Looking for a Tiler in the Adelaide Hills?

Tell us your town, the rooms to tile, whether the floor is timber or concrete, and whether the house drains to sewer, a septic tank or a Community Wastewater Management System (CWMS). Mention any planned floor heating and how a truck reaches the house, so every tiler prices the same job.

Get Free Tiling Quotes

Adelaide Hills Tiling Price Guide

Tiler hourly rate, where charged by the hour$60 - $95
Day rate, one tiler$480 - $780
Floor tiling, ceramic or porcelain$45 - $85 per m²
Wall tiling$50 - $95 per m²
Large-format tiles, 600 mm and over$60 - $110 per m²
Natural stone tiles$80 - $150 per m²
Old tile removal$25 - $50 per m²
Screeding or floor levelling$25 - $55 per m²
Small bathroom retile, tiling labour$2,500 - $4,500
Electric heating under bathroom tiles$1,200 - $3,000

These are 2027 estimates for tiling across the Adelaide Hills. Travel is quoted separately for each address, and your price also depends on the floor structure, waterproofing, access up the block and whether a plumber or electrician is needed.

Hire a Tiler Adelaide Hills SA - Get Local Quotes

Tiling a home in the Adelaide Hills means planning around the house as well as the tiles. Cottages and stone homes with raised timber floors need the floor checked for stiffness and covered with fibre cement sheet before tiling, while newer homes on concrete slabs need less preparation. Uneven stone walls may need flat lining boards before tiling, and vents under a timber floor must stay open so the boards stay dry. Electric heating under bathroom tiles needs a licensed electrician, who issues a compliance certificate once the circuit is connected. Homes that drain to a septic tank or a CWMS, a council wastewater scheme, need a licensed plumber for any change to a floor waste or toilet, and some changes need council approval. Blocks inside a mapped bushfire overlay may need a Bushfire Attack Level (BAL) check, which rates bushfire exposure, before a timber deck or the front steps are rebuilt in tile. Every tiler doing paid work in South Australia needs a contractor's licence issued by Consumer and Business Services. Laying labour for standard ceramic or porcelain floor tiles costs about $45 to $85 per square metre as a 2027 estimate, with travel quoted for each address. A domestic contract of $20,000 or more must be written and signed, with the deposit capped at 5 per cent. Steep driveways and long carries from the road add handling time that a tiler can only price after a site visit. Post your job on The Quote Yard and we will connect you with licensed tilers across the Adelaide Hills who can quote on it.

Tiling Work Across the Adelaide Hills

Hills tiling ranges from a single cracked tile in a Stirling kitchen to a full bathroom refit in a stone cottage at Hahndorf or a heated floor in a new Mount Barker home. We can connect you with licensed tilers who all price the same written description of your job.

Get Free Quotes

At a Glance - Adelaide Hills Tiling Prices, 2027 Estimates

Work 2027 Estimate Hills Factor Trade Involved
Floor tiling, ceramic or porcelain $45 - $85 per m² Timber or slab floor underneath Licensed tiler
Wall tiling $50 - $95 per m² Flatness of stone or brick walls Licensed tiler
Large-format tiles $60 - $110 per m² Floor stiffness and flatness Licensed tiler
Natural stone tiles $80 - $150 per m² Weight, sealing and cutting Licensed tiler
Outdoor tiling on a slab $55 - $100 per m² Bushfire overlay and approval Tiler, certifier if approval needed
Old tile removal $25 - $50 per m² Mortar beds and carrying waste out Tiler or demolition crew
Screeding or levelling $25 - $55 per m² Out-of-level older floors Tiler or levelling contractor
Bathroom waterproofing, membrane only $800 - $1,800 Sheet floor or screed base Licensed waterproofer
Electric heating under bathroom tiles $1,200 - $3,000 Switchboard capacity Electrician and tiler
Travel to the site Quoted per job Distance, days on site and access Shown on its own line

What Adds Cost to a Hills Tiling Job

Where the money goes
Timber floors need a stiffness check and a fibre cement sheet base before tiling. That preparation can cost more than laying the tiles on a small bathroom floor.
Any drainage change needs a licensed plumber for that part of the work. With a septic tank or CWMS, some changes also need a council wastewater works approval.
Floor heating adds an electrician, a thermostat and sometimes switchboard work. Tilers then have to work around the cables without damaging them.
Steep or narrow access slows every delivery and every load of waste. Long carries from the road are priced as extra labour time.
Request separate lines for travel, floor preparation, waterproofing, laying and waste removal. Quotes laid out that way can be compared line by line across different tilers.

Starting a Tiling Job in the Hills

Tiling work in the Adelaide Hills takes in stone cottages on timber floors, brick homes in growing towns such as Mount Barker, and houses rebuilt on bushfire-prone blocks. Each of those homes needs different preparation before tiling starts. Older cottages may need the floor stiffened and covered with sheet underlay, new homes may need heating cables set into the floor, and rural blocks may need a plumber for the septic connection. Getting those steps in the right order protects the finished floor from cracking and leaking. City and coastal homeowners can start with our overview of tilers in South Australia.

Tilers quoting in the Hills will want to know what the floor is made of, how old the house is and how its wastewater is handled. Photos taken through the subfloor access hatch, of the existing tiles and of the driveway help a tiler price the job without guessing. Where the tiling is part of a larger refit, a builder handling bathroom renovations can manage the tiler, plumber and electrician under one contract.

Hills Tiling Prices as 2027 Estimates

As 2027 estimates, standard porcelain or ceramic floor tiles cost about $45 to $85 per square metre to lay, with wall tiles at $50 to $95. Tiles 600 mm or longer on a side, called large-format tiles, cost $60 to $110 per square metre to lay because the floor must be flatter and each tile is heavier to handle. Natural stone runs from $80 to $150 per square metre, and outdoor tiling on a patio or deck slab from $55 to $100. These are the same bands used on our other South Australian tiling pages, so a Hills quote can be compared with a city quote on equal terms. Any gap you see between them should come from travel, access or preparation, not from a different laying rate.

Preparation costs differ from one Hills job to the next, depending on the floor and what lies under the old tiles. Removing old tiles costs about $25 to $50 per square metre, and screeding or levelling a floor about $25 to $55, as 2027 estimates. Screeding means spreading a sand and cement or self-levelling layer to make the floor flat and to set any slope toward a floor waste. Timber floors may instead need new fibre cement sheet fixed over the boards, which a tiler will price after seeing the floor. Licensed waterproofers charge about $800 to $1,800 to lay a bathroom's waterproofing membrane, the sealed layer under the tiles, and $600 to $1,300 when only the shower recess is done. For a small bathroom, the tiling labour across floor and walls comes to about $2,500 to $4,500, and each item is priced in our guide to tiling costs in Adelaide.

Job 2027 Estimate Charged By What Changes It in the Hills
Floor tiles laid, porcelain or ceramic $45 - $85 per m² Square metre Sheeting a timber floor first
Wall tiles laid $50 - $95 per m² Square metre Lining uneven stone walls
Tiles 600 mm or longer $60 - $110 per m² Square metre Stiffness of the floor below
Natural stone tiles $80 - $150 per m² Square metre Sealing and carrying heavy stock
Outdoor tiles on a slab $55 - $100 per m² Square metre Approval in a bushfire overlay
Old tiles removed $25 - $50 per m² Square metre Thick mortar beds, long carries
Screed or levelling compound $25 - $55 per m² Square metre How far the old floor is out
Shower recess membrane $600 - $1,300 Fixed price Hob, set-down or flush floor
Kitchen splashback $400 - $1,200 Fixed price Tile size and power point cut-outs
Regrouting $25 - $50 per m² Square metre Minimum call-out of $150 - $250

Day Rates, Call-Outs and Travel Charges

Where a tiler charges by the hour, rates sit around $60 to $95 per hour as a 2027 estimate, and a full day for one tiler around $480 to $780. Small repairs carry a minimum call-out of about $150 to $250, which covers the first visit whatever the size of the job. Larger jobs are priced as a fixed sum after a site visit, with materials on a separate line if the tiler supplies them. The same structure applies whether the house is in Stirling or Lobethal, with travel added on top.

No single travel rate applies across the Hills, so each tiler quotes travel for your address. Some charge a flat travel fee, some charge by the kilometre and some set a half-day minimum for distant sites. Have travel shown as a separate item, so you can check that it has not been added to the laying rate. Jobs that run over several days mean the tiler drives up and back each day, so the number of days on site changes the travel total. Booking a bathroom, laundry and splashback together means fewer return trips into the Hills. Travel is quoted the same way, over longer distances, when hiring a tiler on the Limestone Coast, a tiler on Yorke Peninsula or in the Mid North or a tiler on the Eyre Peninsula.

Tile supply is a separate decision from laying, and it changes what each quote covers. If you buy the tiles yourself, the tiler's price covers labour, adhesive, grout and preparation, so check which of those items each quote includes.

Reading Travel and Time on a Hills Quote

$480 to $780 a day, a 2027 estimate for one tiler, with travel quoted on top for each address.
Flat travel fee: one figure covers getting to the site, and it should state whether it applies once or on every day of the job.
Per kilometre: the charge rises with distance from the tiler's base, so check the starting point used for the count.
Half-day minimum: a short repair at a distant address is billed as half a day so the trip covers its cost.
Curing days: some jobs pause while screeds and membranes cure, and each return visit can add another trip to the bill.

Tiles on Boards and Joists in Older Cottages

Older Hills cottages and stone houses with suspended timber floors need more work under the tiles than a concrete slab does. Suspended floors are raised off the ground on bearers and joists, the timber beams under the boards, so they flex slightly as people walk across them. Tiles and grout are rigid, and a floor that bends under load can crack them or break their bond with the adhesive. One adhesive maker's technical bulletin for tiles on timber floors with a sheet underlay limits deflection, meaning how far the floor bends, to 1/360 of the span between joists. For tiles larger than 400 by 400 mm, that bulletin tightens the limit to 1/500 of the span, and both figures are the maker's own guidance for its products. Tilers and carpenters check this by looking at the size, spacing and condition of the joists from under the house.

Fibre cement sheet, a stiff cement-based board, can be screwed over existing boards to give the tiles a stable and even base. The same bulletin calls for bond breaker tape over the joints in that sheet, a strip that lets each joint move slightly without tearing the layer above it. Ardex makes uncoupling and crack isolation systems, layers that stop small floor movements cracking the tiles, as well as subfloor levelling compounds. Undersized or rotted joists need fixing before the tiler starts, by a carpenter or a subfloor repair specialist.

Uncoupling membranes are thin plastic sheets laid between the floor and the tiles to absorb small movements, so cracks below do not carry through to the tile face. Schluter-Systems makes DITRA-HEAT, an uncoupling membrane whose studded surface also holds electric heating cables, and the maker lists tongue and groove hardwood floors among its suitable bases.

Tile size matters more on timber than on a slab. Under that maker's guidance, large-format tiles need the stricter 1/500 limit, so a floor that suits small tiles may need extra stiffening for 600 mm tiles. Rectified tiles are ground to exact sizes with square edges, so they are laid with narrow grout joints. Any dip in the floor then shows up as lippage, meaning one tile edge sitting higher than the next. Smaller tiles with wider grout joints hide small dips better on an older floor that cannot be made perfectly flat.

Layer, Bottom to Top What It Does Who Checks or Fits It
Stumps, bearers and joists Carry the floor and limit how far it bends Carpenter or restumping crew
Existing floorboards Form the deck the new layers are fixed to Tiler or carpenter
Fibre cement sheet underlay Gives a stiff, even base for adhesive Tiler or carpenter
Bond breaker tape over sheet joints Lets joints move without tearing the layer above Tiler or waterproofer
Uncoupling membrane, if used Absorbs small movement below the tiles Tiler
Waterproofing membrane, in wet areas Stops water reaching the timber Licensed waterproofer
Adhesive, tiles and grout Form the finished surface you walk on Tiler

Stone Walls, Uneven Rooms and Air Under the Floor

Where a stone or old brick wall leans or bulges, the tiler has to make it flat before tiling, either with render, a cement coating, or with lining boards. Wedi makes building boards with a waterproof core of extruded polystyrene foam, known as XPS, which can be fixed to an uneven wall to give a flat surface for tiles. Lining a wall moves the tile face into the room, so taps, shower outlets and window reveals may need adjusting. Moving taps and shower outlets in a wet area is plumbing work, and it should be listed in the quote. Before any wall is lined, the tiler should check for damp, because tiles fixed to a damp wall can lift and stain. Owners of stone cottages further north face the same question, and our guide to hiring a tiler in the Barossa Valley looks at damp walls in more depth.

Timber floors also need air moving underneath them to stay dry and sound. The housing provisions published by the Australian Building Codes Board call for subfloor openings spaced as evenly as practicable, placed no more than 600 mm in from corners, with an unobstructed path for air. They also require the space under the floor to be cleared of debris and vegetation. Renovations can block vents without anyone noticing, for example when a new tiled step or landing is built against an outside wall. Where the air under your house smells damp or musty, a subfloor ventilation installer can assess it before the new floor goes down.

Where stumps have sunk or rotted, levelling the floor comes before any sheet or membrane. Restumping crews can lift and pack the floor, and a floor levelling contractor can then even out the surface.

Checks Under a Cottage Floor Before Tiling

From the access hatch
Joists should be sound, dry and free of rot or borer damage along their full length.
Stumps should be firm and the floor should sit level before any underlay is fixed down.
Vents in the outside walls should be open and not covered by garden beds, paving or steps.
The housing provisions set 150 mm of ground clearance to the lowest timber where termite inspection is not required, and 400 mm where it is.
Photograph the subfloor before work starts and send the photos with your quote request. Tilers can then tell you early whether a carpenter is needed first.

Heating Cables Under New Tiles

Electric heating cables or mats laid under the tiles can warm a bathroom floor, and a retile is the practical time to add them. As a 2027 estimate, electric under-tile heating for a bathroom costs about $1,200 to $3,000, with a thermostat and floor sensor at $180 to $600. Where the switchboard needs a new circuit, allow about $400 to $1,500 for that electrical work. These figures match our page on underfloor heating installation, which compares electric and hydronic systems and their running costs. For the tiler, the questions are how the cables sit within the layers of the floor and how the tile goes over them.

Concrete slabs, as in newer homes around Mount Barker, take the cables in a thin layer of levelling compound or adhesive directly under the tiles. Electric mats add only a few millimetres to the floor height, but the levelling layer adds more, so doors and thresholds need checking. Tiling the whole floor in one go avoids a step where the heated area meets the rest of the room.

On a timber floor, heating cables are laid over the sheet underlay or inside a studded membrane, then covered by adhesive and tile. Laying them inside a membrane such as DITRA-HEAT keeps the cables at an even depth across the room. Insulation beneath the floor cuts the heat lost to the space under the house, and on a raised floor it can be fitted from below where there is room to crawl. Underfloor insulation installers can fit it before or after the tiling.

The tiler should use an adhesive and grout that the maker lists for heated floors, and the heating should stay off until the adhesive has cured for the time the maker states. Laticrete makes SPECTRALOCK PRO, an epoxy grout the maker promotes for even colour and resistance to stains. Mapei makes Kerapoxy Easy Design, which is also an epoxy grout. Whichever grout is proposed, the tiler can show you its data sheet.

Item 2027 Estimate Done By Point to Check
Electric heating mat or cables, bathroom $1,200 - $3,000 Electrician, with the tiler Who lays it and who tests it
Thermostat and floor sensor $180 - $600 Electrician Sensor placed before tiling
New circuit and switchboard work $400 - $1,500 Electrician Certificate issued within 30 days
Studded membrane to hold cables Priced in the tiling quote Tiler Maker lists the floor type
Underfloor insulation, raised floor Quoted separately Insulation installer Access to crawl under the room
Adhesive and grout for heated floors Part of laying rate Tiler Data sheet allows floor heating

Wiring, Testing and the Electrician's Certificate

Connecting under-tile heating to the switchboard is electrical work under the Plumbers, Gas Fitters and Electricians Act 1995, and it belongs with a licensed electrician. The electrician and tiler should agree who lays the mat, who tests it and when the floor sensor goes in. By law, the electrician must give you an electronic certificate of compliance, called an eCoC, within 30 days of finishing the work. Plumbers have 7 days to issue an eCoC for plumbing work under the same rules. Keep both certificates with the tiling invoice, since a future buyer or your insurer may want to see them. Electricians in the Adelaide Hills can quote the circuit and thermostat on the same day as the tiler's measure-up.

Thermostats fixed to a tiled wall need their box fitted by the electrician before the wall is tiled. Cutting a neat opening through finished tiles later takes extra time and can chip the glaze.

Order of Trades for a Heated Bathroom Floor

Plumber first: sets the floor waste, shower outlet and toilet position before anything covers the floor.
Electrician second: runs the new circuit and marks where the thermostat and floor sensor will sit.
Tiler or carpenter next: fixes sheet underlay or screeds the floor, then lays any uncoupling membrane.
Waterproofer after that: lays the membrane in the wet area and lets it cure for the time the maker sets.
Tiler, then electrician: the tiles go down over the cables, and the electrician connects, tests and certifies the system.

Bushfire Overlays, BAL Ratings and Tiled Surfaces

The Planning and Design Code maps bushfire hazard overlays, zones graded by fire risk, and its bushfire prone areas include urban interface land, meaning built-up land within 500 m of high-risk land. Adelaide Hills Council states that all land in its area must meet bushfire construction requirements. In the high-risk overlay, a home needs a Bushfire Attack Level assessment, known as a BAL, and the council refers dwellings and some additions to the Country Fire Service, known as the CFS. Each BAL rates how much radiant heat, ember attack and direct flame contact a building may face, based on nearby vegetation, its distance and the slope of the land. The CFS uses that rating to guide building standards for the house, and the Building Code links bushfire construction to the national standard AS 3959, Construction of buildings in bushfire-prone areas. You can check which overlay covers your block on PlanSA, the state planning portal, before you brief a tiler.

The bushfire guidance from the CFS and Adelaide Hills Council deals with dwellings, decks, outbuildings and water supply, not with indoor tile choices. Outside work is different, because the council says outbuildings and decks often need a private BAL assessment as part of building approval. If you plan to replace a timber deck with a tiled concrete deck, or build tiled steps against the house, check first whether that work needs approval. Your building certifier or the council's duty planner can tell you which materials the BAL and the approval allow, and an outdoor tiling specialist can then price to that specification. Dry Treat makes impregnating sealers for natural stone, pavers and tiles, and the maker lists its impregnating sealers for indoor and outdoor use.

When you brief a tiler for outside work in an overlay, include the BAL report and the approved plans if you have them. Your tiler can then price the slab, tiles and any edge trims to what has been approved. If no approval is needed, a short note from the council or certifier saying so is useful to keep with the quote.

Tiling Job Bushfire Question to Settle Who Can Answer It
Indoor bathroom or laundry retile None raised in CFS or council guidance Tiler and plumber
Kitchen splashback or floor None raised in CFS or council guidance Tiler
Timber deck replaced with a tiled slab Whether approval and a BAL are needed Council or building certifier
New tiled steps or landing at a door Whether the work counts as an addition Council duty planner
Verandah enclosed as a tiled room Approval, BAL and possible CFS referral Certifier, CFS through the application
Tiling in a home rebuilt after fire Whether the BAL changed with the new design Builder and certifier

Tiling a Home Rebuilt or Repaired After Fire

Owners whose homes were damaged by bushfire can request a streamlined assessment and faster approval to repair or rebuild, according to the South Australian Government. The CFS notes that moving a house on its block or changing its size may change its BAL rating. Tiling comes late in a rebuild, after the frame, roof, pipes inside the walls and floor, and waterproofing are done. When the builder engages the tiler, the tiling falls under the builder's contract and its insurance and warranties. If you engage the tiler directly, you hold a separate contract with them, and the contract and deposit rules described further down apply to it.

Building inspectors in the Adelaide Hills can check the waterproofing and floor preparation at set stages before tiles cover them. Photos of the membrane and floor sheeting taken before tiling give you a record if a problem shows up later.

Before Tiling Starts in a Rebuilt Home

Papers and site checks
Confirm whether the tiler is working for the builder or under a separate contract with you.
Get a copy of the plumber's certificate for the drainage before the floor is screeded or sheeted.
Check that any outside tiled deck or steps match the approved plans and the BAL for the site.
Book a stage inspection of the membrane while it is still visible and fully cured.
In a rebuild, several trades may end up working on the same site at once. Keep the curing times set by the screed and membrane makers in the timetable, even when time is short.

Septic Tanks, CWMS and the Floor Waste

Hills homes outside the sewer network drain to an on-site system such as a septic tank, or to a Community Wastewater Management System, known as a CWMS, run by the council. In the Adelaide Hills Council area, all on-site wastewater systems and alterations to them are subject to a wastewater works approval. Mount Barker District Council states that building, installing or altering a septic system needs approval, and that plumbing work may only be done by licensed operators. Any bathroom retile that moves a floor waste, adds a shower or relocates a toilet involves the drainage, so a licensed plumber must be part of the job. Ask the plumber whether the change counts as an alteration that needs council approval before work starts. Plumbers in the Adelaide Hills can price the drainage at the same time as the tiler prices the floor.

Tilers should not cut into or move a floor waste, even to make the tile layout look neater. The SA variation to the National Construction Code (NCC) requires a wet area floor with a vessel, meaning a fixture such as a shower, to be graded to a floor waste, with some exceptions. Grading means sloping the screed toward the drain so water does not pool, which tradespeople call the fall to the waste. Stormtech makes linear floor wastes with tile insert grates, which let the floor tiles run into a narrow channel in place of a round grate.

Keep tile cutting slurry, paint and leftover adhesive out of the drains while the work is going on. Mount Barker's septic fact sheet warns against discharging paints and petrol products into a septic system, and it advises a pump-out every five years. Brushes and rollers from painting the bathroom ceiling should be washed out away from any drain that runs to the tank. If your tank is due, a septic tank pump-out service can do it before the bathroom is back in use.

If the toilet has to be lifted so the floor can be retiled, refitting it is plumbing work for a licensed plumber. For owners replacing the pan at the same time, Caroma makes dual flush toilets, including its Cleanflush range. The plumber sets the new pan on the finished tiles, and any compliance certificate due for that plumbing must reach you within 7 days.

Wastewater Setup How It Works What a Retile Can Involve Who Signs Off
Mains sewer Drains connect to the public sewer Moving wastes or fixtures Plumber, with an eCoC
Septic tank with soakage Solids settle in the tank, liquid soaks into the ground Alterations needing council approval Plumber and council
Aerated treatment system Treated water is pumped to an irrigation area Extra fixtures adding to the load Plumber and council
CWMS House tank drains to a council scheme Alterations to the connection Plumber and council

Moving Tiles and Waste on a Sloping Block

Tiles, adhesive bags and sheet underlay are heavy, and a steep or narrow driveway changes how they get from the truck to the room. If a delivery truck cannot reach the house, the load may be dropped at the road and carried in by hand or barrow. That extra handling takes time, and a tiler will price it once they have seen the site. Tell each tiler about steps, slopes, gates and where a truck can stop, and send a photo of the driveway. Old tiles, mortar beds and sheeting also have to be carried out along that same path to the road.

Cutting tiles needs power, and wet cutting also needs water, so the tiler should know where the nearest outdoor tap and power point are. If the house runs on tank water, mention it, because a wet saw and cleaning buckets draw from your supply. Rubi makes the TK range of manual tile cutters, which score and snap tiles by hand. Montolit makes the Masterpiuma manual cutter, and it also makes diamond core bits for dry drilling holes through tiles.

Old tiles, mortar and broken sheeting count as building rubble, and somebody has to take it away. The quote should say whether the tiler removes the rubble or leaves it for a skip that you hire. If a skip cannot fit on a steep drive, the rubble may need bagging and carrying to the road, which adds labour time. Where testing finds asbestos in old sheeting, that material needs the separate handling described in the section on cutting dust and demolition.

Access Details to Send With a Quote Request

Truck stopping point: say whether a delivery truck can reach the house or must stop at the road.
Carry distance: give a rough distance and the number of steps from the stopping point to the door.
Cutting area: point out a flat spot outside, close to power and a tap, where tiles can be cut.
Waste pile: show where old tiles and sheeting can be stacked before they are taken away.
One clear photo of the driveway and the path to the room can save a second site visit. It also helps every tiler price handling on the same basis.

Licence, Contract and Deposit Rules

Anyone doing building work for you in South Australia, subcontractors included, must be licensed as a building work contractor by Consumer and Business Services, known as CBS. Licences can carry conditions that limit the work allowed, and CBS has prosecuted a contractor whose licence covered only wall and floor tiling but who contracted to carry out bathroom and laundry renovations. Check the licence on the CBS register and confirm that it covers everything in the quote. Plumbing and electrical work need their own licences under separate law. Our guide to hiring a tiler in Adelaide goes further into licence classes and conditions. You can report unlicensed work to CBS on 131 882.

Tilers working under a builder are subcontractors and still need a licence. If the tiler does not hold enough net assets for a full licence covering specified building work, the South Australian Government allows a restricted licence as a subcontractor only. All building work must also be supervised by a registered building work supervisor, which the licence holder can confirm.

Since 10 November 2025, any domestic building contract of $20,000 or more has to be written down, contain every term, carry the contractor's licence number and bear both signatures. On those contracts the owner can cancel by written notice within 5 clear business days of signing. Deposits are limited to $1,000 on jobs under $20,000, and to 5 per cent of the contract price on bigger jobs. Building indemnity insurance is required for domestic work of $20,000 or more that also needs development approval, and the policy must cover at least $250,000 if the builder dies, disappears or becomes insolvent. Every domestic building contract carries statutory warranties, and a court claim for breaching one has to be filed within 5 years of completion. The Building Work Contractors Act 1995 is available to read on South Australian Legislation.

Lifting old tiles can uncover rotten joists, a cracked screed or a failed membrane that nobody could see at the quoting stage. Agree in writing before work starts how that extra work will be priced, for example at a stated day rate or a square metre rate. Ask for the problem to be photographed and explained before any extra work goes ahead, so you can decide whether to proceed.

Question Job Under $20,000 Job of $20,000 or More
Licensed contractor needed? Yes Yes
Written contract required by law? No, but a written quote protects you Yes, signed by both parties
Largest deposit allowed $1,000 5 per cent of the price
Cooling-off period Check with CBS 5 clear business days
Building indemnity insurance Not required Required if approval is needed
Statutory warranties Apply, 5 year limit Apply, 5 year limit

Membranes, AS 3740 and the Code in Force

South Australia's variation to the NCC requires wet area building elements to comply with AS 3740, the Australian Standard titled Waterproofing of domestic wet areas. PlanSA says the state keeps NCC 2022 Amendment 2 as its Building Code to the end of April 2027, then moves to NCC 2025 from 1 May 2027. If your bathroom work needs approval and runs close to that date, ask your certifier which edition applies. Under the SA variation, bathroom and laundry floors drained by a floor waste must be waterproof, along with the floor and wall junctions and any points where pipes pass through. Copies of the standard are sold through Standards Australia, and a general waterproofing services contractor can tell you how it applies to your room.

In a Hills bathroom, the membrane goes over the screed or sheet floor and up the walls before the tiler returns to fix the tiles. Laticrete makes HYDRO BAN, a thin membrane sold both for waterproofing and for stopping cracks below from reaching the tiles. Wedi makes Fundo shower elements for flush-to-floor showers with point or linear drainage. Bathroom waterproofing specialists can lay and photograph the membrane before tiling, and remedial waterproofing deals with showers that already leak.

Shower design changes what happens under the tiles. Hobs are small raised steps at the shower entry that keep water inside the recess. A set-down is a lowered section of floor in the shower area, which lets the shower floor sit below the rest of the bathroom for a step-free entry. On a timber floor, a set-down means lowering or reworking joists, which is carpentry work that has to be finished before the waterproofer arrives.

Laundries and kitchens have their own wet area rules in the SA variation. In a laundry, the wall around the washing machine taps must be water resistant for 75 mm above the outlets and 75 mm to each side. Where a sink is set into a kitchen bench, the wall junction within 150 mm above it must be water resistant, and tap holes through the bench must be waterproof. Knowing the position of any new laundry tub or sink lets the tiler plan the wall tiles and the water resistant zone around it.

Hold Points for a Hills Wet Area

Stop and check before the next layer
Screed laid: check the fall runs toward the waste and water does not sit in low spots.
Membrane laid: photograph corners, the waste and every pipe that passes through the floor or wall.
Membrane cured: confirm the maker's curing time has passed before the tiler starts.
Tiles grouted: check that junctions between walls and floor are finished with flexible sealant where specified.
Grout is the rigid filler between tiles, while sealant is a flexible filler used at corners and junctions. They are different products that do different jobs in a wet area.

Cutting Dust, Old Sheeting and Demolition

SafeWork SA lists tiles, grout and porcelain and ceramic products as crystalline silica substances, and its rules from 1 September 2024 control how they are cut at work. For high-risk cutting, those rules call for controls such as wet dust suppression or on-tool extraction, with respiratory protection for anyone still exposed. The national engineered stone ban from 1 July 2024 covers benchtops, panels and slabs but excludes porcelain, ceramic wall and floor tiles and sintered stone, a dense fused mineral slab. A tiler may still cut porcelain in your home, but should control the dust while doing it. Festool makes M class mobile dust extractors, rated for medium hazard dust, which a tiler can connect to a saw or grinder. SafeWork SA publishes the full silica rules for employers and workers.

SafeWork SA warns that a house built or renovated before the mid-1980s is likely to contain some asbestos, including in bathrooms, laundries and under floors. If a retile means lifting old sheeting, linoleum or tiles, get the material tested or treat it as asbestos until you know. Asbestos testing gives you an answer before demolition, and a licensed asbestos removalist can take the material out if the test is positive. The national Asbestos Safety and Eradication Agency has guidance written for home renovators.

Agree before work starts where the tiles will be cut, because cutting outdoors keeps silica dust away from furniture and family. If cutting has to happen inside, the tiler should use extraction and close off the room being worked on.

Stripping a bathroom back to the frame is a separate step from tiling, and a bathroom demolition crew can handle it if the tiler does not. The quote should say who removes the old tiles and where that waste goes.

Task Hazard Control to Ask About
Cutting porcelain with a powered saw Silica dust Wet cutting or on-tool extraction
Grinding notches and edges Silica dust Extraction plus a fitted respirator
Scoring and snapping straight cuts Sharp edges Manual cutter and gloves
Lifting old floor tiles or linoleum Possible asbestos backing or adhesive Testing before removal
Removing old wall sheeting Possible asbestos cement Testing and a licensed removalist
Mixing adhesive and grout powders Airborne dust Mixing outside, away from living areas

When Tilework Fails: CBS, Court and Consumer Law

If tiles crack, a shower leaks or patches turn drummy, meaning they sound hollow when tapped, write to the tiler first with photos and dates. The SA Government's disputes guidance says CBS can then assess the matter and offer conciliation, a guided discussion to help both sides agree, either voluntary and by phone or compulsory for serious matters. CBS takes building dispute enquiries on 131 882. Claims under the Building Work Contractors Act can be lodged through CourtSA as a minor statutory proceeding, a claim type where the simpler minor civil rules and cost limits generally apply. Under the Australian Consumer Law, the Australian Competition and Consumer Commission (ACCC) says a service provider has to use an acceptable standard of care and skill.

The ACCC also says services must be fit for any purpose you stated, and supplied within a reasonable time if no date was agreed. Telling the tiler in writing that the floor will carry heating, or that the shower must be step-free, makes that purpose clear. A dated written brief also helps if the job runs well past the time you discussed.

Independent reports help when the tiler and owner disagree about whether a fault comes from the laying or from the floor underneath. Keep the quote, contract, product data sheets and photos taken during the job, since together they show what was promised and what was done. Some time limits are fixed by law and cannot be extended. Court action for breach of a statutory warranty must start within 5 years of completion of the building work. For some claims about defective building work under the Planning, Development and Infrastructure Act 2016, no action can start more than 10 years after completion. Once the cause is fixed, a few cracked tiles can be handled by a tile repair visit instead of a full retile.

What to Look Out For in a Hills Tiling Quote

A quote for tiling on a timber floor that says nothing about the subfloor, sheet underlay or deflection leaves the most important part of the job unpriced. Watch for a single total with no split between labour, materials, waterproofing and travel. Be wary of a tiler who offers to move a floor waste or connect heating cables without a licensed plumber or electrician. Any deposit request over $1,000 on a small job, or over 5 per cent on a large one, breaks the legal cap. If the house is in a bushfire overlay and the job includes an outside deck or steps, the quote should say whether approval is needed.

Quote Gaps to Watch for in Hills Homes

No mention of the timber floor's condition, or of who fixes the joists if they are not up to the job.
No line for drainage work, even though the bathroom layout moves the shower or toilet.
Floor heating listed with no electrician named, and no word on the compliance certificate.
Travel shown as included, with no explanation of how many trips the job needs.
A low price that leaves out preparation, drainage or certificates can end up costing more once those items are added back.

Look for a timeline that includes the curing time the membrane maker sets before tiling starts. If a tiler proposes tiling straight over old tiles, ask how they will check the bond underneath and the new floor height at doorways. Extra layers raise the floor, so doors may need trimming and thresholds adjusting.

Briefing Hills Tilers So the Quotes Line Up

Tiling jobs on older Hills houses are hard to price accurately from photos alone. Book a site visit, and check whether the tiler charges for it, since a trip into the Hills costs them time. Have the subfloor hatch open and the bathroom clear so the visit is quick.

Send every tiler the same written brief, listing the rooms, rough measurements, the tile you want and who supplies it. Add the floor type, the age of the house, whether you are on septic, CWMS or sewer, and whether the property is in a bushfire overlay. Include photos of the existing floor, the space under the house, the switchboard if heating is planned, and the driveway. Say whether you want the tiler to arrange the plumber, electrician and waterproofer, or whether you will book them yourself. Request travel, preparation, waterproofing and laying as separate lines. Three quotes on the same brief make the differences easy to see.

Compare how long each price stays valid, the start date offered and the number of days the tiler expects to be on site. Early start dates are of little use if the plumber and waterproofer cannot fit in around them. Line up all the trades' dates together before you accept any quote.

Homes in other parts of South Australia raise different tiling issues from those in the Hills. Owners of holiday homes can read our guide to hiring a tiler on the Fleurieu Peninsula, and owners near the river can read about hiring a tiler in the Murraylands and Riverland. Wherever the job is, keep the quotes, contract, certificates and photos together for as long as you own the house.

Tilers Across the Adelaide Hills

Tiling prices on this page apply across the Adelaide Hills, from Stirling and Hahndorf to Mount Barker, Woodside and Lobethal. Travel is the price factor that changes with your address, so each tiler quotes it on a separate line.

▶ Stirling & Upper Hills 9 areas
Stirling Aldgate Bridgewater Crafers Piccadilly Summertown Uraidla Mylor Heathfield
▶ Mount Barker & Hahndorf 8 areas
Mount Barker Hahndorf Littlehampton Nairne Echunga Verdun Macclesfield Meadows
▶ Onkaparinga Valley 7 areas
Woodside Balhannah Oakbank Lobethal Lenswood Charleston Forest Range
▶ Northern Hills 8 areas
Gumeracha Birdwood Mount Pleasant Williamstown Kersbrook Forreston Cudlee Creek Houghton

Adelaide Hills Tiler FAQ

What has to happen under a timber floor before it is tiled?
The joists and stumps need to be sound and level, and the floor needs to be stiff enough for tiles. One adhesive maker's own guidance limits floor deflection to 1/360 of the joist span, or 1/500 for tiles over 400 by 400 mm. Fibre cement sheet is then fixed over the boards, with bond breaker tape over the sheet joints. Subfloor vents should also be clear so the timber stays dry under the new floor.
Can heating cables go under tiles laid on a timber floor?
Yes, as long as the floor is prepared first and the products are listed by their makers for that base. Schluter-Systems lists tongue and groove hardwood floors as a suitable base for DITRA-HEAT, its studded membrane that holds heating cables. Electric heating for a bathroom floor costs about $1,200 to $3,000 as a 2027 estimate. Insulation fitted from under a raised floor reduces the heat lost below.
Who connects and certifies electric heating under new tiles?
A licensed electrician connects the heating to the switchboard and fits the thermostat. The electrician must give you an electronic certificate of compliance within 30 days of finishing the work. The tiler and electrician should agree beforehand who lays the mat and when it is tested. Keep the certificate with your tiling paperwork and the invoice.
Do I need approval to swap a timber deck for tiles in a bushfire area?
You might, so check before any work starts. Adelaide Hills Council says decks and outbuildings often need a private BAL assessment as part of building approval. Your certifier or the council's duty planner can tell you what the BAL and the approval allow on your block. Indoor tiling is not covered by the bushfire guidance from the CFS or the council.
Does moving a shower drain on a septic system need approval?
It can, because changes to an on-site wastewater system need a wastewater works approval from the council. In the Adelaide Hills Council area, all on-site systems and alterations to them are subject to that approval. Only a licensed plumber may do the drainage work, and they can tell you whether your change counts as an alteration. Moving a floor waste is never a job for the tiler alone.
Why is travel a separate line on a Hills tiling quote?
The distance from a tiler's base to your house changes from job to job, so travel is quoted for each address. Some tilers charge a flat fee, some charge per kilometre and some set a half-day minimum. Seeing travel on its own line shows that the laying rate is the same one a city customer would pay. Grouping several rooms into one booking can reduce the number of trips.
How do tiles get to a house on a steep or narrow block?
When a truck cannot reach the house, the delivery is dropped at the road and carried in by hand or barrow. That handling is extra labour, and a tiler prices it after seeing the site. Send a photo of the driveway and the path to the room with your quote request. Remember that old tiles and sheeting have to come out the same way.
Which edition of the building code applies to a bathroom renovation in SA?
South Australia keeps NCC 2022 Amendment 2 as its Building Code to the end of April 2027. From 1 May 2027 the state moves to NCC 2025, PlanSA says. Under the SA variation, wet area building elements must comply with AS 3740, the standard for waterproofing domestic wet areas. If your job needs approval near the changeover, your certifier can confirm which edition applies.
Does the engineered stone ban stop my tiler cutting porcelain?
No, the ban that began on 1 July 2024 covers engineered stone benchtops, panels and slabs. It does not apply to porcelain, ceramic wall and floor tiles or sintered stone. SafeWork SA still lists porcelain and ceramic as crystalline silica substances, so its rules require dust controls such as wet cutting or on-tool extraction. Expect the tiler to cut outside or use extraction indoors.
Where do I complain if a tiler will not fix a leaking shower?
Write to the tiler first, with photos and the dates you noticed the leak. If that fails, CBS can assess the dispute and offer conciliation, and you can call them on 131 882. You can also lodge a claim under the Building Work Contractors Act through CourtSA. Court action for a breach of statutory warranty must start within 5 years of the work being completed.

Adelaide Hills Tiling Specialists

For Trades & Contractors - SA

Tiling in the Adelaide Hills can depend on other trades for the parts a tiler cannot do. Drainage changes need a licensed plumber, floor heating needs an electrician, and wet areas need a membrane laid before the tiles. These listings cover the tiling work and the trades booked alongside it.

Compare Adelaide Hills Tiling Quotes

Tell us your town, the rooms to tile, the type of floor and how your house drains, and compare quotes from licensed Hills tilers who are all pricing the same job.

Get Free Tiling Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 13 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All SA tradies are required to hold appropriate licences. Verify at Consumer and Business Services SA.
Prices are estimates based on typical tiling rates in the Adelaide Hills in 2027. Your final price will depend on the tile, the floor or wall preparation and access, so compare written quotes that list labour, materials and waterproofing separately.
Need work done? Get free quotes. Post a Job – It's Free