also accommodate seasonal movement; our coloured concrete SA guide covers the specification context. Stamped patio and path slabs adjacent to SA buildings require the same isolation joint from the footing as plain concrete; our stamped concrete SA guide covers the joint detail for decorative concrete near structure footings.

The Australian Standard AS 2870:2011 governs the design of residential slabs and footings for Australian conditions including the full range of SA soil reactivity classes. The standard defines the footing types and minimum dimensions suitable for each soil class, and it defines the conditions under which an engineer's design is required rather than the prescriptive approach. For commercial buildings and structures beyond the scope of AS 2870, the structural engineer's design governed by AS 3600 and other relevant standards applies from the outset. Understanding which standard applies to a specific SA project, and which soil classification the standard requires the design to address, is the starting framework for any SA footing project.

SA footings serve several distinct structural functions depending on their type and location. Perimeter footings transfer wall loads from the building's external walls to the ground. Internal footings support internal loadbearing walls or column bases. Isolated footings under posts and columns transfer point loads. Retaining wall footings resist both vertical load and overturning moment from the retained soil. Each of these functions requires a different footing geometry and reinforcement, and the SA soil conditions modify each design in ways that make simple rule-of-thumb approaches unreliable on reactive clay sites.

SA Reactive Soils and Their Effect on Footing Design

South Australia's reactive clay soils are distributed across the Adelaide metropolitan area in a pattern that reflects the geology of the Adelaide Plains, the foothills, and the coastal margins. The northern suburbs including Elizabeth, Salisbury, Davoren Park, Parafield Gardens, and Gawler sit on some of the most reactive clay profiles in the metropolitan area, with AS 2870 classifications predominantly in the H1 and H2 range. The southern suburbs including Morphett Vale, Hackham, Christie Downs, Huntfield Heights, and Aldinga Beach have significant areas of M and H1 classified soils. The inner western suburbs around Thebarton, Hindmarsh, and Pennington have areas of made ground and fill over clay that add variability to the soil profile.

The mechanism that reactive soils impose on footings is well-understood. In the dry SA summer, the clay in the upper soil profile loses moisture and shrinks, creating a downward movement that pulls the footing with it if the footing is within the active shrinkage zone. In the wet winter, the clay absorbs moisture and swells, pushing the footing upward. If this movement is uniform across the footing, the building rides up and down as a unit without structural damage. If the movement is differential (different parts of the footing move by different amounts), the footing bends, and the building structure above it is subjected to differential settlement loads that cause cracking and distortion.

The primary design response to reactive soil conditions in SA footing work is depth. By extending the footing below the zone of significant seasonal moisture change, the footing bears on soil that does not move with the seasons. The depth at which the reactive soil influence becomes negligible depends on the specific clay profile at the site, the drainage conditions, vegetation, and the magnitude of the seasonal rainfall variation. For Adelaide Class H1 and H2 sites, the AS 2870 design approach specifies footing bases at depths of 400 to 600mm below the finished surface level, and bored piers at depths of 1,500 to 3,000mm where the soil classification warrants reaching below the reactive soil layer entirely.

The presence of large trees adjacent to SA building footings creates a specific reactive soil risk that goes beyond the standard seasonal cycle. Tree roots draw moisture from the soil over a large radius, creating a soil moisture deficit around and beneath the building that can persist year-round if the trees are large enough. The differential between the dry soil near the tree root zone and the less-affected soil on the opposite side of the building creates persistent differential settlement loading that is more damaging than the normal seasonal cycle because it does not reverse seasonally. SA footing designers and structural engineers who are engaged for reactive soil footing work on properties with established trees should assess the tree proximity and root zone influence as part of their site evaluation, and specify footing depths or pier lengths suitable for the enhanced drying effect that large SA trees like gum trees, blue gums, and pepper trees create in the upper soil profile. The general guidance from SA structural engineers is that a tree with a canopy radius of five metres should be assumed to influence soil moisture to a horizontal distance of approximately five metres from its trunk, and footing designs within that radius should account for the persistent drying effect in the specification. That goes beyond the standard seasonal cycle.

Several Adelaide council areas also have zones of known problematic fill or made ground. Former market garden areas in parts of Pooraka, Para Hills, and Brahma Lodge, former landfill sites in various locations, and areas of imported fill from historical development all present variable soil conditions beneath the nominal reactive clay profile. On fill sites, the fill's compaction, composition, and thickness affect the footing behaviour independently of the reactive clay classification. A geotechnical investigation that identifies fill and characterises its composition and thickness provides information that a standard reactive soil classification alone does not capture. For SA building projects on sites with known or suspected fill, a geotechnical engineer's investigation rather than a simple soil classification visit is the right starting point.

Strip Footings for SA Buildings

Strip footings do more than carry vertical loads in Adelaide. On reactive clay sites they also must span horizontally across zones of differential soil support that change position and magnitude with every SA seasonal cycle. Strip footings are continuous reinforced concrete beams that run beneath loadbearing walls, distributing the wall load along their length to the supporting soil. They are the standard footing type for the perimeter walls of SA residential buildings on Class A, S, and M sites, and form the edge beam component of the stiffened raft slab design that is the dominant residential construction method for stable and moderately reactive SA soils. Understanding the dimensions and reinforcement suitable for different SA soil conditions is the basis for evaluating whether a strip footing quote is genuinely adequate for the site.

For Class M sites, AS 2870 prescribes strip footing dimensions that includes a minimum 300mm deep edge beam for the perimeter footing, with bar reinforcement at the top and bottom of the beam section and a specified concrete cover. The beam width is determined by the wall load and the bearing capacity of the soil, but for standard single-storey residential construction on Class M sites, a 300mm wide by 300mm deep edge beam with 2 N16 bars top and bottom is a common AS 2870 prescriptive design. On Class H1 sites, the prescriptive depth increases to 400mm or more, reflecting the need for the footing to bear below a deeper portion of the reactive soil profile. These dimensions are minimums: a structural engineer may specify larger sections or additional reinforcement for specific site or load conditions, and a quote that provides less than the minimum AS 2870 prescriptive dimension for the confirmed soil class is under-specified.

The reinforcement in SA strip footings does more than carry the vertical loads from the wall above. On reactive soil sites, the footing beam must also span horizontally across zones of differential soil support, functioning as a beam spanning between soil contact points as the soil shrinks and swells unevenly beneath it. This horizontal spanning function requires longitudinal reinforcement at both the top and bottom of the beam, because the footing may be supported at the ends of a span with a softer zone in the middle (causing sagging and requiring bottom reinforcement in tension) or supported at mid-span with soft zones at the ends (causing hogging and requiring top reinforcement in tension). A strip footing with reinforcement only in the bottom of the section, which is a cost-reduction that some SA contractors attempt on residential work, cannot adequately resist the hogging moments that reactive soil differential support creates in Adelaide's reactive clay suburbs. Confirming that the reinforcement specification in any SA strip footing quote includes both top and bottom longitudinal bars of the specified grade is a worthwhile check before accepting the quote.

Pad and Isolated Footings in SA

Isolated pad footings are square or rectangular concrete pads cast below column or post bases to distribute point loads from structural columns, veranda posts, pergola posts, and deck stumps to the supporting soil. They are used in SA residential construction wherever a concentrated structural load from a post or column must be spread to an area large enough to be within the bearing capacity of the soil and must be deep enough to avoid the reactive soil active zone. The standard pad footing for a residential pergola or veranda post in Adelaide on a Class M site is 400mm square by 600mm deep, cast with N32 concrete and a single N16 reinforcing bar cage or mesh layer. On a Class H1 site, the footing should be deeper, 600 to 800mm, to confirm the footing base is below the most active portion of the reactive clay profile. On Class H2 sites, an engineer's design is suitable: the engineer will specify the footing geometry based on the specific soil classification, the post load, and the footing's relationship to the slab and other structural elements. A contractor who quotes identical pad footing dimensions for every SA site regardless of soil classification has not adapted the design to the specific reactive soil conditions of the site.

The isolation between a pad footing and the adjacent patio or driveway slab is a critical detail for SA reactive soil conditions. Our concrete patios SA guide and concrete driveways SA guide both cover the isolation joint detail in depth: the pad footing must be poured first, the isolation joint material placed around the footing perimeter, and the adjacent slab poured up to the joint material without bonding to the footing. This allows the footing and the slab to move independently as the reactive soil conditions change seasonally, without transferring stress between the two elements that would crack the slab at the footing perimeter. Ask specifically how that joint is formed, because it is the detail that stops seasonal slab movement from cracking the footing it sits beside.

For SA decks and elevated structures using concrete stumps or pad footings, the footing depth must consider not only the reactive soil active zone but also the vertical tolerance the structure needs for level adjustment. A concrete pad footing that is poured to exactly the finished level of the deck bearer assumes that no differential settlement will occur over the structure's life. On reactive clay sites, some differential movement is expected, and providing a small adjustment tolerance in the stump or bearer connection is a practical detail that experienced SA deck builders include. Our concrete demolition covers footing and stump specifications for SA deck construction in detail.

Bored Pier Footings for Reactive SA Soils

A bored pier that terminates within the reactive clay active zone is not a solution to reactive soil movement. It is a footing that moves with the soil it was supposed to bypass, providing no more stability than the shallow footing it replaced. Bored pier footings are cylindrical concrete columns drilled into the ground to a depth that places their base below the reactive soil active zone, or in some cases into rock or stable substrate below the reactive clay layer. They are the preferred footing type for Class H2 and E sites across Adelaide's more reactive soil areas, and they are also used where the site conditions do not allow the shallow excavation required for strip or pad footings, such as on steep slopes or where existing services prevent safe trench excavation.

The bored pier construction process involves drilling a cylindrical hole of specified diameter (300 to 450mm for residential applications) to the specified depth using an auger-equipped drilling rig or hand-auger equipment, placing a reinforcing cage in the bored hole, and filling with concrete. The pier extends from the specified depth up to the underside of the slab or beam it is supporting. The connection between the pier and the element above it is made by the reinforcement extending from the pier into the supported element. For SA residential buildings on Class H2 sites, a structural engineer will specify pier diameter, depth, reinforcement cage geometry, and concrete grade: N32 or N40, with the pier depth extending to 1,500 to 3,000mm or to rock, whichever is reached first.

The drilling equipment used for SA residential bored pier work ranges from small tracked drilling rigs capable of accessing tight suburban backyards in Reynella or Salisbury to larger rigs used for commercial pier work in open sites. Access is a significant cost variable: a pier drilled in an accessible front yard with a tracked rig is cheaper than the same pier drilled in a narrow side access with a small machine. For SA homeowners planning extensions or concrete pool surrounds requiring bored piers in confined sites, confirming the drilling contractor's equipment capability for the specific access conditions before accepting a quote avoids the situation of discovering that the quoted rig cannot reach the proposed pier locations. Access determines which rig can be used, so a tight backyard may rule out the faster option and change the price.

The quality of a bored pier depends on what happens during the drilling and concrete pour. On SA sites with high groundwater tables, particularly in the lower-lying parts of the northern suburbs, water ingress into the bored hole during drilling can compromise the concrete placement, washing out cement from the mix and creating weak zones in the pier. A responsible SA drilling contractor working in high groundwater conditions will use temporary casing to stabilise the borehole or will specify a concrete mix suitable for tremie placement in water, with higher cement content and admixtures to maintain concrete quality despite the water presence. Asking specifically about the groundwater conditions at the site and how they will be managed during pier construction is a worthwhile question before accepting any pier footing quote for an Adelaide northern suburbs or coastal fringe property.

Screw Pile Foundations in SA

Screw piles, also called helical piles, are steel tubular piles with one or more helical steel plates welded to the shaft. They are installed by rotating them into the ground using a hydraulic torque drive attached to an excavator or purpose-built installation rig, rather than drilling or driving. Their primary advantage in the SA context is speed of installation and the absence of excavated spoil: the pile is screwed in place without removing soil, which is particularly useful on confined SA sites and on sites where soil disposal creates a difficulty. Screw piles are used in SA for deck and veranda foundations, light commercial structures, retaining wall tiebacks, temporary structures, and in some residential extension footing applications where the reactive soil conditions and site constraints make them a practical alternative to bored piers. The load capacity of a screw pile is established during installation by measuring the torque required to advance the pile: the relationship between installation torque and pile capacity is a well-established empirical method used by SA screw pile contractors to confirm that each pile has reached the design capacity. This in-situ confirmation of capacity at the time of installation is a practical quality assurance feature that neither strip footings nor bored piers can match.

The corrosion protection specification for SA screw piles is an important aspect of the long-term performance that is not always addressed adequately in residential quotes. Steel in SA soils is subject to corrosion at rates that depend on soil pH, chloride content, moisture level, and the specific soil chemistry at the site. Coastal SA properties within a few kilometres of the ocean, and SA properties on saline or acid sulfate soils, have more aggressive corrosion environments than standard Adelaide metropolitan clay. A screw pile manufacturer's standard hot-dip galvanised coating may be adequate for typical Adelaide metropolitan sites but may not be sufficient for coastal or saline SA environments. Asking the screw pile contractor for their assessment of the site's corrosivity classification and the corresponding corrosion protection specification for the piles is a worthwhile part of any SA screw pile footing quote review.

When an Engineer's Design Is Mandatory for SA Footings

An engineer's design for SA building footings is mandatory in several circumstances that SA homeowners and builders should understand before engaging a footing contractor. Proceeding without a required engineer's design creates a compliance failure under the SA building approval process and produces a footing that may not be suitable for the specific site conditions, with consequences that can be expensive to remedy after the building is constructed. Under AS 2870:2011, an engineer's design is required for residential footings on Class H2 and E sites. It is also required where the building geometry, loadings, or site conditions fall outside the scope of the prescriptive tables in the standard: sites with significant slope, sites with non-uniform soil conditions, buildings with basements, buildings with unusually heavy loads, and sites with known fill or problematic soil profiles. Commercial buildings of all classes require an engineer's design for footings under AS 3600 and the NCC, regardless of soil classification. For SA owner-builders, the building certifier engaged for the development approval will confirm whether an engineer's design is required for the specific project and soil conditions.

The structural engineer who designs SA footing systems should be a registered engineering practitioner with experience in reactive clay footing design. Firms that regularly work on residential projects in Adelaide's H1 and H2 suburbs have developed a practical understanding of the AS 2870 design approach that goes beyond simply applying the prescriptive tables: they understand the specific soil profiles of different Adelaide suburbs, the typical tree proximity issues in established suburbs, and the footing solutions that have performed well over many cycles on the reactive clay profiles they regularly encounter. Asking a potential SA structural engineering firm how many residential footing designs they complete each year in Adelaide metropolitan suburbs is a reasonable question to assess the depth of their local experience. Ask to see the design rather than taking the specification on trust, since the document is what the certifier will be checking against.

The engineer's design fee for SA residential footings runs from $1,500 to $4,500 depending on the complexity of the project and the engineer's scope. This fee is a small fraction of the total construction cost and an even smaller fraction of the cost of remediating a failed footing after the building is constructed. SA building owners who attempt to save the engineering fee by using a prescriptive approach on a site that genuinely warrants an engineer's design are making a false economy that the reactive SA soils will eventually expose. SafeWork SA has requirements relating to the structural safety of construction work in SA that apply to footing excavation, formwork, and concrete placement operations.

SA Building Approvals and the Footing Inspection Process

Building footings forming part of a structure requiring a development approval in SA must be inspected by a building certifier before concrete is placed. The pre-pour inspection confirms that the excavation dimensions, depth, and bearing level match the engineer's design, that the reinforcement is correctly placed and of the specified type and grade, and that no soft spots or unsuitable material are present in the excavation base. Once the concrete is placed, none of these items can be re-inspected without demolition. The inspection is not a bureaucratic formality: it is the only practical quality gate between the design intent and the finished footing, and passing through it successfully confirms that the footing will be built as designed. An SA footing contractor who objects to or attempts to delay the pre-pour inspection is raising a red flag about whether the work meets the specification the approval is based on. For SA buildings where the footing has failed to the point that demolition is required, our concrete demolition SA guide covers the demolition process and disposal requirements.

The pre-pour inspection sequence for SA footings is: notify the building certifier at least 24 to 48 hours before the planned concrete pour; the certifier attends the site or reviews documented evidence of compliance; the certifier provides clearance for the pour; concrete is placed. Some SA building certifiers conduct the pre-pour inspection in person; others accept photographic evidence of reinforcement placement and a written declaration from the footing contractor. Confirming with the certifier before work begins exactly what documentation and notification is required prevents the costly situation of having the concrete truck arrive while the certifier is still waiting for notification or documentation. Missing that notification window can mean the pour is delayed or the work has to be uncovered for inspection afterwards.

For bored pier footings in SA, the pre-pour inspection has additional elements beyond what applies to shallow strip and pad footings. The inspection confirms pier diameter, depth (by measuring the bored hole with a tape or rod before concrete placement), reinforcement cage dimensions and cover, and concrete mix grade. Where a geotechnical engineer has specified a founding level based on soil conditions encountered during drilling (which may differ from the assumed depth in the design), the certifier may require the geotechnical engineer to confirm in writing that the founding conditions at the actual depth met the design assumptions before clearance is given for concrete placement. For Class H2 and E sites in Adelaide, this confirmation step is part of the responsible quality assurance process that protects both the building owner and the certifier.

The development approval framework in SA under the Planning, Development and Infrastructure Act 2016 requires that all building work proceed in accordance with the approved plans and the certifier's requirements. Any change to the footing design during construction, such as a change in pier depth based on soil conditions encountered, must be reviewed by the structural engineer and the change documented before proceeding. An SA footing contractor who changes footing dimensions on-site without consulting the engineer and notifying the certifier is creating a compliance issue that could affect the building approval and the insurance of the finished structure. The SA Government planning portal provides information on the building approval process and certifier requirements across SA Local Government Areas.

Pergola, Shed, and Deck Footing Specifications in SA

The footing requirements for pergolas, sheds, and decks in SA are governed by the same reactive soil considerations as residential building footings, but the structural loads are lower and the approval requirements may differ depending on whether the structure requires a development application. For SA homeowners, these accessory structure footings are frequently the first footing work they commission independently, without a builder managing the process, which makes understanding the key specification requirements more important than for a full house construction where the builder coordinates the footing contractor. They are routinely under-specified because the structure looks light, and a pergola post on an inadequate footing lifts and drops with the clay just as a house would. Ask what classification the footing was sized against.

A standard residential pergola in Adelaide on a Class M site requires isolated pad footings under each post, 400mm square by 600mm deep with a 200mm square by 400mm deep column starter reinforced with 4 N12 bars tied with R10 ties, and connected to the pad by starter bars projecting from the footing into the column base. On a Class H1 site, the footing depth should increase to 700 to 900mm, and on a Class H2 site, an engineer's design for the footing is suitable. The practical question for Adelaide homeowners is whether the pergola requires a development application: structures below the accepted development threshold for the relevant SA council zone can proceed without a DA, but the footing must still be suitable for the soil conditions regardless of whether an approval is required. The isolation joint between the pad footing and any adjacent concrete patio or driveway slab remains a critical structural detail regardless of the development approval status: the footing and slab must be designed to move independently to prevent the slab cracking at the footing perimeter as reactive soil conditions change through the Adelaide seasons., 400mm square by 600mm deep with a 200mm square by 400mm deep column starter reinforced with 4 N12 bars tied with R10 ties, and connected to the pad by starter bars projecting from the footing into the column base. Our concrete patios and entertaining areas covers the structural and approval aspects of SA pergola construction in detail, including the footing requirements for different SA soil classifications and the development approval thresholds for pergola structures in SA council zones.

Shed footings in SA vary considerably with the shed size, the slab type, and the connection between the shed structure and the slab. A small residential garden shed on a concrete slab does not require the same footing design as a large machinery shed on a working farm in the Barossa Valley or a commercial warehouse in Adelaide's northern industrial suburbs. For residential sheds, the slab specification incorporates the footing function through the slab's edge beam design, as described in our shed concrete slabs SA guide. For larger agricultural or commercial sheds where column footing loads from steel portal frames are concentrated at specific post base locations, engineer-designed isolated footings at the column positions are required, with the slab designed to work around these concentrated loads rather than to transfer them.

Concrete Footing and Foundation Pricing Across Adelaide - 2026 Guide

Footing pricing in SA is more variable than most other concrete work because the footing depth, access difficulty, soil conditions encountered, and the need for engineering design input vary between sites that appear superficially similar. The pricing below provides a realistic range for standard applications across the Adelaide metropolitan area, but any specific project should be priced after a site visit and soil classification review. A quote given without a soil classification is pricing an assumption rather than your site. Expect the figure to move once the test result comes back.

ApplicationAdelaide Price RangeNotes
Strip footing, Class M (per lm)$180-$280/lmExcavation, N32, bar reinforcement
Strip footing, Class H1 (per lm)$240-$350/lmDeeper section, more reinforcement
Pad footing, pergola post (Class M)$350-$600 each400mm sq x 600mm deep, N32
Pad footing, pergola post (Class H1)$500-$900 each400mm sq x 800mm deep, N32
Bored pier, 300mm dia (per pier)$400-$800 each1,500mm depth, N32, reo cage
Bored pier, 300mm dia (deep, Class H2)$700-$1,200 each2,500-3,000mm depth
Screw pile, residential (per pile)$350-$700 eachInstalled capacity confirmed by torque
Engineer design, residential footings$1,500-$4,500Varies by complexity and firm

The access cost premium is one of the most significant real-world pricing variables for SA footing work in established Adelaide suburbs. A drilling rig or excavator that cannot reach the footing location by a direct route requires either smaller equipment (which is slower and may have reduced capability) or manual excavation. A bored pier in an easily accessible front yard may cost $400 to $500; the identical pier in a rear yard accessible only through a 900mm side gate requires hand-auger equipment and manual labour, pushing the cost to $900 to $1,200 or more. SA homeowners planning footing work in rear yards or confined sites should specifically ask how the contractor plans to access the footing locations and what equipment will be used, before accepting a quote that does not distinguish between accessible and confined site conditions.

What to Look Out For in SA Footing and Foundation Quotes

Footing quotes in SA range from thorough site-specific designs with detailed specifications to generic quotes that assume standard conditions and leave the soil classification and footing depth determination to the excavation stage. The difference between these approaches is a genuine quality risk on Adelaide's reactive clay sites, where the soil conditions determine the footing specification and cannot be left to be resolved after excavation has begun. The difference is not presentation, it is whether anybody has established what the ground under your building actually does. Treat a generic quote as an estimate rather than a price.

Confirm that the quote is based on a known AS 2870 soil classification for the specific site. If the quote does not reference a soil classification, ask the contractor what soil class they have assumed and what would change if the actual classification turned out to be different. A contractor who responds that the footing dimensions will be adjusted on-site based on what the soil looks like in the excavation is describing a reactive approach to a problem that should be solved by design before excavation begins. The soil classification is a $300 to $700 geotechnical investigation: it is a small cost relative to the consequences of under-specifying a footing on Adelaide's reactive clay soils. Beyond the soil classification, confirm that the quote specifies the concrete strength grade, the reinforcement grade and size, the footing dimensions, and the concrete cover to reinforcement: these are the four parameters that determine whether the footing is designed properly for the SA site conditions, and a quote that does not state all four is not providing sufficient information for a meaningful quality comparison. The soil classification is a $300 to $700 geotechnical investigation: it is not a large cost relative to the consequences of under-specifying a footing.

Ask for the specific footing dimensions, reinforcement grade and size, and concrete strength grade in writing. For bored piers, ask for the specified diameter and depth, and how the founding depth will be verified during installation. For screw piles, ask what the design load is per pile, what installation torque confirms that load has been reached, and what corrosion protection specification applies to the piles. A contractor who can answer all of these questions specifically and in writing has a technically adequate approach. One who answers with general assurances without specific parameters has not provided a design basis adequate for a SA reactive soil footing application. For commercial SA footing projects or any project with Class H2 or E soil conditions, request a copy of the structural engineer's footing design drawings as part of the quote documentation: the drawings should specify all of the parameters above, and the contractor's quote should confirm they are building to those drawings rather than to their own interpretation of what is required.

Confirm that the quote includes all elements of the footing scope: excavation and disposal of spoil, formwork for above-ground elements, reinforcement supply and placement, concrete supply and placement, and any pre-pour inspection notification process. Some SA footing quotes include the concrete but exclude excavation, or include excavation but exclude reinforcement supply, producing apparent cost differences between quotes that reflect scope differences rather than price differences. Comparing quotes that include the same complete scope is the only way to make a meaningful cost comparison. Consumer protection for building and trade work in SA is provided by Fair Trading SA under Australian Consumer Law.

Choosing a Footing Contractor in SA

Footing work in SA requires a CBS SA Building Work Contractor (BWC) licence under the Building Work Contractors Act 1995 (SA) for work forming part of a structure requiring development approval. The BWC licence confirms that the contractor has suitable competency and experience for structural building work. Verifying the BWC licence at the CBS SA public register before engaging a footing contractor is a basic due diligence step that SA building owners and owner-builders should take for any footing project. The register shows the licence category, the licence holder's name, the licence status (current or expired), and any disciplinary history. A contractor whose licence has lapsed since their last renewal is not currently licensed for structural building work in SA and should not be engaged until a current licence is confirmed. Public liability insurance (minimum $10 million) and current workers compensation insurance should also be confirmed before any SA footing project starts, as footing excavation work carries genuine risk of adjacent property damage and worker injury that adequate insurance must cover.

For reactive soil footing work in Adelaide, experience in the specific soil conditions of the relevant suburb is a meaningful selection criterion. A footing contractor who has worked extensively on bored pier projects in Salisbury and Davoren Park has developed a practical understanding of the H1 and H2 soil profiles in those areas that a contractor primarily working on Class M sites in the Hills fringe has not. Asking for references from footing projects in suburbs with similar soil classification to yours, and asking those references specifically whether any differential settlement or footing-related cracking appeared in the structure after completion, provides the most relevant quality evidence for a SA reactive soil footing project. Follow-up questions to reference contacts that are specifically useful include: did the contractor raise the soil classification question unprompted during the quoting process; were the footing dimensions consistent with what was quoted or were they changed on-site without consultation; and were the pre-pour inspections managed smoothly or did the contractor attempt to pour before the certifier had attended. These questions reveal the contractor's professional approach to reactive soil specification, compliance management, and quality assurance: the three areas where an SA footing contractor's quality most directly affects the long-term performance of the structure above the footing.

For commercial SA footing projects, the contractor should have a demonstrated relationship with a structural engineering firm, carry professional indemnity insurance in addition to public liability cover, and be able to provide a construction methodology statement for the specific footing system being used. For bored pier or screw pile work at scale, confirm that the contractor's drilling equipment is suitable for the specified pier diameter, depth, and access conditions of the specific SA site. Standards Australia publishes AS 2870 and AS 3600, the key standards governing SA footing design and construction, and a contractor who references these standards in their method statement is demonstrating suitable technical awareness of the regulatory framework within which their work is performed. That relationship matters at inspection stage, when a question needs answering quickly rather than after a week of correspondence.

Concrete Footings and Foundations Across SA

We connect you with experienced footing contractors across South Australia for strip footings, pad footings, bored piers, and screw piles on SA reactive clay sites across Adelaide metropolitan and regional SA.

▶ Adelaide City & Inner Suburbs 16 areas
Adelaide CBD North Adelaide Kent Town Norwood Unley Goodwood Parkside Hyde Park Fullarton Rose Park Toorak Gardens College Park St Peters Walkerville Medindie Prospect
▶ Adelaide Metro 13 areas

Eastern Suburbs

Burnside Magill Kensington Park Glen Osmond Glenunga Beaumont Stonyfell

Western Suburbs

West Beach Henley Beach Grange Lockleys Torrensville Mile End
▶ Adelaide Northern Suburbs 15 areas

Inner North

Nailsworth Prospect Bowden Brompton Croydon

North East

Modbury Tea Tree Gully Golden Grove Paradise Campbelltown Athelstone

North & Playford

Salisbury Elizabeth Mawson Lakes Gawler
▶ Adelaide Southern Suburbs 19 areas

Inner South

Mitcham Unley Park Clarence Park Millswood Black Forest Colonel Light Gardens

South & Marion

Bedford Park Marion Oaklands Park Edwardstown Plympton

Outer South & Onkaparinga

Morphett Vale Reynella Happy Valley Aberfoyle Park Hallett Cove Noarlunga Seaford McLaren Vale
▶ Adelaide Hills 12 areas

Hills Face Zone

Crafers Stirling Aldgate Bridgewater Belair Blackwood

Outer Hills

Mount Barker Hahndorf Nairne Strathalbyn Woodside Lobethal
▶ Adelaide Beaches 9 areas

Bay & Western Beaches

Glenelg Somerton Park Brighton Seacliff West Lakes

Port Adelaide & LeFevre

Port Adelaide Semaphore Largs Bay North Haven
▶ Barossa & Clare Valley 10 areas

Barossa Valley

Tanunda Nuriootpa Angaston Lyndoch

Clare Valley

Clare Auburn Mintaro

Mid North

Kapunda Burra Balaklava
▶ Fleurieu Peninsula 7 areas

South Coast

Victor Harbor Port Elliot Middleton Goolwa

Inland Fleurieu

Mount Compass Yankalilla Normanville
▶ Yorke Peninsula 7 areas

Copper Coast

Kadina Moonta Wallaroo

Southern Yorke

Minlaton Yorketown Ardrossan Maitland
▶ Eyre Peninsula 8 areas

Upper Eyre

Whyalla Port Augusta Port Pirie

Lower Eyre & West Coast

Port Lincoln Coffin Bay Tumby Bay Streaky Bay Ceduna
▶ Limestone Coast 9 areas

Mount Gambier Region

Mount Gambier Port MacDonnell

Coonawarra & Penola

Penola Coonawarra Millicent Robe

Upper Limestone Coast

Naracoorte Bordertown Keith
▶ Riverland & Murray 8 areas

Riverland

Renmark Berri Loxton Waikerie Barmera

Murray Bridge & Mallee

Murray Bridge Tailem Bend Mannum
▶ Kangaroo Island 5 areas
Kingscote Penneshaw American River Parndana Vivonne Bay
▶ Flinders Ranges & Outback 9 areas

Southern Flinders

Port Pirie Jamestown Peterborough

Flinders Ranges

Hawker Wilpena Pound Leigh Creek

Outback SA

Coober Pedy Roxby Downs Woomera

More Concrete Guides - SA

For Trades & Contractors - SA

Browse current concreting leads on the SA job leads board or see concreter jobs in SA.

Concrete Footings FAQs - SA

How much do concrete footings cost in Adelaide?
Strip footings in Adelaide cost $180 to $350 per lineal metre depending on depth and reinforcement required. Isolated pad footings for pergola or veranda posts cost $350 to $900 each depending on size, depth, and soil classification. Bored pier footings cost $400 to $1,200 each for standard residential depths, and up to $1,200 for deep piers on Class H2 sites. Screw pile installation costs $350 to $700 per pile for residential applications. An engineer's design for SA residential footings costs $1,500 to $4,500 depending on the project complexity. Access difficulty is a major cost variable: footings in confined rear yards cost far more than the same footings in open accessible sites. Regional SA carries a travel premium over Adelaide metropolitan rates.
How deep should footings be in Adelaide's reactive clay suburbs?
For Class M sites common in many middle-ring Adelaide suburbs, AS 2870 prescribes a minimum edge beam depth of 300mm. For Class H1 sites in Adelaide's northern suburbs including Salisbury, Davoren Park, and Parafield Gardens, edge beam depths of 400 to 450mm are the minimum under the prescriptive approach, with engineers often specifying 500 to 600mm. For Class H2 sites, an engineer's design is typically required, and strip footing depths of 600mm or more are common, with bored piers extending to 1,500 to 3,000mm where the pier design bypasses the reactive soil layer entirely. The specific depth for any SA site must be based on the site's AS 2870 classification from a geotechnical investigation rather than assumed from the suburb's general classification.
Do I need an engineer for my SA building footings?
An engineer's design is mandatory for SA residential building footings on Class H2 and E sites under AS 2870:2011. For Class A, S, and M sites, the prescriptive approach in AS 2870 may be used without a site-specific engineering design, provided the building is within the scope of the standard and the footing dimensions comply with the prescriptive requirements for the relevant soil class. For all commercial buildings in SA, an engineer's design is required regardless of soil classification. Where any uncertainty exists about whether the prescriptive approach applies to a specific SA site, engaging a structural engineer to confirm or design the footing is the prudent approach. The cost of an engineering design is small relative to the cost of remedying a footing that fails on reactive clay soil.
What is a bored pier and when is it used in SA?
A bored pier is a cylindrical concrete column drilled into the ground to a depth that places its base below the reactive soil active zone, or into stable substrate below the reactive clay layer. It is used in SA for Class H2 and E sites where the reactive clay extends to significant depth and the conventional strip or pad footing cannot reach a stable bearing level at an economical depth. Bored piers are also used on sloped sites where excavation for shallow footings would require significant earthworks, and in confined sites where a drilling rig can access but larger excavation equipment cannot. The pier diameter for residential SA applications is typically 300 to 450mm, with depths from 1,500 to 3,000mm depending on the soil profile. An engineer's design is always required for bored pier footings in SA.
What is the difference between a screw pile and a bored pier?
A screw pile is a steel tubular pile with helical steel plates that is rotated into the ground using a hydraulic torque drive, without drilling or removing soil. Its load capacity is confirmed during installation by measuring the torque required to advance the pile. A bored pier is a concrete-filled drilled hole with a reinforcing cage, cast in place after drilling. Bored piers carry higher loads, suit a wider range of structural configurations, and are more widely accepted for residential and commercial building foundations in SA. Screw piles are faster to install, produce no excavated spoil, and are practical for deck and veranda foundations and light commercial structures. Both require engineer design in SA building applications. For heavy building loads or where the structural design requires rigid connection between the foundation and the structure, bored piers are generally more appropriate than screw piles.
Why does tree proximity affect SA building footings?
Large trees extract moisture from the soil over a wide radius through their root systems, creating a zone of drier soil around the tree that can persist year-round. On Adelaide's reactive clay soils, this drying effect causes the clay near the tree root zone to shrink persistently rather than just seasonally. If a building footing is within the root zone influence of a large tree, the differential moisture content between the dry soil near the tree and the less-affected soil on the opposite side of the building creates persistent differential settlement loading that can be more damaging than standard seasonal reactive soil movement. SA structural engineers designing footings near established gum trees, peppercorn trees, and other large species will typically specify deeper footings on the tree-side of the building to reduce the settlement differential, and may recommend tree removal or barrier installation as part of the foundation strategy.
Can I pour footings without a pre-pour inspection in SA?
No, not for building work that requires development approval. The pre-pour inspection by the building certifier is a mandatory step that must occur before concrete is placed in any footing that forms part of an approved structure. Pouring without inspection creates a compliance failure under SA building law, and if the reinforcement is found to be incorrectly placed, demolition is the only remedy after the concrete has set. For structures that do not require development approval, a pre-pour inspection is still strongly recommended as good practice. The certifier must be notified at least 24 to 48 hours before the planned pour to allow scheduling, and the pour date should not be confirmed with the concrete supplier until the certifier has confirmed inspection availability for that date.
How does Adelaide's soil affect pergola footing depth?
Pergola post footings in Adelaide need to be deeper on reactive clay sites than in cities with more stable soils. On Class M sites common in many Adelaide suburbs, a pad footing of 400mm square by 600mm deep is typically adequate. On Class H1 sites in Adelaide's northern and southern suburbs, 700 to 900mm depth is more appropriate to place the footing base below the most active portion of the reactive clay profile. On Class H2 sites, an engineer should specify the footing depth and dimensions. A pergola footing that is too shallow on a reactive clay site will follow the seasonal soil movement, causing the posts to rise and fall and the pergola structure to rack and distort over time. The isolation joint between the footing and any adjacent patio or driveway slab is also critical to prevent differential movement between the footing and the slab from cracking the slab surface at the footing perimeter.
Do I need an engineer for footings in South Australia?
For anything structural, almost always. AS 2870 sets out footing design for residential slabs and footings, and on the reactive clay common across Adelaide the design depends on a site classification that comes from a soil test. An engineer specifies the depth, the size and the reinforcement against that classification. A contractor quoting footings without reference to a classification or a design is quoting a guess.
What is the difference between bored piers and screw piles?
Both carry load down to stable ground, and the choice is usually about access and soil. Bored piers are drilled and filled with reinforced concrete, which suits open sites and larger loads. Screw piles are driven mechanically, produce no spoil, and suit tight access or sites where excavation would disturb existing structures. Screw piles cost more per element and often less overall once spoil handling is counted.

Need Concrete Footings in SA?

Post your job and connect with experienced footing contractors across Adelaide and regional South Australia for strip footings, pad footings, bored piers, and screw piles on SA reactive clay and stable soil sites.

Get Footing Quotes

About This Guide

This page provides guidance information only and is not professional advice of any kind. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 17 September 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All SA tradies are required to hold appropriate licences. Verify at Consumer and Business Services SA.
Costs reflect Adelaide metropolitan rates for April 2026. Footing type, AS 2870 soil classification, required depth, number of elements, site access, excavation difficulty, and engineer design all affect total cost. Regional SA carries a travel premium. Always confirm the AS 2870 soil classification and engineer design requirement before accepting any SA footing quote.
Need work done? Get free quotes. Post a Job – It's Free