Looking for a Painter in Sydney?
Tell us the suburb and what needs doing, and we will connect you with painters taking work in your area.
What the Search Involves
Painting prices move with condition, ceiling height, access and colour change, so these are indicative only. Condition decides more than anything else, because flaking paint and damaged substrate turn a painting job into a repair job first. Ask for the coat count in writing.
Find a Painter Sydney NSW - What to Check and Get Quotes
Painting is one of the few trades where two honest quotes on the same house can differ by thousands, and the reason is almost always preparation rather than the paint. Interior work commonly runs $15 to $35 a square metre of wall including materials, exterior $25 to $60 because preparation and access vary so much, and most painters quote the job rather than the hour. Whole house figures are more useful: a two bedroom unit interior is $2,500 to $5,000, a three or four bedroom interior $4,500 to $11,000, and a full exterior repaint anywhere from about $6,000 on a small rendered house to $25,000 or more on a double fronted weatherboard needing scaffold. The single best comparison tool you have is the coat count stated on the quote, because two coats over proper preparation and one coat over a wash are completely different products. Two Sydney specifics matter as well. Anything painted before about 1970 probably has lead based paint underneath, which means wet scraping and containment rather than dry sanding or a pressure washer. And coastal exposure shortens repaint cycles noticeably, so eastern suburbs and northern beaches houses need attention years sooner than inland ones. This guide covers the jobs and costs, preparation, older paint, surfaces, salt, access, what happens on the day and reading a quote.
At a Glance - Finding a Painter in Sydney
| Stage | What It Involves | Typical Timeframe | What Decides It |
|---|---|---|---|
| Establish the era | The year the house was built | One question | Pre 1970 changes the method |
| Test where needed | A surface sample for lead | A few working days | Age and maintenance history |
| Settle the preparation | Strip, sand, fill, prime | In the quote | Cladding and condition |
| Check the method against the list | Hand and wet methods against power tools | Same conversation | Whether it becomes a lead process |
| Check the licence position | Interior carved out, exterior over $5,000 | One look | Interior or exterior work |
| Settle access | Scaffold or ladders, and who supplies | In the quote | Storeys and pitch |
| Compare three quotes | Same six questions to all three | One email | Preparation and access |
Two questions on this list account for most of the variation between Sydney painting quotes. The first is what surface preparation the price includes, because on an older property preparation is where the labour and the finish both sit and it is the easiest thing to leave vague. The second is whether the paint has been tested for lead on anything built before 1970, since the answer decides the preparation method and the containment rather than adding a line item. Both are answered in a sentence and a test settles the first properly.
How the Search Works
Painting is the least licensed trade in the house and one of the more regulated ones once the building predates 1970, which is a combination that catches people out in both directions. The licensing side is genuinely light. A contractor licence is required for residential building or trade work over five thousand dollars in labour and materials including GST, but stand alone interior paintwork has been carved out since 2015 and needs no licence even above that figure. Exterior work over the figure still does, and painting is trade work rather than specialist work under the framework published by the New South Wales government.
The lead side is where the real obligations sit, and they are narrower than usually described. NSW Health and the New South Wales Environment Protection Authority both use 1970 as the reference year. Work becomes a lead process only where paint exceeds one per cent lead by dry weight and a listed high energy method is used, and only then can it become lead risk work. Where it does, the duties are notification and health monitoring rather than a licence, and they fall on the business. The current work health and safety regulation commenced on 22 August 2025, replacing the 2017 instrument, so references to the older regulation are out of date rather than describing a different rule.
Guidance is published by SafeWork NSW. Waste runs opposite to expectation. Lead paint waste from residential premises is pre classified as general solid waste in the non putrescible category, while the hazardous classification applies to the same material from other premises. The standards are AS/NZS 2311 and AS/NZS 4361.2, both in their 2017 editions and published by Standards Australia.
The lead paint dates, the lead process and lead risk work tests, the notification and monitoring duties and the waste classification on this page reflect the New South Wales and Commonwealth position in October 2026 under the Work Health and Safety Regulation 2025, which replaced the 2017 Regulation on 22 August 2025, the Protection of the Environment Operations Act 1997 and the Home Building Act 1989. Containment measures are published guidance rather than a prescribed standard. Whether a painting only contract above $20,000 falls within the insurance scheme is not settled on the published material, so confirm it with the scheme administrator. Costs are indicative for greater Sydney and are not quotes.
Finding a Painter in Sydney, Job by Job
A Sydney painting quote is mostly a quote for preparation, and on anything built before 1970 it is also a decision about method. Those two facts explain nearly every gap between three prices on the same house. Start with the era of the building before anything else. Lead paint should be assumed before 1970 and testing settles a particular surface.
The answer decides whether the preparation uses hand and wet methods or power tools, and the power tool route is the one that brings the regulated duties with it. Then turn to the rates themselves and what they include. Interior walls run $15 to $35 per square metre and ceilings $20 to $40, while exterior walls run $18 to $45 with single storey brick veneer at $22 to $32 and weatherboard including preparation at $30 to $45. Hourly rates are $50 to $80 and a day rate $400 to $640. By project the bands are rather easier to check.
A full interior repaint of a three bedroom house runs $4,500 to $9,000 and a full exterior $5,000 to $12,000, with a standard bedroom at $500 to $1,200 for walls only and $350 to $700 including all surfaces. Items and access together finish off the rest of the picture. Doors and trim run $120 to $280 per door set and $1,000 to $3,000 for a whole home of joinery, kitchen cabinets $2,500 to $6,000, eaves fascias and window frames $1,200 to $2,500, a two storey stairwell $500 to $1,500, pressure cleaning $200 to $500 and scaffold $2,000 to $5,000 on a standard double storey. The state pricing guide sets every one of them out in full.
The Painting Jobs Sydney Homeowners Ring About
Most calls that come through for painting in Sydney fall into a handful of familiar jobs. A single interior room, meaning walls, ceiling, skirtings and architraves, usually sits somewhere around $400 to $900 depending on size and how much patching is needed. Repainting the inside of a three bedroom house, ceilings included, commonly lands between $4,500 to $9,000 across Sydney suburbs. Those figures are indicative only, because a 1920s semi in Marrickville with high ceilings and deep cornices costs more to cut in than a newer townhouse out at Rouse Hill.
Every quote also shifts with whether you are going one shade lighter or covering over a dark feature colour. Exterior work is where the numbers spread out furthest, and weatherboard is the clearest example. Painting the outside of a weatherboard cottage, including fascias, barges and window frames, often runs $8,000 to $18,000 once preparation is accounted for. Rendered and bagged brick exteriors tend to be cheaper per square metre, so a similar sized rendered home might come in at $6,000 to $14,000. Roof coating gets priced separately again, with tile roofs commonly quoted $3,500 to $7,500 and metal roofs $4,000 to $9,000 after cleaning and rust treatment.
Treat all of those as indicative ranges rather than fixed prices, since access and condition move them considerably. Smaller jobs still get rung through, and they are worth knowing the going rate for. One feature wall in an existing room, where the rest of the paint stays put, is usually $250 to $500 all up. Timber decks need staining or oiling rather than painting, and a typical rear deck comes in around $900 to $2,500 depending on how much stripping the old coating needs. Fencing is often quoted by the metre, with $20 to $40 per lineal metre a reasonable indicative guide for a stained paling fence. Keep in mind that a painter already on site for a bigger job will almost always do these extras cheaper than a standalone visit.
| Job | Note | Indicative cost |
|---|---|---|
| Single interior room | Walls and ceiling | $400 to $900 |
| Two bedroom unit interior | Walls and ceilings | $2,500 to $5,000 |
| Three or four bedroom interior | Ceiling height and trim detail | $4,500 to $11,000 |
| Exterior, small single storey render | Full repaint | From about $6,000 |
| Exterior, double fronted weatherboard | Scaffold needed | $25,000 or more |
| Roof coating, tile | After cleaning | $3,500 to $7,500 |
| Deck or fence staining | Cleaned and coated | $900 to $2,500 |
Preparation Is The Price
Two quotes on the same Sydney house can differ by three or $4,000 without either painter being dishonest. The gap is almost never in the paint itself, because material cost on an average house is a modest slice of the total. What separates them is how many hours each painter has allowed for getting the surface ready before any topcoat goes on. One quote might assume a quick sand, a spot prime and straight into two coats over a long weekend. The other might include washing down, scraping back flaking areas, filling, caulking gaps, spot priming bare patches and a full prime coat. Both will look identical on the day the drop sheets come up, and only one of them will still look right in six years.
Consumer guarantees from the Australian Competition and Consumer Commission apply to the workmanship regardless of what any warranty document says. Proper preparation on a Sydney exterior starts with a thorough wash to shift salt, dust and the grime that builds up along main roads. Flaking and chalky paint gets scraped and sanded back to a sound edge, not just feathered over at the worst spots. Gaps around window reveals, weatherboard joins and render cracks get raked out and filled with a flexible sealant that will move with the house.
Bare timber, patched render and any rusted metal then need the right primer on them before colour goes anywhere near the surface. Corners get cut in predictable places, and most of them are invisible from the footpath. Skipping the wash means the new coat is bonding to dirt rather than to the surface underneath it. Leaving old flaking paint in place guarantees the new film lifts with it the first wet winter. Thinning paint well past what the tin allows stretches four litres across more wall and leaves a coat that barely covers. Asking a painter to walk you through their preparation steps, in order, tells you more about the quote than the dollar figure at the bottom does.
Why Two Quotes on the Same House Differ by Thousands
Preparation is where the money and the lifespan both sit, and it is also the part that disappears from a cheaper quote without anybody saying so out loud. A coat count on the quote is the simplest comparison tool you have, since two coats over proper preparation and one coat over a wash are completely different products. Condition decides more than anything else, because flaking paint, water damaged plaster or rotten weatherboards turn a painting job into a repair job first. Ask what happens if more repair is found once the scraping starts, as that answer tells you whether the price is a quote or an opening position.
Older Sydney Houses And The Paint Underneath
Plenty of Sydney housing stock went up well before 1970, from the inner west terraces to the federation homes around Haberfield and Hunters Hill. Paint used on those houses in their early decades contained lead, and it is usually still sitting there under the later coats. You cannot tell by looking, though a few signs make it likely: many thick layers on timber windows, chalky pinkish or cream undercoats showing through chips, and alligator style cracking on old weatherboards. Cheap swab kits from a paint shop give a rough indication, and a proper sample test through a lab is inexpensive if you want certainty. Any painter who regularly works on pre war housing around Sydney will assume it is present and price the preparation accordingly.
Dry sanding or power sanding that old paint is the wrong move, and it is the most common shortcut on a cheap quote. The dust it creates travels through the house, settles in roof spaces and lands in the garden beds where kids and pets spend their time. Orbital sanders and heat guns running hot enough to scorch timber make the problem considerably worse rather than better. Wet scraping, chemical stripping and careful hand work with sheeting laid underneath are the slower but sensible approaches.
If a quote for an old Balmain or Newtown terrace mentions machine sanding the exterior, that is worth questioning closely before you sign anything. Working safely around old paint adds real hours, and honest quotes show it in the price. Expect somewhere between $1,500 to $4,000 extra on a full exterior repaint of a pre war Sydney house, depending on how much of the timber is flaking. Sheeting the ground, bagging waste separately, wet methods and slower hand scraping all cost labour rather than materials. That premium buys you a surface that will actually hold paint, as well as a yard nobody has to worry about afterwards.
| Point | What it means | What to do |
|---|---|---|
| Houses painted before 1970 | Lead based paint is likely underneath | Assume it until tested |
| Dry sanding it | The worst possible approach | Do not let anybody do it |
| Power washing it | Spreads it across the yard | Avoid |
| Wet sanding and scraping | The safe approach, slower | Expect it to cost more |
| Drop sheets and containment | Catching the debris | Should be on the quote |
| Soil and garden beds | Where the debris ends up | Cover them |
| Children and pregnant women | Keep clear during the work | Non negotiable |
Why a Sydney Painting Job Starts With the Year the House Was Built
Painting looks like the least regulated trade in the house until the building predates 1970, at which point a different set of rules arrives with the sandpaper. Lead based paint was used widely in Australian housing, and disturbing it is the part of a repaint that carries real health consequences and not merely aesthetic ones. The guidance from the health and environment regulators is consistent on the year. NSW Health refers to lead based household paints used before 1970 and lists renovating a house built before 1970 as an exposure activity.
The New South Wales Environment Protection Authority uses the same date. What makes this a pricing question as much as a safety one is that preparation is most of the labour on an older Sydney house. Stripping, sanding and making good a hundred year old terrace in Paddington or Glebe is the job, and the paint going on at the end is the smaller part of it. A quote that has not asked the age of the house has not priced the preparation it implies.
| The Era | What to Assume | What It Changes | Source |
|---|---|---|---|
| Built before 1950 | Paint with as much as 50 per cent lead was used | Preparation method and containment | Commonwealth guidance |
| Built before 1970 | Assume lead paint may be present | Testing before disturbing it | NSW Health and NSW EPA |
| Built 1970 to 1997 | Lower limits, but not zero | Still worth testing older layers | Commonwealth guidance |
| Built after December 1997 | The 0.1 per cent limit applied | Lead is not the concern | Commonwealth guidance |
| Unknown history | The usual position on a resale | Test the surface, do not assume it | Laboratory testing |
| Any era, industrial coatings | Can exceed domestic limits | Check what was used | Commonwealth guidance |
Weatherboard, Render, Bagged Brick, Fibro And Metal
Each surface around Sydney wants something different, and the coat count follows from that. Weatherboard needs the timber sound first, so rotten boards and loose nails get dealt with before an oil based or acrylic primer and two topcoats go on. Rendered walls take a sealer where the render is new or patched, then two coats of a quality exterior acrylic that can still breathe. Bagged brick drinks the first coat almost completely, which is why experienced painters allow for a generous seal coat plus two finish coats rather than two coats in total. Fibro sheeting, common right across the post war Sydney suburbs, wants a flexible coating and sealed joints, with no sanding or cutting of the sheets themselves.
Metal needs the most attention to whatever sits underneath the colour. Rusted gutters, fascias and roof sheets have to be wire brushed or ground back and treated with a rust converting primer before anything else happens. Galvanised surfaces that have never been painted need an etch primer, or the topcoat simply peels away in sheets within a year or two. Steel roof sheeting gets pressure washed, treated for rust at the screws and fixings, then rolled or sprayed with two coats of a roof membrane. Tile roofs are different again, needing a sealer soaked into the porous surface before the colour coats will hold at all.
Lifespan depends heavily on which part of Sydney the house happens to sit in. Inland and sheltered, a good acrylic on render will hold eight to twelve years and weatherboard around seven to ten. Within a couple of streets of the water at Bondi, Coogee, Manly or Avalon, knock three or four years off both of those figures. South and west facing walls that cop the weather fail first, and north facing timber bakes and chalks faster than people expect. Coatings on a roof generally give you eight to fifteen years, with the lower end again belonging to the coastal ones. Those are indicative spans only, because gutter overflow, poor drainage and a neighbour's sprinkler can shorten any of them dramatically.
| Surface | Preparation | How long the finish lasts |
|---|---|---|
| Weatherboard | Scrape, sand, prime bare timber, two coats | Seven to ten years inland |
| Render | Wash, fill, seal patches, two coats | Ten years or more |
| Bagged brick | Wash, stabilise, two coats | Similar to render |
| Fibro sheet | Gentle preparation, never dry sanded | Long, if left undisturbed |
| Metal, gutters and trim | Treat rust, prime, then topcoat | Depends on exposure |
| Timber windows and doors | Most labour intensive part of any exterior | Shorter, needs attention |
| Roof tiles | Clean, prime, two coats | Varies widely with pitch |
Coastal Exposure And Salt Air
Salt does not need to land on the wall as spray to cause trouble. Fine airborne salt drifts a long way inland on a nor easter and settles invisibly on every exterior surface. Once it is sitting there, it holds moisture against the paint film and works away at anything metal underneath, including nail heads and window hardware. Houses in the eastern suburbs and along the northern beaches therefore show chalking, blistering and rust bleed years earlier than equivalent homes at Castle Hill or Penrith.
Giving the exterior a hose down two or three times a year genuinely extends the time between repaints. Product choice matters more near the coast than almost anywhere else in Sydney. Premium exterior acrylics with high resin content cost maybe $20 to $40 more per four litre tin and buy noticeably more years on a salt exposed wall. Where metal is involved, a quality rust inhibiting primer under the topcoat is the difference between four years and ten.
Nail heads on coastal weatherboard should be punched, filled and spot primed rather than painted straight over, because rust stains bleed through any colour you put on them. Ask specifically what product and what primer the painter intends to use on the weather side of the house. Colour choice quietly decides how often you will be back up on the ladder. Deep charcoals, navies and strong reds on a sun facing coastal wall fade and chalk fastest, since the pigments and the surface temperature both work against you. Mid tones and off whites in the greys, sands and muted greens hold their look far longer in that sort of exposure. Where a dark scheme is what you want, keep it for sheltered elevations, front doors and trim rather than the whole weather side.
| Exposure | What happens | What helps |
|---|---|---|
| Within a few hundred metres of surf | Salt drives repaint cycles shorter | Rinse down and better products |
| Eastern suburbs and northern beaches | Shorter life on every exterior surface | Expect five to seven years |
| Harbourside but sheltered | Better than open coast | Still shorter than inland |
| Inland suburbs | Longest intervals | Seven to ten years on weatherboard |
| Dark colours in full sun | Fade and move more | Mid tones last better |
| Metal fixings and gutters | First to show | Treat early |
| Premium exterior systems | Cost more per litre | Usually cheaper per year |
Height, Scaffold And Difficult Blocks
Access is the quiet line item that explains a lot of exterior quotes in Sydney. A three storey terrace in Paddington or Glebe, with a parapet wall and iron lacework across the balcony, cannot be painted properly off a ladder. Scaffolding or a boom lift becomes the only sensible way to reach the upper facade and the parapet capping safely. Steep blocks in Mosman, Balmoral and around the lower north shore create the same problem from the other direction, where the downhill side of the house sits two storeys above the ground.
Anywhere the painter cannot stand square to the wall, the hours go up and so does the price. Scaffold hire on a typical Sydney terrace runs roughly $1,500 to $4,000 for a two to three week hire, depending on height and street frontage. Narrow inner west streets add cost again, because the crew may need council approval for the footpath or a loading zone and lose half a day sorting it. Boom lifts and knuckle booms sit around $400 to $900 a day and only work where there is room to set up. Ladders are cheaper and perfectly fine for a single storey, though they slow the work down and tempt a painter into skipping awkward spots. Expect any honest exterior quote on a tall or steep property to show access as its own figure.
Iron lacework and decorative balustrades on older terraces deserve their own mention, since they swallow labour. Each panel has to be wire brushed, rust treated and brushed by hand, which no amount of spraying ever shortens. Allow $600 to $2,000 for a typical terrace balcony depending on how much rust has taken hold. Parapet walls and the rendered capping along the top also need checking for cracks, because that is where water gets in and pushes paint off the front wall below.
Height, Scaffold and Narrow Sites
Scaffold on a three storey terrace is a real line item rather than a preference, and a quote that has not allowed for it is not a quote for the same job. Inner suburban parking restrictions and permit zones add time to every single day, which is why access gets priced before materials on a city painting job. Strata work carries extra cost for approvals, insurance paperwork and working around other residents, and all three belong on the quote rather than in a conversation later. Three metre ceilings in an inner city terrace mean more area and trestles rather than a step ladder, so interior height matters as much as exterior height.
The Lead Paint Dates and What Each One Actually Means
Four dates circulate in discussions of lead paint and they do not all mean the same kind of thing, which is worth untangling because the differences matter to what you do next. Treating them as four bans produces the wrong conclusion. Paints containing as much as fifty per cent lead were used inside and outside homes built before 1950. Until the late 1960s, paint with more than one per cent lead was still being used. The one per cent figure is described in the Commonwealth guidance as a rule of thumb by 1970 rather than as a hard cut off, and the same guidance warns expressly that homes built after 1970 might still contain paint over one per cent where old, industrial or marine paints were used. The later two dates are different again in kind.
A limit of 0.25 per cent was recommended in 1992, and the guidance uses the word recommended rather than describing a regulated limit. The figure has been 0.1 per cent since December 1997, and that one reads as a firm limit. The practical upshot is the honest version, not the tidy one. Assume lead paint may be present in a Sydney house built before 1970, treat the 1970 figure as guidance instead of a guarantee, and test if the age or the maintenance history gives you reason to. Lead paint testing settles it on a particular surface.
Four Dates and What Each One Is
Treating 1970 as a trigger for testing rather than as a safe boundary is right because the Commonwealth guidance says so in terms. It describes the one per cent limit as a rule of thumb by 1970 and then warns that later homes may still carry high lead paint where old stock, industrial or marine paints were used. That matters on a Sydney house that was repainted in the seventies with whatever was in the shed. Testing a surface is inexpensive against the containment cost of getting it wrong, and the result decides the preparation method instead of the colour.
What Happens On The Day
A good crew arrives early, masks up and spends the first stretch of the day on protection rather than paint. Floors get covered, furniture gets moved to the middle and wrapped, and power points, switches and light fittings get taped. Interior work usually starts with ceilings, moves on to walls and finishes with doors, skirtings and architraves last. One average bedroom, start to finish with two coats, takes a painter most of a working day. A full three bedroom interior typically runs five to eight working days with a crew of two, while a complete exterior repaint on a Sydney house commonly takes two to three weeks.
Drying times in Sydney are not what the tin promises, especially through a humid February. Water based paints need the moisture in them to evaporate, and that stalls badly once humidity climbs past roughly 70 percent. Recoat times stretch from two hours out to four or five, which is why a job can lose a day without anyone slacking off. Experienced painters will not put an exterior coat on late in the afternoon through summer, because dew settling on a fresh film ruins the finish. Winter brings the opposite problem, with cold mornings in the hills districts keeping surfaces too cold for paint to cure properly before about nine o'clock. Clearing properly before the crew arrives saves you money, because every hour they spend moving your things is billed.
Take pictures, mirrors, curtains and anything else on the walls down, and empty wardrobes if the insides are being painted. Pull beds, bookshelves and lounges at least a metre off the walls, or out of the room entirely where you can manage it. Outside, cut back shrubs and climbers touching the walls, move pots and garden furniture clear, and unlock side gates and meter boxes. Keeping pets inside and away from wet surfaces matters more than people realise, particularly with a freshly stained deck. Let the painter know about parking, strata rules and any neighbour sensitivities before day one rather than halfway through.
What to Clear and How Long It Takes
Interior work moves at roughly a room a day once preparation is done, and the bottleneck is almost always drying time between coats rather than the painting itself. Sydney humidity genuinely stretches drying, so a painter who tells you a whole house interior will be done in three days is telling you something about the coat count. Clearing the walls and the perimeter before the first morning is free money, because moving your furniture and your pot plants is charged as labour. Agree which rooms stay usable and in what order the work moves through the house, as that single conversation makes living through it far easier.
Notification and Health Monitoring
Where painting preparation does amount to lead risk work, two duties attach and both sit on the business, not on you. Neither is onerous and both are free, which removes the usual commercial objection. Notification goes to the work health and safety regulator in writing and must state the type of lead process. The published guidance is inconsistent on the timing, with one page describing seven days to notify and another seven days before the work starts, so the safe reading is to notify before work begins. Notifications attract no fee at all, which removes the usual objection. A separate notification is required where a worker is removed from lead risk work.
Health monitoring is the second duty and it runs at the business expense. It starts before lead risk work begins and repeats one month after starting, then at intervals set by the last result. A business that has never arranged monitoring and is proposing to machine sand a pre 1970 Sydney exterior has not thought the job through. None of this is a reason to avoid preparing an old house properly. It is a reason to prefer a preparation method that keeps the job out of the lead process list where that is practical, which is the same thing a careful painter would choose anyway.
| The Duty | Who Owes It | The Timing | Cost |
|---|---|---|---|
| Notification in writing | The business carrying out the work | Before work starts, on the safe reading | No fee |
| What the notice states | The type of lead process | With the notification | No fee |
| One notice per period of work | Covers the whole period | Not per day | No fee |
| Removal notification | Where a worker is removed | Separate notification | No fee |
| Health monitoring, baseline | The business | Before work and one month after starting | At the business expense |
| Monitoring intervals | The business | Set by the last result | At the business expense |
| Homeowner doing their own work | No duty attaches | Not applicable | Guidance still sensible |
Blood Lead Numbers and Which Pair Is Which
Two sets of blood lead figures appear in this area and they are easy to confuse, which matters if you are reading older material or checking a contractor's claim. The two pairs of figures measure entirely different things. The first pair is the lead risk work threshold. Work in a lead process is lead risk work where it is likely to cause a worker blood lead above five micrograms per decilitre for a female of reproductive capacity, or twenty micrograms per decilitre in any other case. The same figures are the return to work levels. The second pair of figures is the removal level.
A worker must be removed from lead risk work at ten micrograms per decilitre for a female of reproductive capacity, or one who is pregnant or breastfeeding, and at thirty micrograms per decilitre for others. The ten and thirty pair was the lead risk work threshold before an amendment, which is exactly why it still turns up in the wrong place. Monitoring intervals then follow from whatever the last result was. Before the work starts and one month after starting is the baseline, and after that the interval tightens as the figure rises. The practical point for a householder is simply that a business doing genuine lead risk work has a documented monitoring regime behind it, which is a reasonable thing to ask about.
Statutory Warranties on a Paint Job
Statutory warranties are implied into residential building contracts whether or not they appear in the document, and they do reach painting. What matters is which warranty period applies, because the two limbs are far apart. The statute uses major defect and any other case rather than structural and non structural. The period is six years for a breach resulting in a major defect and two years in any other case, measured from completion.
If a breach becomes apparent in the last six months of the period there is a further six months to commence proceedings. The realistic answer for painting is the two year limb. Major defect is tied to load bearing components, fire safety systems and waterproofing, and a paint failure is unlikely to qualify. Anybody promising six years on a repaint is describing the wrong limb of the section. The warranties that actually bite on a paint job are the content ones, not the period. Work must be done with due care and skill and in accordance with the plans and specifications in the contract, materials must be good and suitable for purpose and new unless otherwise agreed, the work must comply with the law, and it must be fit for a particular purpose where you made that purpose known and relied on the contractor judgment.
Which Limb Applies to a Repaint
Being clear about this before signing matters because painting disputes are almost always about workmanship and finish, not about anything structural. That puts them in the two year category, so a complaint raised in year four on an exterior repaint is outside the period even though the paint has failed. The useful protection is therefore the content of the warranties, not their length. Write the surface preparation and the number of coats into the contract, because due care and skill is measured against what was specified.
What Painting Costs Around Sydney
Sydney painting prices sit above the national average, and labour is most of the reason. Per square metre of wall area, interior work commonly falls between $15 to $35 including materials, with ceilings at the higher end when they need two coats. Outside the house the range is wider, roughly $25 to $60 per square metre, because preparation and access vary so much between properties. Hourly rates for a licensed painter around Sydney generally sit between $50 to $80, with apprentices and second hands charged lower. All of these are indicative figures, and most painters will quote a fixed price for the job rather than work by the hour.
Whole house figures give a more useful sense of what to budget. A two bedroom unit interior, walls and ceilings together, typically lands between $2,500 to $5,000 across the Sydney market. Three and four bedroom house interiors commonly run $4,500 to $11,000 depending on ceiling height, trim detail and colour changes. Full exterior repaints spread from about $6,000 on a small single storey rendered home to $25,000 or more on a double fronted weatherboard needing scaffold. Add a roof and you are usually looking at another $3,500 to $9,000 on top of all that.
Several things move a quote and it helps to know which ones you control. Ceiling height is a big one, since three metre ceilings in an inner city terrace mean more area and trestles rather than a simple step ladder. Going from a dark colour to a light one often means a third coat, which can add fifteen or twenty percent to an interior price. Condition decides more than anything else, because flaking paint, water damaged plaster or rotten weatherboards turn a painting job into a repair job first. Timing has an effect too, with spring and early summer being the busiest stretch and winter quotes often coming in softer. Strata work on units carries extra cost for approvals, insurance paperwork and working around other residents.
| Item | Indicative rate | Note |
|---|---|---|
| Interior, per square metre of wall | $15 to $35 | Including materials |
| Exterior, per square metre | $25 to $60 | Preparation and access vary widely |
| Licensed painter, hourly | $50 to $80 | Most quote the job instead |
| Two bedroom unit interior | $2,500 to $5,000 | Walls and ceilings |
| Three or four bedroom interior | $4,500 to $11,000 | Height and trim detail |
| Full exterior repaint | $6,000 to $25,000 or more | Scaffold at the top end |
| Roof | $3,500 to $9,000 | On top of the rest |
Six Questions That Make Three Sydney Quotes Comparable
Three painting quotes on the same house routinely differ by thousands, and on an older Sydney property the gap is almost always preparation rather than paint. Six questions sent to all three narrow most of that gap. The preparation question does the most work of the six, because it is where an honest quote and an optimistic one diverge most and where the finish is actually decided. The lead question is second on anything built before 1970, since it changes both the method and the containment. Put the same six to each of them in one email. Painting services quoted from one written brief become comparable in a way that three separate walk arounds never are, and the answers tell you who has looked at the surfaces.
The Six to Send to All Three
Taken together these six reduce to asking what has been assumed instead of accepting a figure. Each is answered in a sentence, and a painter who answers all six plainly has looked at the surfaces, not merely measured the walls. Preparation and access between them account for most of the legitimate variation on an older Sydney property. On a $9,000 exterior repaint the difference between the highest and lowest quote usually sits inside those two answers rather than in the paint.
What to Look Out For on a Sydney Painting Quote
The clearest sign of a decent quote is that it names things rather than generalising. Coat counts should appear surface by surface, so you can see whether the ceilings get one coat or two and whether bare timber gets a primer. Product brands and specific product names belong on the page, not a vague promise of quality trade paint. A quote reading simply as paint exterior, two coats, $14,000 gives you nothing to compare and nothing to hold anyone to. Ask for the preparation steps listed separately from the painting, and ask for the licence number to be shown on the quote. Deposit patterns tell you a great deal about who you are dealing with.
A reasonable painter asks for nothing up front on a small job, or around ten to twenty percent on a large one to cover materials. Requests for half the job in cash before a brush is lifted, particularly from someone who knocked on your door, are the pattern to walk away from. Cash only arrangements with no written quote leave you holding nothing at all if the work fails in two years. Progress payments tied to visible stages, such as preparation complete and first coat on, protect both sides sensibly. A few other things are worth checking before you commit to a Sydney painter.
Quotes that arrive without anyone having walked the property are guesses, and they tend to grow once the work starts. If you live in a unit or townhouse, confirm that your exterior colour has strata approval in writing, because painters have been sent back to redo whole balconies over this. Written warranties of five to seven years on workmanship are normal from established Sydney painters, and a refusal to put one in writing says something. Make sure the quote states who covers scaffold, waste removal and any repairs found along the way, so nothing turns into a variation later. Products named by brand are worth insisting on, because a quote that says Dulux, Taubmans or Wattyl by name and line can be checked, and one that says premium cannot. Standards Australia publishes AS/NZS 2311 for the painting of buildings, which is the document a careful painter is working to on surface preparation and coat numbers.
Sydney Suburb by Suburb
What changes between Sydney areas is the building era and the cladding, and between them they decide whether a repaint is a straightforward job or a preparation project with a lead question attached. The inner suburbs through Paddington, Glebe, Newtown, Balmain, Annandale and Woollahra carry Victorian and Federation housing where lead paint should be assumed and where rendered masonry, timber trim and cast iron all need different preparation. Access is tight and heritage expectations are high, which is where the specialty and heritage rate applies. The interwar and postwar middle ring through Haberfield, Ryde, Chatswood, Hurstville and Hunters Hill brings brick with painted trim, eaves and window frames, where the eaves fascia and window line at $1,200 to $2,500 is often the whole job.
Weatherboard through parts of the north shore and the inner west is the preparation heavy case at $30 to $45 per square metre including preparation. The western and south western corridors through Blacktown, Penrith, Liverpool, Campbelltown and Fairfield run to later brick veneer where lead is not the concern and the work is area and access. Newer estates out through Castle Hill and the north west are the simplest case. A Sydney plasterer usually goes before the painter where walls need making good, and a Sydney builder coordinates where painting sits inside a renovation.
What the Era and Cladding Change
Era matters more than postcode because it decides which of three jobs you are buying. On a pre 1970 inner suburban house the job is preparation with a lead question and a containment plan. On an interwar brick home it is frequently just the painted elements, meaning eaves, fascias, window frames and doors. For a newer western suburbs house it is area, access and coats. Scaffold at $2,000 to $5,000 on a double storey is the line that moves most between the first case and the third.
Painters Across Greater Sydney
Painters across greater Sydney, from the Victorian and Federation inner suburbs where lead should be assumed through the interwar brick middle ring to the later brick veneer corridors. Pick your area below to see what the local building era usually means for the job.
▶ Sydney 30 areas
▶ Central Coast 24 areas
▶ Blue Mountains 22 areas
▶ Illawarra 30 areas
▶ Southern Highlands 24 areas
▶ South Coast 28 areas
Finding a Painter in Sydney - FAQ
Does my Sydney house have lead paint?
Is disturbing lead paint automatically regulated work?
Do I need a licensed lead paint removalist?
Does my painter need a licence?
How should lead paint debris from my house be disposed of?
What containment should I see on a lead paint job?
What does painting cost in Sydney?
Why is weatherboard more expensive to paint?
How long are painting defects covered for?
Does a painting contract over $20,000 need insurance cover?
Painting Services Across New South Wales
Related Services
For Trades & Contractors - SA
Painters looking for work around Sydney can see current jobs on the New South Wales leads board, or register to receive enquiries from homeowners in the areas you cover.
Ready to Get Painting Quotes?
Tell us the suburb and what needs doing, and we will connect you with painters taking work in your area.
Get Painting QuotesAbout This Guide
This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Looking for more services across New South Wales? View all available trade services.
Reviewed by The Quote Yard Editorial Team
How The Quote Yard Works
We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.