Kitchen Cabinets to Price?

Tell us the run length, the finish you are after and whether the old kitchen is coming out, and we will put you in touch with cabinet makers and joiners in your area.

Get Free Kitchen Cabinet Quotes

Typical Costs

Flat pack cabinets, supply only, per linear metre$350-$700
Flat pack supplied and installed, per linear metre$700-$1,300
Laminate or vinyl wrap, made to measure, per linear metre$1,100-$2,000
Two pack polyurethane doors, per linear metre$1,800-$3,200
Timber veneer or solid timber, per linear metre$2,400-$4,500
Small kitchen, 4 linear metres, flat pack installed$2,800-$5,200
Average kitchen, 7 linear metres, made to measure$7,700-$14,000

Costs vary by the length of the cabinet run, the carcass material, the door finish, the hardware specified, and how many tall and specialty cabinets are included.

Kitchen Cabinet Cost NSW 2026 - Complete Pricing Guide

Kitchen cabinets are quoted per linear metre of cabinetry, and the figure moves by a factor of six depending on how the boxes are made and what the doors are finished in. Flat pack cabinets supplied only run $350 to $700 a linear metre across New South Wales in 2026, and $700 to $1,300 with somebody else assembling and fitting them. Made to measure cabinets with laminate or vinyl wrap doors are $1,100 to $2,000, two pack polyurethane doors $1,800 to $3,200, and timber veneer or solid timber $2,400 to $4,500. On a seven linear metre kitchen, which is an ordinary size for a Sydney house, those bands come out between $2,450 at the cheapest end and $31,500 at the dearest, for cabinets that occupy the same space and hold the same crockery. The things that move the price are the carcass board, the door finish, the hinges and runners, and how many tall units, corner solutions and drawer banks are in the run, because a drawer bank costs roughly twice what a cupboard of the same width does. Benchtops, splashbacks, appliances, plumbing, electrical and tiling are all separate line items, and the engineered stone prohibition that took effect across Australia on 1 July 2024 changed what benchtop can legally go on top of those cabinets. The other figure worth knowing before you start is that cabinetry is commonly between a third and a half of the cost of a full kitchen renovation, so a cabinet quote on its own is not a budget for a new kitchen.

Kitchen Cabinets Across New South Wales

Pricing for flat pack and made to measure kitchen cabinets, laminate, vinyl wrap, two pack polyurethane, timber veneer and solid timber doors, carcass materials, hinges and drawer runners, pantries and corner cabinets, removal of the old kitchen and installation across New South Wales. We can connect you with kitchen trades across New South Wales who quote against the same written scope.

Get Free Quotes

At a Glance - Kitchen Cabinet Costs NSW 2026

Cabinet Type Per Linear Metre 7m Kitchen Lead Time Made to Measure
Flat pack, supply only $350-$700 $2,450-$4,900 In stock to 3 weeks No
Flat pack, supplied and installed $700-$1,300 $4,900-$9,100 2-4 weeks No
Laminate doors, made to measure $1,100-$1,700 $7,700-$11,900 4-7 weeks Yes
Vinyl wrap doors, made to measure $1,250-$2,000 $8,750-$14,000 4-7 weeks Yes
Two pack polyurethane doors $1,800-$3,200 $12,600-$22,400 6-10 weeks Yes
Timber veneer doors $2,400-$3,800 $16,800-$26,600 6-12 weeks Yes
Solid timber doors $2,800-$4,500 $19,600-$31,500 8-14 weeks Yes
Painted shaker, two pack $2,000-$3,500 $14,000-$24,500 6-10 weeks Yes

Cost Depth: Linear Metres, Boxes and What Is Not Included

A linear metre of cabinetry means a metre measured along the wall, counting base cabinets and the wall cabinets above them as one metre instead of two. That convention is standard in the trade and it is also the first place quotes diverge, because some suppliers quote base and wall apart from each other and the per metre figures then look half the price of a competitor quoting both together. Ask which convention a quote uses before comparing anything. The second divergence is what the number includes. A cabinet quote may or may not cover removal and disposal of the old kitchen, the benchtop, the splashback, appliance supply, the sink and tap, plumbing disconnection and reconnection, electrical work, patching and painting of the walls behind, and the kickboard and end panels. On a seven metre kitchen those exclusions add up to many thousands of dollars, and a quote that is noticeably cheaper is often cheaper because fewer of them are in it.

Costs reflect run length, carcass material, door finish, hardware specified, the proportion of drawers and tall units, whether the old kitchen is removed, wall condition and squareness, and location within New South Wales.

Kitchen Cabinet Costs in New South Wales for 2026

The hardest thing about comparing kitchen cabinet quotes is that two suppliers can use the same words to describe very different things. Flat pack cabinets, supplied for you to assemble, are $350 to $700 a linear metre. The same cabinets assembled and installed by a tradesperson are $700 to $1,300. Made to measure cabinets with laminate or vinyl wrap doors sit at $1,100 to $2,000, two pack polyurethane at $1,800 to $3,200, and timber veneer or solid timber at $2,400 to $4,500. On a seven linear metre kitchen the spread runs from about $2,450 to about $31,500, and the cabinets at both ends of that range will hold the same number of plates.

A linear metre in this trade means a metre along the wall with the base cabinets and the wall cabinets above them counted together. Some suppliers quote base and wall runs separately, which halves the apparent per metre figure and makes a quote look far keener than it is. Establishing which convention each quote uses is the first thing to do, before any comparison means anything.

Within a band, the figure moves on four counts. The carcass board forms the box itself, and it decides whether the kitchen survives a leak under the sink. The door finish supplies the visible part and contributes more than anything else. The hardware, meaning the hinges and drawer runners, the place where a cheap kitchen announces itself within two years. And the mix of cabinet types, because a bank of drawers costs roughly twice a cupboard of the same width and a corner solution costs more again.

Everything on top of and around the cabinets is separate. Benchtops, splashbacks, appliances, the sink and tap, plumbing, electrical work, tiling, and patching and painting the walls behind the old kitchen are all their own line items. The engineered stone prohibition that commenced on 1 July 2024, administered in this state by SafeWork NSW, also changed the benchtop options available. For the whole project rather than the cabinets alone, see kitchen renovation costs, and the trade itself is cabinet making and joinery.

How Cabinets Are Measured and Quoted

Measuring conventions differ across New South Wales, and a quote written in one cannot be compared with a quote in another. The most common is the combined linear metre. A metre along the wall includes the base cabinet and the wall cabinet above it, so a seven metre kitchen with overheads throughout is seven linear metres. Most made to measure suppliers mean this, and the figures on this page follow that convention. Ask the question plainly and you will get a plain answer.

The second is base and overhead quoted separately. A seven metre run with overheads becomes fourteen linear metres at a lower rate, and the arithmetic often lands in a similar place. The risk lies in weighing a combined rate against a separated one and concluding that one supplier is twice the price of the other. The third is per cabinet, the way flat pack is usually sold and how some custom joiners prefer to quote. Of the three it is the most transparent, because you can see what each box costs and decide to drop a cabinet or swap a drawer bank for a cupboard. It also compares least easily against a per metre figure, which is why asking for a per cabinet breakdown of a per metre quote is a reasonable request.

A fourth figure appears on renovation quotes and causes confusion. Some builders quote a whole kitchen supply and install figure with no breakdown at all. That works for a package, but it leaves you unable to see what the cabinetry component is, and if you later want to change a door finish there is no line item to change. Ask for cabinetry, benchtop, appliances and trades to be separated even inside a package price.

Convention What a 7m Kitchen Becomes Typical Rate Easy to Compare Used By
Combined linear metre 7 linear metres $1,100-$3,200 Against other combined quotes Most made to measure suppliers
Base and overhead separate 14 linear metres $550-$1,600 Only after conversion Some kitchen retailers
Per cabinet 18 to 24 cabinets $280-$1,100 each Very, item by item Flat pack and custom joiners
Supply and install package One figure Varies widely Not at all Renovation builders
Per square metre of door face Door area only Varies No Rare, door replacement only
Cost plus hourly Hours plus materials $75-$130 an hour No Small bespoke joiners
Per metre including benchtop 7 metres, bundled $1,900-$5,000 Only if both bundle Package kitchen suppliers

Carcass Board, and the Part You Never See

The box behind the door decides whether your kitchen is still sound in fifteen years, and it is the easiest place for a supplier to save money invisibly. Standard particleboard with a melamine surface is the usual carcass material and it is adequate for most of a kitchen. Its one real weakness is water getting in. Once the melamine edge is breached and moisture reaches the core, particleboard swells irreversibly, and the places that happens are the cabinet under the sink, the base of the dishwasher cabinet and anywhere near a tap. Once a carcass has swollen there is no repair for it, only replacement of the box.

Moisture resistant board, usually described as HMR and tinted green through the core so it can be identified on sight, handles damp far better. A sensible specification calls for HMR throughout the wet areas at minimum, and many quality suppliers now use it across the whole kitchen because the cost difference across a seven metre run is modest against the consequence. Plywood carcasses occupy the premium end, lighter for the same strength, more stable, and holding screws far better over repeated adjustment. They cost more and turn up mostly in high end bespoke joinery. Board thickness matters too, with 16 millimetre being standard and 18 millimetre giving noticeably more rigidity in wide cabinets and under heavy stone.

Ask explicitly about two items at quoting stage. Whether the carcass is HMR in the sink and dishwasher cabinets, which should be a yes on any quote at any price. And whether the cabinet backs are a full thickness panel let into a groove or a thin sheet pinned on, because the back is what keeps a cabinet square and a pinned three millimetre back in a tall pantry will rack over time.

Material Water Resistance Typical Use Cost Effect Identify It By
Melamine particleboard, 16mm Poor once the edge is breached Standard carcass Baseline White core
Moisture resistant board, 16mm Good Wet areas, better kitchens Add 5 to 12 per cent Green tinted core
Moisture resistant board, 18mm Good, more rigid Wide cabinets, stone tops Add 10 to 18 per cent Green core, thicker
Plywood Very good High end bespoke joinery Add 25 to 50 per cent Visible laminations at the edge
Melamine on MDF Moderate Doors and panels, not carcasses Varies Smooth dense core
Full thickness back panel Not applicable Better cabinets Small Back sits in a groove
Thin pinned back Not applicable Budget cabinets Saving Back stapled to the rear edge

Door Finishes From Laminate to Solid Timber

Doors contribute more to the price of a kitchen than anything else, and they are the only part most people look at. Laminate doors take a decorative laminate pressed onto a board substrate with an edge applied. The two names you will meet on the samples are Laminex and polytec, the latter an Australian owned business headquartered at Somersby on the Central Coast, which is useful to know if a door needs matching in five years. They give the most durable surface in everyday use, resisting scratches and heat better than most alternatives, and they come in a great many finishes. Shape is the limitation, because laminate cannot wrap a profile, so laminate doors are flat. Edge quality shows up cheap laminate doors, and a poorly bonded edge lifts at the corners within a few years.

Vinyl wrap, also sold as thermolaminated or thermofoil doors, is a vinyl film vacuum pressed over a routed door of medium density fibreboard, shortened to MDF. Because the film conforms to a shape, this is how affordable profiled and shaker style doors are made. Heat is the known weakness, since sustained heat from an oven or an under bench appliance can lift the film at an edge, and that has to be managed with heat deflectors and sensible appliance placement.

Two pack polyurethane means paint, sprayed and cured onto an MDF door in a controlled environment. It gives a continuous finish with no edge to lift, any colour, any profile, and a gloss level of your choosing. It dominates the premium end of Australian kitchens for good reason. It can be chipped by a hard knock on a corner, and it can be repaired and recoated later, an advantage no wrapped or laminated door has.

Timber veneer puts a thin layer of real timber over a stable substrate, giving genuine grain at a fraction of the weight and movement of solid timber. Solid timber doors, usually in a shaker or panelled form, cost the most and the only one that can be sanded back and refinished repeatedly. Both move with humidity, which matters more in a coastal New South Wales kitchen than an inland one.

The practical point for a budget is that doors can be changed later on a carcass that was built properly. Specifying good carcasses and good hardware with modest laminate doors leaves you the option of two pack doors in eight years. Doing the reverse gives you beautiful doors on boxes that will not survive to see them replaced. Refinishing what you already have gives you the other route, priced under kitchen cabinet painting.

Finish Per Linear Metre Durability Profiles Possible Known Weakness
Melamine or laminate, flat $1,100-$1,700 Very good Flat only Edge lifting if poorly bonded
Vinyl wrap, flat $1,250-$1,800 Good Flat and routed Film lifting from sustained heat
Vinyl wrap, shaker profile $1,400-$2,000 Good Yes Film lifting at profile edges
Two pack polyurethane, flat $1,800-$2,600 Very good Flat and routed Chips on a hard corner knock
Two pack polyurethane, shaker $2,000-$3,500 Very good Yes Chips, but repairable
Timber veneer $2,400-$3,800 Good Flat and framed Moves with humidity, fades in sun
Solid timber $2,800-$4,500 Very good, refinishable Yes Movement, highest cost

Hinges, Runners and the Hardware That Outlives the Kitchen

Hardware takes a small fraction of the price of a kitchen and generates more complaints two years later than anything else. A kitchen has somewhere between twenty and sixty hinges and a dozen or more drawer runners, and every one of them is operated several times a day for twenty years. Cheap hinges lose their adjustment and the doors go out of alignment across the run, the clearest visible sign of a budget kitchen. Cheap runners develop side play, start to catch, and eventually drop a loaded drawer. Neither failure is repairable without replacing the part, and matching an obsolete unbranded hinge ten years later is close to impossible.

The established European brands dominate this part of the market across Australia. Blum, an Austrian manufacturer, along with the German firms Hettich and Häfele, are specified by most quality cabinet makers and all three publish load ratings, cycle testing figures and warranty terms you can read before buying. Naming them is a point about published specifications and parts availability in ten years, not an endorsement of a particular model.

Soft close is now close to standard and worth having on every door and drawer instead of selectively. The mechanism also protects the cabinet, because a door slammed repeatedly works its fixings loose. Full extension runners, which bring the whole drawer clear of the cabinet, are the other upgrade that changes daily use, since a three quarter extension drawer keeps the back of itself permanently out of reach. The question to ask is simple and most quotes do not answer it unprompted. What brand and model of hinge and runner is included, what is the warranty, and is soft close on everything. A quote that specifies the hardware by name usually comes from somebody who knows what they are selling.

What to Ask About Hinges and Runners

The whole subject reduces to four questions. Which brand and model of hinge, and is it soft close on every door. Which runner, by brand and model, and is it full extension or three quarter. What is the load rating on the runners, which matters on a wide pot drawer carrying cast iron. And what is the warranty, because the reputable manufacturers offer long warranties and the parts stay available.

There is a related question about the drawer boxes themselves. A metal sided drawer system from one of the established manufacturers is a different proposition from a board drawer box running on separate runners, both in rigidity and in how it stays square under load. The metal systems cost more per drawer and are the reason a drawer bank is dearer than a cupboard, and on the drawers that take weight they are worth the difference.

Get the hinge and runner brand, model, soft close, extension type and load rating written into the quote.

Flat Pack, Semi Custom and Full Custom Compared

These three are genuinely different products and the right choice depends on the room more than the budget. Flat pack cabinets come in fixed module widths, typically in hundred millimetre increments, and are assembled on site. They cost least by a wide margin and the quality of the better flat pack ranges is considerably higher than the reputation suggests, with HMR board and brand name hardware available in the upper ranges. Fixed widths are the constraint, which means filler panels where a module does not reach the wall, and those fillers are what make a flat pack kitchen look like one.

Semi custom sits in between the other two. Cabinets are made to order from a standard system but to your measurements, so the run fits the wall exactly and the door finishes are chosen from a catalogue. Most New South Wales kitchens land here, and it marks the best value point for a room with ordinary walls and no unusual requirements. Full custom means a cabinet maker measures, designs and builds to the room. It answers the awkward cases: a kitchen with an odd shape, a curved wall, a ceiling height that needs cabinets to the top, or a feature the owner wants built in. It also opens up materials and details outside any standard catalogue.

A specific case for flat pack worth stating. In a rental property, a holiday house or a kitchen that will be replaced again in eight years, flat pack with good hardware is a rational choice instead of a compromise. The argument against it is strongest where the kitchen is meant to last twenty five years and the walls are not straight. There is more on that option under flat pack kitchen costs.

Factor Flat Pack Semi Custom Full Custom
Per linear metre installed $700-$1,300 $1,100-$2,600 $2,400-$4,500
Fits the wall exactly No, filler panels needed Yes Yes
Cabinet widths Fixed increments Made to measure Any
Lead time In stock to 3 weeks 4-7 weeks 6-14 weeks
Door finishes Catalogue range Wide catalogue Anything
Awkward rooms Poorly suited Mostly suited Designed for it
Best for Rentals, budget, quick turnaround Ordinary rooms, best value Awkward rooms, long term

Layout Decisions That Move the Price

Length does not settle the price. Two kitchens measuring the same can differ by thousands on what sits in the run. A bank of drawers costs roughly twice what a cupboard of the same width does, and the reason is in the hardware and the labour. A 600 millimetre cupboard has one door, two hinges and a shelf. A 600 millimetre drawer bank has four drawer boxes, four pairs of runners and four fronts to align. Drawers are far better to use and they are the upgrade most people are happiest about afterwards, but the price is real and it should be a deliberate choice and not a surprise.

Corners are the other expensive element in a run. A blind corner cupboard is cheap and nearly useless. A corner carousel or a pull out corner mechanism makes the space usable and costs several hundred dollars in hardware. Designing the corner out altogether, by running the bench past it or placing an appliance there, is sometimes the cheapest and best answer. Raise it at the design stage, because it is a layout decision and not a hardware one.

Tall units carry a premium beyond their width. A full height pantry needs more board, more hardware, careful fixing to the wall because of the load, and a door that stays flat over nearly two metres. Running wall cabinets to the ceiling instead of stopping at a bulkhead adds a second row of doors and the awkward top section where nothing is reachable without a ladder, so it is worth deciding whether that storage is genuinely wanted.

Islands are quoted separately and usually come out dearer per metre than a wall run. An island has finished panels on the back and the ends instead of a wall behind it, often carries the sink or the cooktop with the services that implies, and needs a benchtop with more exposed edges. A three metre island is rarely the same price as three metres of wall cabinetry. The cheapest sensible kitchen layout is a straight run or an L shape against existing wall positions, with the plumbing and the cooktop staying where they are. Every time a service moves, another trade is involved. What relocating a sink actually involves is set out under kitchen plumbing costs.

Benchtops, and the Engineered Stone Prohibition

Benchtops are a separate line item from cabinets and the rules changed substantially in 2024. A prohibition on engineered stone benchtops, panels and slabs took effect across Australia on 1 July 2024. It bans the manufacture, supply, processing and installation of engineered stone, defined as an artificial product containing at least one per cent crystalline silica by weight that is made by combining natural stone material with resins or other chemical constituents. The prohibition exists because of silicosis among stonemasons who cut and processed these products, and in this state it is administered by SafeWork NSW under work health and safety law.

What that means for a kitchen in 2026 is that the product which dominated Australian benchtops for twenty years is no longer available. What remains available includes natural stone such as granite and marble, sintered stone and porcelain products made without resin, laminate, solid surface materials, stainless steel, concrete and timber. Engineered stone containing less than one per cent crystalline silica is also outside the prohibition, as are concrete, ceramic tiles, grout, mortar and plasterboard.

There is a separate rule about existing benchtops. Work that removes, repairs or modifies engineered stone already installed in a house is permitted, with respiratory protective equipment required and notification to the regulator, because the alternative would be leaving householders unable to have an existing benchtop taken out. If your current kitchen has an engineered stone top, that affects how the demolition is quoted and who can lawfully do it. For budgeting, benchtops commonly run from around $200 a square metre for laminate to well above $1,000 a square metre installed for natural stone or premium sintered products, with the fabrication of cut-outs, edge profiles and waterfall ends adding substantially. Get the benchtop quoted as its own line with the material named, and our kitchen benchtop cost guide covers the detail.

What the Prohibition Means for Your Kitchen

From 1 July 2024 onward, engineered stone benchtops, panels and slabs can no longer be made, sold, cut or fitted anywhere in Australia. The definition catches any artificial product holding at least one per cent crystalline silica that was created by binding stone material with resins. Still on the table are natural granite and marble, resin-free sintered stone and porcelain, laminate, solid surface, stainless steel, concrete and timber.

For a householder that lands in two places. If a supplier offers you an engineered stone benchtop in 2026, something is wrong and you should not proceed. And if your existing kitchen has engineered stone, its removal is permitted but regulated, requiring respiratory protection and notification to the regulator, so the demolition quote should reflect that it is controlled work. Kitchen demolition costs covers that side of it in more detail.

Engineered stone benchtops cannot be supplied or installed. Removing an existing one is permitted but controlled work.

Measuring, Templating and the Order of Operations

The sequence a kitchen gets built in is fixed by physics and getting it wrong is the most common cause of a delayed kitchen. Cabinets are made to a measurement taken from the room. On a renovation where the old kitchen is still in place, that measurement is taken over the existing cabinets and finishes, and a careful cabinet maker will allow for what is behind them. Where walls are being removed, replastered or retiled, the final measurement cannot be taken until that work is done, which means the cabinet order cannot be placed until then either.

Benchtops come after the cabinets, never with them. A stone or sintered benchtop is templated on the installed cabinets, because a one or two millimetre discrepancy in a cabinet position becomes a visible gap at the wall. That template, fabrication and installation adds one to three weeks after the cabinets go in, and that is the period a household spends with cabinets and no bench, and it is worth planning for rather than discovering.

Splashbacks come after benchtops for the same reason. Tiling or a glass splashback is set off the finished bench surface, so a glass splashback is measured after the bench is in and adds a further one to two weeks. The consequence for a household is that a kitchen renovation takes longer in calendar weeks than in working days, and most of the waiting happens between trades instead of during them. Asking for a sequenced schedule with the template date and the splashback date marked on it is the most useful single thing to request from whoever is coordinating the job.

The Sequence a Kitchen Has to Follow

Demolition and disposal, then any structural, plastering or wall work, then the rough-in of plumbing and electrical to the new positions, then flooring where it goes under the cabinets, then cabinet installation, then benchtop templating, then benchtop installation, then splashback, then plumbing and electrical fit-off, then appliance installation, then painting touch-ups. The delays live at two points in that sequence. The final measurement cannot be taken until wall work is finished, so the cabinet lead time starts later than people expect. And the benchtop template cannot happen until the cabinets are standing, which is why there is a gap of one to three weeks with a kitchen you cannot use. Both are predictable and both should appear on a schedule before the job starts.

Final measurement waits on wall work and the benchtop template waits on installed cabinets, and both of those delays are predictable.

Installation, Scribing and Walls That Are Not Square

No wall in a house is straight and no corner is square, and the installer is the person who hides that. Scribing means cutting a panel to follow the actual line of a wall so the cabinetry appears to meet it cleanly. On a new build with plasterboard walls, a few millimetres of scribe is all that is needed. In an older New South Wales house, in a Federation home with lath and plaster, or in a brick house where the render undulates, the discrepancy over three metres can be twenty millimetres and hiding it is skilled work that takes time.

Floors matter every bit as much as walls. Base cabinets sit on adjustable legs for precisely this reason, and a floor that falls fifteen millimetres across a kitchen is normal in an older house. The cabinets are levelled to each other rather than to the floor, and the gap that opens up at one end is covered by the kickboard, which is scribed to the floor line. This is the reason a cabinet installation quote is more than assembly labour. A straightforward installation in a new or recently renovated kitchen might be a day for a seven metre run. The same cabinets in a hundred-year-old terrace with out of square corners, a sloping floor and a chimney breast to work around can be two or three days, and the figure in the quote should reflect which one you have.

There is a related item worth getting in writing. End panels, filler panels and the kickboard are the pieces that make a kitchen look finished, and they are sometimes excluded from a supply quote. A run of cabinets with a raw particleboard end visible at the fridge gap is a common and avoidable disappointment. Related trim work falls under carpentry services.

Items That Get Left Out of Quotes

Check specifically for these. End panels where a cabinet run finishes in open space or against an appliance. Filler panels where a cabinet does not reach the wall. The kickboard along the base, and whether it is scribed to the floor. Shelf quantities, because a budget cabinet may come with one shelf where you expected two. Handles, which are often an allowance instead of a selection.

Then come the labour items, starting with removal and disposal of the old kitchen. Cutting the benchtop for the sink and cooktop, which may be the benchtop supplier and not the cabinet maker, and drilling for the tap holes. Fixing the tall cabinets into the wall structure is another item, and patching the wall where the old kitchen came off, usually a plasterer and a painter instead of the cabinet maker.

End panels, fillers, kickboard, shelves, handles, old kitchen removal and wall patching are the common exclusions.

Plumbing, Electrical and the Trades a New Kitchen Triggers

A kitchen is the most trade-dense room in a house and the cabinetry is only one of the trades involved. Plumbing covers disconnecting the old sink and dishwasher, any relocation of the waste and water, and the fit-off of the new sink, tap and dishwasher connection. Keeping the sink in its existing position is materially cheaper than moving it, because moving a waste means working on the drainage and sometimes cutting a slab. Licensed plumbing work in New South Wales requires a licensed plumber and a certificate of compliance for the work.

Electrical covers power points, the circuits for an oven and a cooktop which are frequently on dedicated circuits, under cabinet and in cabinet lighting, and the rangehood. An induction cooktop in particular may need a dedicated circuit and sometimes a switchboard upgrade, a cost that surprises people choosing induction for the first time. Every bit of that is licensed electrical work, and the lighting side is priced under kitchen lighting costs.

Then there are the trades that follow on behind. A plasterer where walls have been damaged by the old kitchen coming out or where a wall has been removed. A tiler for the splashback and sometimes the floor. A painter for the walls and ceiling, far easier before the new cabinets go in than after. And a waste removal service for the old kitchen, which on a full strip-out is a skip instead of a trailer.

The practical budgeting point is that cabinetry on a full kitchen renovation is commonly somewhere between a third and a half of the total project cost. A quote that covers cabinets alone, however detailed, is not a budget for a new kitchen, and treating it as one is the most common way a renovation runs over. The whole picture is laid out in kitchen renovation costs, and the final stage is appliance installation.

Lead Times and How Long You Lose a Kitchen For

The question most households actually want answered is how many weeks without a kitchen, and the cabinet lead time is only part of it. Flat pack is available from stock or within a few weeks, its other real advantage beyond price. Semi custom cabinets are typically four to seven weeks from order, and the order cannot be placed until the final measurement is taken. Full custom runs six to fourteen weeks depending on the joiner and the specification, and two pack doors add time because the spraying and curing happens in a booth with its own schedule.

On site, the active work is shorter than people fear. Demolition takes a day, and the rough-in of plumbing and electrical is a day or two. Cabinet installation on a seven metre kitchen is one to three days. Benchtop installation is half a day, a splashback is a day, and fit-off with the appliances is another day.

The waiting between those stages is what makes it long. Between cabinet installation and benchtop installation there is a template and a fabrication period of one to three weeks, and between the benchtop and a glass splashback another one to two. A realistic total for a full kitchen renovation from demolition to finished is four to eight weeks on site, of which perhaps six to eight working days involve anybody being there.

Shortening the whole business comes down to two moves. Having the cabinets delivered and the trades booked before demolition starts, rather than one after the other, compresses the schedule considerably. And choosing a benchtop material that does not need off-site fabrication, such as laminate, removes the longest single gap. A temporary sink and a bench in the laundry or garage makes the gap livable either way.

Stage Duration Can It Overlap Note
Design and final measurement 1-2 weeks After wall work only Order cannot be placed before this
Flat pack supply Stock to 3 weeks Yes Fastest option
Semi custom manufacture 4-7 weeks Yes, order early Most common
Full custom manufacture 6-14 weeks Yes, order early Two pack adds curing time
Demolition and disposal 1 day No Skip may be needed
Plumbing and electrical rough-in 1-2 days No Before cabinets
Cabinet installation 1-3 days No Longer in out of square rooms
Benchtop template to install 1-3 weeks No The longest gap in the job

Assembling and Fitting Flat Pack Yourself

Flat pack assembly and flat pack installation are two different jobs and most people who try both find the second one harder than expected. Assembly is repetitive work and forgiving of errors. Each cabinet is a set of panels, cams, dowels and screws, and with a drill, a square and a flat clean floor a competent person can build a cabinet in twenty to forty minutes. Twenty of them amounts to a long weekend of work. The saving against paying for assembly is real and the risk of getting it wrong is low, with the main pitfall being building a cabinet with the back panel on the wrong face.

Installation is the half that needs real skill. The cabinets have to be levelled against each other across a floor that is not level, fixed to a wall that is not straight, scribed so the gaps do not show, and set out so the appliance openings are exact, because an oven that does not fit its cavity is not a problem you can argue your way out of. Tall cabinets have to be fixed into something structural.

The middle path works well and is what many households choose. Assemble the cabinets yourself over a weekend, then pay a carpenter or a kitchen installer for one to two days to set them out, fix and scribe them. That typically captures most of the saving while leaving the part with the real consequences to somebody who does it every week. One warning belongs here, and it is about appliance openings. Appliance specifications are precise, and a cabinet built or placed a few millimetres out can leave an integrated dishwasher or a built-in oven that will not sit flush. Read the appliance installation specification before building the cabinet it goes into, not after, and get the actual appliances on site or at least their exact model numbers before anything is cut.

What a Flat Pack Build Needs

For assembly: a cordless drill with a clutch set low, a decent set of driver bits, a large builder’s square, a rubber mallet, a clamp or two, and a clean flat area big enough to lay a cabinet out. A second pair of hands for the tall units. Expect twenty to forty minutes a cabinet once you have built the first two. For installation, add a long spirit level or a laser level, a jigsaw for the sink and service cut-outs, a stud finder, packers, and a hole saw set. If that list is unfamiliar, the sensible split is to assemble the boxes and pay somebody for the install day. Fixing tall cabinets and setting out appliance openings are where mistakes cost real money.

Assembly needs a drill, a square and floor space, while installation needs levels, a jigsaw and experience.

Licensing, Contracts and the Dollar Thresholds

A kitchen is one of the few domestic jobs large enough to cross both New South Wales thresholds for residential building work, and crossing them changes what paperwork you are entitled to receive. The lower figure is $5,000 of labour and materials together. Past it, the person doing residential building work has to be licensed, or working under somebody who is. Ordering cabinets for delivery is not building work at all, so a supply-only purchase sits outside this. Supply and install of a kitchen almost always passes $5,000, which puts the installation inside it.

The upper figure sits at $20,000 of work. Past that, the contractor owes you home building compensation cover and a full written home building contract, not a quote. A seven metre kitchen in two pack with a stone top and the trades around it will clear $20,000 without difficulty, so a job of that size being run off a single page is a question to raise before any deposit changes hands.

Deposits themselves are capped in the legislation for residential building contracts here, which makes a request for a large payment up front a reason to check the current limit instead of paying it. The licence classes, the deposit cap and the contract requirements are all set out by the NSW Government. Where a kitchen job goes wrong, the forum is the NSW Civil and Administrative Tribunal. Beyond licensing, a kitchen answers to two further regulators. Site safety, including the silica dust controls and the engineered stone rules covered earlier, falls to SafeWork NSW. Separately, if cabinets delaminate or runners fail long before they should, the remedy comes from the statutory consumer guarantees and not from the warranty card, and the national regulator for those is the Australian Competition and Consumer Commission.

What You Should Have Before Work Starts

Over $5,000, you want the licence number of whoever is installing, plus a written quote with an itemised scope. Over $20,000, you want a full written home building contract, evidence of home building compensation cover, and a deposit inside the statutory cap. In both cases, ask for a schedule marking the measurement date, the manufacturing period, the install date and the benchtop template date. Hold on to the cabinet specification as well, meaning the carcass board, the door finish with its exact product name and colour code, and the hinge and runner brand and model. Eight years from now, when a door gets damaged or a runner gives out, that single sheet decides whether you get a matching replacement or a visible compromise across the whole kitchen.

Over $5,000 you want a licence number and an itemised scope, and over $20,000 a written contract with compensation cover.

Pricing Across Sydney and the Metropolitan Area

Sydney has the largest concentration of cabinet makers in the country and some of the widest price spread in it, because the housing stock asks for very different kitchens. The inner west, inner south and eastern suburbs carry terraces and semis with small kitchens in awkward rooms, frequently four to six linear metres, with out of square walls, chimney breasts and sometimes a ceiling that is not level. Custom earns its premium on jobs like these, because a flat pack module run will not fit the room without visible compromise, and they are also the jobs where access is a real cost, with cabinets carried through a house or along a lane. The north shore and the northern beaches have larger kitchens and a higher proportion of two pack and timber veneer specifications, with islands and butler’s pantries common. Run lengths of ten to fifteen linear metres across a kitchen and an adjoining pantry are normal, and that is where the total figures climb past thirty thousand dollars on cabinetry alone.

Western and south western Sydney have the newest housing in the metropolitan area, with square rooms, plasterboard walls and good access. These are the fastest kitchens to install and the ones where flat pack and semi custom perform best, because the modules fit and the installation is a day rather than three. The per metre rates out there are the keenest in greater Sydney. A pair of metropolitan quoting notes is worth adding. The number of cabinet makers in Sydney means it is genuinely worth getting three quotes, because two joiners can price one specification very differently. And access should be discussed at quoting stage, since a joiner who has not seen the stairs or the laneway will reprice when the delivery truck arrives.

Area Typical Run Semi Custom per m Two Pack per m Main Cost Driver
Inner west and inner south 4-7m, awkward rooms $1,300-$2,200 $2,000-$3,400 Out of square walls, access
Eastern suburbs 5-9m, mixed $1,400-$2,400 $2,100-$3,600 Access, high specifications
North shore 8-14m with pantry $1,350-$2,300 $2,000-$3,400 Run length, premium finishes
Northern beaches 8-12m, islands common $1,350-$2,300 $2,000-$3,400 Islands, finished panels
Western Sydney 6-9m, square rooms $1,100-$1,800 $1,800-$2,900 Keenest rates, fast installs
South west growth areas 6-9m, new build $1,100-$1,750 $1,800-$2,800 Modules fit, good access
Hills district 7-12m, larger homes $1,200-$2,000 $1,900-$3,100 Run length

Regional New South Wales Pricing

Regional cabinet pricing is set less by labour rates than by who makes the cabinets and how far they travel. Most regional centres have local joiners, and a local cabinet maker working from a workshop in town is frequently better value than a city firm delivering, because the delivery of a full kitchen is a truck and a day. Where cabinets come from a metropolitan factory, freight is a real line item and it is worth asking whether it is in the quote. The Hunter, Newcastle, the Illawarra and the Central Coast all have substantial local joinery industries and pricing close to outer Sydney. The North Coast has a strong trade base with high demand through the holiday periods, and booking outside those windows is where the saving sits. The Blue Mountains and the Southern Highlands bring older housing stock with the same out of square challenges as the inner suburbs, so custom is often the practical answer there too.

In the Riverina, the central west, the New England region and the far west, the local joiner is usually the best option and the per metre rate is lower than the city, with a longer lead time because one workshop is serving a large area. Flat pack bought in a regional centre and installed by a local carpenter is a well-trodden and sensible route in these areas. The strategy that works regionally is to combine the cabinetry. A kitchen quoted alongside laundry cabinetry and built-in wardrobes gives a joiner a run of work, one delivery and one trip to install, and the rate on all of it improves. A workshop quoting three rooms will sharpen a pencil that it would not sharpen for one.

Region Semi Custom per m Two Pack per m Lead Time Note
Newcastle and the Hunter $1,150-$1,900 $1,800-$3,000 4-8 weeks Strong local joinery
Central Coast $1,150-$1,900 $1,800-$3,000 4-8 weeks Close to Sydney supply
Illawarra and Wollongong $1,150-$1,900 $1,800-$3,000 4-8 weeks Good local options
North Coast $1,200-$2,000 $1,850-$3,100 5-10 weeks Holiday period demand
Blue Mountains $1,250-$2,100 $1,900-$3,200 5-9 weeks Older homes, custom often needed
Southern Highlands $1,250-$2,100 $1,900-$3,200 5-9 weeks Period housing, acreage travel
Riverina and central west $1,000-$1,750 $1,700-$2,900 6-12 weeks Local joiner, longer waits

What to Look Out For in a Cabinet Quote

A quote you can act on differs from a number that will grow in five specific places. The first of them is the measuring convention. Establish whether the per metre figure counts base and overhead together or separately, because the difference is a factor of two and it is by far the commonest reason two quotes appear miles apart when they are not.

The second is the specification itself, in writing. Carcass material including whether it is moisture resistant in the wet cabinets, the board thickness, the door finish with the exact product name and colour, and hinge and runner brand and model. A quote naming none of these is not comparable with one that names all of them. The third is a full list of the exclusions. Removal and disposal of the old kitchen, benchtop, splashback, appliances, sink and tap, plumbing, electrical, tiling, wall patching, painting, end panels, filler panels, kickboard, handles and shelf quantities. Ask for the exclusions listed explicitly rather than inferring them from what is absent.

The fourth is the schedule, with the final measurement date, the manufacturing period, the installation date and the benchtop template date on it. The fifth is the contract position: a licence number where the work exceeds $5,000, and a written home building contract with compensation cover where it exceeds $20,000. Put one written specification to three suppliers, and in Sydney the gap between the highest and lowest is wide enough to make it worth the effort. Where one of them comes in dramatically lower, the usual causes are standard particleboard instead of moisture resistant board in the wet cabinets, unbranded hardware, base and overhead counted separately, or several of the exclusions above sitting outside the price. For the trade behind all of this there is cabinet making and joinery, with related rates in the carpentry pricing guide.

Ten Things to Get in Writing

Ask for these before comparing anything. Whether the per metre rate counts base and overhead together. The carcass board and whether it is moisture resistant in the sink and dishwasher cabinets. The board thickness as well. The door finish by its exact product name and colour, and the hinge and runner brand, model and warranty, and whether soft close is on everything.

Then there are another five worth covering. Ask for the full list of exclusions, and whether end panels, filler panels and the kickboard are included. Ask for shelf quantities per cabinet, and the schedule with the measurement, manufacture, install and benchtop template dates. And the licence number, plus a written contract and compensation cover where the job exceeds $20,000.

Measuring convention, carcass board, door product name, hardware brand, exclusions and the schedule, all in writing.

Kitchen Cabinets Across New South Wales

We connect you with cabinet makers, joiners and kitchen installers throughout New South Wales for flat pack and made to measure kitchen cabinets, door finishes, hardware and full installation.

▶ Sydney Inner City 18 areas
Sydney CBD Surry Hills Darlinghurst Potts Point Paddington Redfern Newtown Glebe Balmain Pyrmont Ultimo Chippendale Alexandria Waterloo Zetland Erskineville Rozelle Leichhardt
▶ Greater Sydney 25 areas

Western Sydney

Parramatta Penrith Blacktown Mount Druitt Seven Hills Wetherill Park Auburn Fairfield Cabramatta St Marys

South Western Sydney

Liverpool Campbelltown Bankstown Revesby

Northern Sydney

Hornsby Chatswood Epping Macquarie Park Eastwood

The Hills District

Castle Hill Baulkham Hills

Inner West

Ryde Strathfield Burwood

St George

Hurstville Kogarah
▶ Sydney Coastal 23 areas

Northern Beaches

Manly Dee Why Curl Curl Freshwater Brookvale Collaroy Narrabeen Mona Vale Newport Avalon Palm Beach

Eastern Suburbs

Bondi Tamarama Bronte Coogee Maroubra Randwick

Harbour Suburbs

Double Bay Rose Bay Watsons Bay

Sutherland Shire

Cronulla Miranda Sutherland
▶ Hunter & Central Coast 19 areas

Central Coast

Gosford Terrigal Wyong The Entrance Tuggerah Erina Woy Woy

Hunter Valley

Newcastle Maitland Lake Macquarie Charlestown Belmont Raymond Terrace Cessnock Singleton Muswellbrook

Port Stephens

Nelson Bay Salamander Bay Shoal Bay
▶ Illawarra & South Coast 18 areas

Illawarra

Wollongong Shellharbour Kiama Dapto Corrimal Thirroul Gerringong

Shoalhaven

Nowra Berry Ulladulla Huskisson Vincentia

Sapphire Coast

Batemans Bay Moruya Narooma Bega Merimbula Eden
▶ North Coast 19 areas

Mid North Coast

Port Macquarie Forster Taree Kempsey Laurieton

Coffs Coast

Coffs Harbour Bellingen Sawtell Grafton Yamba

Northern Rivers

Byron Bay Tweed Heads Ballina Lismore Bangalow Lennox Head Brunswick Heads Mullumbimby
▶ Blue Mountains & Highlands 17 areas

Blue Mountains

Katoomba Leura Wentworth Falls Blackheath Springwood Hazelbrook Glenbrook Faulconbridge Lawson Blaxland Lithgow

Southern Highlands

Bowral Moss Vale Mittagong Bundanoon Robertson Berrima
▶ Regional NSW 21 areas

Central West

Orange Bathurst Dubbo Mudgee Parkes Forbes Cowra Young

Riverina

Wagga Wagga Albury Griffith Leeton Goulburn Queanbeyan

New England

Tamworth Armidale Inverell Moree Narrabri

Far West

Broken Hill Cobar

Kitchen Cabinet FAQs

How much do kitchen cabinets cost in New South Wales?
Flat pack supplied only runs $350 to $700 a linear metre and $700 to $1,300 supplied and installed. Made to measure cabinets with laminate or vinyl wrap doors are $1,100 to $2,000, two pack polyurethane $1,800 to $3,200, and timber veneer or solid timber $2,400 to $4,500. On a seven linear metre kitchen that is roughly $2,450 at the cheapest and about $31,500 at the dearest, for cabinets occupying the same space.
What does a linear metre of kitchen cabinets include?
In the most common convention it means a metre measured along the wall with the base cabinet and the wall cabinet above it counted together. Some suppliers quote base and overhead separately, which halves the apparent rate and makes their quote look far cheaper. Establishing which convention each quote uses is the first thing to do, because the difference is a factor of two.
Is flat pack worth it, or should I go made to measure?
It depends on the room more than the budget. Flat pack comes in fixed widths, so it needs filler panels where a module does not reach the wall, and in an old house with out of square walls those compromises are visible. In a square room with plasterboard walls, good flat pack with brand name hardware performs well. For a rental or a kitchen being replaced again in eight years it is a rational choice.
Why is a drawer bank more expensive than a cupboard?
Because of the hardware and the labour. A 600 millimetre cupboard has one door, two hinges and a shelf. A 600 millimetre drawer bank has four drawer boxes, four pairs of runners and four fronts to align. It costs roughly twice as much, and metal sided drawer systems from the established manufacturers cost more again. Drawers are the upgrade most people are happiest about afterwards, but it should be a deliberate choice.
What is the best door finish for a kitchen?
Laminate is the most durable everyday surface but can only be flat. Vinyl wrap allows profiled and shaker doors affordably but can lift at an edge under sustained heat. Two pack polyurethane gives an unbroken finish in any colour or profile, can be chipped on a corner, and can be repaired and recoated later, which nothing wrapped or laminated can. Timber veneer and solid timber cost the most and move with humidity.
Can I still get an engineered stone benchtop?
No. A prohibition on the manufacture, supply, processing and installation of engineered stone benchtops, panels and slabs took effect across Australia on 1 July 2024, covering artificial products with at least one per cent crystalline silica made by combining stone with resins. Natural granite and marble, sintered stone and porcelain made without resin, laminate, solid surface, stainless steel, concrete and timber remain available.
What if my existing kitchen has an engineered stone benchtop?
Removing, repairing or modifying engineered stone that is already installed is permitted, but it is controlled work requiring respiratory protective equipment and notification to the regulator. In practice that means the demolition component of your renovation has to be done by somebody set up for it, and the quote should reflect that rather than treating it as ordinary strip-out.
How long will I be without a kitchen?
Four to eight weeks from demolition to finished is realistic for a full renovation, of which only six to eight working days involve anybody on site. The waiting dominates: the cabinet order cannot be placed until the final measurement after any wall work, and the benchtop cannot be templated until the cabinets are standing, which adds one to three weeks with cabinets and no bench.
What hardware should I ask for?
Ask which brand and model of hinge and of drawer runner is included, whether soft close is on every door and drawer, whether the runners are full extension, the load rating, and the warranty. Blum, Hettich and Häfele dominate the quality end of the Australian market and all publish load ratings and cycle testing. Hardware is a small part of the price and the largest source of complaints two years later.
Do I need a licensed contractor for a kitchen?
A licence is required once residential building work exceeds $5,000 in labour and materials combined, which a supply and install kitchen almost always does. Above $20,000 the contractor must also provide home building compensation cover and a full written home building contract. Supply-only cabinets are not building work, but the installation is.

More Kitchen and Joinery Cost Guides

For Trades & Contractors - SA

Are you a cabinet maker or joiner? Browse current job leads on the NSW job leads board, with related work including carpenter jobs in NSW and builder jobs in NSW.

Kitchen Cabinets Needed in New South Wales?

Post your job and connect with cabinet makers and joiners across NSW for flat pack and made to measure kitchen cabinetry and installation.

Get Free Kitchen Cabinet Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 6 October 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All NSW tradies are required to hold appropriate licences. Verify at NSW Fair Trading.
Prices are estimates based on typical New South Wales market rates and may vary based on the length of the cabinet run, carcass material, door finish, hardware specified, and the proportion of drawers and tall units. Benchtops, appliances and trades are separate.
Need work done? Get free quotes. Post a Job – It's Free