Looking for a Builder in Canberra?

Tell us your suburb, what you want built, the age of the house and whether you already have plans or approvals. We will pass that brief to licensed local builders, so every quote you receive prices the same project.

Get Free Builder Quotes

Canberra Building Price Guide

Small alteration or repair$2,500 - $15,000
Bathroom renovation$25,000 - $65,000
Kitchen renovation$28,000 - $95,000
Garage conversion$28,000 - $62,000
Single-room extension$80,000 - $220,000
Second storey addition, per sq m$4,200 - $6,800
Granny flat$140,000 - $320,000
Whole-house renovation$280,000 - $850,000
New home or knockdown rebuild$450,000 - $1,200,000+
Building certifier fees$1,500 - $4,500

These figures are 2027 estimates for building work in Canberra. Your price depends on the design, the slope and soil of the block, the finishes you choose and whether asbestos, protected trees or approvals add steps.

Canberra Builder Quotes for Extensions, Renovations and New Homes

Hiring a builder in Canberra starts with two questions: which licence class fits the job, and who will approve and inspect the work. A bathroom renovation is estimated at $25,000 to $65,000 for 2027, and a single-room extension at $80,000 to $220,000. A new custom home or knockdown rebuild, where the old house is demolished and a new one built on the same block, is estimated from $450,000 to more than $1,200,000. Every builder needs an ACT construction licence, and the class printed on it limits the height and type of building they may take on. For most extensions and new homes you, the landowner, appoint the building certifier, the independent official who approves plans and inspects each stage. Work that needs building approval and costs $12,000 or more carries statutory warranties, which are promises set by law about workmanship and materials. Before that kind of work starts, the builder must also hold residential building work insurance or a fidelity fund certificate, which is cover issued by an approved industry fund. That cover protects you if the builder dies, disappears or goes broke part way through. Large trees, old asbestos and the energy rules for new homes can all change the price, so raise them early. Many single homes are exempt from development approval, the planning permit, yet they still need building approval, the certifier's technical sign-off, and written notice to neighbours. Post your job on The Quote Yard and we will connect you with licensed builders across Canberra who can quote on it.

Canberra Building Work Covered

Building work across Canberra ranges from a new doorway or deck to a second storey, a granny flat or a full knockdown rebuild. We can connect you with licensed local builders who all price the same written brief for your block.

Get Free Quotes

At a Glance - Hiring a Builder in Canberra, 2027 Estimates

Job Price Range How It Is Charged What Drives It In Canberra Who Can Do It
Small alteration or repair $2,500 - $15,000 Whole job Whether structure is touched Builder, Class D or higher
Bathroom renovation $25,000 - $65,000 Whole job Layout changes and fixtures Builder or renovator
Kitchen renovation $28,000 - $95,000 Whole job Cabinetry and wall changes Builder or renovator
Garage conversion $28,000 - $62,000 Whole job Floor, insulation and windows Builder, Class C or higher
Raised and roofed deck $680 - $1,400 per sq m Per square metre Height and roof type Builder
Single-room extension $80,000 - $220,000 Whole job Footings and joining the old roof Builder, Class C or higher
Second storey addition $4,200 - $6,800 per sq m Per square metre Stairs and new structure Builder, Class C or higher
Granny flat $140,000 - $320,000 Whole job Size and service runs Builder, Class C or higher
Whole-house renovation $280,000 - $850,000 Whole job Scope and hidden faults Builder
House demolition, single storey $15,000 - $45,000 Whole job Asbestos and site access Licence with demolition endorsement
New home or knockdown rebuild $450,000 - $1,200,000+ Whole job Design, block and finishes Builder, Class C or higher
Building certifier $1,500 - $4,500 Per project Project size and inspections Licensed building surveyor

What Pushes a Canberra Building Price Up

What is involved
Sloping blocks need deeper footings, retaining walls and more excavation. Rock found while digging is often charged at a separate rate.
Older homes can hide asbestos in sheeting and eaves. Testing and licensed removal add cost and time before building starts.
A protected tree near the work can mean a tree management plan, an arborist and a changed footprint.
New homes must meet the 7 star energy standard, a rating of how well a home holds its temperature. Better insulation, glazing and all-electric services are part of the build price.
Ask each builder to show site works, footings, frame, roof, cladding, finishes and allowances on separate lines. Quotes laid out that way can be compared stage by stage.

Hiring a Builder for a Canberra House or Block

A builder is the licensed tradesperson or company that takes charge of structural work, from a new deck or a removed wall to an extension, a granny flat or a whole new house. In Canberra the builder usually manages the other trades as well, booking the concreter, carpenter, plumber, electrician and roofer in the right order. The ACT guide to licensed builders and their project costs explains the building work itself, while this page explains how to hire one under Territory rules. Those rules decide who can legally do the job, who approves the plans and what protection you have if something goes wrong. Getting them straight before you ask for prices saves weeks of back and forth later.

Start with a short written brief that lists the suburb, the block, the age of the house and what you want built. Add any plans or sketches, photos of the area involved and notes about slope, large trees or access for trucks. If you are still deciding whom to approach, the guide to finding a builder in Canberra covers register searches and the local housing eras in detail. With a clear brief in hand, every builder prices the same project and the quotes can be laid side by side.

Canberra Building Prices to Budget For, 2027

ACT price guides estimate a small alteration or repair, such as a new doorway or a replaced section of wall frame, at $2,500 to $15,000 for 2027. A bathroom renovation run by a builder is estimated at $25,000 to $65,000, and a kitchen renovation at $28,000 to $95,000. Turning a garage into a living room is estimated at $28,000 to $62,000, because the floor, insulation and windows all need to change. A single-room extension is estimated at $80,000 to $220,000, and a larger multi-room extension at $220,000 to $650,000. Measured by floor area, a single-room extension is estimated at $3,400 to $5,200 a square metre and a second storey addition at $4,200 to $6,800. A raised and roofed deck is estimated at $680 to $1,400 a square metre, depending on its height and the roof style.

Larger projects are where budgets most often stretch, so treat the top of each range as a real possibility rather than a worst case. A granny flat, meaning a small second home on the same block, is estimated at $140,000 to $320,000. A whole-house renovation is estimated at $280,000 to $850,000, and a custom new home or knockdown rebuild at $450,000 to more than $1,200,000. Knocking down a single-storey house is estimated at $15,000 to $45,000 before any new work begins, rising to $25,000 to $70,000 for two storeys. The ACT pages on home extensions and granny flat builders break those totals down further by size and district. Footings, the concrete base that carries the walls down into the ground, can shift an extension price a long way, especially on a sloping block.

Job 2027 Estimate How It Is Charged What Changes It
Small alteration or repair $2,500 - $15,000 Whole job Structure involved
Bathroom renovation $25,000 - $65,000 Whole job Fixtures and layout changes
Kitchen renovation $28,000 - $95,000 Whole job Cabinetry and appliances
Garage conversion $28,000 - $62,000 Whole job Slab, insulation and windows
Raised and roofed deck $680 - $1,400 per sq m Per square metre Height and roof type
Single-room extension $80,000 - $220,000 Whole job Footings and joining the old roof
Single-room extension by area $3,400 - $5,200 per sq m Per square metre Finishes and slope
Multi-room extension $220,000 - $650,000 Whole job Size and services
Second storey addition $4,200 - $6,800 per sq m Per square metre Stairs and structure
Granny flat $140,000 - $320,000 Whole job Size and service runs
Whole-house renovation $280,000 - $850,000 Whole job Scope and hidden faults
Single-storey house demolition $15,000 - $45,000 Whole job Asbestos and access
Two-storey house demolition $25,000 - $70,000 Whole job Height and slab removal
New home or knockdown rebuild $450,000 - $1,200,000+ Whole job Design, block and finishes

Builder, Carpenter or Another Trade: Who the Job Really Needs

Not every job around the house needs a licensed builder, and booking one for a small single-trade task can add cost without adding protection. Carpenters and bricklayers need no licence of their own in the ACT, so trim, doors and other non-structural timber work, which holds up no part of the house, can go straight to a Canberra carpenter. Once a job changes the structure, such as removing a load-bearing wall or adding a room, a licensed builder must do or supervise it. A load-bearing wall is one that holds up the roof or the floor above, so taking it out needs a beam and an engineer's design. If you are unsure which side of that line your job sits on, ask a builder or a building certifier before you book anyone.

Some jobs belong with other trades rather than a builder, even when they sound like building work. A new concrete slab, path or driveway on its own usually suits a Canberra concreter. Cracked ceilings or new internal linings, the plasterboard sheets on walls and ceilings, are a job for a Canberra plasterer. A worn or leaking roof with no change to the frame is better handled by a Canberra roofer. When several of these trades are needed on one project, a builder can bring them together under one contract and one timeline.

Matching the Job to the First Booking

Job and first booking
For a new room, a second storey or a granny flat, book a licensed builder with the right class and ask about the certifier.
For a kitchen or bathroom that keeps the same walls, a builder or renovation business can run the trades in order.
For trim, doors or other non-structural timber work, a carpenter can usually quote directly.
For demolition of a whole house, the contractor needs a demolition endorsement added to their licence.
If a wall, beam or post is coming out, treat the job as structural until an engineer says otherwise. Structural changes usually bring building approval and a licensed builder into the job.

Reading the Licence Class on a Canberra Builder's Card

Every builder in the ACT must hold a construction occupation licence, and the class printed on it sets the size and type of building they may work on. Class A is unlimited, so the holder may build to any height on any class in the Building Code of Australia, the national rulebook for construction. Class B covers buildings of three storeys or lower, again of any class. Class C covers houses, townhouses and small apartment buildings of two storeys or lower, plus the garages, carports and sheds that go with them. Class D is limited to non-structural basic building work, meaning work that leaves the parts holding the building up untouched. Demolishing a building or installing a swimming pool needs a separate specialist endorsement added to the licence.

The class matters because a builder working outside it is, in effect, unlicensed for that job. A Class C builder can take on most house extensions and new single homes, while a three-storey townhouse block needs at least Class B. Companies and partnerships also need their own licence before they can offer or advertise building work in the Territory. Search the public register of licensed construction practitioners on the Access Canberra website, and check that the name and licence number match the quote. ACT guidance also suggests looking at the disciplinary register for any compliance action taken against the builder or its directors.

Owner-builders are a separate case, because the ACT licenses people who manage the building of their own home under an owner-builder licence. Work done by a licensed owner-builder sits outside the statutory warranty scheme, so a later buyer of that home has less legal protection. If you plan to run the job yourself and hire each trade directly, read the owner-builder duties first and weigh up that loss of cover. For most households, hiring a licensed builder under a written contract is the simpler and safer path.

Work on the Job Who Does It ACT Licence Needed
Extension, new home or granny flat Builder Builder licence, Class A, B or C to suit
Non-structural basic building work Builder Class D or higher
Whole house demolition Builder or demolisher Licence with demolition endorsement
Swimming pool installation Pool builder Licence with pool endorsement
Wiring, switchboards and lights Electrician Electrician licence
Pipes, drains and gas lines Plumber, drainer or gasfitter Plumber, drainer or gasfitter licence
Framing and carpentry under a builder Carpenter No separate licence
Bricklaying under a builder Bricklayer No separate licence
Plan approval and stage inspections Building certifier Building surveyor licence
Energy rating for a sale or lease Building assessor Building assessor licence

Exempt Work, Development Approval and Building Approval Are Separate Steps

Two separate approvals can apply to a Canberra building job, and it helps to keep them apart in your mind from the start. Development approval, often called a DA, is planning permission that checks a design against the Territory Plan, the rulebook for what can be built where. Building approval is the technical sign-off by a certifier that the plans meet the building code and the Building Act 2004. Many single houses and extensions are exempt from development approval under the Planning (Exempt Development) Regulation 2023, but most still need building approval. A single home is generally exempt when it is the only dwelling on the block, the neighbours have been told and it meets the development controls. Those controls are the measurable planning rules, such as maximum height, distance from each boundary and how much of the block may be built on.

Telling the neighbours is a formal step rather than a friendly chat over the back fence. The person proposing the work must take reasonable steps to give adjoining residents written information, including site plans, elevations and shadow diagrams where needed. Elevations are drawings of each face of the building, and shadow diagrams show where the new walls will cast shade during the day. If a design departs only slightly from a development control, an exemption declaration can sometimes avoid a full DA and save both time and fees. A building certifier can also issue a formal exemption notice, and the ACT planning website has a self-check for exempt projects. When we checked, the final Territory Plan had been in effect since 27 September 2024, replacing an interim version from November 2023.

Questions That Sort Out the Approval Path

Ask before the design is final
Is this the only home on the block, or will the work create a second dwelling?
Does the design meet every development control, such as setbacks, the distances a building must sit from each boundary?
Have the adjoining residents been given written plans, elevations and any shadow diagrams?
Is the block over 800 square metres, where the Territory Plan now allows dual occupancy, meaning two homes on one block, each with its own title?
Any DA or exemption declaration must be in hand before building approval is granted. Starting work on the strength of an approval that has not been issued can mean stopping the job later.

Appointing Your Own Certifier and Booking the Stage Inspections

A building certifier is a licensed building surveyor who approves the plans, gives the go-ahead to start and inspects the work as it goes. In the ACT the landowner appoints the certifier, although you can authorise another person to do it for you. A residential building contract must not include clauses that give the builder the right to appoint the certifier or act as your agent with them. If you want the builder to handle that step, ACT guidance says to set it out in a separate written agreement. ACT price guides estimate certifier fees at about $1,500 to $4,500 for 2027, depending on the size of the project.

Before the builder starts, the certifier issues a commencement notice, the formal permission to begin work under the building approval. The certifier must check that residential building work insurance is in place before that notice goes out. Once work begins, the builder must tell the certifier when each stage inspection is due, and you can ask for extra inspections too. The certifier can also issue a stop notice, an order that halts the work, if something on site does not match the approval. Electrical, plumbing, drainage and gas work are inspected separately by the ACT Government, arranged by the licensed trades who carry them out.

At the end, the certifier issues a certificate of completion once the approved work is finished and has passed its checks. For most new building work, including additions, you then need a certificate of occupancy or use before anyone moves in or uses the space. ACT guidance is plain that occupying a building before that certificate is issued is against the law. Plan your move, your lease end or your furniture delivery around that final certificate rather than the builder's finishing date.

Stage What Is Checked Who Arranges It
Excavation and reinforcing Footing trenches and steel before concrete is poured Builder tells the certifier
Reinforced concrete members Steel in slabs and beams before the pour Builder tells the certifier
Structural framework Wall, floor and roof frames before linings go on Builder tells the certifier
Electrical work Wiring and the switchboard Licensed electrician
Plumbing and drainage Pipes and drains before they are covered Licensed plumber or drainer
Gasfitting Gas lines and connected appliances Licensed gasfitter
Completion All approved work finished Builder tells the certifier
Extra inspections Anything you ask the certifier to check Landowner

Residential Building Work Insurance and Fidelity Fund Cover

For work over $12,000 on homes and residential buildings of three storeys or fewer, the builder must hold residential building work insurance or a fidelity fund certificate before starting. Both protect the owner if the builder becomes insolvent, dies or disappears before the work is finished or fixed. Insolvent means the business can no longer pay its debts and has been wound up or declared bankrupt. A fidelity fund is an industry scheme approved in the ACT that issues certificates in place of a policy from an insurer. The cover also passes to later owners if you sell the home, which matters when the house goes to market.

Ask for a copy of the policy or certificate before you pay anything beyond the deposit, and keep it with your contract. Check that it names the right builder, your address and the full cost of the work, because errors can cause trouble at claim time. When we checked, the time to lodge a claim had risen to 180 days from the day the owner becomes aware the builder is insolvent, dead or missing. Your contract should also let you end the agreement fairly if the builder cannot get the insurance in time.

Checking the Insurance Paperwork

Confirm in writing
The builder named on the policy or fidelity certificate matches the licence holder on your contract.
The site address and the contract price on the certificate match the figures in your contract.
The certificate was issued before the commencement notice, not after work had begun.
A copy sits with your contract, plans and building approval in one folder.
If a builder says insurance is not needed for a home job over $12,000, ask the certifier before you sign. The certifier must see proof of cover before issuing the commencement notice.

The Statutory Warranties Built Into Every ACT Building Contract

Statutory warranties are promises written into the Building Act 2004 that apply whether or not your contract mentions them. They cover residential building work that needs building approval and costs $12,000 or more. The builder warrants that the work follows the Building Act, is done properly and skilfully, and uses good and proper materials. If no finish date is agreed, the work must be done with reasonable promptness, and it must be fit for purpose where you relied on the builder's judgement. Any clause in a contract that tries to limit these warranties has no effect, because the law treats it as void.

The warranty periods run from the completion day, which is the later of the day the work is finished and the day the contract ends. Defects in structural elements, the parts that hold the building up, are covered for six years. Defects in non-structural elements, such as fittings, finishes and fixtures, are covered for two years. You do not have to be the first owner to rely on the warranty, since a buyer takes over whatever time is left.

Keep a simple record so that you can use those warranties if you ever need them. Write down the completion day, and keep the contract, the plans, every variation and the certificate of completion together. A variation is any change to the agreed work or price, and ACT guidance says to get each one in writing and signed. Photograph each stage before it is covered up, such as the slab steel, the frame and the waterproof membranes in bathrooms and laundries. Report any defect to the builder in writing as soon as you notice it, rather than waiting until the end of a period. Dated records make it far easier for a certifier, a mediator or a tribunal to see what happened.

ACT Statutory Warranty Periods at a Glance

Part of the work
How the warranty applies
Structural elements
Six years from the completion day
Non-structural elements
Two years from the completion day
Work under $12,000 or without building approval
Outside the statutory warranty scheme
Work by a licensed owner-builder
Outside the statutory warranty scheme
Later owners of the home
Whatever part of the period remains
Contract clauses limiting cover
Void under the Building Act
Consumer guarantees under the Australian Consumer Law, the national consumer protection law, still apply to services where the statutory warranties do not. Fair Trading at Access Canberra can explain those rights on 13 22 81.

Noise, Site Fences and Neighbours During a Canberra Build

A building site affects the whole street for months, so agree the ground rules before the first truck arrives. In residential areas, construction noise above the usual noise standard is permitted between 7am and 6pm from Monday to Saturday, with public holidays excluded. Outside those hours the normal limits apply, so early concrete pours and late deliveries need careful timing. Work health and safety laws also require site signage, fencing and basic amenities for workers. WorkSafe ACT is the regulator for those safety rules, and your builder should explain how the site will be fenced and signed.

Before any digging, the builder or excavator should request plans of underground pipes and cables through Before You Dig Australia, which supplies them free. Striking a gas line, power cable or water main can injure workers and cut services to the whole street. If the work sits close to a boundary, a dilapidation report records the state of the neighbouring house before work begins, so any new cracks can be judged fairly. ACT price guides estimate a dilapidation report at about $400 to $700 for 2027, a small sum beside a dispute over damage. Talk to the neighbours early about deliveries, parking and any shared fence that may need to come down for access.

Shared fences often suffer during a build, so agree in writing who repairs or replaces the fence and when. A Canberra fencer can quote the replacement once the heavy machinery has gone, which avoids paying for the same fence twice. Keep the verge, the public strip between your block and the road, and the footpath clear of stored materials, and ask the builder where skips and deliveries will sit. Ask too how rubbish and loose soil will be contained each day so nothing blows into the street or washes into drains.

Item What to Agree Why It Matters
Working hours 7am to 6pm, Monday to Saturday Louder work is allowed only then
Public holidays No noisy work Normal limits apply all day
Site fence and signs Installed before work starts Required under safety laws
Underground services Plans requested before digging Avoids hitting pipes and cables
Neighbouring house Dilapidation report if close Records cracks before work
Shared boundary fence Who repairs it and when Avoids disputes at handover
Deliveries and parking Times and places Keeps the street usable
Rubbish and loose soil Contained every day Keeps drains and gutters clear

Regulated Trees and Tree Protection Zones Near Your Build

Large trees on your own block can be protected under the Urban Forest Act 2023, and that often decides where an extension can go. A tree on private land is regulated if it stands 8 metres or taller or has a canopy 8 metres or wider. A trunk circumference of 1 metre or more, measured 1.4 metres above the ground, also makes it regulated. Every tree on public land, including street trees on the verge, is protected as well. Around each protected tree sits a tree protection zone covering the ground under the canopy, a 2 metre strip beyond its edge and a 4 metre area around the trunk. Check these measurements before the design is settled, because moving a footing is far cheaper on paper than on site.

A tree management plan must be approved before any work happens inside a tree protection zone. ACT guidance suggests hiring a consulting arborist, a tree specialist, to prepare that plan, and the government may ask for a tree bond, a refundable deposit held until the work ends. Without approval, the zone rules bar cutting roots thicker than 50 millimetres or digging deeper than 10 centimetres over 4 square metres or more. Raising the soil level by more than 10 centimetres over the same area is also off limits. A Canberra gardener or Canberra landscaper booked after the build should get a copy of the plan too.

Tree Questions for the Design Stage

Measure and ask
Is any tree on the block 8 metres tall, or wider than 8 metres across its canopy?
Does the footprint, the driveway or a service trench cross a tree protection zone?
Will a street tree on the verge be affected by deliveries or a new driveway?
Has an arborist been asked to prepare a tree management plan where one is needed?
Approval is needed before removing, heavily pruning or lopping, which means cutting large limbs back hard, a protected tree on leased land, which in Canberra includes private home blocks. Ask City Services before any work that could damage one.

Asbestos in Older Canberra Homes Before Walls Come Down

Asbestos is a mineral fibre once mixed into building products, and breathing in its dust can cause serious lung disease many years later. WorkSafe ACT says homes built or refurbished between 1950 and 1985 are likely to contain asbestos, and the ACT asbestos website warns of a high chance in homes built on or before 1990. Any renovation that cuts, drills or removes old wall, ceiling or floor materials in those homes should start with testing. Removal is not allowed unless an appropriately licensed asbestos removalist does it, apart from minor work during routine maintenance. A licensed asbestos assessor can test materials, advise on their condition and carry out clearance inspections, the final check that an area is safe after removal. ACT price guides estimate an asbestos survey at about $400 to $1,200 for 2027.

Loose-fill asbestos insulation, often known as Mr Fluffy, is loose raw asbestos that was installed in the roof spaces of some older Canberra homes. Affected homes are listed on the Affected Residential Premises Register, and a warning sign must be displayed where the insulation is still present. Register searches, permitted work and the buyback history are covered in the guide to finding a Canberra builder, so check the address there before going further. Rebuilds on former affected blocks follow the normal development process, and any trees left on them may still be protected.

Build the asbestos steps into the program and the price, rather than leaving them as a surprise halfway through. Ask each builder whether their quote assumes a survey has been done, and who pays if asbestos turns up behind a wall. For a whole-house demolition, the contractor needs the right endorsement, and a licensed asbestos removal business handles the hazardous material. Testing before the quote stage is the cheapest way to get firm prices, and an asbestos testing and inspection service can report on each suspect material. Keep the clearance paperwork with your building records once removal is finished.

Task Who Does It When
Testing suspect materials Licensed asbestos assessor Before quotes and design
Advice on condition and options Licensed asbestos assessor Before quotes and design
Removal of asbestos materials Licensed asbestos removalist Before demolition or strip-out
Minor routine maintenance Trades following safe work rules Limited tasks only
Air monitoring during removal Licensed asbestos assessor During removal where needed
Clearance inspection Licensed asbestos assessor After removal, before rebuilding
Loose-fill register check Owner or buyer Before signing any contract

Cladding, Framing and Windows to Name in a Building Quote

Named products let you check the maker's instructions and warranty, so ask for them on every building quote. James Hardie makes fibre cement cladding, including Linea weatherboards and Axon panels, which suit many extension designs. Weathertex makes weatherboards and wall panels from Australian hardwood for owners who want a timber look. Austral Bricks makes face bricks and render bricks for brick veneer, a brick skin built outside a timber frame. Hebel makes autoclaved aerated concrete panels, a lightweight concrete sold as PowerPanel for walls and PowerFloor for floors. Lysaght makes steel roofing and wall profiles such as Custom Orb and Klip-Lok.

BlueScope makes COLORBOND steel, the pre-painted steel used for many roofs, gutters and wall claddings. Hyne makes structural pine framing in its T2 range and glulam beams, which are timber layers glued into one strong member. Pryda makes the timber connectors, nail plates and bracing that tie frames and roof trusses, the factory-made triangular roof frames, together. Gyprock makes plasterboard for internal walls and ceilings, including fire-rated Fyrchek and acoustic Soundchek boards. Bradford makes insulation and acoustic products that help an extension meet the energy rules. Stegbar makes windows and doors in aluminium, timber and composite frames.

VELUX makes skylights, roof windows and sun tunnels that bring daylight into rooms without an outside wall. Hume Doors makes entrance and internal doors, cavity sliding units and door frames, and says it manufactures them in Australia. Dulux makes exterior and interior paints, including the Weathershield range for cladding and trims. Ask for each product name and range on the quote, and for any substitute to be agreed in writing before it is used.

Product Lines a Clear Building Quote Shows

Layer
What the quote should name
Footings and slab
Concrete strength and the engineer's design
Wall and roof frame
Timber or steel, and the frame supplier
External cladding
Brand, profile and finish
Roof covering
Brand, profile and colour
Insulation
Product and R-value for walls, roof and floor
Windows and doors
Brand, frame type and glazing
Internal linings
Board type in wet and fire-rated areas
R-value measures how well insulation resists heat flow, and a higher number insulates better. Ask the builder to match the R-values on the quote to the energy rating report for the design.

Seven Star Energy Rules, EER Statements and Going All-Electric

New ACT homes have had to meet tougher energy rules since 15 January 2024, when the Territory adopted the remaining parts of the 2022 national construction code. The thermal performance of a new home must now reach the equivalent of 7 stars, a rating of how well the building holds warmth in winter and keeps heat out in summer. New homes also face a whole of home energy budget, which counts the energy used by fixed appliances such as heating, hot water and lighting. Condensation rules and liveable housing design, which makes homes easier to use for people with limited mobility, arrived at the same time. Ask a builder to show how the design meets those rules before you sign, not after the plans are approved.

Gas is another early decision for a knockdown rebuild in Canberra. Since 8 December 2023, new gas network connections have been prevented in residential zones, although homes with gas already installed can keep using it. If a connection is decommissioned, meaning permanently disconnected, for site safety during a rebuild or major renovation, it cannot simply be switched back on, because that would count as a new connection. A new home on the same block will therefore usually be all-electric, so plan electric heating, hot water and cooking from the start. A Canberra electrician and a Canberra plumber can size the switchboard, the hot water system and the pipework early.

Existing homes carry a separate rating called the Energy Efficiency Rating, or EER, which is required when a property is sold or leased. The rating is out of 6 stars, it must appear in sale advertisements and a licensed building assessor prepares the statement. A well-insulated extension with good windows can lift that rating, which helps if you later sell or rent the home. Upgrades such as wall and ceiling insulation or double glazed windows are easiest to add while the walls are open.

Decision What to Ask Who Helps
Thermal rating for a new home Does the design reach the 7 star equivalent? Energy assessor and designer
Whole of home energy budget Which appliances and solar are assumed? Energy assessor
Gas or all-electric Will the old gas connection be decommissioned? Builder and plumber
Hot water system Heat pump hot water size and location Plumber and electrician
Insulation R-values for walls, roof and floor Builder
Windows Frame type and glazing Builder and window maker
Rooftop solar Roof space and direction Solar installer
Existing home EER Will the work change the rating? Licensed building assessor

Written Contracts, Deposits and Progress Payments

ACT law does not require a written contract for residential building work, but ACT guidance strongly recommends one for every job. The contract should list every inclusion, even small items, so nothing can change without your agreement. There is no mandatory cooling-off period in the ACT, so read the whole document and get independent legal advice on any clause you do not understand. Check the clauses on extensions of time, liquidated damages, practical completion and termination, because these decide what happens when a job runs late. An extension of time is extra time the builder may claim for delays outside its control, such as long spells of wet weather. Liquidated damages are a set daily amount the builder pays for finishing late, and practical completion is the point where the home can be handed over with only minor defects left.

The ACT sets no limit on the first deposit, although industry practice is usually up to 10 per cent of the contract price. Progress payments should only pay for work already completed, such as the slab poured or the frame passed by the certifier. If a lender is funding the job, check its rules for releasing each payment before you agree a schedule with the builder. Keep every invoice, receipt and inspection record in one place, and pay only against stages you can see. An independent inspector can check a stage for you, and ACT price guides estimate a new build stage inspection at about $250 to $400.

Stage What Should Be Finished Evidence to Ask For
Deposit Contract signed and insurance in place Signed contract and certificate
Base or slab Footings and slab poured Certifier inspection record
Frame Wall and roof frames standing Certifier frame inspection
Lock-up External walls, roof, windows and doors in Photos and a site visit
Fixing Linings, doors, cabinets and trims fitted Photos and a site visit
Practical completion Work finished apart from minor defects Certificate of completion

Defects, Complaints and ACAT After Handover

If something goes wrong, raise it with the builder in writing first and give them a fair chance to fix it. While construction is still under way, talk to your building certifier about anything that may not match the approval. Complaints about land, planning or building matters can also go to Access Canberra, which keeps the register of licensed builders. ACT guidance suggests getting help early, because disputes are easier to settle before both sides dig in. Use any dispute process written into your contract before moving to a tribunal.

The ACT Civil and Administrative Tribunal, known as ACAT, hears civil disputes where the amount claimed is $25,000 or less. For a building dispute about defects, ACAT may ask the parties to lodge a Scott schedule, a table listing each defect, the fix wanted and the cost claimed. ACAT encourages negotiation or mediation first, where an independent mediator helps both sides look for an agreement. If a case stays disputed, it can move through a conference and then on to a hearing. For claims above that amount, ask a lawyer which court or tribunal applies before you lodge anything.

What to Look Out For Before Booking a Canberra Builder

A low price can hide gaps, so look first at what each quote leaves out. Watch for provisional sums and prime cost items, the allowances for work or fittings not yet chosen, that are set far below realistic prices. Be wary of any builder who suggests skipping building approval, starting before the commencement notice or appointing the certifier for you inside the contract. A request for a large upfront payment, or for cash with no invoice, is another warning sign. Check that the licence class on the register suits the building and that the name matches the company on the quote. A builder who cannot show insurance or a fidelity certificate for home work over $12,000 should not start.

Look closely at how each builder handles the things that most often push a Canberra job over budget, such as slope, asbestos and protected trees. Ask whether rock or poor soil is allowed for in the footings, and what rate applies if excavation hits it. A soil test and an engineer's design usually set the footing type, so favour builders who have priced from real reports. Ask how variations are priced and approved, since a clear process stops small changes adding up unnoticed. For cosmetic updates that leave the structure alone, a renovation services business may be a better fit, so check the scope before choosing.

Signs of a Complete Building Quote

Signs of a complete quote
A licence number and class that match the public register, plus the ABN, the Australian Business Number, and trading name.
Separate lines for demolition, site works, footings, frame, roof, cladding and finishes.
Provisional sums and prime cost items with realistic amounts and a clear list.
A note of who obtains building approval, any DA and the certificate of occupancy.
Insurance or fidelity certificate details for home work over $12,000.
If two quotes differ by a large amount, compare the provisional sums first. A cheap total often reflects low allowances that will be topped up later.

Getting Canberra Builder Quotes That Price the Same Project

ACT guidance suggests getting at least three quotes, and it notes that the cheapest quote is not always the best value. Send every builder the same plans, specifications and site photos so the prices can be compared line by line. Include the block address, any soil or engineering reports and the results of any asbestos survey. Ask each builder for details of similar past work and recent clients you can contact. A builder who visits the site before quoting is more likely to spot slope, access and drainage issues that change the price.

Give builders enough time to price properly, as a detailed quote for an extension or new home can take several weeks. Ask each one to state the start date, the expected build time and what happens if the job runs late. Request a written breakdown that follows the same stages as the payment schedule, so each payment can be checked against the work. When a kitchen or bathroom is part of the job, compare the allowances with prices for kitchen renovations and bathroom renovation work.

Post your job on The Quote Yard with the plans, the block details and your timeframe, and we will pass it to licensed builders across Canberra. Each builder can then quote on the same brief, which makes it far easier to compare like with like. Keep the shortlist to builders whose licence class, insurance and past work all check out. Once you choose, sign a written contract that matches the quote and keep a copy with your approvals. A careful start with the right builder usually means fewer disputes and a smoother handover.

Builders Across Canberra

Building prices on this page are for Canberra as a whole. The block, the design and the approvals move a price far more than the suburb does, so give every builder the same brief wherever you live.

▶ North Canberra 16 areas
Civic Acton Braddon Turner Reid Campbell Russell Ainslie Dickson Downer Hackett Watson Lyneham O’Connor Majura Pialligo
▶ South Canberra, Woden & Weston Creek 32 areas
Barton Forrest Kingston Griffith Narrabundah Red Hill Deakin Yarralumla Curtin Garran Hughes Phillip Woden Mawson Pearce Torrens Chifley Lyons Farrer Isaacs Weston Holder Duffy Stirling Rivett Chapman Fisher Waramanga Wright Coombs Denman Prospect Whitlam
▶ Belconnen 28 areas
Belconnen Bruce Aranda Cook Hawker Weetangera Page Scullin Higgins Holt Latham Macgregor Charnwood Dunlop Fraser Flynn Florey Melba Evatt Spence McKellar Lawson Jamison Kaleen Giralang Macquarie Hall Belconnen Town Centre
▶ Gungahlin 18 areas
Gungahlin Harrison Franklin Palmerston Nicholls Ngunnawal Amaroo Forde Bonner Moncrieff Casey Taylor Throsby Jacka Crace Mitchell Gundaroo Sutton
▶ Tuggeranong 20 areas
Tuggeranong Greenway Kambah Wanniassa Oxley Fadden Gowrie Macarthur Monash Gilmore Chisholm Richardson Calwell Theodore Isabella Plains Bonython Gordon Banks Conder Tharwa

Canberra Builder FAQ

Which builder licence class do I need for a two-storey extension?
Class C covers building work on homes of two storeys or lower, including houses, townhouses and small apartment buildings. It also covers the garages, carports and sheds that go with those homes. A two-storey extension to a house therefore sits within Class C, and Class A or Class B holders may also do it. Check the class on the Access Canberra public register before signing, not only the card the builder shows you.
Can my builder choose the building certifier for me?
No, the landowner appoints the building certifier in the ACT, although you can authorise someone to act for you. A residential building contract must not include clauses that let the builder appoint the certifier or deal with them as your agent. If you want the builder to handle it, ACT guidance says to use a separate written agreement. The certifier works to building and planning laws rather than for the builder, which is why that separation matters.
Will my neighbours be told about my extension plans?
Yes, if you rely on the exemption from development approval for a single home, the neighbours must be told. The person proposing the work has to take reasonable steps to give adjoining residents written information about the design. That information includes site plans, elevations and, where needed, shadow diagrams showing where new walls will cast shade. A completed information form for adjoining residents goes with the plans as well. Talking to neighbours before the formal step often heads off complaints later.
Who pays out if my builder goes broke halfway through the job?
Residential building work insurance or a fidelity fund certificate covers home work over $12,000 on buildings of three storeys or fewer. It protects the owner if the builder becomes insolvent, dies or disappears before finishing. The builder must arrange the cover before the certifier issues the commencement notice, and the certifier must check it. When we checked, claims had to be lodged within 180 days of the owner becoming aware of the problem, so act quickly.
When can we move into a new home or extension?
For most new building work, including additions, you need a certificate of occupancy or use before anyone moves in. The building certifier first issues a certificate of completion once the approved work is finished and inspected. After that, the owner applies for the certificate of occupancy or use, which is emailed back once issued. ACT guidance says it is against the law to occupy a building before that certificate exists. Leave a buffer between the builder's finish date and your moving day.
Can I keep my gas connection after a knockdown rebuild?
Homes with gas already connected can keep it, but a knockdown rebuild usually changes that. When we checked, new gas network connections had been prevented in residential zones since 8 December 2023. If the existing connection is decommissioned for site safety during the rebuild, reconnecting it would count as a new connection. Plan the new home as all-electric from the design stage, with electric heating, hot water and cooking.
Is there a cooling-off period after signing a building contract?
No, there is no mandatory cooling-off period for residential building contracts in the ACT. Once you sign, you are bound by the contract terms, so read every clause beforehand. ACT guidance recommends independent legal advice on any term you are unsure about. Make sure you receive a signed copy promptly and file it with your plans and approvals.
How big a deposit can a Canberra builder ask for?
The ACT sets no legal limit on the first deposit for residential building work. ACT guidance notes that industry practice is usually up to 10 per cent of the total contract price. After that, each progress payment should cover only work already completed, such as a poured slab or an inspected frame. Paying well ahead of the work leaves you exposed if the builder stops trading.
Do I need approval to build near a large tree on my block?
Approval is needed if the tree is protected and the work could damage it. A tree on private land is regulated if it is 8 metres or taller, has an 8 metre canopy or has a trunk circumference of at least 1 metre at 1.4 metres above ground. Work inside its tree protection zone needs an approved tree management plan first. A consulting arborist can measure the tree and prepare that plan for you.
What hours can a builder make noise on a Canberra street?
Noisy building work is permitted in residential areas between 7am and 6pm on Monday to Saturday. Public holidays are excluded, and the normal noise limits apply outside those hours. Early concrete pours and late deliveries therefore need planning so they fall inside the window. Ask your builder to share the working hours with the neighbours before the job starts.

Canberra Building Specialists

For Trades & Contractors - ACT

Building jobs in Canberra bring steady work for concreters, carpenters, plumbers, electricians, roofers and painters, usually booked in stages by the builder. Links to trade jobs across the ACT sit below for businesses looking for new clients.

Ready to Book a Builder in Canberra?

Post your job with your plans, block details and timeframe, and we will connect you with licensed builders across Canberra. Compare written quotes that price the same project before you sign.

Get Free Builder Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 27 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All ACT tradies are required to hold appropriate licences. Verify at Access Canberra.
Prices are 2027 estimates based on current ACT building price guides. Your final price will depend on the design, the block, the finishes and any asbestos, tree or approval steps, so compare written quotes that show site works, structure, finishes and allowances separately.
Need a builder in Canberra?Get free Canberra builder quotes Post a Job – It's Free