Looking for a Bricklayer in Sydney?

Describe the brickwork you need in your Sydney suburb, with its rough length and height, its distance from the boundary and any narrow access. Local bricklayers then quote from that one description, so the prices you get back cover identical work.

Get Free Bricklaying Quotes

Sydney Bricklaying Price Guide

Brick veneer labour, per 1,000 bricks laid$1,200 - $1,800
Standard face bricks, each$0.80 - $1.50
Brick fence, low to mid height$350 - $700 per metre
Brick pier for a gate or fence$600 - $1,200 each
Brick letterbox built on a footing$800 - $2,000
Concrete block wall laid$150 - $300 per m²
Block retaining wall$250 - $500 per m²
Repointing worn mortar joints$80 - $150 per m²
Steel lintel replaced over an opening$800 - $2,500
Engineer's design for a wall$500 - $2,500

These are typical Sydney price ranges for 2026. Your price depends on the brick chosen, the ground under the footing, the height of the wall, the access to the site and whether an engineer or planning approval is needed.

Hire a Bricklayer Sydney NSW - Get Local Quotes

Sydney bricklayers take on everything from one cracked brick to the full brick skin of a new house, and the rules change as the job grows. NSW treats bricklaying as its own licensed trade once labour and materials pass $5,000, and work over $20,000 needs home building compensation cover before any deposit is paid. Masonry fences on side and rear boundaries are exempt from approval only up to 1.2 metres, which is lower than the limit for timber or metal. Clay soils across western Sydney swell when wet and shrink when dry, while homes close to the ocean beaches and the harbour need tougher bricks and stronger mortar. Figures quoted here are typical 2026 Greater Sydney ranges for weekday work, and they leave out engineering, approval and council fees. Post your job on The Quote Yard and we will connect you with local bricklayers across Sydney who can quote on it.

Sydney Brick Jobs, From One Lintel to a Whole House

Sydney bricklayers renew worn mortar joints and replace cracked lintels, the beams that carry brickwork over a window or door. They also build new brick fences, letterboxes, block retaining walls and brick veneer homes, where one skin of brick is tied to the house frame. Send us one written description and every Sydney bricklayer who replies prices exactly the same job.

Get Free Quotes

At a Glance - Sydney Bricklaying Prices 2026

Job Price Band How It Is Charged What Drives It In Sydney Who Can Do It
Brick veneer labour $1,200 - $1,800 per 1,000 Per thousand bricks laid Wall height, openings and access Licensed bricklayer
Standard face bricks $0.80 - $1.50 each Per brick supplied Range, colour and salt grade Brick maker or merchant
Feature or handmade bricks Over $3 each Per brick supplied Range and order size Brick maker or merchant
Brick fence, low to mid height $350 - $700 per metre Per linear metre Height, piers and footing Licensed bricklayer
Brick fence, full height $800 - $1,500 per metre Per linear metre Approval, engineering and footing Licensed bricklayer
Brick pier $600 - $1,200 each Per pier Size, capping and gate hardware Licensed bricklayer
Brick letterbox $800 - $2,000 Fixed price Footing, render and inserts Bricklayer
Concrete block wall $150 - $300 per m² Per square metre of wall face Core fill and reinforcement Bricklayer or blocklayer
Block retaining wall $250 - $500 per m² Per square metre of wall face Height, drainage and engineering Bricklayer or wall builder
Repointing $80 - $150 per m² Per square metre Joint depth and scaffold Bricklayer or restorer
Tuckpointing $150 - $300 per m² Per square metre Two colour joint work Specialist restorer
Steel lintel replacement $800 - $2,500 Fixed per opening Width of opening and bricks above Bricklayer
Engineering for a wall $500 - $2,500 Fixed fee Height, soil and loads Structural engineer

What Pushes a Sydney Brickwork Price Up

What is involved
Bricks with a higher salt attack grade can cost more, but sites near the ocean or harbour need them.
Reactive clay under a fence calls for deeper or reinforced footings and sometimes an engineer.
Rock close to the surface turns a quick footing dig into saw cutting or breaking out rock.
Narrow side access means every pallet of bricks and bag of mortar goes in by barrow.
A Sydney quote that splits labour, bricks, mortar, footings and waste removal into separate lines, and names the brick range and salt grade, is far easier to check. A single total with no breakdown hides where one price differs from another.

What to Gather Before a Sydney Quote

Have your suburb, rough measurements, photos of the site and any existing brickwork, a spare brick or the name of the range if you know it, and any house plans or soil report. Note whether the property is near the water, heritage listed or on bushfire prone land.

Get Free Quotes
Free · No obligation · NSW-wide

Your Role When You Hire a Sydney Bricklayer

In Sydney, a bricklaying job can be one brick swapped out of a garden wall or the whole outer skin of a new two storey house. If you have looked at the NSW bricklaying and blockwork services guide, you will find the same price bands here, and the repair prices match our brick repair pages. In brick veneer, a single skin of brick is tied to a timber or steel frame, and it is the frame, not the brick, that holds up the roof. Bricklayers can work for a builder as a subcontractor or take a job straight from a homeowner, and the paperwork differs between the two. When you hire one directly, you become the client, so the licence check, the written contract and the payment terms are yours to get right.

Start by writing down what you want built, its rough length and height, and where it sits in relation to the boundaries and the house. Photos of the site, the existing bricks and any cracks help a bricklayer price the job without guessing at what is there. If you can find the original house plans or a soil report from when the home was built, keep them ready, because footing design depends on both. Writing a short brief like this also means every bricklayer you contact is pricing exactly the same piece of work.

What Common Sydney Brick Jobs Cost

Labour for brick veneer is typically priced at $1,200 to $1,800 per 1,000 bricks laid, and standard face bricks add roughly $0.80 to $1.50 each on top. Feature, glazed and handmade bricks can cost more than $3 each, which lifts the material bill well above a job laid in a standard brick. Low to mid height brick fences are priced at $350 to $700 per metre, while full height brick fences run at about $800 to $1,500 per metre. Brick piers, the square columns that carry gates or infill panels, cost about $600 to $1,200 each, and a brick letterbox comes in at $800 to $2,000. Walls built from hollow concrete blocks cost about $150 to $300 per square metre, rising to $250 to $500 per square metre once the wall has to hold back soil. Engineering, where a wall needs it, adds $500 to $2,500, and that fee sits outside the bricklayer's own price.

Repair work is priced differently from new work because so much of the time goes into preparation. Repointing, where the bricklayer rakes out crumbling mortar and packs the joints with a fresh mix, costs $80 to $150 per square metre of wall. Tuckpointing adds a thin line of contrasting mortar along each joint and is priced at $150 to $300. Replacing a single damaged brick costs about $50 to $150, and stitching a crack with stainless steel bars set into the joints runs at $150 to $400 per metre. If a lintel, the steel angle that carries the bricks over a window or door, has rusted, steel lintel repairs typically cost $800 to $2,500. Galintel, a division of NEPEAN Building & Infrastructure, makes galvanised steel lintels and a stainless steel range for corrosive environments.

Job Sydney Band How It Is Charged What Moves It
Brick veneer labour $1,200 - $1,800 per 1,000 Per thousand bricks Height, openings and scaffold
Standard face bricks $0.80 - $1.50 each Per brick Range and salt attack grade
Brick fence, low to mid height $350 - $700 per metre Per linear metre Height and number of piers
Brick fence, full height $800 - $1,500 per metre Per linear metre Approval and footing design
Brick pier $600 - $1,200 each Per pier Size, capping and gate fixings
Brick letterbox $800 - $2,000 Fixed price Footing, render and insert
Block retaining wall $250 - $500 per m² Per square metre Height, drainage and engineering
Single brick replaced $50 - $150 Per brick Access and colour match
Crack stitching $150 - $400 per metre Per metre of crack Crack length and wall type
Small repair visit $400 - $700 Half day Travel and materials
Tuckpointing $150 - $300 per m² Per square metre Two colour joints and scaffold
Engineering for a wall $500 - $2,500 Fixed fee Height, soil and loads

How Sydney Bricklayers Turn a Job Into a Price

Bricklayers price new veneer work per 1,000 bricks because that count can be worked out from the plans before anyone arrives on site. On a home that needs 10,000 bricks, a difference of $100 per thousand in the labour rate changes the bill by $1,000. Fences and garden walls are more often priced per metre of length, with piers, capping and gates listed as separate items. Blockwork and retaining walls are priced per square metre of wall face, since height changes how much block and core fill, the concrete poured into the hollow blocks, goes in. Some bricklayers charge small repair jobs as a half day or a full day, and a half day visit costs about $400 to $700. Whichever method a bricklayer uses, the quote should still show the quantity it is based on, so you can check that count against your own plans.

Materials are handled in one of two ways, and the difference matters when you compare totals. Supply and lay quotes include the bricks, sand, cement and wall ties, the metal strips holding the brick skin to the frame, while labour only quotes leave the bricks for you to buy. Labour only work can save the bricklayer's margin on materials, but it leaves you to manage deliveries, breakages and any shortfall in the order. If you do buy the bricks, order a few extra from the same batch, since a top up order months later may not match the colour.

Reading a Sydney Bricklaying Quote

$1,200 to $1,800, per 1,000 bricks laid for veneer labour, before the bricks and mortar
Line on the quote
What it covers
Labour rate
Per thousand bricks, per metre or per square metre
Bricks
Range name, quantity and price for each brick
Mortar and ties
Sand, cement, additives and wall ties
Scaffold and waste
Hire, skip bins and cleaning down the brickwork

The quantity of bricks should be shown as a number, not just as a lump sum.

Staged pricing lets you hold back money until each part is finished.

Link each progress payment to a stage you can see, such as a finished footing or brickwork up to window height, rather than to a calendar date.

The NSW Bricklaying Licence and the $5,000 Line

Bricklaying is a licence category of its own in NSW, separate from a general builder's licence. Bricklaying work valued at more than $5,000 in labour and materials, including GST, needs a contractor licence, according to the licensing pages on the NSW Government website. To qualify, an applicant needs a Certificate III in Bricklaying and Blocklaying, the current course being CPC33020, or one of the older equivalent courses, and individuals must also supply a National Police Check. Building Commission NSW manages the licence, and applications are lodged through Service NSW. Licences can be issued for one, three or five years, so compare the expiry date on the licence with the date your job is due to finish.

There are three licence types to understand when you read a bricklaying quote. An individual contractor licence lets that person contract for bricklaying work in their own name. Company and partnership contractor licences cover the business itself, and a licence held by an individual does not allow that person's company to sign the contract. The third type is a qualified supervisor certificate, which shows a person is qualified to supervise bricklaying work but does not by itself let them contract with you. For that reason, the name and licence number on the written contract must match the business you are paying. Searching the Service NSW licence lookup is free and shows the holder's name, the licence class and the expiry date.

Licence or Document What It Allows When You Need It What to Check
Individual contractor licence Contracting in that person's own name Bricklaying work over $5,000 Name matches the contract
Company or partnership licence Contracting by the business The business signs the contract Licence held in the business name
Qualified supervisor certificate Supervising bricklaying work Alongside a contractor licence Not a licence to contract on its own
No licence Bricklaying work up to $5,000 Small repairs and minor jobs Written quote and insurance
Home building compensation certificate Cover if the contractor cannot finish Residential work over $20,000 Issued before any deposit
Written contract Sets the price, scope and payments Residential work over $5,000 Small or large jobs format
Certificate of currency Proof of public liability cover Before work starts on site Policy dates and insured name

Small Job and Large Job Contracts for Brickwork

NSW requires a written contract for residential building work worth more than $5,000 including GST, and the type of contract depends on the price. If the price is not known when you sign, the test is the reasonable market cost of the labour and materials involved. Work between $5,000 and $20,000 needs a small jobs contract, which is shorter but still has to name the licence holder exactly as the licence shows. Work over $20,000 needs a large jobs contract with more detail, including a cooling-off period of five clear business days after you receive a copy. The deposit on either kind of contract is capped at 10 per cent of the price. Priced together as one job, a brick fence, a letterbox and a retaining wall can cross the $20,000 line, so check which contract type applies before signing.

Home building compensation cover, known as HBCF and arranged through the state insurer icare, is required for residential work over $20,000. It protects you if the contractor dies, disappears or becomes insolvent and the work is left unfinished or defective. No deposit or other payment can lawfully be taken on a job that needs this cover until the cover is in place and you have the certificate. Check that the certificate names the right address and the right work before you transfer any money. If a bricklayer suggests skipping it on a job over $20,000, treat that as a firm reason not to sign. Later payments should match stages you can see, such as footings poured, brickwork up to window height and brickwork finished and cleaned.

Contract Steps by Job Size

Job value
What NSW requires
$5,000 or less
No licence or written contract required by law
$5,000 to $20,000
Small jobs contract and a licensed contractor
Over $20,000
Large jobs contract and five day cooling-off
Over $20,000
HBCF certificate before any payment
Any size over $5,000
Deposit no more than 10 per cent
Do not pay a deposit on a job over $20,000 until you hold the home building compensation certificate for that address.

The 1.2 Metre Limit on Brick Side and Rear Fences

Sydney owners planning a tall brick boundary fence should know about a lower height limit that applies only to masonry. Exempt development is the planning term for minor work that needs no approval, as long as every listed standard is met, and you can read the fence standards on the NSW Planning Portal. In a residential zone, a side or rear fence can be built as exempt development up to 1.8 metres high. That limit drops to 1.2 metres if the fence is built from masonry, which takes in brick, block and stone. Built in brick, a 1.8 metre side boundary fence therefore needs planning approval, while the same height in timber or metal may not.

The exempt fence rules apply in the residential zones R1 to R4 and the village zone RU5, and the Planning Portal shows the zoning for every address. They do not apply to a property on the State Heritage Register or under an interim heritage order, where a new fence needs approval. Gates in an exempt fence must not open outwards, which matters when a bricklayer sets out the piers for a driveway or pedestrian gate. Shared boundary fences also come under the Dividing Fences Act 1991, so agree the design and cost split with your neighbour in writing before any brick fences and walls go up on that line.

Fence Exempt Height Approval Needed If Watch For
Side or rear fence, timber or metal Up to 1.8 m Taller than 1.8 m Neighbour agreement
Side or rear fence, brick or block Up to 1.2 m Taller than 1.2 m Footing size for the height
Front fence, any material Up to 1.2 m Taller than 1.2 m Gates must not open outwards
Secondary road fence on a corner Up to 1.2 m Under 20 per cent see-through above 400 mm Solid piers wider than 350 mm
Fence on bushfire prone land Normal heights apply Combustible materials are used Non-combustible or hardwood only
Property on the State Heritage Register Not exempt Any new fence Talk to the council first
Old fibro fence being replaced Not a height issue Asbestos found in the sheets Test before demolition

Front Fences, Corner Blocks and Pier Widths

Fences along a primary or secondary road boundary, or within the setback from that road, are exempt only up to 1.2 metres. Corner blocks have two road frontages, and the fence along the secondary road, usually the side street, has extra conditions. Above 400 millimetres, that fence must be at least 20 per cent transparent, meaning a fifth of its face is open so you can see through it. Solid piers or posts on that frontage must be no wider than 350 millimetres. Two standard bricks wide, a pier measures close to 470 millimetres, well over that limit, so agree the pier size when the fence is set out. Openings between narrower piers can be filled with steel, aluminium or timber battens to reach the required see-through area.

Suburbs on the bushland edges of Sydney can be mapped as bushfire prone land, and the NSW Rural Fire Service lets you check the mapping for any address. On that land, an exempt fence must be built from non-combustible materials or hardwood. Brick, block and stone are non-combustible, so a masonry fence meets that part of the rule without any special treatment. Infill panels and gates need the same care, because a gate made from a timber that is not hardwood would fall outside the exempt standard. Any new house or extension on the same land has its own bushfire requirements, so mention the mapping when a builder or bricklayer quotes the whole job.

Corner Block Fence Checks

350 mm maximum width of a solid pier or post on a secondary road frontage
Item
Exempt standard
Height on any road frontage
No more than 1.2 metres
See-through area above 400 mm
At least 20 per cent on the side street
Solid pier or post width
No more than 350 mm
Gates
Must not open outwards
Bushfire prone land
Non-combustible materials or hardwood
Measure the pier width on the drawing before the footing is poured, because a pier that is too wide is hard to fix later.

Brick and Block Retaining Walls Without a Development Application

Low retaining walls, built by bricklayers or specialist retaining wall builders, can also be exempt development, but the conditions are strict. Under the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008, an exempt wall can be at most 600 millimetres high, with any cut or fill kept within 600 millimetres of existing ground level. The wall must also sit at least 1 metre from any lot boundary, registered easement, sewer or water main, and at least 40 metres from a natural body of water. Where a site has more than one retaining wall, the walls must be at least 2 metres apart horizontally, so a stepped garden of low walls set close together does not qualify. The wall must not redirect surface or ground water or wash sediment onto the neighbour's land, and it must be structurally adequate and built to the manufacturer's instructions. Check with your council as well, because some council fact sheets word these limits differently and local controls can add conditions.

Heritage conservation areas add another condition that applies across parts of Sydney's older suburbs. In a heritage conservation area, an exempt retaining wall can only be built in the rear yard, and no exempt retaining wall can be built on a heritage item at all. Your council's local environmental plan shows whether a property is a heritage item or inside a conservation area, and the Planning Portal map shows the same layers. Check both maps before you accept a quote, so the wall is planned for the right part of the yard from the start. Going over these limits, or building in a front yard inside a conservation area, means getting approval and usually an engineer's design, so plan for retaining wall engineering and certification as part of the job. Drainage behind the wall, such as a slotted pipe laid in gravel, is part of the structure, not an extra, so look for retaining wall drainage as a priced line on the quote.

Condition Exempt Limit Why It Matters If You Exceed It
Height 600 mm high, with cut or fill within 600 mm Taller walls carry more soil load Approval and engineering
Lot boundary, easement, sewer or water main 1 m or more away Protects neighbours and services Approval needed
Natural body of water 40 m or more away Protects creeks and foreshores Approval needed
Other retaining walls on the site At least 2 m apart Stops walls loading each other Treat as one taller wall design
Heritage conservation area Rear yard only Protects the street view Approval for front yard walls
Heritage item Not exempt Listed fabric is protected Approval for any wall
Surface and ground water Not redirected onto the neighbour Prevents flooding and erosion next door Redesign the drainage

Harbour Foreshore and Surf Coast Brick Grades

Salt carried in sea spray and ground water can break down bricks and mortar over time, so minimum brick grades apply to coastal sites. Land up to 1 kilometre from a surf coast or up to 100 metres from a bay or inlet counts as a severe marine environment, and only Exposure grade bricks should be used there. Sydney has both kinds of shoreline, with ocean beaches facing the surf and a harbour, bays and river foreshores that do not. Two streets back from an ocean beach, a home can sit inside the severe band, but near Botany Bay or the Georges River only homes within 100 metres of the water are inside it. The marine band beyond that, from 1 to 10 kilometres from surf and from 100 metres to 1 kilometre from calm water, needs at least General Purpose grade bricks. These distances and grades come from the online guide to building on the coast published by PGH Bricks & Pavers.

Brick salt attack grades come from testing under AS/NZS 4456.10, where samples are soaked in salt solution and dried through repeated cycles. General Purpose bricks must lose less than 0.4 grams over 15 cycles, and Exposure grade bricks must lose less than 0.4 grams over 40 cycles. Manufacturer durability guides pair Exposure grade bricks in severe marine areas with M4 mortar, a stronger cement-rich mix than the M3 class used with General Purpose bricks. Exposure grade bricks are also needed below the damp proof course, the waterproof layer near the base of a wall, wherever salts in the ground can reach the brickwork.

Which Brick Grade for Which Address

Location
Minimum brick grade
Within 1 km of a surf beach
Exposure grade, with M4 mortar
Within 100 m of a bay, harbour or inlet
Exposure grade, with M4 mortar
1 to 10 km from surf
At least General Purpose
100 m to 1 km from calm water
At least General Purpose
Below the damp proof course on any site
Exposure grade where salts can reach
Have the salt attack grade of the chosen brick written on the quote, as well as the range name and colour.

Shale Clay Soils and Small Footings in Western Sydney

Much of western Sydney sits on clay soils weathered from the Wianamatta Group shales, the rock beneath the Cumberland Plain. The NSW Government's report on the Blacktown soil landscape, covering areas such as Mount Druitt and Leppington, rates its deep clay subsoils as moderately reactive and highly plastic, with a localised high shrink and swell limitation. Reactive clay swells when it gets wet and shrinks as it dries, and that movement can lift or drop a footing that is too small or too shallow. Long brick fences are rigid, so uneven movement along their length tends to show up as stepped cracks through the mortar joints. Houses are designed to AS 2870, the Australian Standard for residential slabs and footings, which classes a site by how much the ground is expected to move. Fences, letterboxes and garden walls sit outside the house slab design, so the bricklayer or an engineer has to size their footings separately.

Control joints, which are deliberate vertical gaps filled with a flexible sealant, let a long masonry wall move without cracking at random points. On reactive clay, ask the bricklayer how far apart the control joints will be and how the footing will be reinforced. Bostik and Sika both make flexible sealants that suit filling these joints in brick and block walls. Where rock sits close to the surface, digging the footing can mean saw cutting or breaking out rock, which a quote should price as its own item. Cracks in the walls of the house itself are a different matter, and underpinning and foundation repair or a structural engineer should be called in before a bricklayer.

Fence and wall footings also run close to pipes and cables, which can add to the cost of digging. Sewer and stormwater lines along a boundary may need to be located or bridged by a licensed plumber, and you can find one by hiring a plumber in Sydney. Lights in brick piers, an intercom in a letterbox or a motor for a sliding gate need conduit laid before the bricks go up, so line up the wiring early by hiring an electrician in Sydney. Before any footing is dug, lodge a free enquiry with Before You Dig Australia, which brings back information from asset owners about recorded pipes and cables.

Ground or Situation What Can Happen Footing Approach Question for the Quote
Reactive shale clay Fence lifts or drops in sections Deeper, reinforced strip footing Is an engineer needed?
Rock close to the surface Slow, noisy excavation Footing keyed into the rock Is rock breaking priced?
Fill from earlier building work Uneven settlement Dig through to natural ground How deep is natural ground?
Sewer or stormwater near the line Pipe damage or blocked access Bridge or move the pipe Who books the plumber?
Large trees nearby Roots dry and shrink the clay Root barrier or wider set back Are tree approvals needed?
Sloping site Fence must step down the slope Stepped footing and courses How are steps detailed?
Clay kept wet by a downpipe Soft ground and settlement Fix the drainage before building Where do the downpipes discharge?

Sydney Shale and the City's Brickmakers

Sydney has made bricks from its own shale and clay for well over a century, and that history still shows in the colours of older streets. Opened by the NSW Government at Homebush Bay in 1911 to hold down brick prices, the State Brickworks was sold in 1936, closed in 1940, reopened after the Second World War and shut for good in 1988. The old brick pit at Sydney Olympic Park is now habitat for the green and golden bell frog, with a ring walk built above it. Austral Bricks extracts clay and shale at Horsley Park in western Sydney, and PGH Bricks & Pavers has made bricks under that name since 1958. Baines Masonry makes concrete masonry products, including retaining wall blocks, at Appin on the south western edge of Greater Sydney. Austral Masonry, part of the same Brickworks group as Austral Bricks, makes concrete blocks for walls and retaining.

Older Sydney bricks can differ in size from current ones, which matters when new brickwork has to line up with old courses. When matching a pre-war wall, the bricklayer needs to check the brick height and the joint thickness, because a small difference repeated over many courses puts the new work out of line with the old. Salvaged bricks from a demolition yard can suit a small repair on an older house, though they need to be cleaned of old mortar and checked for cracks and soundness first. Larger repairs on older homes may suit a mason who works with soft historic bricks and lime mortar, and some of these trades also handle stone masonry repairs to sandstone and heritage fabric.

Brick and Block Makers Around Sydney

Maker
What it makes
Austral Bricks
Clay bricks, with clay and shale extracted at Horsley Park
Bowral Bricks
Brand now listed on the Austral Bricks NSW site
PGH Bricks & Pavers
Clay bricks and pavers under a name dating from 1958
Baines Masonry
Concrete masonry made at Appin
Austral Masonry
Concrete blocks for walls and retaining
Name the exact range, colour and batch number on the quote, so the delivery matches the sample you approved.

Ordering a Renamed or Older Range for a Colour Match

Brick ranges are renamed, merged and dropped over time, which can make matching difficult when you extend a house or rebuild part of a fence. Bowral Bricks is one example, as its website now leads to the Austral Bricks NSW site, where the Bowral brand and a Bowral 76 range are still listed. If your house was built with a range that has changed name, take a sound brick, or a clear photo with any brand stamp, to a brick selection centre and find out what replaced it. Colours can vary from one firing to the next, so a new batch of the same range may not sit perfectly beside a wall laid decades ago.

Laying a sample panel of a few courses, left to dry before the full order is placed, shows how the new brick and mortar look in daylight. Mortar colour can matter as much as the brick when you are matching old work. Cement Australia and Boral make the cement that goes into mortar, and coloured oxides or off-white cement change the tone of the joints. The joint profile changes the look as well, since an ironed joint, pressed into a shallow curve with a steel tool, casts a different shadow line from a flush one. Where a close match is not possible, the whole wall can be covered instead, so compare brick painting costs with the price of rendering and texture coating before deciding. Dulux AcraTex makes acrylic render and coating systems that can be applied over brick when the whole wall is to be covered.

Matching Task Who Can Help What to Bring Good to Know
Identify the original range Brick selection centre A sound brick or clear photo Ranges are renamed over time
Check a renamed brand The maker's NSW website Brand and range name Bowral is listed under Austral
Test the colour Your bricklayer Bricks from the new batch Lay a sample panel first
Match the mortar Your bricklayer A piece of old mortar Sand and oxide change the tone
Match the joint profile Your bricklayer Photos of the old joints Ironed, raked or flush
Cover a poor match Painter or renderer Photos of the full wall Paint or render the whole face
Keep spares for later Your bricklayer The batch number Store a few bricks under cover

SafeWork NSW Dust Rules for Cutting Brick and Block

Cutting, grinding and chasing bricks, blocks and mortar releases respirable crystalline silica, a fine dust that can cause silicosis and other lung disease when breathed in. SafeWork NSW guidance treats brick, concrete or stone cutting as a crystalline silica process, so the dust must be controlled every time it happens. The controls it names include wet dust suppression, an on-tool dust extraction system and local exhaust ventilation, along with respiratory protection. Husqvarna and Stihl make cut-off saws with water feed kits for cutting brick and block. Festool, Hilti and Makita make dust extractors that connect directly to grinders and saws. Dry cutting with an angle grinder and no extraction should not be happening on your site, even for a handful of bricks.

Bricks, pavers and similar blocks fall outside the national engineered stone ban, which started on 1 July 2024 and is published by Safe Work Australia, so they can still be used and cut with proper controls. Where cutting is likely to be high risk, the business must record a risk assessment in writing. It must also prepare a silica risk control plan, a written plan for keeping the dust down, which on a construction job can take the form of a safe work method statement. From 1 October 2025, NSW employers must also notify the Silica Worker Register of workers doing high risk silica processing within 28 days of that work starting. These duties sit with the bricklaying business, and a careful one will tell you how cutting will be handled before work starts. Old fibro fences and sheds near the work can contain asbestos, so have them tested before anyone breaks them, and arrange asbestos fence removal by a licensed removalist if the test finds it.

Dust Controls to Expect on Site

Task
Control
Cutting bricks or blocks
Wet saw or on-tool extraction
Raking out joints for repointing
Grinder with a shroud and extractor
Cleaning up
Wet methods or an industrial vacuum, not dry sweeping
High risk work
Written risk assessment and a safe work method statement
Keep children, pets and open windows away from the cutting area until the dust has been cleaned up.

Calcium Silicate Bricks and Clay Bricks Compared

Not every brick or block delivered to a Sydney building site is made from fired clay. Calcium silicate bricks are made from sand and lime that are pressed into shape and hardened with steam rather than fired in a kiln. According to SafeWork NSW, their crystalline silica content is about 50 to 55 per cent, compared with up to 30 per cent for clay bricks, while concrete and mortar range from 25 to 70 per cent. That higher figure means cutting calcium silicate bricks produces dust with more silica in it, so the controls described above matter even more. Hebel, made by CSR, is a different product again, being autoclaved aerated concrete, a lightweight steam cured concrete, supplied as panels and blocks rather than face brick.

The practical differences for a homeowner are the look of the finished wall, the sizes on offer and how the wall is detailed around openings and joints. Calcium silicate units tend to be very regular in shape with crisp edges, while clay bricks show more variation in colour from one brick to the next. Calcium silicate and concrete masonry shrink slightly as they dry, while clay bricks expand slowly after firing, so the spacing of control joints differs between them. AS 3700, the Australian Standard for masonry structures, and AS 4773 for masonry in small buildings set the design and construction rules for all of these materials, and copies are sold through Standards Australia.

Material Made From Silica Content Movement Over Time
Clay brick Fired clay and shale 30 per cent or less Expands slowly after firing
Calcium silicate brick Sand and lime, steam cured About 50 - 55 per cent Shrinks slightly as it dries
Concrete block Cement, sand and aggregate 25 - 70 per cent for concrete Shrinks as it dries
Mortar Cement, lime and sand 25 - 70 per cent Class chosen for the exposure

Statutory Warranties and Brickwork Disputes in NSW

Residential building work in NSW carries statutory warranties, which are promises the law writes into every contract whether or not they appear on paper. For contracts signed on or after 1 February 2012, the warranty period is six years for major defects and two years for all other defects. Major defects involve major elements of a building, such as load bearing walls and footings, and the full definition is in the Home Building Act 1989. If a problem appears in the last six months of a warranty period, you have a further six months after the period ends to act. The owner is responsible for applying to the tribunal before the warranty runs out, so a dispute left to drag on can cost you the right to claim. Where HBCF cover applies, notify the insurer in writing as soon as you become aware of defective or incomplete work.

The first step in any dispute is to raise it with the bricklayer, then confirm what was agreed in a dated letter or email. For questions about quality, the NSW Guide to Standards and Tolerances gives a shared reference for what counts as acceptable building work, including brickwork. If talking does not fix it, Building Commission NSW offers dispute resolution, though both parties must agree to take part and an inspection is only carried out where there is a major defect. An inspector can order the contractor to fix the work, and if that rectification order is ignored you can lodge a claim with the NSW Civil and Administrative Tribunal, known as NCAT. Any retaining wall leaning or bulging toward a path or play area should be fenced off and assessed straight away, before any retaining wall repairs are booked.

Gaps to Look Out For in a Sydney Brickwork Quote

Every quote for new brickwork should name the brick range, colour, salt attack grade and quantity, along with the mortar class and the joint finish. For fences and walls, it should give the length, height, pier spacing and footing size, and say whether the footing is reinforced. Where the job needs planning approval, the quote should say who is applying for it and whether the fee is included. Check that the licence number on the quote belongs to the business named at the top, and that the licence covers bricklaying. For a job over $20,000, the quote should mention the HBCF certificate, and no deposit should be requested before you have it. Scaffold, waste removal, cleaning down the new brickwork and any engineering should each appear as a line, even if that line says excluded.

Some warning signs relate directly to the Sydney and NSW rules covered above. A quote for a 1.8 metre brick side fence that says nothing about approval has missed the 1.2 metre masonry limit. Pricing a front yard retaining wall in a heritage conservation area as exempt work is another sign the planning rules have not been checked. Near the ocean or the harbour, a General Purpose brick named for a house inside the severe marine band should be questioned before you sign. Payment requests above the 10 per cent deposit cap, or cash discounts offered in return for skipping the contract, are reasons not to go ahead with that business. If a quote makes no mention of dust control or how bricks will be cut, the business may not have thought about the silica rules.

Gaps and Warning Signs

What is involved
Separate prices for labour, bricks, mortar, footings and taking away waste.
The brick range, colour and salt attack grade named in writing on the quote.
Footing size, reinforcement and control joint spacing stated for every fence or wall.
The licence number matching the business name on the quote and contract.
The HBCF certificate supplied before any deposit on a job over $20,000.
Dust controls for cutting described before the first brick is cut on site.

A tall brick side fence priced with no mention of planning approval.

A deposit request above 10 per cent of the contract price.

A Sydney quote far below the others may have left out the footing, the engineering, the salt grade of the brick or the waste removal.

Comparing Quotes From Sydney Bricklayers on Equal Terms

Bricklayers can only give comparable prices when they are all working from the same information about the site and the work. Send each one the same brief, the same photos and, for anything larger than a small repair, a simple drawing with lengths, heights and the boundary positions marked. Nominate the brick you want, or have each bricklayer price the same range, so the material cost does not hide differences in labour. If an engineer's design is needed, have it done before quoting so everyone prices the same footing and reinforcement. Collecting three written quotes gives you a fair spread to compare, and each one should say how long the price holds.

Timing affects the price of a bricklaying job as well as the date it can start. Brick deliveries, any required inspections and the engineer's sign off all need to fit around the bricklayer's other work, so ask for a realistic program instead of a promised start. Larger jobs that include a slab, a new driveway or an extension may be better run by a licensed builder, and you can begin that search through finding a builder in Sydney. Removing an old fence or wall can be quoted separately by a demolition services contractor, which keeps the price for the new brickwork clear. At handover, keep the contract, invoices, brick range details and any engineering certificate together, because a future buyer's inspector may ask for them. Spare bricks from the same batch, stored under cover, make a later repair much easier to match.

Bricklayers Across Sydney

Bricklaying prices on this page apply across Sydney. Jobs close to the main centres rarely carry a travel charge, while outer suburbs and fringe areas sometimes do.

▶ Sydney Inner City 18 areas
Sydney CBD Surry Hills Darlinghurst Potts Point Paddington Redfern Newtown Glebe Balmain Pyrmont Ultimo Chippendale Alexandria Waterloo Zetland Erskineville Rozelle Leichhardt
▶ Greater Sydney 25 areas

Western Sydney

Parramatta Penrith Blacktown Mount Druitt Seven Hills Wetherill Park Auburn Fairfield Cabramatta St Marys

South Western Sydney

Liverpool Campbelltown Bankstown Revesby

Northern Sydney

Hornsby Chatswood Epping Macquarie Park Eastwood

The Hills District

Castle Hill Baulkham Hills

Inner West

Ryde Strathfield Burwood

St George

Hurstville Kogarah
▶ Sydney Coastal 23 areas

Northern Beaches

Manly Dee Why Curl Curl Freshwater Brookvale Collaroy Narrabeen Mona Vale Newport Avalon Palm Beach

Eastern Suburbs

Bondi Tamarama Bronte Coogee Maroubra Randwick

Harbour Suburbs

Double Bay Rose Bay Watsons Bay

Sutherland Shire

Cronulla Miranda Sutherland
▶ Hunter & Central Coast 19 areas

Central Coast

Gosford Terrigal Wyong The Entrance Tuggerah Erina Woy Woy

Hunter Valley

Newcastle Maitland Lake Macquarie Charlestown Belmont Raymond Terrace Cessnock Singleton Muswellbrook

Port Stephens

Nelson Bay Salamander Bay Shoal Bay
▶ Illawarra & South Coast 18 areas

Illawarra

Wollongong Shellharbour Kiama Dapto Corrimal Thirroul Gerringong

Shoalhaven

Nowra Berry Ulladulla Huskisson Vincentia

Sapphire Coast

Batemans Bay Moruya Narooma Bega Merimbula Eden
▶ North Coast 19 areas

Mid North Coast

Port Macquarie Forster Taree Kempsey Laurieton

Coffs Coast

Coffs Harbour Bellingen Sawtell Grafton Yamba

Northern Rivers

Byron Bay Tweed Heads Ballina Lismore Bangalow Lennox Head Brunswick Heads Mullumbimby
▶ Blue Mountains & Highlands 17 areas

Blue Mountains

Katoomba Leura Wentworth Falls Blackheath Springwood Hazelbrook Glenbrook Faulconbridge Lawson Blaxland Lithgow

Southern Highlands

Bowral Moss Vale Mittagong Bundanoon Robertson Berrima
▶ Regional NSW 21 areas

Central West

Orange Bathurst Dubbo Mudgee Parkes Forbes Cowra Young

Riverina

Wagga Wagga Albury Griffith Leeton Goulburn Queanbeyan

New England

Tamworth Armidale Inverell Moree Narrabri

Far West

Broken Hill Cobar

Sydney Bricklayer FAQ

Does a bricklayer need a licence for a small job in NSW?
Bricklaying work worth more than $5,000 in labour and materials, including GST, needs a contractor licence. Jobs at or below that figure can be done without a licence, but a written quote and public liability insurance still protect you. You can check any licence for free through the Service NSW licence lookup.
How high can I build a brick side fence without approval in Sydney?
In residential zones, a side or rear fence is exempt up to 1.8 metres, but only up to 1.2 metres if it is built from masonry. A taller brick fence on that boundary needs planning approval. Heritage listed properties and some other sites cannot use the exempt rules at all.
Which bricks should I use for a house near the harbour or the beach?
Land within 1 kilometre of a surf coast, or within 100 metres of a bay, harbour or inlet, counts as a severe marine environment. Only Exposure grade bricks should be used there, and PGH Bricks & Pavers publishes these distances in its coastal building guide. Have the brick grade written on the quote before you accept it.
How much deposit can a Sydney bricklayer ask for?
The deposit on a residential building contract in NSW is capped at 10 per cent of the price. On a job over $20,000, no deposit or other payment can be taken until home building compensation cover is in place. Later payments should be tied to finished stages of the work.
When must a bricklayer give me a home building compensation certificate?
The certificate is needed for residential building work valued at more than $20,000. It must be given to you before the contractor takes a deposit or any other payment. Before you pay anything, confirm that it names your address and the right work.
Can I build a low brick retaining wall in a heritage conservation area?
An exempt retaining wall in a heritage conservation area can only be built in the rear yard. It must also stay within the height, boundary and spacing limits that apply to every exempt wall. A wall in the front yard, or on a heritage item, needs approval first.
How should a bricklayer control silica dust at my home?
SafeWork NSW lists brick cutting as a silica process, so dust must be controlled with wet cutting, on-tool extraction or local exhaust ventilation. Husqvarna and Stihl make cut-off saws with water feed kits, and Festool makes dust extractors that connect to the tool. Dry sweeping and dry cutting without extraction should not be used.
Why does my brick fence in western Sydney keep cracking?
Large areas of western Sydney sit on clay soils from the Wianamatta Group shales, which swell when wet and shrink as they dry. A footing that is too small or too shallow moves with the clay, and a rigid brick fence then cracks along its mortar joints. Rebuilding the fence on a deeper reinforced footing with properly spaced control joints reduces that risk.
Where can I find a replacement for a discontinued brick such as Bowral?
The Bowral Bricks website now leads to the Austral Bricks NSW site, where the Bowral brand and a Bowral 76 range are still listed. Take a sound brick or a clear photo to a brick selection centre to find the closest current range. Laying a small sample panel before the full order shows how close the match really is.
How long do I have to claim for defective brickwork in NSW?
For contracts signed on or after 1 February 2012, statutory warranties run for six years for major defects and two years for other defects. You must apply to the NSW Civil and Administrative Tribunal before the warranty period ends. Raise the problem with the bricklayer in writing as soon as you notice it.

Sydney Bricklaying Specialists

For Trades & Contractors - NSW

Some Sydney brick jobs need help from trades that handle the parts a bricklayer cannot. Pipes near a footing need a licensed plumber, lights and gate motors in piers need an electrician, and taller walls need an engineer's design. Each of the trades listed below can be booked for the same Sydney property as your brickwork.

Compare Sydney Bricklaying Quotes

Describe the wall, fence or repair, its rough size and how near it sits to a boundary, and local Sydney bricklayers will each quote on that same brief.

Get Free Bricklaying Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 31 October 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All NSW tradies are required to hold appropriate licences. Verify at NSW Fair Trading.
Prices are estimates based on typical Sydney bricklaying rates in 2026. Your final price will depend on the bricks chosen, access and the footings needed, so compare written quotes that list labour, materials and any engineering separately.
Need work done? Get free quotes. Post a Job – It's Free