Planning a Concrete Pour?

Tell us the slab area and what it has to carry, and we'll put you in touch with licensed ACT concreters.

Get Free Concreting Quotes
Free · No obligation · ACT-wide

Typical Costs

Small slab or path (under 15m²)$1,500-$5,000
Residential driveway (30-60m²)$4,500-$15,000
Shed or carport slab (40-80m²)$5,500-$14,000
Small house slab and footings (100m²)$12,000-$28,000
Larger residential slab (150-200m²)$22,000-$50,000
Commercial / structural slab$40,000-$80,000+
Decorative finish premium$30-$280/m² extra

Costs include site preparation, formwork, reinforcement supply and placement, concrete supply and placement, finishing, curing, and removal of formwork. They exclude excavation beyond minor levelling, retaining structures, complex earthworks, and decorative finishes beyond a standard broom finish unless specified. Always obtain a fully-detailed written fixed-price contract from a licensed concreter and verify trade licences and any required builder licence through Access Canberra before signing.

Concreting Services in the ACT: 2026 Costs and Specifications

Concreting services in the ACT in 2026 cost $1,500 to $5,000 for small slabs and paths, $4,500 to $15,000 for residential driveways, $5,500 to $14,000 for shed and carport slabs, $12,000 to $28,000 for small house slabs around 100 square metres, $22,000 to $50,000 for larger residential slabs, and $40,000 to $80,000 or more for commercial work. ACT concreting must comply with AS 2870 for residential slabs and footings, with the slab class designed for the soil reactivity common across Canberra. This guide covers slab types, soil classes A to P, reinforcement specs, concrete mix design, finishes from broom-finish to polished and exposed aggregate, drainage, curing, and pricing across Belconnen, Gungahlin, Tuggeranong, Woden, Weston Creek, Molonglo Valley, Queanbeyan and Jerrabomberra. The gap between two quotes for the same driveway is almost always a specification gap rather than a margin gap, because slab thickness, mesh grade, concrete strength and finish each move the per-metre rate by a known amount. A 100mm slab with SL72 mesh and 25 MPa concrete is a different product to an 80mm slab with SL62 and 20 MPa, and only the first will carry a trade vehicle without cracking. Reactive clay across Gungahlin, the Molonglo Valley and much of the inner north pushes that specification further again. Post your project on The Quote Yard.

Concreting Services Across the ACT

Detailed pricing for residential driveways, shed and carport slabs, house slabs and footings, paths, patios and pool surrounds, decorative concrete including exposed aggregate and stencil, and commercial and structural slab work across North Canberra, South Canberra, Belconnen, Gungahlin, Tuggeranong, Woden Valley, Weston Creek, the Molonglo Valley and surrounding districts including Queanbeyan, Jerrabomberra, Googong, Murrumbateman, Bungendore and Yass.

Get Free Quotes

At a Glance - Concreting Costs ACT 2026

Project Type Indicative Cost Per m² Range Typical Use
Path or small slab (under 15m²) $1,500-$5,000 $120-$340 Footpath, courtyard, AC pad
Residential driveway (30-60m²) $4,500-$15,000 $140-$280 Single, double, long driveway
Shed or carport slab (40-80m²) $5,500-$14,000 $130-$220 Large shed, double carport
Small house slab (100m²) $12,000-$28,000 $120-$280 Small home, granny flat slab
Larger residential slab (150-200m²) $22,000-$50,000 $140-$320 Family home slab
Commercial / structural slab $40,000-$80,000+ $180-$450 Heavy-duty, multi-storey support
Decorative finishes (premium) +$30-$280/m² over base Exposed agg, polished, stencil

Cost Depth: What Drives ACT Concreting Pricing

Concrete pricing is driven by area, thickness, reinforcement specification, concrete mix design, soil class, finish type, and access. Standard residential broom-finish concrete at 100mm thickness with SL72 mesh costs $130 to $200 per square metre in 2026 ACT pricing, increasing with thicker slabs (a 125mm structural slab adds $25 to $45 per square metre over 100mm), heavier reinforcement (SL82 over SL72 adds $5 to $12 per square metre, a layer of N12 bars adds $15 to $30 per square metre), higher-strength concrete (32 MPa over 25 MPa adds $8 to $18 per square metre), reactive soil class (Class M moderately reactive sites require thicker slabs and stronger reinforcement than Class A non-reactive sites), and decorative finishes (exposed aggregate adds $50 to $90 per square metre, stencil concrete adds $35 to $75, polished concrete adds $80 to $280 depending on the level of polish). Access to the pour location matters too: pumped pours into back yards add $400 to $1,500 over kerbside pours.

Concreting work that forms part of building approval projects (house slabs, structural footings) requires a licensed builder or building surveyor sign-off in addition to the concreter. Verify licences on the Access Canberra register before signing a contract.

Get Concreting Quotes

Connect with licensed ACT concreters for residential driveways, shed and carport slabs, house slabs and footings, paths and patios, decorative concrete and commercial slab work across Canberra and surrounding areas.

Get Free Quotes
Free · No obligation · ACT-wide

Concreting Costs in the ACT for 2026

Concreting is one of the most fundamental trades in Australian residential and commercial construction, and the work covers everything from a simple footpath to a 200 square metre house slab to a structural commercial floor. ACT concreters work to AS 2870 (residential slabs and footings) for housing work and to AS 3600 (concrete structures) for commercial and structural work, with the slab class, the reinforcement specification, and the concrete strength designed for the specific application and the underlying soil conditions. Pricing in 2026 ranges from approximately $130 per square metre for a basic broom-finish residential slab through to $450 per square metre or more for a heavy-duty commercial slab with high-strength concrete and heavy reinforcement. Those two ends of the range are different products rather than different margins on the same product. Reading a quote means reading the specification behind the rate.

The ACT concreting market in 2026 is well-served by a mix of small owner-operator concreting teams (usually 2 to 4 concreters with their own equipment, working on residential driveways, shed slabs and small house slabs), mid-sized concreting contractors (5 to 15 staff working on larger residential and small commercial slabs), and structural concreters working on commercial buildings and infrastructure. The right contractor for a specific job depends on the scale and the technical requirements: a residential driveway is well-suited to an owner-operator team, while a structural slab supporting a multi-storey extension sits better with a mid-sized contractor with structural experience and engineer coordination. Scale is the honest guide to which tier suits a job. A team that pours driveways all week is the right call for a driveway, and the wrong call for a suspended structural slab.

Concrete supply in the ACT is dominated by the established commercial batching plants, which deliver to construction sites on demand subject to the booking arrangements. Concrete is a perishable product (workability is lost after approximately 90 minutes from batching, and quality is compromised after about two hours) so the supply timing must align with the placement programme on site. A small slab might require one truck of 5 to 7 cubic metres, while a larger slab requires multiple trucks delivered in sequence to keep the placement continuous. Where the work forms part of a broader project that includes earthworks, our excavation ACT guide covers site preparation pricing, and our licensed ACT builder guide covers the broader context of building work.

What Concreting Services Cover in the ACT

Residential and commercial concreting services in the ACT cover work of every scale, and the quoted scope on a standard job runs through a predictable sequence. Site preparation comes first, clearing the work area, removing topsoil and vegetation, and levelling to the design grade. Formwork follows, using timber or metal forms to define the slab edge and any internal features, after which reinforcement is placed as steel mesh or bars to the engineered specification, with a vapour barrier and screeding aids set up before any concrete arrives. Placement runs through chute, pump or barrow depending on access, followed by screeding and levelling, then the specified finish of broom, trowel, exposed aggregate or another nominated surface. Curing and the removal of formwork once the concrete has gained sufficient strength close out the scope.

For house slabs and structural footings, the scope adds compliance with the engineer's design, mid-works inspection by the certifier or engineer (to verify reinforcement placement before pour), placement of services penetrations through the slab (waste pipes, water supply, electrical conduits) coordinated with the plumbing and electrical trades, and provision of the post-pour test cylinder samples that confirm the concrete strength meets the specification. The mid-works inspection is a critical step because reinforcement errors discovered after the pour cannot be corrected without breaking out the concrete. Allow the certifier or engineer a clear day in the programme for that inspection rather than booking the truck for the same morning. Pours have been cancelled on site over reinforcement cover that could have been corrected the day before.

Decorative finishes add to the scope and the cost. Exposed aggregate finish exposes the larger aggregate in the concrete by washing the surface paste off shortly after placement, producing a durable textured surface. Stencil concrete uses paper or vinyl stencils placed on the wet concrete to create patterns mimicking pavers or tiles. Polished concrete grinds and polishes the cured slab surface to produce a smooth reflective finish. Stamped or stamped concrete imprints patterns into the wet surface using rubber stamps. Each finish has different surface preparation, finishing time, and curing requirements, and the concreter should be specifically experienced in the finish chosen because the timing of finishing operations is critical.

Residential vs Commercial Concrete Work

The distinction between residential and commercial concrete work matters because the standards, the design framework, and the licensing requirements differ. Residential concreting under AS 2870 covers slabs and footings for houses and townhouses up to two storeys, with the slab type classified by the soil class and the building load. The standard provides standard slab solutions for typical situations and requires engineer-designed solutions for non-standard situations. Most residential concreting work in the ACT proceeds under the standard solutions in AS 2870, with engineer involvement only where the soil class or the building configuration falls outside the standard range.

Commercial concrete work under AS 3600 is always engineer-designed and covers the full range of commercial and industrial concrete structures from warehouse floors to multi-storey building elements. The design considers loads from imposed live and dead loads, deflection limits, crack control, durability requirements, and any specific functional requirements such as resistance to chemical attack or fire performance. Commercial slabs generally use higher-strength concrete (32 to 50 MPa is common, versus 20 to 25 MPa for typical residential), heavier reinforcement, and are often post-tensioned for longer spans. Commercial concreters are usually engaged through a head contractor rather than directly by the property owner.

Light commercial work occupies a middle ground: small commercial buildings, larger storage sheds with concrete floors, and similar projects where the loads are higher than residential but the structural complexity is moderate. Pricing for light commercial work falls in the upper part of residential pricing or the lower part of commercial pricing depending on specifics, and the choice between a residential concreter and a commercial concreter for this work depends on the specific scope, the engineering involved, and the contractor's experience. Where the project includes external concrete works for a residential property, our concrete driveways ACT guide covers driveway-specific pricing in detail. The active workforce in this category is reflected in current concreter job leads listed across Australia.

AS 2870 Residential Slabs and Footings

Australian Standard AS 2870 is the governing standard for residential slabs and footings in Australia, including the ACT. The standard specifies the minimum design requirements for slabs, strip footings, pad footings, raft slabs, and waffle slabs, with the requirements graded by the site classification. The site classification reflects the reactivity of the soil to seasonal moisture changes, with Class A (non-reactive) at one end of the spectrum and Class P (problem sites requiring engineer design) at the other end. Most ACT sites fall in Class S (slightly reactive), Class M (moderately reactive), or Class H1/H2 (highly reactive), with the slab class and reinforcement specification adjusted accordingly.

The standard slab solutions in AS 2870 cover typical residential situations for each soil class. A Class S site with a typical single-storey brick veneer house can be supported on a 100mm waffle slab with SL72 reinforcement and standard edge beam dimensions. A Class M site requires a thicker slab (often 110mm to 125mm) and stronger reinforcement (SL82 or additional bars in the edge beams). A Class H1 or H2 site requires far more reinforcement, deeper edge beams, and sometimes a piled foundation in addition to the slab. A Class P site is outside the standard solutions and requires a project-specific engineer's design.

Compliance with AS 2870 is verified through the building approval process. The certifier reviews the slab design against the standard, confirms the soil class is sound (usually through a geotechnical soil report by a qualified geotechnical engineer), and inspects the slab during construction at key stages including formwork and reinforcement placement before pour. The household receives a certificate of occupancy and use at completion, which confirms (among other matters) that the slab meets the standard. A slab built outside the standard without an engineer's certification is non-compliant and exposes the household to enforcement, insurance, and resale issues.

The slab type chosen for a specific ACT residential project depends on the soil class, the building configuration, and the design preferences of the engineer or builder. Waffle slabs, formed using polystyrene void formers placed on the prepared subgrade, are the most common slab type for new ACT homes because they provide good thermal performance, are quick to construct, and use less concrete than equivalent-strength conventional slabs. Conventional stiffened raft slabs, with internal beams formed within the slab thickness, are an alternative used where waffle slabs do not suit the site or where the household or builder prefers the conventional approach. Strip footing and suspended slab construction is older technology, still used occasionally in renovations and on sloping sites, but uncommon for new builds.

For ACT renovations and extensions where a new slab is poured next to an existing structure, the slab must be designed to accommodate any differential settlement between the new and existing footings. This normally requires either an isolation joint between the two slabs (allowing them to move independently) or a structural connection designed to transfer the loads between them. The design choice depends on the specific situation and is generally made by the engineer rather than the concreter. Slab connections that are made without engineer involvement, particularly the simple approach of doweling new concrete into existing slabs, often produce cracking at the junction within a few years as the differential movement exceeds the dowel capacity.

ACT Soil Classes and Geotechnical Considerations

ACT soil conditions vary across the Territory and across districts. The Inner North and Inner South suburbs usually have Class M (moderately reactive) clay soils, with localised areas of higher reactivity in the suburbs near Mount Ainslie and along the Limestone Avenue corridor. Belconnen and Tuggeranong commonly have a mix of Class S and Class M soils depending on the specific block, with some pockets of higher reactivity near drainage lines. Gungahlin and the Molonglo Valley have a higher proportion of Class M and H1 soils because of the underlying clay geology. The Inner South suburbs around Yarralumla and Deakin have some Class A and Class S soils on the higher ground and Class M to H1 soils on lower ground near drainage lines.

A soil report from a qualified geotechnical engineer is the reliable way to confirm the site classification for a specific block, and is a normal pre-construction step for any new house slab. The report generally involves test pits or boreholes at the proposed slab corners, laboratory testing of soil samples to determine plasticity index and shrinkage characteristics, and a written report with the site classification and any specific recommendations. Soil report cost runs $1,200 to $3,500 depending on the site complexity and the depth of investigation required, and is money well spent because the slab design that follows is then matched to the actual site conditions rather than assumed conditions. Order the report early enough that the result can shape the slab design rather than arriving after the builder has priced the job. A fortnight of lead time is normal for the fieldwork and laboratory testing.

Tree influence on slab design is a specific ACT consideration because of the prevalence of mature trees on residential blocks, particularly in older suburbs. Trees can increase soil moisture uptake, increasing reactive soil movement and changing the effective site classification. AS 2870 provides specific guidance on tree influence zones (commonly up to 1.5 to 2 times the mature tree height), and slabs within these zones may require deeper edge beams, additional reinforcement, or piled footings to manage the differential movement risk. A geotechnical engineer or a structural engineer familiar with ACT soil conditions can advise on tree-influenced slab design where relevant. Where significant earthworks and underpinning of existing structures are required to address soil movement issues, our underpinning services ACT guide covers foundation remediation pricing.

Reinforcement and Steel

Concrete reinforcement provides tensile strength to a material that is otherwise brittle in tension. Residential slab reinforcement often uses welded mesh products such as SL62 (lighter, used in non-structural slabs), SL72 (standard for residential slabs), or SL82 (heavier, used in more loaded or reactive-site slabs). Edge beams and structural elements often use deformed bar reinforcement (N12, N16 or N20 bars) placed in addition to or instead of mesh. The reinforcement specification is determined by the engineer or the AS 2870 standard solution and is non-negotiable: substituting a lighter mesh for a heavier specification compromises the slab's structural capacity and the warranty.

Reinforcement placement must achieve the specified cover (usually 30mm to 50mm of concrete between the steel and the slab surfaces), the specified spacing, and the specified lap lengths where mesh sheets join. Bar chairs and supports keep the mesh and bars at the correct height during the pour, and the concreter must check the placement before the pour rather than relying on the formwork inspection alone. Reinforcement that ends up at the slab surface (because chairs failed or the mesh was disturbed during the pour) provides little structural benefit and creates a corrosion entry point that compromises the slab's long-term durability. Walk the slab before the pour and look along the mesh at eye level, where a sagging sheet shows up immediately. Chairs at the wrong spacing are the usual cause.

For higher-load applications, post-tensioned reinforcement using high-tensile cables or bars stressed against the concrete after curing is sometimes specified. Post-tensioning is more common in commercial concrete than residential, but is occasionally seen in residential work for long-span elements such as garage door openings, very large open spans, or structural slabs over basements. The specialist nature of post-tensioning means it is delivered by structural concreting contractors with specific equipment and experience, rather than general residential concreters. Tradies in this trade can find current opportunities through steel fixer job leads on national job boards.

Reinforcement supply in the ACT is from the major Australian steel suppliers including OneSteel, BlueScope and Liberty, with the steel delivered to site cut and bent to the engineer's bar bending schedule for structural slabs, or in standard mesh sheets and offcut bars for typical residential work. Australian-made reinforcing steel is preferred over imported product because the certification chain is more reliable: imported reinforcement has been the subject of compliance issues over the past decade where the actual product properties did not match the claimed specifications. The concreter should be able to provide mill certificates for the reinforcement on request, particularly for engineered slab work where the steel grade and properties are specified. Keep those certificates with the building file rather than discarding them after the pour. They are the only record of what grade of steel went into the slab.

Tying the reinforcement together at intersections with reinforcement tie wire is the standard method of holding the mesh and bars in their designed positions during the pour. Tie wire fixing is labour-intensive on larger structural slabs and can add meaningfully to the labour cost where extensive bar reinforcement is specified. Mechanical couplers are sometimes used in commercial work for joining bars where tying is not practical, but are uncommon in residential concreting. The installed reinforcement should be inspected before any concrete is placed: any bars that have been displaced, mesh that is no longer at the correct cover, or chairs that have collapsed must be corrected before the pour rather than after.

Concrete Mix and Strength Specifications

Concrete strength is specified in megapascals (MPa) and states the compressive strength at 28 days of age. Residential concreting usually uses 20 MPa for non-structural slabs (such as concrete paths), 25 MPa for typical residential house slabs and driveways, 32 MPa for higher-load residential applications and for some structural elements, and 40 MPa or higher for commercial and structural work. The mix design itself includes the aggregate type and grading, the cement content, the water-cement ratio, and any admixtures used to control workability, set time, or specific properties. The mix is specified by the engineer or the standard solution rather than chosen on the day. A concreter who offers to substitute a cheaper mix is offering a different slab.

Slump is the measure of concrete workability, with higher slump (more flowable mix) easier to place but lower strength, and lower slump (stiffer mix) harder to place but stronger. Typical residential slabs use 80mm to 100mm slump as a compromise between placeability and quality. Pumped pours sometimes specify slightly higher slump to make the concrete easier to push through the pump line. Adding water on site to make the concrete easier to place (as occasionally requested by inexperienced concreters) reduces the strength meaningfully and is a non-conforming practice that the household should reject.

Concrete supply for ACT residential work is commonly from one of the major commercial batching plants serving Canberra, with the concrete delivered in 7 to 8 cubic metre truck loads. The batching plant supplies a delivery docket with each truck identifying the mix design, the concrete strength, the slump, and the time of batching. The concreter should record this information and confirm it matches the engineer's specification. For larger pours requiring multiple trucks, the trucks are scheduled to maintain continuous supply to the pour without unacceptable cold joints between sections.

Curing Requirements

Curing is the process of maintaining the concrete moisture and temperature during the early hardening period to allow the cement to fully hydrate and the concrete to develop its specified strength. Inadequate curing produces concrete that is weaker than specified, more prone to surface cracking, more permeable to water, and shorter in useful life. The most common curing methods are wet curing (keeping the surface continuously moist), curing compound application (spraying a curing membrane that retains the internal moisture), and plastic sheeting (covering the slab to prevent moisture loss). Whichever method is used, it has to start as soon as finishing is complete rather than the following morning. The first few hours decide how much of the design strength the slab reaches.

Curing duration depends on the concrete strength, the ambient conditions, and the concrete mix. Typical residential slabs require seven days of effective curing to develop most of their design strength, with continued strength gain over the following 28 days. In Canberra's typical conditions, the first 24 to 72 hours after pour are the most critical because the concrete is most vulnerable to moisture loss during this period. Hot dry conditions in summer (low humidity, high temperature, breeze) can dehydrate a freshly placed slab quickly, producing surface plastic shrinkage cracks that are visible within hours of the pour. Curing compound application immediately after finishing is the standard preventive measure.

Cold weather curing in Canberra winters is also a consideration. Concrete sets more slowly at low temperatures, and at temperatures below approximately 5 degrees the hydration reaction effectively stops. Pours scheduled in cold weather should ideally use accelerated set admixtures, should be protected from frost overnight, and should not be exposed to freezing during the first 48 to 72 hours. Concreters experienced with Canberra winter pours plan accordingly and may delay a pour rather than risk frost damage to a fresh slab.

Canberra's climate produces specific concreting challenges that are worth understanding when scheduling a pour. Summer temperatures regularly exceed 30 degrees with low humidity and afternoon breezes that accelerate moisture loss from fresh concrete. Pours in these conditions are best scheduled for early morning starts, with placement and finishing complete before midday and curing protection applied immediately after finishing. Winter temperatures regularly drop below freezing overnight, particularly in May to August, and pours scheduled in these months need overnight frost protection with insulation blankets or polythene sheeting. The shoulder seasons (March to April and September to October) generally provide the most favourable concreting conditions in Canberra and are preferred for larger pours where weather risk is best minimised.

Joint design in concrete slabs deserves attention because shrinkage cracking is reduced (although not eliminated) by providing controlled joints at planned spacings. Construction joints occur where successive pours meet and are generally designed with shear keys, dowels, or both to maintain load transfer between sections. Control joints are saw-cut into the cured concrete (normally within 24 to 48 hours of pour) at spacings of 4 to 6 metres on residential slabs, providing a controlled location for the inevitable shrinkage cracking to occur. Expansion joints, less common in residential work, are wider gaps filled with compressible material that allow the slab to expand and contract with temperature changes. The joint pattern is usually proposed by the concreter and should be reviewed against the slab geometry so controlled joints land where cracking would otherwise be most likely. Demand for the trade base is reflected in excavator and earthworks job leads nationally, with steady ACT representation.

Concrete Finishes and Decorative Options

The standard residential concrete finish is broom finish, which is created by drawing a stiff broom across the surface after the initial bull-floating to produce a textured surface with good slip resistance. Broom finish suits driveways, paths, shed slabs, and outdoor areas where slip resistance and durability matter more than visual aesthetics. The labour and material cost is included in the base concreting price. It is also the finish most tolerant of a hot or windy pour day, because the texture hides minor surface variation. That tolerance matters on a windy Canberra summer afternoon.

Trowel finish (smooth steel-finished concrete) suits indoor slabs where smooth, hard, dust-free surfaces are wanted. Power trowelling produces a denser surface than hand trowelling and is the standard for warehouse and commercial floor finishes. Trowel finish is occasionally specified for residential garage floors but is less suitable for driveways and outdoor areas because it has lower slip resistance when wet. Where additional slip safety is needed on existing slip-prone surfaces, our non-slip floor coating ACT guide covers retrofit slip-resistance treatments.

Exposed aggregate finish exposes the larger aggregate by washing the surface paste off the concrete shortly after placement, producing a durable textured surface with the visual character of the aggregate. Common aggregate choices in ACT exposed aggregate work include local river pebbles, quartz, granite chips, and recycled glass. The premium over standard broom finish is often $50 to $90 per square metre, and the look ranges from subtle (small aggregate, light exposure) to dramatic (larger aggregate, deeper exposure). Exposed aggregate is increasingly popular for residential driveways and outdoor entertaining areas.

Stencil concrete uses paper or vinyl stencils placed on the wet concrete surface to create patterns mimicking pavers, brickwork, or other formats. The stencil pattern is then coloured with surface hardener or stain, producing a coloured patterned finish at meaningfully lower cost than actual paving. Cost premium over broom finish is $35 to $75 per square metre. The look can be very effective for entry paths, courtyards, and pool surrounds, although the long-term wear shows the underlying concrete colour where the stencilled top wears off, so households should weigh the longer-term maintenance cost against the upfront saving.

Polished concrete grinds and polishes the cured slab to produce a smooth reflective finish, used as the final floor finish in modern home extensions, commercial fit-outs and contemporary residential builds. The level of polish is graded from satin (lightly polished, matt finish) through to high-gloss (heavily polished, mirror-like finish), with cost increasing with the level of polish. Premium over broom finish is $80 to $280 per square metre depending on level of polish and any colour or aggregate effects. Polished concrete works particularly well in homes with hydronic underfloor heating because the thermal mass of the slab pairs with the heating system to deliver consistent room temperature. Where a polished slab runs through a new cooking and dining space, the cabinetry and appliance layout in our kitchen renovation ACT guide should be settled before the grind, since fixings into a finished surface are harder to hide. Paved areas meeting the slab edge are covered in our paving and driveway installation ACT guide.

Drainage and Falls

External concrete must drain water effectively, and the design of falls is part of the concreter's scope. Driveways usually fall to the kerb or to a side drain at a minimum 1 percent grade (1 in 100), with 2 to 3 percent falls common for better drainage performance. Paths commonly fall to the side at 2 percent. Pool surrounds and outdoor entertaining areas need careful fall planning to drain water away from the building and away from any seating areas. A driveway with insufficient fall pools water at the lower edge and develops surface ageing patterns that look like premature failure but are actually drainage design problems.

Internal slabs generally have falls only in wet areas (bathroom and laundry slabs falling to the floor waste outlet) with the rest of the slab being effectively level. Wet area falls are 1 in 80 minimum to the floor waste under AS 3500.3, and the slab finish usually sits below the level of the surrounding internal floor to allow for the water-waste differential and the floor finish. Coordination between the concreter, the plumber and the bathroom designer at the design stage prevents the more expensive scenario of correcting fall problems after the slab is poured. Set-down depths and waste positions are settled in the planning covered by our bathroom renovation ACT guide, and the membrane detail that follows sits in our bathroom waterproofing ACT guide.

Stormwater drainage from concrete surfaces sometimes requires additional drainage infrastructure: kerb cuts to direct runoff to existing stormwater outlets, channel drains across driveways at the building line, agricultural drains around slab edges to prevent water pooling against the building, and connection of all collected runoff to the legal point of discharge. The ACT requires that stormwater discharge complies with the relevant provisions of the Plumbing Code of Practice and the Building Code, with any concentrated discharge directed to an approved drainage point. Where significant external concrete is part of the scope and retaining work or earthworks are also required, our retaining wall builders ACT guide and excavation ACT guide cover the related scope items. Settle the discharge point before the formwork goes up rather than after the slab is cured. Retrofitting a drainage connection through finished concrete costs several times the original pipe work.

Concreting Pricing Across Canberra Districts

Concreting pricing varies modestly across Canberra districts, with the main drivers being soil class (which affects slab thickness and reinforcement), access conditions to the pour location, and the typical specification chosen by the household. The following ranges reflect 2026 ACT pricing for typical residential concreting work delivered by a competent concreter. Treat the figures as a starting point for comparison rather than a fixed rate for every block. Access and soil class move them in both directions.

Canberra District Driveway 50m² House Slab 150m² Notes
Inner North (Ainslie, Braddon, Lyneham, Dickson) $8,000-$15,000 $26,000-$48,000 Class M soils, narrow access
Inner South (Forrest, Manuka, Yarralumla, Deakin) $8,500-$16,000 $28,000-$52,000 Mixed soils, premium specs common
Woden Valley (Curtin, Hughes, Garran, Phillip) $7,500-$14,000 $25,000-$46,000 Class M soils, sloping blocks add cost
Weston Creek (Chapman, Stirling, Waramanga, Duffy) $7,500-$13,500 $24,000-$45,000 Mixed soils and access
Belconnen (Aranda, Hawker, Cook, Florey) $7,000-$13,500 $23,000-$44,000 Mixed era, mostly Class S to M
Tuggeranong (Kambah, Calwell, Gordon, Banks) $7,000-$13,000 $22,000-$42,000 Mostly Class S, simpler scope
Gungahlin (Casey, Crace, Forde, Throsby) $7,000-$13,000 $23,000-$43,000 Class M and H1 prevalent
Molonglo Valley (Coombs, Wright, Denman Prospect) $7,000-$13,500 $24,000-$46,000 Class M and H1, newer stock

Inner North and Inner South pricing carries a small premium for residential concreting work because of the access conditions on many of the original quarter-acre and smaller blocks, with concrete pump trucks sometimes required where direct truck access to the pour location is not available. A pumped pour adds $400 to $1,500 to a typical residential job depending on the volume placed and the access difficulty. Where the pour is part of a broader project that includes a granny flat or extension, our granny flat builders ACT guide and home extensions ACT guide cover the integrated project pricing. Pump access is worth confirming at quote stage on any inner-suburb block with a narrow side setback. The cost difference is known in advance rather than discovered on pour day.

Gungahlin and the Molonglo Valley have a higher proportion of Class M and H1 reactive soils than the older suburbs, and house slab pricing reflects the additional reinforcement and slab thickness sometimes needed. The pricing premium is modest in standard cases (perhaps 5 to 10 percent over a Class S equivalent) and significant in more reactive sites where the slab requires serious engineering. Where the project also requires demolition of existing structures before the slab can be placed, our demolition services ACT guide covers strip-out and selective demolition. Trade demand in this category remains active, with current builder job leads illustrating ongoing job activity.

Pricing in Queanbeyan and ACT Surrounds

Queanbeyan, Jerrabomberra and Googong receive concreting work from the same Canberra-based concreters who service ACT suburbs, and pricing often aligns with Tuggeranong and Belconnen ranges depending on access and soil conditions. A typical residential driveway in Queanbeyan runs $7,000 to $13,500, and a 150 square metre house slab runs $22,000 to $45,000. The concrete supply comes from the same batching plants serving the ACT, and the design framework (NSW Building Code with NCC base provisions) produces broadly equivalent technical requirements. Concrete supply bookings for Queanbeyan and Googong come out of the same plants that serve Tuggeranong, so lead times are comparable. Travel is the only real variable on price.

Murrumbateman, Bungendore and Yass operate in a slightly different market because of the larger rural blocks and the more variable soil conditions. Many rural blocks have areas of clay over rock, areas of deep alluvial soils near drainage lines, and pockets of sharply reactive soils that require specific engineering attention. Pricing in these areas varies more than in the suburbs because the site conditions vary more, and a geotechnical soil report is particularly valuable on rural blocks where local knowledge of the specific soil profile is limited. Travel time can add 5 to 12 percent to labour costs on rural concreting work compared to suburban work, although the actual concrete supply cost is similar because the major batching plants service the broader region. Where the rural block also requires significant external paving and driveway work, our concrete driveways ACT guide covers driveway-specific requirements.

What to Look Out For When Hiring an ACT Concreter

The clearest warning sign on a concreting quote is a square-metre rate with no specification behind it. Thickness, mesh grade, concrete strength and finish each carry a known cost, so a quote that omits all four is not cheaper, it is simply undefined. Ask every contractor to write the thickness, the mesh code, the MPa figure and the finish onto the quote before you compare totals. A contractor who will not put those four numbers in writing is telling you something useful. Treat the lowest price in a set of three as a specification question rather than a win.

Watch for quotes that skip the soil class entirely on a house slab. Reactive clay across Gungahlin, the Molonglo Valley and parts of the inner north changes the slab design, and a standard solution applied to a Class H1 block without a soil report is a cracking risk the household carries, not the concreter. Be cautious too about pours scheduled into a Canberra cold snap without frost protection, or into a 35 degree afternoon without curing compound on hand, because both produce surface damage that shows up weeks later. Ask who inspects the reinforcement before the pour and when that inspection happens. Reinforcement sitting at the wrong height cannot be corrected once the truck has discharged. Where the slab forms part of a larger job, our renovation services ACT guide covers how the concrete stage fits the wider build programme.

Payment structure is the third area worth checking before signing. A deposit beyond 10 percent of the contract price, or a request for the full concrete supply cost up front, is not standard practice for residential work in the Territory. Progress payments tied to real milestones, such as formwork complete, reinforcement inspected and pour complete, protect both sides. Confirm as well that the quote names who removes the formwork and the excavation spoil, because an unpriced spoil pile becomes a variation the week after the pour. Households adding decorative work above the slab should also read our rendering and texture coating ACT guide before locking in the finish schedule.

What to Look For in a Concreting Quote

A quality concreting quote specifies the slab area in square metres, the slab thickness, the concrete strength specification (e.g. 25 MPa, 80mm slump), the reinforcement specification (e.g. SL72 mesh on chairs at 50mm cover), the formwork scope, the finish specification (for example broom finish on the driveway with exposed aggregate on the entry path), the curing method, the site preparation included, the access arrangements (kerbside truck access vs pump), the inclusions and exclusions, the proposed pour date subject to weather, and the contract sum. A quote that simply states a square-metre rate and a total without specification details is incomplete and exposes the household to disputes about what was contracted.

Ask each concreter for evidence of public liability insurance (usually $5 million minimum for residential work, $10 million for commercial), workers compensation insurance, references from at least two recent jobs of comparable scope, and details of any building licence held where the work is part of a larger building project. The Access Canberra licence register can be checked online to confirm any licence claims. Workplace health and safety on site is governed by the Work Health and Safety Act 2011 (ACT), and the requirements for residential and commercial concreting sites are set out by WorkSafe ACT, including Safe Work Method Statements, fall protection, and the safe handling of fresh concrete and reinforcement. Ask to see the Safe Work Method Statement for the pour rather than taking its existence on trust. Any established ACT contractor will have one ready to hand over.

Compare quotes carefully on specification, programme and inclusions. A quote that specifies 100mm slab thickness, SL72 mesh, 25 MPa concrete and broom finish for $14,500 is comparing different products to a quote at $12,500 that specifies 80mm thickness, SL62 mesh and 20 MPa concrete: the cheaper quote may be cheaper because the specification is lower, not because the contractor is more efficient. The Australian Standards governing ACT concreting work include AS 2870 (residential slabs and footings), AS 3600 (concrete structures, for commercial work), AS 1379 (specification and supply of concrete), AS 3610 (formwork for concrete), AS 4671 (steel reinforcing materials) and AS 3735 (concrete structures retaining liquids). The Standards Australia framework sits behind each of these referenced provisions. The Australian Competition and Consumer Commission publishes consumer protection guidance applicable to concreting contracts. Where concreting forms part of a building approval project, our licensed ACT builder guide covers the broader regulatory context, and our renovation services ACT guide covers integrated renovation work that includes concrete elements.

Aftercare, Curing and Long-Term Maintenance

Practical completion of a concrete pour is followed by the curing and gradual strength gain period during which the new concrete must be protected from heavy loads, mechanical damage, and adverse weather. For a typical residential driveway, light foot traffic is acceptable after 24 to 48 hours, vehicle traffic after 7 to 14 days, and full design loading after 28 days. For a house slab, the curing period determines when the building work above the slab can start, with most builders waiting at least 7 days after pour and ideally 14 days before starting wall framing. Mark the pour date on the build programme and work back from it, because the slab sets the start of everything above it. Builders who rush that window create problems in the frame.

Long-term maintenance of concrete is generally minimal but not zero. Driveways and external concrete benefit from periodic sealing with a clear concrete sealer (every 3 to 7 years depending on the sealer type and exposure), which reduces water absorption, dust formation and surface degradation. Sealed concrete also resists oil staining better than unsealed concrete. The sealer is applied with a roller or sprayer at modest cost (commonly $4 to $12 per square metre supplied and applied) and is straightforward DIY for households who want to handle the maintenance themselves. Stained or tinted concrete may need refresher coats more frequently than unsealed concrete to maintain colour consistency.

Cracking in concrete is sometimes mistaken for failure but is a normal characteristic of the material rather than a defect. Concrete shrinks during curing and continues to undergo small movements with temperature and moisture changes for the life of the slab. Hairline cracks visible at the surface but not extending through the slab thickness are not structural concerns and do not affect the slab's performance. Larger cracks (more than 1mm wide), cracks that extend through the slab, or cracks that are progressively widening warrant assessment by an engineer, particularly for house slabs. Well-cured slabs perform for 50 years or more with little intervention beyond sealing, and masonry built over a new slab has its own sequencing requirements, which our bricklaying and blockwork ACT guide covers, and wet areas above the slab need the protection set out in our waterproofing services ACT guide. Post your concreting project on The Quote Yard to connect with licensed ACT concreters for residential driveways, shed and carport slabs, house slabs and footings, paths and patios, decorative concrete and commercial slab work across Canberra and surrounding areas.

Concreting Services Across the ACT

We connect you with licensed ACT concreters throughout the Australian Capital Territory for residential driveways, shed and carport slabs, house slabs and footings, paths, patios and pool surrounds, decorative concrete including exposed aggregate and stencil, and commercial slab work across all Canberra districts and surrounding NSW areas including Queanbeyan, Jerrabomberra, Googong, Murrumbateman and Bungendore.

▶ Canberra Central 17 areas
Canberra City Braddon Turner Reid Acton O'Connor Ainslie North Ainslie Campbell Russell Downer Watson Watson Ridge Hackett Dickson Lyneham Glebe Park Area
▶ Inner South 11 areas
Barton Kingston Griffith Narrabundah Forrest Red Hill Yarralumla Deakin Fyshwick Symonston Oaks Estate
▶ Belconnen 19 areas
Belconnen Aranda Bruce Macquarie Florey Evatt Melba Flynn Holt Scullin Hawker Weetangera Latham Page Giralang Spence Fraser Dunlop Lawson
▶ Woden Valley & Weston Creek 22 areas

Woden Valley

Woden Phillip Lyons Chifley Garran Hughes Curtin Torrens Pearce Farrer Mawson Isaacs O'Malley Swinger Hill

Weston Creek

Weston Holder Duffy Stirling Waramanga Fisher Rivett Chapman
▶ Tuggeranong 16 areas
Greenway Wanniassa Kambah Calwell Gordon Conder Isabella Plains Bonython Monash Oxley Fadden Gowrie Richardson Theodore Macarthur Banks
▶ Gungahlin 16 areas
Gungahlin Harrison Franklin Amaroo Forde Bonner Ngunnawal Palmerston Casey Casey Rise Crace Moncrieff Throsby Taylor Jacka Gungahlin Town Centre
▶ Molonglo Valley 9 areas
Wright Coombs Coombs North Denman Prospect Denman Prospect Heights Whitlam North Wright Kama Molonglo
▶ Canberra Region 14 areas
North Canberra South Canberra West Canberra East Canberra Majura Kowen Pialligo Canberra Airport Jerrabomberra Hume Beard Oaks Estate Rural ACT Properties Canberra Surrounds

Concreting FAQs - ACT

How much does concreting cost in Canberra in 2026?
A small slab or path under 15 square metres generally costs $1,500 to $5,000. A residential driveway of 30 to 60 square metres runs $4,500 to $15,000. A shed or carport slab of 40 to 80 square metres often costs $5,500 to $14,000. A small house slab around 100 square metres runs $12,000 to $28,000, and a larger residential slab of 150 to 200 square metres usually costs $22,000 to $50,000. Commercial and structural slabs run $40,000 to $80,000 or more. Per square metre rates range from $130 to $200 for standard residential to $180 to $450 for commercial.
What slab thickness do I need for a residential driveway?
Standard residential driveways use 100mm thick concrete with SL72 mesh reinforcement, which carries cars, light commercial vehicles and occasional trade vehicle access. Driveways serving heavier vehicles such as horse floats, larger caravans, or trade trucks commonly use 125mm thick concrete with SL82 mesh or additional bar reinforcement. Concrete strength is generally 25 MPa for residential work, with 32 MPa used for higher-load applications. The slab must be designed for the soil class on the specific block, with reactive soils requiring additional reinforcement and sometimes thicker slabs than non-reactive sites.
What is AS 2870 and does it apply to my concrete slab?
AS 2870 is the Australian Standard for residential slabs and footings, governing the design of slabs, strip footings, pad footings, raft slabs, and waffle slabs for houses and townhouses up to two storeys. It applies to all ACT residential slab and footing work and is referenced in the National Construction Code. The standard provides standard slab solutions for typical situations, classified by soil class from Class A (non-reactive) to Class P (problem sites). Most ACT sites fall in Class S, M or H1/H2, with the slab class and reinforcement adjusted accordingly. Compliance is verified through the building approval process.
Do I need a soil report before concreting?
A soil report from a qualified geotechnical engineer is required for new house slabs and is good practice for larger residential concrete work where the underlying soil class is not already known. The report identifies the site classification under AS 2870 and any specific recommendations for the slab design. Soil report cost runs $1,200 to $3,500 depending on site complexity. For smaller residential work such as a typical driveway or shed slab, a soil report is not always required, but the concreter should still consider the obvious site conditions (including reactive clay, sloping ground, or proximity to mature trees) when proposing the slab specification.
How long does concrete take to cure?
Concrete reaches approximately 70 percent of its design strength at 7 days and 100 percent at 28 days under normal curing conditions. Light foot traffic on a residential driveway is acceptable after 24 to 48 hours, vehicle traffic after 7 to 14 days, and full design loading after 28 days. House slab construction above can start after 7 to 14 days under most builder programmes. Curing protection during the first 24 to 72 hours is critical, particularly in hot dry summer conditions where surface plastic shrinkage cracks can develop within hours. Curing compound, wet curing or plastic sheeting are the standard methods.
Can I get exposed aggregate or polished concrete in the ACT?
Yes, both finishes are available from ACT concreters and increasingly popular in residential and commercial work. Exposed aggregate adds $50 to $90 per square metre over standard broom finish and produces a durable textured surface with the visual character of the chosen aggregate. Polished concrete adds $80 to $280 per square metre depending on level of polish, and produces a smooth reflective surface suitable as the final floor finish. Both finishes require concreters with specific experience in the technique because the timing of finishing operations is critical to the result. Confirm the contractor's experience and ask for references from comparable completed work.
Is hairline cracking in my new concrete slab a problem?
Hairline cracks (less than 1mm wide) are normal in concrete slabs and reflect the shrinkage that occurs during curing and the subsequent thermal and moisture movement over the slab's life. They do not affect structural performance and do not require remediation. Cracks wider than 1mm, cracks that extend fully through the slab thickness, or cracks that are progressively widening warrant assessment by an engineer, particularly for house slabs. Cracks at construction joints (where two pours meet) and at edges where the slab meets walls are also normal. Control joints saw-cut into the slab surface are deliberately placed to direct cracking to controlled locations rather than random surface positions.
Should I seal my new concrete driveway?
Sealing is recommended for residential driveways and external concrete because it reduces water absorption, surface dusting, oil staining, and gradual surface degradation. The sealer is usually a clear acrylic or silicone-based product applied with a roller or sprayer at $4 to $12 per square metre supplied and applied. Initial sealing 28 days after pour gives the concrete time to fully cure before the sealer is applied, and re-sealing every 3 to 7 years maintains protection. Coloured concrete and exposed aggregate finishes often benefit from sealing more than plain broom finish because the sealer also enriches the visual character of the aggregate or colour.
Do I need approval for a new driveway or shed slab in the ACT?
A slab that forms part of a habitable building, such as a house slab or an extension slab, sits inside the building approval process and needs certifier involvement along with an engineer-designed or standard-solution slab under AS 2870. A plain driveway or shed slab on an existing block generally does not need building approval, but a new or widened verge crossing onto a public road does require separate approval because it affects Territory land. Confirm the crossing requirements with Access Canberra before the pour is booked, since a crossing built without approval may have to be removed. Your concreter should know the process for the district they work in.
What is the best time of year to pour concrete in Canberra?
The shoulder seasons from March to April and September to October give the most reliable conditions, with mild days, moderate humidity and little frost risk overnight. Summer pours work well when scheduled for an early morning start with curing compound applied straight after finishing, since afternoon heat and breeze pull moisture out of fresh concrete fast. Winter pours from May to August need overnight frost protection and often an accelerating admixture, because hydration slows sharply below 5 degrees and effectively stops near freezing. A concreter who offers to delay a winter pour by a few days for better weather is protecting the slab, not stalling.

More Building Guides - ACT

For Trades & Contractors - ACT

Browse current concreting and slab leads on the ACT job leads board or see concreter jobs in the ACT.

Need Concreting in the ACT?

Post your job and connect with licensed ACT concreters for residential driveways, shed and carport slabs, house slabs and footings, paths and patios, decorative concrete and commercial slab work across Canberra and surrounding areas.

Get Concreting Quotes

Published: 15 October 2026. Prices are estimates based on typical ACT market rates and may vary by slab area, thickness, reinforcement specification, concrete strength, soil class, finish type, access conditions, and location. Verify trade licences and any required builder licence through Access Canberra before signing a contract.

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 15 October 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All ACT tradies are required to hold appropriate licences. Verify at Access Canberra.
Prices are estimates based on typical ACT residential and commercial market rates and may vary based on slab area, thickness, reinforcement specification, concrete strength, soil class, finish type, access conditions, and location. Always obtain a fully-detailed written fixed-price contract from a licensed concreter and verify trade licences and any required builder licence through Access Canberra before signing.