Converting or Attaching?

Tell us what you have in mind and we'll put you in touch with granny flat builders in your area.

Get Convertion Quotes
Free · No obligation · NSW-wide

Typical Costs

Garage conversion$60,000-$120,000
Under house conversion$80,000-$180,000
Attached addition$130,000-$230,000
Fire and acoustic separation$6,000-$18,000
Raising ceilings or lowering floors$8,000-$40,000
Structural works to existing house$8,000-$45,000

Indicative 2026 NSW estimates only. Converting non habitable space into a dwelling triggers requirements the original structure never had to meet. Have the ceiling height and floor level checked by a certifier before committing to anything.

Granny Flat Addition Costs NSW 2026 - Get Free Quotes

Converting a garage into a secondary dwelling costs $60,000 to $120,000 in New South Wales, an under house conversion $80,000 to $180,000, and an attached addition sharing a wall with the home $130,000 to $230,000. Households pursue these routes expecting to beat a detached build, and quite often they do not. The reason is that a garage is classified as non habitable space, and turning it into a dwelling means meeting rules it never had to satisfy when it was built: ceiling height, natural light, ventilation, insulation, damp proofing and a floor that does not fall to a roller door. Ceiling height is the one that ends projects, because raising a roof costs $18,000 to $40,000 and lowering a floor is usually worse again. Have it measured first, before you spend a dollar on anything else. Any wall shared with the house also needs rated fire and acoustic separation continuing up into the roof space, which adds $6,000 to $18,000 that households rarely see coming. This guide covers the three routes, habitable standards, separation and the structure. Post your job on The Quote Yard to compare quotes across New South Wales.

Granny Flat Additions Across NSW

Practical guidance on attached and converted secondary dwellings anywhere in NSW, covering the three routes available and what separates them, what changes when non habitable space becomes habitable, why ceiling height ends more conversion projects than any other factor, damp proofing and floor levels in existing slabs, the fire and acoustic separation a shared wall requires, structural work to the existing house, and the separate entry, metering and outdoor space an attached dwelling still needs, whether you are in Greater Sydney, Newcastle, Wollongong, the Central Coast, the Hunter or regional New South Wales.

Get Free Quotes

At a Glance - Addition Routes NSW 2026

Route Typical Cost Usual Deal Breaker
Garage conversion$60,000-$120,000Ceiling height and floor fall
Under house conversion$80,000-$180,000Head height and damp
Attached addition$130,000-$230,000Setbacks and existing footings
Detached build for comparison$140,000-$250,000Available yard area
Fire and acoustic separation$6,000-$18,000Required on any shared wall
Raising ceilings or lowering floors$8,000-$40,000Often not viable at all
Structural works to existing house$8,000-$45,000Discovered after opening up

Cost Depth: Why Conversions Disappoint

The appeal of a conversion is that the structure already exists, so a household reasons that walls, a roof and a slab represent most of a building and the remainder should be modest. What that reasoning misses is that those elements were built to serve a garage, and a garage is not required to keep people warm, dry, ventilated or comfortable. Bringing them up to the standard a dwelling must meet involves insulating walls never designed to hold insulation, fixing a slab that deliberately falls toward a door, achieving a ceiling height that may not exist, forming window openings in walls that have none, and separating the space from the house it is attached to. The existing structure is worth something, but considerably less than it appears.

As an example, a household considers converting a double garage. The shell is sound and they budget $70,000, expecting to spend it on a kitchen, a bathroom and some linings. The certifier measures a ceiling at 2.25 metres, which is below what habitable rooms generally require, and the slab falls eighty millimetres toward the roller door with no damp proof membrane beneath it. Raising the roof structure to gain height is quoted at $34,000 and a new insulated slab over the existing one costs another $19,000, which alone consumes three quarters of the original budget before a single fixture is installed. That project either becomes a $135,000 job or it stops.

Disclaimer

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Granny Flat Additions in NSW

Converting a garage into a secondary dwelling costs $60,000 to $120,000 across New South Wales, an under house or basement conversion runs $80,000 to $180,000, and an attached addition sharing a wall with the existing house costs $130,000 to $230,000. Fire and acoustic separation adds a further $6,000 to $18,000 wherever a wall ends up shared between the two dwellings, works to raise a ceiling or lower a floor add $8,000 to $40,000 on top of that, and structural work to the existing house adds $8,000 to $45,000 again where it proves necessary once the building has been opened up. Approvals and certification add a further $4,000 to $9,000 on top of every figure above, regardless of which of the three routes you eventually take, as set out at granny flat rules. None of these figures makes any allowance for furniture, landscaping, or finding somewhere else on the property to park the car once the garage has gone.

Households choose these routes expecting to undercut a detached build, and the arithmetic does not always cooperate. A detached dwelling costs $140,000 to $250,000 to build from scratch, so a garage conversion sitting at the bottom of its range genuinely does save money, while an under house conversion landing at the top of its range saves nothing whatsoever. Which end you land on is determined by conditions that exist before you start rather than by decisions you make afterwards. The era in which the garage was originally built will tell you considerably more about the likely cost than its floor area ever will. Concrete and brick garages put up during the 1960s and 1970s were commonly built to a lower ceiling than anything constructed in the decades since. Get one quote for each viable route before settling on any of them.

The single most useful thing you can do is have the ceiling height and the floor level measured by somebody who knows what they are looking for, before you commission drawings or set a budget. Those two dimensions between them decide whether a conversion turns out to be a straightforward project or an expensive rebuild in disguise, and neither one can be changed cheaply once the building exists. Building new instead is priced at granny flat costs. A certifier or a sufficiently experienced builder will complete both measurements in a single visit and tell you honestly whether the project is viable at all. Paying somebody properly for that one visit is the best value available anywhere in the entire exercise.

The Three Routes

A garage conversion turns an existing detached or attached garage into a dwelling, and it is the route households consider first because the structure looks complete. Walls, a roof and a slab all exist already, side access has usually been established for years, and the position of the building within the block was settled when the house went up. The problems are that garages are built to a lower standard than dwellings in every respect that matters, and the extent of that gap is not visible from inside the building. A detached garage sitting in the rear corner of a block is a very much better candidate than one built underneath the main roof of the house. The more genuinely separate the structure already happens to be, the less separation work you will end up having to do to it later. Ask when the garage was built, since the era tells you more about the likely ceiling height than any photograph will.

An under house or basement conversion uses space beneath an existing dwelling, which is common on sloping sites through the northern beaches, the Illawarra and the Blue Mountains. It preserves the yard entirely, which is its single great advantage over every other option, and it brings with it the hardest set of technical problems of any route available. Head height, damp, natural light, ventilation and access all need solving simultaneously, and a failure on any one of them stops the project. Access is frequently the forgotten problem in these projects, since a staircase leading down from inside the house does not give a separate dwelling anything resembling its own entry. Forming an external door and a usable path leading to it on a steeply sloping site can easily mean retaining walls, steps and a good deal of excavation. Access is the forgotten problem, since a stair down from inside the house gives a separate dwelling no entry of its own.

An attached addition builds new space sharing a wall with the existing house, which is the most expensive route and the most predictable. Because the structure is new throughout it can be built correctly from the outset rather than corrected afterwards at expense, and the ceiling height, the insulation, the damp proofing and every window position are decided by you. What you take on instead is the junction between new and existing, which is where attached projects find their difficulties. It is also the route most likely to require full council consent rather than the faster certifier pathway, depending entirely on how the new work sits on the block. Setbacks measured from the face of the new wall rather than from the old one catch households out with some regularity.

Choosing between the three is less a preference than a reading of your site. A household with a high ceilinged brick garage sitting on a level block with good separation from the house has an excellent conversion candidate on their hands, while one with a low garage of tilt slab construction, where the concrete wall panels were cast flat and lifted upright, falling away toward the street does not. Have somebody assess the existing structure before you develop any attachment to a particular route. Ask a builder which route they would take on your particular block before you have decided yourself, and check credentials the way granny flat builders describes. Their answer, and rather more importantly how quickly they arrive at it, tells you a great deal about how often they have done this kind of work before.

All three still require approval and none of them proceeds because the structure already exists. The proposal goes to a certifier, mandatory inspections fall at set points during the work, and nobody may move in until an occupation certificate is issued, just as with a new building. The pathway options are set out at granny flat approval. Work already carried out on the property without approval complicates matters considerably and generally has to be resolved before anything new is allowed to proceed. Building information certificates exist for precisely that situation, and obtaining one takes time you will need to allow for in the programme. Work already done without approval has to be resolved first, and a building information certificate takes time to obtain.

Becoming Habitable Space

The governing idea behind every conversion is that a garage is classified as non habitable space and a dwelling is not. Non habitable space carries no requirement to keep anybody warm, dry, ventilated or comfortable, and it gets built accordingly, with uninsulated walls, minimal weather sealing, no damp proofing beneath the slab and frequently no windows at all. Converting it means bringing every one of those elements up to a standard the original construction was never intended to reach. That single distinction between habitable and non habitable space explains very nearly every cost that surprises households on a conversion project. Once you hold that idea firmly in mind, the quotes you receive stop looking unreasonable and start looking entirely explicable.

Natural light and ventilation are required in habitable rooms and most garages have neither. Forming window openings in masonry walls means lintels, structural certification and a good deal of making good afterwards, and doing the same thing in a tilt slab or precast concrete wall is a considerably larger exercise again. Where the garage happens to be attached on two or even three of its sides, there may be very few walls available to put any windows into at all, which constrains the layout before it is drawn. That constrains the internal layout before anybody has drawn it, which is why the assessment comes before the work covered at granny flat floor plans.

Thermal performance has to be demonstrated and a converted garage starts a long way behind. Uninsulated masonry walls, an uninsulated roof space with no Bradford or Earthwool batts, a slab with no edge insulation and single glazed openings all count against the assessment together, and the remedies involve furring out walls, losing internal floor area in the process, and specifying considerably better glazing than you expected to buy. This work is invisible in the finished room and appears in full on the quote. Furring out a wall so that it can take insulation costs you somewhere between seventy and ninety millimetres of internal width on every single wall treated. Across a single garage that can quietly remove a square metre of floor area from a building which had none at all to spare in the first place.

The sustainability assessment applies to conversions in the same way it applies to new work. It considers the building fabric, the glazing, the orientation and the fixed appliances together, and a garage facing the wrong direction with very limited window options can be genuinely difficult to bring through it. Commission the assessment early rather than treating it as paperwork at the end, and the process is described at granny flat complying development. A garage whose only available wall faces south is the genuinely difficult case, since the glazing that would help the assessment most cannot be placed anywhere useful. Discuss it with the assessor before the layout is fixed.

Everything above applies equally to under house conversions and rather more severely. Below ground walls bring damp with them, along with limited window opportunity, restricted ventilation and frequently no possibility of achieving a compliant window in a bedroom at all. Establish what can be achieved in that space before assuming a bedroom is possible there. Mechanical ventilation can solve a portion of the problem and it cannot solve the whole of it. A room that relies entirely on a fan running in order to remain habitable is a room somebody will find distinctly unpleasant by year three.

Ceiling Height

Ceiling height ends more conversion projects than every other factor combined, and it is measured in five minutes. Habitable rooms are generally required to achieve somewhere around 2.4 metres, with lower figures permitted in certain circumstances and for particular room types, and your certifier will confirm exactly what figure applies to your own situation. Older structures and anything under a low pitched roof are the usual offenders. Measure it before anything else at all, because every later decision including those at granny flat approval depends on the answer. Take the measurement yourself with a tape before paying anybody for an opinion.

Measure from the finished floor to the underside of the ceiling rather than to the roof structure, and measure in several places. A garage with an exposed truss or an open rafter overhead may look perfectly generous while the actual clear height beneath the bottom chord, the horizontal timber running along the base of each truss, falls well under what a habitable room requires. Where a ceiling will be installed as part of the conversion, the measurement that matters is what remains once it is in place. Remember that any new floor build up will eat directly into whatever height you measure today. Where a screed or a raised timber floor is going in, subtract that full thickness before concluding the height works.

Gaining height by raising the roof is expensive and it is a real structural project rather than an adjustment. New wall plates, new roof framing, new tie downs, revised bracing and fresh engineering certification are all involved in the exercise, and $18,000 to $40,000 is a realistic range depending on the roof form and the size of the building. Where the garage is attached to the house, the junction with the existing roof adds further complexity. Expect the roofing, the guttering and quite possibly the stormwater arrangements to be affected as well.

Gaining height by lowering the floor is usually worse than raising the roof. Excavating below an existing slab means undermining the very footings that support the walls standing above it, which requires underpinning, engineering input and a great deal of care, and on a building this small it frequently costs more than demolishing and rebuilding. Treat this option with real scepticism when somebody proposes it casually. Ask specifically whether underpinning has been included in the figure quoted, because that single answer separates a real quote from an optimistic one.

Under house spaces have the same problem in a more acute form. A subfloor offering 2.1 metres of head height cannot become a bedroom without excavation of some kind, and excavating beneath a house you fully intend to keep living in throughout is substantial work. Get the head height measured before anything else happens, because a negative result here saves you the entire cost of investigating everything downstream. Removing soil from under an occupied dwelling also raises questions about the existing footings, which an engineer rather than a builder should answer.

Damp and Floor Levels

Garage slabs are commonly poured without a damp proof membrane beneath them, because a garage does not need one. A dwelling most certainly does, since moisture rising through a slab destroys floor coverings, produces persistent damp and creates the conditions for mould, and a slab already sitting in the ground cannot have a membrane retrofitted beneath it afterwards. The remedy is a topical membrane or a new insulated slab laid over the existing, which costs $12,000 to $25,000 and consumes ceiling height you may not have. This is the second and equally good reason that the height measurement comes before everything else.

Garage floors are also laid to fall toward the door so that water drains out, and that fall is typically fifty to a hundred millimetres across the length of the slab. A dwelling needs a level floor throughout, and levelling one means either a screed that adds thickness and reduces the head height further, or a raised timber floor that achieves the same thing rather more expensively. Neither option is available where the ceiling is already marginal. The two problems interact directly with each other, which is exactly what makes a low garage with a falling slab such a poor candidate.

The relationship between the floor level and the ground outside matters more than households expect. A dwelling floor generally needs to sit above the adjacent ground level in order to keep surface water out of the building, and a garage slab is frequently level with the driveway alongside it or slightly below it. Where that is the case, drainage works, a threshold detail or raising the floor all become necessary, and each of them costs money and head height. Every one of those costs money, and most of them cost you head height into the bargain. Look at where water sits in the driveway after heavy rain.

Under house conversions face damp from the walls as well as the floor. Below ground masonry sitting in direct contact with soil transmits moisture continuously and indefinitely, and tanking, which is the application of a waterproof barrier to a below ground wall, is specialist work that has to be carried out from the soil side rather than the room side to be effective at all. Doing it badly produces a room that smells and a problem that recurs indefinitely, and remedial options sit at rising damp assessment and repairs. External tanking means excavating along the side of the house itself, which is why internal systems get proposed so often and why they so frequently disappoint.

Have somebody assess the slab and the surrounding drainage before committing to any conversion. A moisture reading, a look at where the stormwater currently goes, and an honest opinion about the fall running across the floor together take about an hour and are the cheapest money you will spend on the entire project. Drainage works are covered at stormwater drainage. Ask specifically where the stormwater coming off the main roof currently discharges to. A downpipe emptying directly beside the garage wall explains a great deal about a persistently damp slab, and it is cheap to redirect. Ask where the stormwater from the main roof currently discharges, since a downpipe beside the garage wall explains a great deal.

Fire and Acoustic Separation

A wall shared between a secondary dwelling and the main house has to perform in ways an internal wall does not. Fire separation between separate occupancies is required so that a fire starting in one dwelling does not immediately reach the other, and the wall itself has to achieve a rated performance verified against the relevant construction requirements. This is a construction specification rather than a lining choice, and it cannot be satisfied by adding a sheet of plasterboard. Ask which system is being proposed and ask to see the supporting documentation for it, since a certifier will check exactly that during the inspections described at granny flat complying development.

Achieving a rated wall in existing construction is more involved than building one new. The rating applies to the whole assembly including every junction at the floor, the ceiling and the roof space above, and a wall that simply stops at the ceiling line while the roof space continues uninterrupted over both dwellings achieves nothing at all. Continuing the separation into the roof space is frequently the most awkward part of an attached project. Where the two buildings share one continuous roof cavity between them, that work has to happen in a very confined space indeed.

Penetrations through a rated wall all need treating. Power points, switches, pipes, ducts and any opening whatsoever reduce the performance of the assembly unless each one is detailed correctly, and a certifier examines them at inspection. This is a common source of rework on conversions where an electrician has run cabling through the separating wall without anybody raising the question first. Tell your electrician clearly which wall is the rated one before they begin any work.

Acoustic separation is a different requirement from fire separation and it is what determines whether the arrangement is tolerable. Airborne noise travelling through a shared wall and impact noise coming through a shared floor are both addressed separately, and the constructions that achieve them involve mass, isolation and careful sealing rather than insulation alone. Two households living either side of a poorly separated wall is a situation nobody enjoys. It also cannot be improved afterwards without opening the whole wall up again, which is precisely why it belongs in the specification from the outset.

Budget $6,000 to $18,000 for separation on any attached arrangement and treat it as unavoidable. Households frequently discover this cost late, having assumed the existing wall between the house and the garage was sufficient because it already looked like a wall. Specification of the assemblies follows published standards available through Standards Australia. A wall that has stood perfectly well for forty years is not thereby a fire rated wall.

Structure of the Existing House

Attaching new work to an existing house means engaging with a structure nobody has examined in decades. Existing footings may be shallower than current practice would allow, the wall construction may not be what the plans suggest at all, and previous alterations may well have been carried out without approval or any engineering input. All of that becomes relevant the moment you connect to it, and none of it is visible until work begins. That is the fundamental structural difference between an addition and a new building going up on clear ground.

Differential movement between old and new is the technical problem at the heart of attached additions. A new slab sitting on new footings settles quite differently from a house that finished settling decades ago, and the junction between the two has to accommodate that movement rather than attempt to resist it. Articulation joints, separate footing systems and detailing at the connection are how this is managed, and skipping it produces cracking within a year or two. Skipping any of it produces cracking within a year or two that nobody afterwards can confidently attribute to anyone. Ask to see the articulation joints marked on the drawing rather than left to the bricklayer.

Removing or altering any part of the existing structure requires engineering. Cutting an opening in a load bearing wall, removing a section of the roof structure, or altering a bracing wall all change how loads travel down to the ground, and an engineer determines what is needed in each case. Builders who propose these changes without engineering input are proposing something you should decline. Ask for the engineer's details and confirm the work has genuinely been designed rather than simply estimated on site.

Existing conditions discovered mid project are the most common source of cost overruns on additions. Termite damage in a wall frame, asbestos in old sheeting, footings sitting on uncompacted fill, or a roof structure that somebody modified previously all surface only once things have been opened up. Building a contingency of fifteen to twenty per cent into an addition budget is more important than on any new build. Agree in advance exactly how variations will be priced, since that conversation becomes very much harder once a wall has been opened up.

A pre commencement inspection of the existing structure is worth commissioning. Somebody who properly assesses the footings, the frame, the roof structure and any prior alterations gives you a far better basis for setting a budget than a builder working entirely from assumptions. Inspections of this kind sit at building inspection. It also gives you a document to hand to every builder so that all of them are pricing the same building. That one step alone usually improves the quality of the quotes you get back. It also gives every builder the same document to price against, which tightens the quotes you get back.

Entry, Metering and Outdoor Space

An attached or converted dwelling still needs its own entry, and it usually needs to be reachable without passing through the main house. That path has to remain usable at night, in heavy rain and by somebody carrying shopping in both hands, which in practice means lighting, a hard surface underfoot and adequate width. Where a converted garage opens only onto the driveway, forming an entry that reads as a front door rather than a side access is worth some thought. It affects how the occupant feels about living there more than the floor area does, and entry treatment is examined at granny flat designs. An entry that reads as a front door rather than a side access changes how the occupant feels about living there.

Private open space, meaning a usable outdoor area belonging to that dwelling alone rather than shared with the main house, is generally required and easy to overlook on a conversion. A converted garage sitting hard against a boundary with a driveway directly in front of it may have nowhere obvious to provide any, and carving an area out of the main house yard reduces what the primary dwelling gets to keep. Establish this early, since it can determine whether the proposal works at all, and area limits are covered at 60 sqm granny flats. It is also the single requirement most often overlooked on a conversion, because the building already exists and so the yard question simply never gets asked.

Separate metering is worth deciding before the electrical work is done rather than afterwards. A separately metered dwelling allows the occupant to hold their own account and pay for their own usage directly, while a shared connection means the main household pays the bill and recovers the money informally afterwards. Retrofitting separate metering after the walls are closed is considerably more expensive than allowing for it during the rough in. Decide the metering question at the same time you decide whether the dwelling will ever be tenanted.

Water and sewer connections for an attached dwelling are usually simpler than for a detached one, since the existing services are close. That is a genuine saving relative to a detached build, and it is one of the few areas where the conversion arithmetic works in your favour. The water authority may still require notification depending on the arrangement, so confirm rather than assume. Sydney Water charges for any new connection and the fee scales with the work involved, so obtain that figure early rather than treating it as incidental.

Parking, waste storage and clotheslines all still need positions on the site. A garage conversion in particular removes the parking it previously provided, and where the council expects parking to be retained this becomes a live issue rather than a detail. Ask the question before the roller door comes out, and general planning services are accessible through Service NSW. A garage conversion in particular removes the off street parking that the site previously provided. Ask the council about parking before the roller door comes out rather than after.

What Drives the Price

The condition of the existing structure determines the cost more than the size of the space does. A sound brick garage with adequate ceiling height, a level slab and two external walls available for windows converts cheaply, while a low tilt slab garage with a falling floor and one usable wall does not. Two identical footprints can differ by seventy thousand dollars for reasons entirely established before you arrived. This is why quotes on conversions vary far more than quotes for the work described at granny flats in NSW.

Whether ceiling or floor works are needed is the largest single variable. A conversion requiring neither sits at the bottom of its range, and one requiring a raised roof or a new slab moves toward the top or beyond it. Establish this before setting a budget rather than after, since it is the item most likely to change the project fundamentally. A household that discovers this late has usually already spent good money on drawings that may not be usable.

Separation requirements scale with how much wall is shared. A detached garage in the corner of the yard may need no separation at all, while a garage integrated under the main roof needs a rated assembly continuing into the roof space. The more the two buildings are entangled, the more this line grows. A freestanding garage sitting three metres clear of the house is a materially different proposition from one built under the same roof.

Services position affects the plumbing cost substantially. Where the existing sewer line runs close to the converted space the connection is straightforward, and where the bathroom ends up on the far side of the building the drainage has to travel with adequate fall. Cutting a trench through an existing slab to achieve that fall is disruptive and expensive. Position the bathroom close to the existing sewer line wherever the layout will allow it.

The unknowns are what separate an addition budget from a new build budget. A new dwelling on clear ground has few surprises once the soil report is in, while an addition has a house full of them, and the contingency should reflect that difference honestly. Anything you pay a trade to do carries consumer guarantees, which the ACCC oversees. Your contingency should reflect that difference honestly rather than optimistically. Agree how variations will be priced before a wall is opened rather than after.

Addition Costs Across Sydney

Across Sydney conversions are attractive because yard space is scarce and the existing footprint is already approved. The difference is usually decided by the era the garage was built in rather than the suburb it sits in, and the same holds for the budgets at granny flat costs. Check whether the garage was built under the original approval or added later, since an undocumented structure has to be resolved before it can become anything. A structure that appears on no approval record may need retrospective consent before it can be converted into anything habitable.

Sydney AreaConversion CostCommon Constraint
Inner & Eastern Suburbs$90,000-$170,000Low ceilings, shared walls
North Shore & Northern Beaches$95,000-$180,000Under house damp
Western Sydney$60,000-$120,000Detached garages convert well
Hills & North West$70,000-$135,000Integrated garages
South & Sutherland$75,000-$150,000Mixed building eras

Through the western suburbs a detached garage in the rear corner of the block is the best conversion candidate available. It is separate from the house so separation requirements are minimal, it usually has three or four external walls for windows, and the ceiling height in a freestanding garage is often adequate. These convert at genuine savings against a new build. Ceiling height in a freestanding garage is more often adequate than in an integrated one.

Across the northern beaches and the upper north shore, under house space on sloping blocks is the common proposition and the hardest one. Damp, head height and getting a compliant window into a partly buried room all bite at the same time, and the projects that do succeed there are usually the ones where a builder has said no to something early. Existing subfloor ventilation is worth inspecting before anything else, because closing a well ventilated space in without addressing it creates a damp problem that was not there before. Ask what the ground does in heavy rain.

Addition Costs in Regional NSW

Regional blocks generally have room for a detached dwelling, which changes the calculation entirely. Where a new building can go up in a clear part of the yard for a comparable figure, the argument for converting an existing structure has to rest on something other than saving money. Keeping the yard intact or reusing a structure you value are perfectly good reasons, and factory built alternatives sit at prefab granny flat costs. Get one quote for each approach before deciding, since the comparison is rarely as obvious as it looks from the outside.

Regional AreaConversion CostCommon Constraint
Newcastle & Hunter$65,000-$130,000Older brick garages
Central Coast$75,000-$155,000Under house on slopes
Wollongong & Illawarra$75,000-$160,000Escarpment damp
Regional cities$60,000-$120,000Detached build often better
Rural & remote$70,000-$150,000Sheds are not garages

Converting a rural shed is a proposition worth examining carefully rather than dismissing or embracing. A shed has a slab poured for machinery rather than habitation, walls with no insulation and often no lining, a roof with no sarking, and a structural system designed for a different loading. The result can be excellent and it is a substantial construction project rather than a fit out. Price it as construction and it will make sense, and note that a supplied structure carries its own issues at granny flat kit homes.

Onsite wastewater applies to unsewered properties and a conversion adds load exactly as a new dwelling does. Existing drainage often has no capacity for a second household, and bringing it up to standard is significant work priced quite separately from everything else. Have capacity assessed before the project is designed rather than after the drawings are paid for. The assessment considers the number of bedrooms rather than the floor area, so a second bedroom can change the answer even where the building does not grow.

Regional building surveyors and certifiers are fewer and busier, which matters more on a conversion than on a new build. Conversions generate more questions requiring a determination, and each one waits on somebody who may be servicing a wide area. Build that into the programme rather than being surprised by it. Conversions generate more questions requiring a determination than new builds do.

What to Look Out For

Have the ceiling height measured before anything else. Habitable rooms generally need around 2.4 metres with some exceptions your certifier will confirm, and many garages were built below that, particularly older ones under a low pitched roof. Raising a roof costs $18,000 to $40,000 and lowering a floor is usually worse, so a negative result here saves you the cost of investigating everything downstream. Take the measurement yourself with a tape before paying anybody, since it costs nothing and tells you immediately whether the conversation is worth having.

Check the slab for damp proofing and for fall. Garage slabs are commonly poured without a membrane because a garage does not need one, and they are laid to fall fifty to a hundred millimetres toward the door so water drains out. A dwelling needs a level, dry floor, and achieving both over an existing slab costs $12,000 to $25,000 while consuming head height you may not have. It also consumes head height, which is why this check and the height check belong together.

Do not assume the existing wall between house and garage is adequate separation. Fire separation between occupancies is a rated construction specification rather than a lining choice, it has to continue into the roof space to mean anything, and every penetration through it needs detailing. Budget $6,000 to $18,000 wherever a wall is shared and treat it as unavoidable rather than negotiable. Ask where the separation terminates, since one stopping at the ceiling does nothing, and check it against the staged inspections at granny flat construction.

Keep the classification distinction in mind throughout, because it drives almost every cost above. Natural light, ventilation, insulation, weather sealing and thermal performance all have to be brought up to a standard the original construction was never intended to reach, and forming windows in masonry means lintels and structural certification. None of it is visible in the finished room and all of it appears on the quote. Furring out walls for insulation quietly costs internal width you may not have.

Carry a larger contingency than you would on a new build. Termite damage, asbestos, footings on fill and undocumented prior alterations all surface once things are opened up, and fifteen to twenty per cent is realistic. Disputes with a builder over work of this kind are heard by NCAT. Fifteen to twenty per cent is realistic on a conversion rather than pessimistic. Agree how variations will be priced before work starts.

What to Look for in a Quote in NSW

An addition quote should state what has been assumed about the existing structure. It should confirm whether the ceiling height has been measured and found adequate, say whether the slab is assumed to be sound and damp proofed, identify the separation construction proposed and where it terminates, list what structural work to the existing house is allowed for, state what happens if conditions differ once work begins, and confirm who commissions the engineering. The assumptions about the existing building are what separate a reliable quote from an optimistic one. Ask for them in writing rather than accepting a verbal reassurance, and licensing checks run through NSW Fair Trading.

Send each builder the same information about the existing structure. Provide the age of the house, any plans you hold, the measured ceiling height, what you know about the slab, whether previous alterations were approved, and photographs of the space from several angles. Builders pricing a conversion are pricing risk as much as work, and better information produces a tighter and more honest number. A vague enquiry produces a figure padded against everything they cannot see.

A builder who inspects the space before quoting is worth more than one who prices from photographs. Someone who measures the ceiling, looks at where the stormwater goes, checks the fall on the slab and asks what is behind the plasterboard is pricing what is actually there. A number produced without a site visit rests on assumptions you will fund later. Ask how long they spent on site, since twenty minutes with a tape measure is worth more than any amount of email.

Settle the ceiling height, the slab condition and the separation before you commission drawings. Have the height measured, get an opinion on damp and fall, establish where separation is required and how far it must continue, and price the structural unknowns with a proper contingency. Compare the whole exercise against building new at granny flat construction, and builders working nationally are listed on the granny flat builders hub. Price the structural unknowns with a proper contingency rather than a hopeful one.

Granny Flat Additions Across NSW

We connect homeowners with granny flat builders, carpenters and licensed trades across NSW for garage conversions, under house conversions and attached additions, whether you are in Greater Sydney, Newcastle, Wollongong, the Central Coast, the Hunter or regional New South Wales.

▶ Sydney Inner City 18 areas
Sydney CBD Surry Hills Darlinghurst Potts Point Paddington Redfern Newtown Glebe Balmain Pyrmont Ultimo Chippendale Alexandria Waterloo Zetland Erskineville Rozelle Leichhardt
▶ Greater Sydney 25 areas

Western Sydney

Parramatta Penrith Blacktown Mount Druitt Seven Hills Wetherill Park Auburn Fairfield Cabramatta St Marys

South Western Sydney

Liverpool Campbelltown Bankstown Revesby

Northern Sydney

Hornsby Chatswood Epping Macquarie Park Eastwood

The Hills District

Castle Hill Baulkham Hills

Inner West

Ryde Strathfield Burwood

St George

Hurstville Kogarah
▶ Sydney Coastal 23 areas

Northern Beaches

Manly Dee Why Curl Curl Freshwater Brookvale Collaroy Narrabeen Mona Vale Newport Avalon Palm Beach

Eastern Suburbs

Bondi Tamarama Bronte Coogee Maroubra Randwick

Harbour Suburbs

Double Bay Rose Bay Watsons Bay

Sutherland Shire

Cronulla Miranda Sutherland
▶ Hunter & Central Coast 19 areas

Central Coast

Gosford Terrigal Wyong The Entrance Tuggerah Erina Woy Woy

Hunter Valley

Newcastle Maitland Lake Macquarie Charlestown Belmont Raymond Terrace Cessnock Singleton Muswellbrook

Port Stephens

Nelson Bay Salamander Bay Shoal Bay
▶ Illawarra & South Coast 18 areas

Illawarra

Wollongong Shellharbour Kiama Dapto Corrimal Thirroul Gerringong

Shoalhaven

Nowra Berry Ulladulla Huskisson Vincentia

Sapphire Coast

Batemans Bay Moruya Narooma Bega Merimbula Eden
▶ North Coast 19 areas

Mid North Coast

Port Macquarie Forster Taree Kempsey Laurieton

Coffs Coast

Coffs Harbour Bellingen Sawtell Grafton Yamba

Northern Rivers

Byron Bay Tweed Heads Ballina Lismore Bangalow Lennox Head Brunswick Heads Mullumbimby
▶ Blue Mountains & Highlands 17 areas

Blue Mountains

Katoomba Leura Wentworth Falls Blackheath Springwood Hazelbrook Glenbrook Faulconbridge Lawson Blaxland Lithgow

Southern Highlands

Bowral Moss Vale Mittagong Bundanoon Robertson Berrima
▶ Regional NSW 21 areas

Central West

Orange Bathurst Dubbo Mudgee Parkes Forbes Cowra Young

Riverina

Wagga Wagga Albury Griffith Leeton Goulburn Queanbeyan

New England

Tamworth Armidale Inverell Moree Narrabri

Far West

Broken Hill Cobar

Granny Flat Addition FAQs - NSW 2026

Is converting a garage cheaper than building new?
Sometimes, and less often than households expect. A garage conversion runs $60,000 to $120,000 against $140,000 to $250,000 for a detached dwelling, so a conversion at the bottom of its range genuinely saves money while an under house conversion at $180,000 saves nothing at all. Which end you land on is determined by conditions existing before you start rather than by decisions you make afterwards. The appeal is that walls, a roof and a slab already exist, but those elements were built to serve a garage, and a garage is not required to keep anybody warm, dry, ventilated or comfortable. Bringing them up to dwelling standard means insulating walls never designed for it, correcting a slab that deliberately falls toward a door, and achieving a ceiling height that may not exist.
What ceiling height do I need?
Habitable rooms are generally required to achieve around 2.4 metres, with lower figures permitted in some circumstances and for some room types, and your certifier will confirm what applies to your situation. This ends more conversion projects than every other factor combined and takes five minutes to check. Measure from the finished floor to the underside of the ceiling rather than to the roof structure, and measure in several places, since a garage with exposed trusses may look generous while the clear height beneath the bottom chord falls well short. Where a ceiling will be installed as part of the works, what matters is the height remaining once it is in place. Many garages were built below the mark, particularly older ones and those under a low pitched roof.
Can I raise the roof or lower the floor?
Raising the roof is possible and expensive, running $18,000 to $40,000 depending on the roof form and size, and it is a real structural project involving new wall plates, new roof framing, new tie downs, revised bracing and engineering certification. Where the garage is attached to the house, the junction with the existing roof adds further complexity again. Lowering the floor is usually worse, because excavating below an existing slab means undermining the footings supporting the walls above, which requires underpinning, engineering and considerable care, and on a small building it frequently costs more than demolishing and rebuilding from scratch. Treat that option with real scepticism when a builder proposes it casually rather than as a last resort.
What is the problem with the slab?
Two things, and both cost money. Garage slabs are commonly poured without a damp proof membrane beneath them because a garage does not need one, and moisture rising through a slab destroys floor coverings, produces persistent damp and creates conditions for mould. A membrane cannot be retrofitted underneath an existing slab, so the remedy is a topical membrane or a new insulated slab over the top, costing $12,000 to $25,000 and consuming ceiling height you may not have. Separately, garage floors are laid to fall toward the door so water drains out, typically fifty to a hundred millimetres across the slab, and levelling that means a screed or a raised timber floor, each adding thickness and reducing head height further.
Do I need fire separation from the main house?
Wherever a wall is shared between the secondary dwelling and the main house, yes. Fire separation between separate occupancies is required so a fire in one does not immediately reach the other, and the wall must achieve a rated performance verified against the relevant construction requirements. This is a construction specification rather than a lining choice and cannot be satisfied by adding a sheet of plasterboard. The rating applies to the whole assembly including junctions at the floor, ceiling and roof space, so a wall stopping at the ceiling line while the roof space continues over both dwellings achieves nothing. Every penetration for power points, switches, pipes and ducts needs detailing correctly. Budget $6,000 to $18,000 and treat it as unavoidable.
Is acoustic separation the same thing?
No, it is a separate requirement and it is what determines whether the arrangement is tolerable to live with. Fire separation stops a fire spreading, while acoustic separation addresses airborne noise through a shared wall and impact noise through a shared floor, and the constructions achieving them involve mass, isolation and careful sealing rather than insulation alone. Two households living either side of a poorly separated wall is a situation nobody enjoys, and it is not something that can be improved afterwards without opening the wall up again. Households frequently discover both requirements late, having assumed the existing wall between the house and the garage was sufficient because it already looked like a wall and had been there for years.
What about under house conversions?
They preserve the yard entirely, which is the great advantage, and they bring the hardest technical problems of any route. Head height, damp, natural light, ventilation and access all need solving at once, and failure on any single one stops the project. A subfloor with 2.1 metres of head height cannot become a bedroom without excavation, and excavating beneath a house you intend to keep living in is substantial work. Below ground masonry in contact with soil transmits moisture continuously, and tanking a below ground wall properly is specialist work that must be done from the correct side to be effective. There may also be no possibility of a compliant window in a bedroom at all, so establish what can be achieved before assuming a bedroom is viable there.
What can go wrong with the existing house?
Attaching new work means engaging with a structure nobody has examined in decades. Existing footings may be shallower than current practice, wall construction may not match the plans, and previous alterations may have been done without approval or engineering, none of which is visible until work begins. Differential movement is the technical problem at the heart of attached additions, since a new slab on new footings settles differently from a house that settled decades ago, and the junction has to accommodate that movement through articulation joints and careful detailing rather than resist it. Termite damage, asbestos in old sheeting and footings sitting on fill all surface once things are opened up, which is why a contingency of fifteen to twenty per cent matters more here than on any new build.
Does a converted garage still need approval?
Yes, and nothing about the structure already existing changes that. A certifier assesses the proposal, inspections occur at defined stages, and an occupation certificate is required before anybody lives there, exactly as for a new building. The sustainability assessment applies in the same way too, considering the fabric, the glazing, the orientation and the fixed appliances, and a garage facing the wrong direction with limited window options can be genuinely difficult to bring through. Commission that assessment early rather than treating it as paperwork at the end. Separate matters also arise that households overlook: private open space attached to the dwelling is generally required, and a garage conversion removes parking the site previously provided, which the council may expect to be retained.
Can I convert a rural shed?
It is worth examining carefully rather than dismissing or embracing. A shed has a slab poured for machinery rather than habitation, walls with no insulation and often no lining at all, a roof with no sarking, the foil or membrane layer laid under the roof sheeting to stop condensation and dust, and a structural system designed for entirely different loading. The result can be excellent, and it is a substantial construction project rather than a fit out, so price it as one. On unsewered properties the wastewater question also applies, since a conversion adds load exactly as a new dwelling does and the system serving the main house frequently cannot take a second household, with upgrading priced separately from everything else. Have capacity assessed before the project is designed. Regional certifiers are also fewer and busier, and conversions generate more questions requiring determination.

Granny Flat Specialists - NSW

For Builders & Trades - NSW

Are you a licensed builder or trade contractor? Browse current job leads on the NSW job leads board, with relevant work including granny flat builder jobs Australia-wide and builder jobs Australia-wide.

Planning a Granny Flat Addition in NSW?

Post your job and connect with granny flat builders across NSW for garage conversions, under house conversions and attached additions, across Greater Sydney, Newcastle, Wollongong, the Central Coast, the Hunter and regional New South Wales.

Get Addition Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 18 August 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All NSW tradies are required to hold appropriate licences. Verify at NSW Fair Trading.
Indicative 2026 NSW estimates only. Converting non habitable space into a dwelling triggers requirements the original structure never had to meet. Have the ceiling height and floor level checked by a certifier before committing to anything.
Need work done? Get free quotes. Post a Job – It's Free