Looking for a Bathroom Renovator in Brisbane?

Tell us the suburb and which of the three bathroom jobs you want, and we will connect you with renovators taking work in your area.

Get Bathroom Quotes

What the Search Involves

Cosmetic refresh$3,000 to $8,000
Like for like strip and rebuild$18,000 to $30,000
Reconfiguration with new drainage$28,000 to $50,000
Tiling labour$70 to $110 per m2
Frameless screen installed$1,200 to $2,500
Portable toilet hire$120 to $200 a week
Builder margin on the whole job15 to 25 per cent

Bathroom prices move with the scope rather than the floor area, so treat these as indicative only. Whether the plumbing moves, what the floor is built on and how old the house is matter far more than the size of the room. Ask for the quote broken into stages.

Find a Bathroom Renovator Brisbane QLD - What to Check and Get Quotes

Three different jobs get called a bathroom renovation in Brisbane, and they sit at very different prices. A cosmetic refresh keeps the tiles, the layout and the waterproofing where they are and runs about $3,000 to $8,000. A like for like strip and rebuild takes everything back to the frame and puts the fittings back in the same positions for roughly $18,000 to $30,000. Reconfiguration, where the shower, the toilet or the basin move to new walls, commonly lands between $28,000 and $50,000 because every relocated waste means new drainage and new falls. Settling which of the three you actually want is the most useful thing you can do before collecting quotes, since the three are not comparable with each other. Two stages decide whether the room lasts. Waterproofing is the most common failure in a Brisbane bathroom and the most expensive to put right, and the floor fall under the tiles is the other, because neither can be inspected once the tiling is finished. Both take time that cannot be compressed, and subtropical humidity stretches membrane curing out rather than shortening it. This guide covers the three jobs and their costs, the order the trades have to work in, waterproofing and falls, what an older Queenslander hides, moving plumbing, extraction, tiles, fit off, selections and reading a quote.

Finding a Bathroom Renovator in Brisbane and Across Queensland

Decide which of the three jobs you are buying before you ring anybody, because a cosmetic refresh, a like for like rebuild and a reconfiguration cannot be compared against each other on price. Then ask for waterproofing, the flood test and the drain type as their own lines on every quote. We can connect you with Brisbane bathroom renovators who quote the same scope.

Get Free Quotes

At a Glance - Finding a Bathroom Renovator in Brisbane

Stage What It Involves Typical Timeframe What Decides It
Settle which of the three jobs Refresh, like for like rebuild or reconfiguration An evening Whether the layout works now
Test the floor and the fan Half a bucket of water and a torch in the roof Twenty minutes What the screed and ducting are like
Check what the house is built on Concrete slab or suspended timber floor Ten minutes The cost of moving any waste
Look for asbestos in a pre 1990 house Sheeting behind tiles and under the floor In the inspection Licensed removal or not
Lock the selections down Drain type, niches, tapware, tiles and the fan Two to three weeks Lead times on anything imported
Get three quotes on one scope Membrane, coats, flood test and allowances named One week Inclusions rather than totals
Check the licences and the warranty Plumber, electrician, waterproofer and the builder One afternoon The public register
Plan three weeks without the room Second toilet, a shower elsewhere, dust control Before demolition Whether the household copes

Two stages explain most of what goes wrong in a Brisbane bathroom. The first is waterproofing, which does not announce a failure for one to three years and by then has the damage in the frame. The second is the fall in the screed, because a floor that sends water toward the door rather than the waste is a rebuild rather than a repair. Both are invisible once the tiling is on, so both belong in writing before anybody starts.

How the Search Works

Start by deciding which of the three jobs you want rather than describing a bathroom. A cosmetic refresh leaves the membrane and the layout alone, a like for like rebuild strips to the frame and puts everything back where it was, and a reconfiguration moves wastes and therefore changes the drainage, the falls and the screed. Those three sit in different price bands and no quote can be compared across them. Waterproofing is the stage worth understanding before you read a single quote. Waterproofing of domestic wet areas is covered by AS 3740, published by Standards Australia, and the plumbing and drainage work alongside it by AS/NZS 3500.

Applying a wet area membrane is licensable work in Queensland in its own right, so ask for that licence number separately from the builder and the tiler. Licensing is where most of the paperwork questions land. Residential building work over the state threshold needs a licensed contractor, and the licence can be checked on the public register kept by the Queensland Building and Construction Commission. Above the contract value threshold the builder also pays a premium into the Queensland Home Warranty Scheme, and Business Queensland publishes the contract and dispute material that sits behind it. Older Brisbane houses add one more step before anything is demolished.

Wet area sheeting and floor coverings in houses built before 1990 may contain asbestos, and the Queensland Government asbestos service sets out who may remove what, while WorkSafe Queensland covers the duties that apply on site. Tiling and glazing have their own standards in AS 3958.1 and AS 1288, and the National Construction Code provisions are published by the Australian Building Codes Board. Last, get three quotes against one written scope and compare the inclusions rather than the totals. A useful quote names the membrane product, the number of coats, who runs the flood test, the drain type, the tile allowance per square metre and every fit off item. Payment should follow finished stages, and consumer guarantees from the Australian Competition and Consumer Commission sit underneath whatever the contract says.

Costs on this page are indicative for greater Brisbane and are not quotes. Scope, whether the plumbing moves, the floor type and your selections move them most. Have waterproofing, the flood test and the drain type stated as their own lines on every quote.

Finding a Bathroom Renovator in Brisbane, Stage by Stage

A Brisbane bathroom quote is really two numbers: the hidden work under the tiles and the fittings you can see. Bathroom renovation across Queensland prices sit in wide bands because the hidden half varies so much from one house to the next. On a small room the arithmetic is tighter still, and small bathroom costs are driven by the number of wet points rather than the floor area. The hidden half is where the money and the risk both sit.

Waterproofing to AS 3740 takes two to three days of coats and curing that nobody can compress, and Brisbane humidity stretches that out rather than shortening it. Where a shower is already failing, regrouting and leak repairs are worth pricing before you commit to a full strip out. Plumbing decides whether the job stays in the middle band or jumps to the top of it. Moving a toilet on a concrete slab means cutting the floor, while most pre 1980 houses around Paddington, Annerley and Wilston sit on suspended timber where a plumber can work from underneath. Bathroom renovation plumbing is the line to question first when a quote comes in high, and a licensed Brisbane plumber can tell you in half an hour what is possible.

Surfaces are the easiest part of the quote to compare line by line. Tiling labour at $70 to $110 a square metre moves with the pattern rather than the tile price, so a herringbone layout can add up to a third to the hours. Allow seven to ten days after tiling for the glazier, since a shower screen is measured on the finished walls and usually sets the completion date. Two items cost very little during the job and a great deal afterwards. A fan ducted to an eave or a roof cowl costs $150 to $400 while the ceiling is open, and it is the single cheapest defence against the condensation that drives Brisbane bathroom mould. Tiled niches at $300 to $600 and the wiring for a heated towel rail belong on the same list, because retrofitting either one means breaking tiles and the membrane underneath them.

The Three Kinds Of Bathroom Job

Three jobs get called a bathroom renovation, and they sit at very different prices. A cosmetic refresh keeps the tiles, the layout and the waterproofing exactly where they are. You swap tapware, the vanity and the mirror for something current. Towel rails, a new shower screen and fresh paint finish the room off. Brisbane prices for that work run roughly $3,000 to $8,000 including fittings, indicatively. Nothing in that band touches the membrane, so the job stays short and the risk stays low.

A like for like strip and rebuild is the common Brisbane job on a 1960s or 1970s bathroom. Everything comes out to the frame, the surfaces are waterproofed again, and the fittings go back in the same positions. Because the toilet, the shower and the basin stay put, drainage work is minimal and the plumber mostly reconnects. Expect something near $18,000 to $30,000 for a standard room done this way, indicatively. That figure assumes a 2.5 by 2 metre bathroom and mid range selections rather than imported stone.

Reconfiguration is the third job, and it is where budgets move hardest. Moving the shower to the other wall, turning the toilet, or stealing space from a hallway all mean new drainage. Brisbane reconfigurations commonly land between $28,000 and $50,000, and heritage Queenslanders can run past that. Deciding which of the three jobs you actually want is the most useful thing to settle before quoting.

Job What it covers Indicative
Cosmetic refresh Tapware, vanity, mirror, screen and paint $3,000 to $8,000
Like for like strip and rebuild Back to frame, fittings in the same spots $18,000 to $30,000
Reconfiguration Shower, toilet or basin relocated $28,000 to $50,000
Heritage Queenslander rebuild Single skin walls framed and lined Often past $50,000
Separate toilet combined into one room Wall removal and new drainage $6,000 to $15,000 on top

The Order The Work Has To Happen In

Bathroom work runs in a fixed order, and every stage waits on the one before it. Demolition and strip out comes first, usually one to two days for a small room. Plumbing and electrical rough in follows, taking another one to two days while walls are open. Screeding and sheeting then flatten the surfaces over about a day, and nothing can be tiled until that base is right.

Waterproofing sits in the middle and sets the pace of the whole job. Membrane goes on in coats, each needing proper drying time, so allow two to three days. Tiling starts only once the membrane has cured, and a standard bathroom takes three to five days including grouting. Fitting off, where tapware, the toilet, the vanity and the screen go in, needs another one to two days.

Screen glass is often measured after tiling, which adds a week of waiting in many cases. Three to four weeks is the realistic window for a full Brisbane strip and rebuild. Slippage almost always happens at two points: waiting on a trade and waiting on a product. Tilers and plumbers get booked across several sites, so a two day gap between stages is normal. Any quote promising ten days on a full rebuild deserves a careful second look.

Stage Working days What waits on it
Demolition and strip out One to two days Everything else
Plumbing and electrical rough in One to two days Sheeting and screed
Screeding and wall sheeting About one day The membrane
Waterproofing in coats, with curing Two to three days All tiling
Tiling, grouting, then fit off Four to seven days Screen glass measure

Waterproofing, And Why It Cannot Be Rushed

Waterproofing is the most common bathroom failure in Brisbane and the most expensive to put right. A failed membrane does not announce itself for one to three years, by which time the damage is in the frame. Drummy or lifting tiles near the shower, a musty smell, bubbling paint next door and soft skirtings in the adjoining room are the signs. Fixing it properly means stripping the tiles and starting again, which is most of a new bathroom. Corners, wall to floor junctions and pipe penetrations get bond breakers and reinforcing before any coats go on. The membrane then runs up the shower walls to at least 1800mm and across the whole floor.

A flood test, where the drain is plugged and the floor held with water overnight, is the proof you want. Request photographs of each coat and the certificate naming the product that was used. Rushing the membrane is the single most common corner cut on a cheap quote. Each coat needs hours to cure, and Brisbane humidity stretches that out rather than shortening it. A tiler pushed onto a half dried membrane will damage it with buckets, knees and screed. Two coats applied the same morning is not two coats, so build three clear days into the program and refuse to compress them.

What Good Waterproofing Looks Like

AS 3740 is the standard Wet area waterproofing for domestic housing
What to ask for
Why it matters
Bond breakers in every corner
Movement joints that let the membrane flex
Reinforcing at wall to floor junctions
The place failures start most often
Shower walls coated to 1800mm
Full floor coated across the room
Penetrations sealed individually
Tap bodies, wastes and screen fixings
Flood test held overnight
The only real proof before tiling

Waterproofing of domestic wet areas is covered by AS 3740, and in Queensland it is a licensable trade in its own right. A tiler cannot simply add the membrane on without holding that separate licence. Ask the Brisbane builder for the licence number and check the public register kept by the Queensland Building and Construction Commission. Photographs of each coat and the certificate naming the product are worth keeping for resale. A flood test held overnight costs nothing and is the one check that cannot be faked.

No certificate and no flood test means you are buying a membrane you cannot inspect.

Floor Falls And The Drain

The floor has to send water to the drain, and that slope is called the fall. Run a simple test: tip half a bucket of water onto the shower floor and watch where it sits. Water that travels toward the door rather than the waste tells you the screed was never shaped properly. Correcting that is floor rebuild work, not a patch, because the fall is built under the tiles.

Falls are set in the screed before waterproofing, so correcting them means lifting everything above. A shower floor wants roughly 1:60 to 1:80 toward the waste, with no flat spots. Linear drains along one wall tile more neatly with large format tiles. Traditional centre wastes need the floor shaped from every side, which is harder with big tiles.

Choose the drain type early because it changes both the screed and the tile size. Hobless or step free showers have become standard in new Brisbane bathrooms and they raise the stakes. Without a hob, the floor outside the shower must still drain, so falls across the whole room matter. On a suspended timber floor the joists often need packing down to get the drop required. Get this answer in writing at quote stage rather than discovering it on demolition day.

Checking Whether Your Floor Actually Drains

Half a bucket of water The cheapest test you can run yourself
What to check yourself
Tip half a bucket onto the shower floor and watch where the water travels.
Water heading toward the door rather than the waste means the screed was shaped badly.
Look for a puddle that is still sitting there twenty minutes afterwards.
Tap the tiles near the waste and listen for a hollow drummy sound.
Check the floor outside the shower as well on any hobless Brisbane bathroom.
Note the drain type, because a linear drain and a centre waste need different screeds.

The fall is built into the screed under the tiles, so correcting it means lifting everything above. That is a rebuild of the floor rather than a patch of any kind. A shower floor wants roughly 1:60 to 1:80 toward the waste with no flat spots. Drainage provisions sit in the plumbing standard AS/NZS 3500 for plumbing and drainage work. Resloping one shower zone in Brisbane commonly runs an indicative $2,500 to $6,000.

Decide on a linear drain or a centre waste before anybody screeds the floor.

What A Queenslander Bathroom Hides

A Queenslander bathroom hides more than most, and what you find changes the price. Single skin walls, where tongue and groove boards are both lining and structure, are common. There is no stud cavity for new pipes or wiring to run through. Battening and lining eats 50mm to 70mm off each wall and a small bathroom feels it immediately.

Budget an extra $2,000 to $5,000 where single skin walls have to be framed and lined. Under the floor you often find tongue and groove boards laid straight onto the joists. Those boards flex, and flexing floors crack tiles and tear membranes, so they get overlaid with sheeting. Old chrome plumbing is the other regular surprise, and it is usually at the end of its life.

Replacing the runs back to a sound connection point commonly adds $800 to $2,500. Termite damage and previous patch repairs show up once the lining comes off. Ask your builder to open a small inspection hole before quoting if the house predates 1950. A borescope through a 20mm hole near the shower tells you a lot for very little. Carrying a $3,000 to $6,000 contingency on an older timber house is sensible rather than pessimistic.

Find Why it matters Indicative add
Single skin tongue and groove walls No cavity for pipes or wiring $2,000 to $5,000
Flexing tongue and groove floor Cracks tiles and tears membranes $900 to $2,200
Old chrome plated plumbing At the end of its service life $800 to $2,500
Asbestos sheeting behind the tiles Licensed removal in any pre 1990 house $1,500 to $4,000
Termite damage or earlier patching Framing replaced before lining $3,000 to $6,000 contingency

Slab On Ground Against Suspended Timber

Whether your house sits on a concrete slab or suspended timber decides how easy plumbing changes are. Slab on ground means the waste pipes are cast into or buried under the concrete. Moving a toilet on a slab needs the floor cut, the pipe rerouted, and the slab patched. Typical cost for that cut, reroute and repair runs $1,500 to $4,000 depending on distance. Suspended timber floors, which most pre 1980 Brisbane houses have, are far more forgiving. Pipes run in the subfloor space, so a plumber can often reposition a waste in half a day.

Shifting a shower two metres might add only $600 to $1,500 where access underneath is good. Low set houses with tight subfloor clearance remove that advantage, so put a torch under the house before assuming timber means cheap. Pipes need continuous slope to the sewer, and on a slab that slope is already fixed. Timber floors let the plumber drop between joists and pick up fall over a longer run. Sewer connection height relative to the bathroom can put a hard limit on a slab job. Finding that out early can turn a reconfiguration back into a like for like rebuild.

Move On a concrete slab On suspended timber
Toilet moved a metre $1,500 to $4,000 with slab cutting $800 to $2,000 from underneath
Shower moved two metres $1,200 to $3,000 plus patching $600 to $1,500 with good access
Basin waste repositioned $600 to $1,500 $300 to $800
New floor waste added Core drilled and reconnected Usually straightforward
Low set house, tight subfloor Not applicable Loses the timber advantage

Moving Plumbing And Walls

Moving fixtures is the decision that separates a $20,000 bathroom from a $40,000 one. Each relocated waste means new drainage, a new vent consideration, and new falls in the screed. Relocating a toilet is the costliest single move because the 100mm waste needs real slope. Basins and showers are easier since smaller wastes have more routing options.

Taking out a wall changes the job from a bathroom renovation into building work. Internal walls may carry roof load, so a structural assessment and often a beam become necessary. Combining a separate toilet and bathroom into one room is the classic Brisbane 1960s move. It usually works well and costs $6,000 to $15,000 on top of the bathroom.

Expect the neighbouring rooms to need touching up too, because walls never come out cleanly. Reconfiguration earns its money when the room is genuinely unusable rather than merely dated. Spending $10,000 to move plumbing so the layout works for twenty years is defensible. Spending the same amount to shift a vanity 400mm for appearance alone rarely is. Draw the room to scale on paper and test whether the existing layout can be made to work.

Change What it drags in Indicative
Shower to the opposite wall New waste, new falls, new screed $2,000 to $5,000
Toilet turned or moved A 100mm waste needing real grade $2,000 to $6,000
Vanity and basin shifted Wall framing and new water points $900 to $2,200
Internal wall removed Structural check and often a beam $4,000 to $12,000
Hallway space absorbed Doorway, flooring and patching next door $3,000 to $8,000

Humidity, Extraction And Where The Fan Discharges

Brisbane humidity makes extraction the difference between a bathroom that lasts and one that moulds. Warm wet air condenses on cool surfaces, and the ceiling cornice is usually the first to show it. A fan rated around 200 to 250 cubic metres per hour suits a standard bathroom. Running the fan for fifteen minutes afterwards does more than any coating or paint.

Where the fan discharges matters more than the fan itself. Many Brisbane bathrooms have exhaust fans that dump straight into the roof space, which simply moves the problem. Moist air then condenses under the roof sheeting and rots battens and insulation, while proper installation ducts it out to an eave vent, a gable vent or a roof cowl. Have your electrician confirm the discharge point in writing and then look for yourself.

Put your head into the roof space with a torch and find the fan housing. A loose flexible duct lying on the insulation, or no duct at all, is extremely common. Sarking stained dark above the bathroom confirms the moisture has been going there for years. Adding proper ducting during a renovation costs $150 to $400 and prevents a much larger repair.

Where the Fan Actually Discharges

$150 to $400 What proper ducting costs during the job
What to look for
Put your head into the roof space with a torch and find the fan housing.
Follow the duct and check it reaches an eave vent, a gable vent or a cowl.
A loose flexible duct lying on the insulation is extremely common in Brisbane houses.
Dark staining on the sarking above the bathroom confirms years of trapped moisture.
Check the fan is rated near 200 to 250 cubic metres an hour.
Have the electrician confirm the discharge point in writing before fit off begins.

Brisbane humidity turns extraction into a structural question rather than a comfort one. Warm wet air condenses on the first cool surface it reaches inside the room. A fan discharging into the roof space moves the moisture somewhere you cannot see. Fan and light wiring is electrical work under AS/NZS 3000, so the electrician must be licensed. Proper ducting during the renovation costs an indicative $150 to $400 and prevents framing repairs.

Look into the roof space yourself rather than taking the discharge point on trust.

Tile Choice, Size And Layout

Tile choice drives labour cost more than material cost in most bathrooms. Small mosaics and subway tiles need more cuts, more grout lines and more time. Large format tiles, say 600 by 600 and up, lay faster but demand a far flatter substrate. If the walls are out of plumb, a tiler will charge to level them first.

Allow $70 to $110 per square metre for tiling labour in Brisbane as an indicative figure. Layout patterns change the hours significantly and some add a third again. Herringbone, chevron and stacked vertical work all create more cuts and more setting out. Straight stack and brick bond are the quickest and cheapest to install well.

Order 10 to 15 percent more tile than the measured area to cover cuts and future repairs. Floor tiles need enough grip for a wet room and that limits the finish. Polished porcelain looks good in a showroom and becomes genuinely dangerous underfoot when wet. Ask for a slip rating suitable for a shower floor and check it on the box. Store a box of spare tiles in the shed because matching a discontinued line later is impossible.

Choice Effect on the job Indicative
Straight stack or brick bond Fastest and cheapest to lay well $70 to $110 per m2 labour
Herringbone or chevron More cuts and more setting out Adds up to a third
Large format, 600 by 600 and up Needs a far flatter substrate Wall levelling priced separately
Mosaics and small subway tiles More grout lines and more hours Dearest to install
Order allowance over measured area Covers cuts and future repairs 10 to 15 per cent extra

Tapware, Vanities, Screens And Fit Off

Fit off is the stage where the room stops looking like a building site. Tapware, the toilet suite, the vanity, mirrors, towel rails and the screen all go in. Mixer tapware for a basin and shower runs roughly $250 to $900 per set at mid range, and back to wall toilet suites commonly cost $400 to $1,200 supplied. Wall hung vanities with a stone top sit around $900 to $2,500 for 900mm wide units. Shower screens deserve separate planning because they usually control the finish date. Frameless screens in 10mm glass cost $1,200 to $2,500 for a typical corner installation.

Semi frameless units come in nearer $700 to $1,400 and still look clean. Measuring happens after tiling, so the glazier needs seven to ten days from that point. Niches, shaving cabinets and heated towel rails are cheap to include and expensive to add later. A tiled shower niche costs perhaps $300 to $600 while the walls are open. Retrofitting the same niche means breaking tiles and the waterproofing, so it rarely happens. Heated towel rails and underfloor heating both need the electrician before tiling begins.

What the Fittings Cost Supplied

Fit off is one to two days Mid range Brisbane supply prices, indicative only
Item
Indicative supply
Basin or shower mixer set
$250 to $900 per set
Back to wall toilet suite
$400 to $1,200 supplied
Wall hung vanity, 900mm, stone top
$900 to $2,500
Frameless screen in 10mm glass
$1,200 to $2,500 installed
Tiled shower niche built in
$300 to $600 while walls are open

Shower screens usually control the finish date because the glazier measures after tiling. The glass then needs seven to ten days to be cut and delivered. Glass in a shower enclosure has to comply with AS 1288 for glass in buildings. Niches, shaving cabinets and heated towel rails are cheap while the walls are open. A heated towel rail needs the electrician back before any tiling begins.

Order the screen early and expect it to be the last thing installed.

Which Trades Are Involved And Who Coordinates Them

A bathroom renovation involves six or seven trades in a small room over three weeks. Demolition, plumbing, electrical, waterproofing, screeding, tiling, glazing and painting all have their turn. Each one needs the previous trade finished and the room empty on arrival. The waterproofer and the tiler are sometimes the same person, which helps that handover.

Sequencing is therefore the real skill in a bathroom job. Most friction comes from gaps between trades rather than from the work itself. Somebody has to own the sequence, and you want that named before you sign. A builder taking the whole job coordinates the trades and carries the program, usually for a margin of 15 to 25 percent. Managing it yourself saves that margin and costs you every phone call and delay. Owner managed jobs typically run a week or two longer because trades prioritise their regular builders.

Licence numbers for the plumber, the electrician and the waterproofer should appear on the quote. Insurance matters too, because water damage from a bathroom can reach the whole house. For jobs over the state threshold your builder also arranges home warranty insurance, and the certificate should come to you. Keep every certificate and all the waterproofing paperwork together in one folder for resale.

Who Is on Site and Who Owns the Program

15 to 25 per cent A builder margin for carrying the whole job
Trade
When they appear
Demolition and rubbish removal
First in, sets the start date
Plumber and electrician at rough in
Both licensed, both certificated
Waterproofer, licensed separately
Often the same person as the tiler
Tiler, then glazier
Glass measured after tiling finishes
Builder or you, coordinating
Where the program actually lives

Six or seven trades pass through one small Brisbane room over three weeks, and most of the friction comes from the gaps between them rather than the work itself. Licence numbers for the plumber, the electrician and the waterproofer should appear on the quote, and Business Queensland publishes the contract material that sits behind them. Where the contract value sits above the threshold, the builder pays the premium into the Queensland Home Warranty Scheme and the certificate should be sent to you. Managing the trades yourself saves the builder margin and costs you every phone call, and owner managed Brisbane jobs typically run a week or two longer.

Name the person who owns the sequence before you sign anything.

Living Without A Bathroom

Losing your only bathroom for three weeks needs planning before demolition starts. Households with a second toilet cope reasonably well, and those without should arrange something early. Portable toilet hire in Brisbane costs about $120 to $200 a week delivered. Gyms, family nearby and a camping shower off the laundry tap all get used regularly. Dust travels further than people expect from a bathroom strip out. Tape plastic over doorways, lift hallway carpet, and move anything soft out of the adjoining rooms.

Cover the hallway floor with hardboard, because trades carry rubble and tiles through it all day. Pets need somewhere else to be while doors stand open and tools run, and agreed start and finish times keep the house from standing open at odd hours. Plan the laundry too, since many Brisbane bathrooms share a wall or a drain with it. Water gets isolated for parts of the job, usually a few hours at a time rather than days. Have the builder warn you before any water shutdown so you can fill containers and run a load. Three weeks is manageable with a system and fairly miserable without one.

Making Your Selections Before The Job Starts

Every tile, tap and fitting should be chosen and ideally on site before demolition. Ordering tiles two weeks ahead is sensible because stock runs out and dye lots vary. Imported stone, specialty tapware and custom vanities can take six to twelve weeks to arrive. Confirm lead times at the showroom rather than assuming anything sits in a local warehouse.

Late changes cost far more than the price difference of the item itself. Switching from a centre waste to a linear drain after screeding means redoing the screed. Variations on a bathroom job commonly carry a $300 to $800 administration and delay cost each. Lock your selections into a written schedule attached to the contract.

Build your selection list around the things that are hard to change later. Drain type, niche positions and the in wall cistern come first on that list. Towel rail and fan positions matter just as much because they need wiring. Take samples home and look at them in the actual light of the room. Bathroom lighting in a showroom flatters almost everything and tells you very little.

The Order to Lock Your Choices In

$300 to $800 What a single late variation commonly costs
The order that works
Settle the drain type first because it dictates the screed and the tile size.
Fix the niche positions and the in wall cistern while the framing is open.
Confirm fan, towel rail and light positions before the electrician roughs in.
Choose tiles next and order two weeks ahead to protect the dye lot.
Pick tapware and the vanity, then confirm every lead time at the showroom.
Leave paint colour last since it is the only thing easily changed later.

Every tile, tap and fitting should be chosen and ideally on site before demolition day. Imported stone, specialty tapware and custom vanities can take six to twelve weeks to land. Confirm the lead time at the showroom rather than assuming there is local stock. Late changes cost far more than the price difference of the item itself. Variations on a Brisbane bathroom job commonly carry an indicative $300 to $800 each.

Lock the selections into a written schedule attached to the contract.

Demolition Day And The First Week

Demolition day starts early and is considerably louder than most people imagine. Tiles come off with hammers and a jackhammer, and the noise carries to the neighbours. Everything in the room goes, including the vanity, the screen, the floor and often the ceiling. Let the neighbours know the day before, especially in a Queenslander where sound travels through the floor. By the end of day two you are usually looking at bare frame and subfloor. That is the moment surprises appear: rot, termite tracks, old pipework, or a missing lintel.

Expect a conversation about variations at this point, and insist they come priced in writing. Take your own photographs of the open walls because you will want them in ten years. The first week usually covers strip out, rough in and sheeting. Progress looks slow because almost nothing visible changes between the frame and the tiles. Trades come and go for a few hours rather than full days, which feels unproductive but is entirely normal. Weekly check ins on site keep small questions from turning into variations, so ask what is happening next and what is waiting on a delivery.

What A Bathroom Renovation Costs Around Brisbane

Brisbane bathroom pricing clusters around three bands and all figures here are indicative. Cosmetic refreshes sit near $3,000 to $8,000 and take under a week. Like for like strip and rebuild on a standard room runs $18,000 to $30,000. Reconfiguration with relocated plumbing commonly lands between $28,000 and $50,000.

Premium finishes, stone, custom joinery and underfloor heating push past that without changing the layout at all. Room size matters less than the number of wet points and the condition of the structure. Doubling the floor area adds tile and screed but not another shower or waste. A tiny 1950s bathroom with single skin walls and failed plumbing can cost more than a large modern one, and an upstairs bathroom in a high set Queenslander carries a labour premium for access. Materials run roughly 35 to 45 percent of a bathroom budget, with labour taking the rest. Get three quotes and compare the inclusions rather than the totals.

A quote should list the waterproofing product, the tile allowance per square metre, the drain type and the fit off items. Allowances are where cheap quotes hide money, so check the dollar figure behind each one. Payment should follow stages, with a deposit and progress claims rather than a large sum upfront. Holding back a final payment until the flood test and the screen are done protects you.

Item Indicative Note
Cosmetic refresh, under a week $3,000 to $8,000 Nothing touches the membrane
Like for like rebuild $18,000 to $30,000 A 2.5 by 2 metre room
Reconfiguration with new drainage $28,000 to $50,000 Three to four weeks on site
Tiling labour $70 to $110 per m2 Pattern changes it most
Portable toilet hire $120 to $200 a week Where there is no second bathroom

What To Look Out For On A Brisbane Bathroom Quote

A suspiciously cheap bathroom quote almost always saves money on waterproofing or screeding. Watch for quotes that bundle waterproofing into tiling without naming the product or the coats. No flood test mentioned anywhere is a reliable sign the membrane will never be checked. Quotes with no stage program and no timeline usually mean the trades are not booked.

Any builder unwilling to put the drain type and the fall in writing is guessing. Large deposits are the other warning worth taking seriously. More than 10 percent upfront on a standard bathroom leaves you no bargaining room if work stalls. Cash only arrangements leave you without warranty, insurance or any record of who did what. Verbal variations are equally risky, so insist that every change comes as a priced written note.

Check the licence number on the quote against the public register before you pay anything. Useful quotes are specific, detailed and faintly boring to read through. They name the membrane, the screed, the drain, the tile allowance and every fitting. Line items such as bathroom renovation complete are impossible to compare or enforce. Put the same three questions to each builder: how many days for waterproofing, who does the flood test, and what happens if there is rot. Answers to those questions sort the field faster than any price comparison.

What to Check on a Brisbane Bathroom Quote

Three quotes, same scope Compare the inclusions rather than the totals
What to check
What good looks like
Waterproofing named separately
Product, number of coats and the licence
Flood test written into the program
Before any tile goes on the floor
Drain type and fall stated
Linear or centre waste, and the gradient
Tile allowance per square metre
A dollar figure behind every allowance
Deposit no more than 10 per cent
Progress claims against finished stages
Licence number on the paperwork
Checked against the public register first

A cheap Brisbane bathroom quote almost always saves the money on waterproofing or screeding, because those are the two stages nobody can inspect afterwards. Ceramic tiles are installed to AS 3958.1, and a quote that names the adhesive, the screed and the membrane is easier to enforce than one promising a complete bathroom. Cash arrangements leave you with no warranty, no insurance and no record of who did what, and a dispute then has nowhere useful to go. Put the same three questions to each Brisbane builder: how many days for waterproofing, who runs the flood test, and what happens if there is rot.

Specific, detailed and faintly boring is what a good quote reads like.

Bathroom Renovators Across Brisbane and South East Queensland

Bathroom renovators across Brisbane and the surrounding region, from the pre war Queenslanders in the inner suburbs with single skin walls and tongue and groove floors to the slab on ground houses in the newer estates where moving a waste means cutting concrete. Pick your area below to see what the local housing stock usually means for the job.

▶ Brisbane 31 areas
Brisbane CBD Fortitude Valley New Farm Newstead Teneriffe Paddington Toowong Indooroopilly St Lucia Chapel Hill Kenmore Mount Ommaney Sunnybank Coorparoo Camp Hill Carindale Bulimba Hawthorne Wynnum Manly Chermside Aspley Everton Park The Gap Ashgrove Stafford Nundah Clayfield Hamilton Carseldine Bridgeman Downs
▶ Gold Coast 26 areas
Southport Surfers Paradise Broadbeach Mermaid Beach Miami Burleigh Heads Palm Beach Currumbin Coolangatta Tugun Robina Varsity Lakes Mudgeeraba Nerang Carrara Ashmore Benowa Helensvale Hope Island Coomera Upper Coomera Oxenford Pacific Pines Mount Tamborine Currumbin Valley Ormeau
▶ Sunshine Coast 26 areas
Maroochydore Mooloolaba Alexandra Headland Buderim Sippy Downs Caloundra Golden Beach Currimundi Kawana Waters Coolum Beach Peregian Beach Noosaville Noosa Heads Tewantin Cooroy Pomona Eumundi Nambour Yandina Palmwoods Woombye Maleny Montville Mapleton Beerwah Landsborough
▶ Moreton Bay & Redcliffe 29 areas
Redcliffe Scarborough Margate Woody Point Clontarf Kippa-Ring Rothwell Deception Bay North Lakes Mango Hill Griffin Murrumba Downs Kallangur Petrie Lawnton Strathpine Bray Park Albany Creek Warner Cashmere Samford Dayboro Caboolture Morayfield Burpengary Narangba Bribie Island Woodford Wamuran
▶ Ipswich & Lockyer Valley 28 areas
Ipswich Booval Bundamba Goodna Redbank Springfield Springfield Lakes Brookwater Augustine Heights Ripley Yamanto Raceview Flinders View Karalee Karana Downs Rosewood Marburg Walloon Plainland Hatton Vale Laidley Gatton Forest Hill Withcott Helidon Grandchester Esk Lowood
▶ Logan & Redlands 28 areas
Logan Central Woodridge Kingston Slacks Creek Springwood Daisy Hill Shailer Park Loganholme Loganlea Meadowbrook Beenleigh Eagleby Browns Plains Regents Park Marsden Jimboomba Yarrabilba Cleveland Capalaba Victoria Point Wellington Point Thornlands Alexandra Hills Birkdale Ormiston Redland Bay Mount Cotton Russell Island

Finding a Bathroom Renovator in Brisbane - FAQ

What does a bathroom renovation actually cost in Brisbane right now?
Brisbane bathrooms fall into three broad price bands, and all figures here are indicative only. A cosmetic refresh that keeps the existing tiles, layout and plumbing points usually lands between $6,000 and $15,000, covering a new vanity, toilet, tapware, shower screen and paint. Like for like rebuilds strip back to the frame and replace everything in the same positions, which generally runs $22,000 to $38,000 for a standard three metre by two metre room. Reconfiguring the layout, so the shower, bath or toilet move to new spots, pushes the range to $35,000 to $60,000 and beyond on tight or older sites. Decide which band you are in before you start collecting quotes, because the three are not comparable.
How long does a bathroom renovation take, and how long am I without the bathroom?
Most full bathroom renovations in Brisbane take three to five weeks on site once demolition starts. The sequence is fairly fixed, running from strip out to plumbing and electrical rough in, wall sheeting, waterproofing, curing, tiling, then fit off and sealing. Waterproofing cure time alone eats two or three days that nobody can compress, and tiling adds another three to six. Realistically you are without that bathroom for the whole period, so plan a second shower, a gym membership or a friendly neighbour. Small cosmetic refreshes can be finished in eight to twelve working days. Delays almost always come from trades arriving out of order or a product landing late rather than from the building work itself.
Why is waterproofing the thing that fails, and what does good waterproofing look like?
Waterproofing fails more often than any other element because it is hidden, cheap to skimp on and impossible to inspect once tiled. Common causes include membrane applied too thin, corners and wall to floor junctions left without bond breakers or reinforcing tape, screeds laid over a membrane that had not cured, and penetrations around taps or wastes left unsealed. Good work looks like a continuous coloured membrane carried up the walls, turned into the door threshold and lapped over the hob. Two coats are standard, applied in different directions, with photographs taken before anything gets covered over. Ask for those photos as a condition of progress payment, because they are your only record of what sits under the tiles.
How do I tell whether my bathroom floor actually drains properly?
Pour a bucket of water across the floor and watch carefully where it goes. A floor that drains properly moves every drop to the waste within a minute or two, leaving no puddles sitting in corners or along the screen track. Pooling near the door, water tracking back under the vanity, or a damp patch that never dries all point to a screed with too little fall or a waste set too high. Tap the tiles near the waste as well, since a hollow sound suggests the screed has lifted. Where the shower floor fails this test, resloping means removing tiles, screed and membrane in that zone, which typically costs an indicative $2,500 to $6,000.
How much does moving a toilet or a shower add to the job?
Moving a toilet or shower is the single biggest jump in a bathroom budget. Shifting a toilet more than a few hundred millimetres usually means breaking into the slab or cutting the subfloor to re run the hundred millimetre waste at the right grade, which commonly adds $2,000 to $5,000. Relocating a shower is a little cheaper, often $1,500 to $3,500, because the waste is smaller and far more forgiving. On a suspended timber floor the work is easier and cheaper than on a ground slab, where concrete cutting, spoil removal and extra core holes stack up. These are indicative numbers, so ask each builder to price the relocation as a separate line item.
How can I tell what my Queenslander bathroom is hiding behind the walls?
Queenslander bathrooms hide more surprises than any other housing type around Brisbane. Behind the walls you commonly find hardwood framing that no longer sits plumb, old tongue and groove lining buried under later sheeting, lead paint on original boards, and plumbing in galvanised steel or early copper that is due for replacement. Floors are often springy because joists have been notched for pipes, and rot shows up around the old shower base and hob. Expect a contingency of ten to fifteen percent of the contract value for this reason. Lift a floor vent or an access panel and photograph what you find before quoting, so the builder prices reality instead of guessing from the doorway.
Which trades are involved in a bathroom renovation, and who coordinates them?
A standard bathroom pulls in six to eight separate trades over a few weeks. Demolition and rubbish removal come first, then a plumber for rough in, an electrician for lighting, fan and power, a carpenter to reframe and sheet, a waterproofer, a tiler, a glazier for the screen, and a painter at the end. Cabinet makers and stone benchtop fabricators join the list if the vanity is custom. Whoever holds your contract should be sequencing all of them, booking inspections and wearing the cost of a trade turning up to an unready site. Where you engage each trade yourself you become the coordinator, which can save ten to fifteen percent but puts every clash on you.
What happens to the price if I change my mind on tiles or a vanity late?
Late selections are the most expensive habit a homeowner can have. Once tiling is booked, a change of tile means the tiler stands down and waits for stock, and a two week lead time on an imported tile can idle the site at a cost of $500 to $1,500 each week. Swapping a vanity after the plumber has roughed in the waste and taps means reopening walls, so budget $800 to $2,000 for that variation. Choosing a wall hung toilet instead of a close coupled one after framing is complete costs more again. Pick and pay for every fixture, tile and tap before demolition day, and the figures above never arise.
Does tile size and layout really change what the tiling costs?
Tile size and layout change the labour bill more than most people expect. Large format tiles, say 600 by 1200, cover ground quickly but demand a very flat substrate, extra levelling, careful handling and two sets of hands, so wall preparation costs rise even as tile counts fall. Mosaics and small subway formats are cheap to buy and slow to lay, with labour often doubling per square metre. Herringbone, stacked vertical and any diagonal pattern adds twenty to forty percent to tiling labour because of the cutting and setting out. Tiling labour around Brisbane sits near an indicative $70 to $120 per square metre, so confirm which layout your quote has assumed.
What should I look for on a bathroom renovation quote?
A good bathroom quote reads like a build sequence rather than a single number. Look for itemised allowances for tiles, tapware, vanity and screen with dollar figures you can check against showroom prices, plus separate lines for demolition, rubbish removal, waterproofing, tiling labour and fit off. It should name the trades, state a start date and a working day duration, set out progress payment stages tied to completed work, and list the licence number of whoever holds the contract. Watch for the words allowance and to be confirmed doing heavy lifting, since those are simply future variations. Anything missing from the page will arrive later as an extra, so insist on exclusions being written down too.

Bathroom Renovation Services Across Queensland

For Trades & Contractors - SA

Bathroom renovators, waterproofers and tilers looking for work around Brisbane can see current jobs on the Queensland leads board, or register to receive local enquiries as they come in.

Ready to Get Bathroom Quotes?

Tell us the suburb and which of the three bathroom jobs you want, and we will connect you with renovators taking work in your area.

Get Bathroom Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 19 October 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All Queensland tradies are required to hold appropriate QBCC licences. Verify at the Queensland Building and Construction Commission.
Costs are indicative for greater Brisbane in October 2026 and are not quotes. Scope, whether plumbing moves, the floor type and your selections move them most.