Can a Crane Reach Your Yard?
Tell us what you have in mind and we'll put you in touch with modular granny flat suppliers in your area.
Typical Costs
Indicative 2026 NSW estimates only. Craneage is priced on reach and weight rather than distance, so a lift over a two storey house costs several times one from the kerb.
Modular Granny Flat Costs NSW 2026 - Get Free Quotes
Getting a modular granny flat onto a New South Wales block costs $6,000 to $30,000 for transport, craneage and access works, and that sits on top of the dwelling itself. The entire proposition turns upon one question that has nothing to do with the building itself: can a crane physically deposit several tonnes of finished dwelling precisely where you want it. Reach and weight together drive the price rather than distance travelled, so a lift from the kerb onto a front yard is routine while the same module swung over a two storey dwelling into a rear yard needs a far larger machine and costs several times as much. Overhead power, mature street trees and a narrow road can rule it out altogether. Have that assessed before you pay a deposit, because a module you cannot install is a serious problem. Budget one to three weeks after craneage, since service connections, the perimeter junction, subfloor skirting, steps and external works must all follow before anybody moves in. This guide covers the factory, transport, craneage and subsequent sitework. Post your job on The Quote Yard to compare quotes across New South Wales.
At a Glance - Delivery and Installation NSW 2026
| Item | Typical Cost | What Decides It |
|---|---|---|
| Transport, metropolitan | $3,000-$10,000 | Distance from factory |
| Transport, regional | $8,000-$25,000 | Permits and escorts |
| Crane hire, half day | $2,500-$7,000 | Reach and weight |
| Traffic control or road closure | $800-$4,000 | Street width |
| Clearing and access works | $1,500-$12,000 | Trees and fences |
| Joining a two module unit | $2,000-$6,000 | Roof and wall junction |
| Time on site after delivery | 1-3 weeks | Services and finishing |
Cost Depth: Why the Crane Sets the Budget
A crane is rated by what it can lift at a given radius, and that rating falls sharply as the load moves away from the machine. A module weighing several tonnes that sits ten metres from the crane is a routine lift for a mid sized unit, and the same module twenty five metres away over a roof needs a substantially larger machine, a bigger setup area and often a road closure to stand in. That is the whole reason two apparently identical projects a street apart can differ by five thousand dollars on craneage alone. Setup matters as much as reach, because a crane needs firm level ground for its outriggers and a clear swing path, and a soft verge, a sloping street or a parked car in the wrong place can prevent a machine from working at all. None of this is discoverable from a floor plan, which is why the crane assessment belongs before the deposit rather than after.
As an example, a single module delivered to a corner block in western Sydney with a wide frontage and no overhead wires might cost $4,500 for transport, $3,000 for the crane and nothing for traffic control, because the machine stands on the nature strip and lifts straight over a low fence. The same module going into a rear yard behind a two storey house on a narrow inner suburban street can reach $8,000 for transport with a restricted delivery window, $9,000 for a larger crane, $2,500 for traffic control and a road occupancy permit, and $4,000 to remove and reinstate a section of fence and prune a tree. The building is identical and the delivery has trebled.
Disclaimer
This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Modular Granny Flats in NSW
Delivering and installing a modular secondary dwelling costs $6,000 to $30,000 across New South Wales, covering transport at $3,000 to $10,000 within the metropolitan area or $8,000 to $25,000 regionally, crane hire at $2,500 to $7,000 for a half day, traffic control at $800 to $4,000 where a street needs managing, access works at $1,500 to $12,000 and $2,000 to $6,000 to join a two module unit. That sits on top of the dwelling, which is priced at prefab granny flat costs. Those figures cover getting the building onto your land and nothing else. The dwelling, the footings and the approvals are separate items with their own numbers. Compare the delivered total rather than any single component, since suppliers divide the same work differently between line items. Ask for each of those lines separately rather than accepting a single delivery figure, because a lump sum hides which assumption is doing the work.
The entire proposition turns on a question that has nothing whatsoever to do with the building itself. A crane has to physically place several tonnes of finished dwelling on prepared footings in your yard, and whether that is straightforward, expensive or impossible depends on your street, your neighbours' rooflines, your trees and the wires overhead. Households fall for a floor plan first and then discover the access constraint afterwards, which is precisely the wrong order to do it in. A floor plan tells you absolutely nothing about whether a crane will be able to reach the spot you have chosen.
What modular does well is run two jobs at once. While the module is being built indoors, your footings are being poured and your services trenched, so a process that would take twelve to twenty weeks sequentially compresses into something closer to eight. Running the two processes in parallel is the real advantage of the method, and it only works if the site preparation is genuinely finished on the day the truck actually arrives. Sequential building wastes whole weeks waiting on weather and on trades, and running the two halves of the job in parallel recovers most of that lost time. The whole saving evaporates if the footings have not cured by the time the truck arrives at the gate.
What Happens in the Factory
A module is built on a production line under cover, which removes the single largest source of delay on a conventional site. Framing, cladding, roofing, windows, internal linings, kitchen and bathroom fitout, electrical and plumbing all happen indoors on a schedule that does not care about rain. Six to ten weeks is typical for a secondary dwelling, and it runs at the same time as work on your block rather than after it. Rain that would cost a fortnight on an open site costs nothing indoors. That single fact accounts for most of the programme advantage. Six to ten weeks is typical for a secondary dwelling and it overlaps with the site work rather than following it, which is the whole basis of the time saving.
Modules, commonly clad in Colorbond steel from BlueScope for weight and durability, are engineered quite differently from an equivalent site built dwelling, because they have to survive being lifted by crane and driven along a highway. Additional bracing, a structural chassis or a steel base frame, and temporary restraints all exist to carry loads the finished building will never experience again. Some of that structure remains permanently and adds weight, which is one reason a module needs a larger crane than its floor area suggests. A building that will then sit perfectly still for fifty years has to survive one afternoon of being swung through the air on a hook. The structure carrying that lifting load has to be built in whether or not it is ever needed again afterwards.
Quality control inside a factory is generally more consistent than it is on an open site, and that is a perfectly fair reason to choose the method. The same team builds the same details repeatedly, materials are stored dry, and work is done at bench height under good light rather than crouched in a trench. That said, consistency and quality are not the same thing at all, and a factory producing to a low specification will produce that specification very consistently indeed. Repetition produces consistency and consistency is worth having. Ask to see the written specification rather than assuming the factory environment guarantees the outcome by itself.
Ask what inspection actually happens during manufacture and whether you are able to attend and see it. Established manufacturers photograph each stage and many will accommodate a visit, which is worth taking up because it is the only time you will see behind the linings. Insulation, the framing detail, waterproofing membranes and every service run all disappear permanently once the internal sheeting goes on. A factory visit is worth taking a day off for if the supplier offers one, since it is the only opportunity you will have to see the building open, and property and planning services in this state run through Service NSW.
The specification locks considerably earlier than it does on a site build, and that is a genuine difference in how you have to work through the project. Colours, finishes, fixtures and electrical layout are settled before production starts, sometimes months before anything physical exists, and changes after that point are difficult rather than merely expensive. Certification runs in parallel and is described under granny flat complying development. If choosing finishes is not your strength, take somebody along who enjoys it, since the door closes firmly behind you.
Assessing the Transport Route
A module travels as an oversize load, and the whole route has to be physically driven and checked in advance rather than assumed from a map. What stops a truck is rarely obvious: a roundabout too tight for the turning circle, a low branch across a suburban street, a railway bridge with limited clearance, a weight restricted culvert on a rural road, or a corner where a long trailer cannot swing without mounting the kerb. Google satellite imagery is useful for orientation and useless for clearance heights. Somebody still has to drive the thing to your gate. A roundabout too tight for the turning circle stops a delivery as effectively as a low bridge does, and neither shows up as a problem until the driver is committed.
Oversize loads carry their own permits, and depending on the final dimensions they may also require pilot vehicles, police escorts and restrictions on the hours during which they can travel. Movements are commonly limited to particular hours of the day, which is exactly why these deliveries so often arrive at first light. None of this is unusual and all of it is priced, so ask whether the quoted transport figure includes permits and escorts or whether those sit outside it. Early morning starts are very much the norm rather than the exception on delivery day. Permitted movement windows are narrow, which shapes when the truck is able to reach you at all.
Road transport limits decide how wide any module can be, and the factory designs within those limits rather than around them. That constraint shapes the design before you ever see it, and it is why a wider dwelling arrives as two modules rather than one. Ask what the maximum transportable dimensions actually are before you fall for any particular layout, since those limits shape everything that follows. A layout that cannot legally travel on a public road is not a plan at all, however well it happens to suit your block. Ask what the transportable dimensions are before you fall for a layout, because that constraint has already shaped every plan you are being shown.
The final approach to the property is where regional deliveries most often come unstuck. A long unsealed driveway that is fine for a car may not carry a loaded semi trailer, particularly after rain, and a gateway, a cattle grid or a soft creek crossing can stop the delivery at the last two hundred metres. Have the transport operator physically inspect that final stretch of road rather than accepting a general assurance about it. Rain in the week before delivery can turn a passable track into an impassable one, and the truck will not attempt it.
Where the route is genuinely difficult, the answer is sometimes a smaller module or a different delivery method rather than abandoning the idea. Suppliers who work a particular area regularly already know which streets and which approaches cause trouble. Asking whether they have delivered nearby is a quick way to find out what you are dealing with. Ask whether the supplier has delivered in your suburb before, since local experience answers most of this quickly and cheaply, and compare against granny flat construction on a difficult block.
Crane Day
Everything converges on a single morning and it is worth understanding what has to line up. The truck arrives, the crane sets up, the module is rigged, lifted, swung and lowered onto footings that must be within millimetres of correct, then unrigged and released. On a straightforward site the lift itself takes under an hour, and everything around it takes most of the morning. Most of the day is spent setting up and packing down rather than lifting. Rigging, lifting, swinging and setting down onto footings that must be within millimetres of correct is the whole of it, followed by unrigging and release.
Crane capacity falls as the load moves further from the machine, which is the fact that governs the whole exercise. A module ten metres from the crane is a modest lift and the same module twenty five metres away over a roof may need a machine several times larger. That relationship, rather than the distance from the factory, is what makes one delivery cost three thousand dollars and another nine. This single relationship explains most of the price variation between apparently similar sites. A machine that handles a module comfortably at ten metres may be nowhere near adequate at twenty five, which is why the reach figure matters more than the weight.
The crane needs somewhere genuinely solid to stand, and that standing position carries a set of requirements all of its own. Outriggers must sit on firm level ground capable of carrying substantial point loads, which rules out soft verges, some driveways, areas over drainage pits and anywhere with a service running underneath. If the machine must stand on the road, traffic control and sometimes a road occupancy permit from the council are required, and both take time to arrange. Ask where the machine will set up, then walk out and look at that spot yourself before delivery day arrives.
Overhead power is the constraint that most often ends a modular proposal outright. Minimum approach distances apply between cranes and live electrical lines, exclusion zones are enforced, and a street with low voltage mains running across the frontage may make a lift unlawful rather than merely difficult. Work near overhead electricity is regulated, and safety requirements sit with SafeWork NSW. Minimum approach distances between cranes and live lines are enforced rather than advisory, and no operator will breach them for your convenience.
Trees, fences and neighbouring structures all need considering in the swing path. A mature tree in the flight line may need pruning, which requires council approval in its own right, and a section of fence frequently comes out and goes back in. A swing path crossing a neighbour's property makes their agreement worth obtaining well in advance rather than on the morning. Pruning a protected tree needs council approval in its own right and cannot be arranged on the morning, which is where arborist reports come in. A section of fence frequently comes out and goes back in as part of the exercise.
Be present on the day and have somebody with you. Look the module over before the rigging comes off. A mark discovered while the machine is still standing there is a very different conversation from one raised a week later. Photograph the cladding, roof, glazing and internals, and record any observation on the delivery documentation rather than signing it blind. Photograph the module from several angles before anything is signed, including the roof if you can safely get above it, since damage up there is the hardest to argue about later.
One Module or Two
A dwelling wider than road transport allows arrives in two sections, and that changes the day and the following fortnight. Two lifts rather than one means more crane time, the two halves have to be aligned precisely, and the junction between them becomes site work performed after the machine has gone. Both halves usually arrive on the same day and both have to be placed before the crane stands down. Budget $2,000 to $6,000 for the joining work and allow the time for it in the programme, since it happens after the crane has already gone.
The joint runs through the roof, the walls, the ceiling and the floor, and how well it is executed shows over the following years. Ridge capping, wall linings across the junction, flooring continuity and the waterproofing of the connection are all done on site by trades rather than in the factory. Find out whose trades close that junction up, and what cover applies to it once they have gone. Waterproofing at the ridge is the detail most worth asking about, since a joint that leaks does so quietly for years before anyone notices.
A single module is simpler in every respect and it constrains the plan. Everything has to fit within a transportable width, which suits long narrow layouts and rules out wider open plan arrangements. Where a single module works for your household it is the cheaper and lower risk option, and layouts at this scale appear under granny flat floor plans. Narrow layouts suit transport and wider open plan arrangements do not. Where a single module suits your household it is the cheaper and lower risk option by a comfortable margin.
Two modules also double the delivery risk in a very practical sense on the day. Both have to travel the same route successfully, both have to be lifted on the same day in most arrangements, and a problem with either stops the whole exercise. Suppliers manage this routinely and it remains a reason to prefer a single module where the design allows. A delay to either one leaves the first module sitting exposed while the second is rescheduled.
Ask to see a completed two module dwelling in person before committing to that arrangement. Photographs rarely show the join, and standing in the room tells you immediately whether it has been done well. The junction is visible if you know where to look, and a supplier confident in their site work will happily show you an example rather than a render. A supplier confident in their site work will show you an example rather than describe one, and where they cannot point to anything nearby, that absence is worth weighing carefully before you commit.
Getting the Site Ready
The footings must be complete, inspected and cured before the module arrives, and there is no flexibility in that. Pouring cannot happen until reinforcement has been signed off, the concrete then wants its curing days, and a crane slot cannot be shuffled cheaply, so the whole sequence is planned backwards from delivery day. This is the coordination that a supply and install arrangement handles and a supply only purchase leaves to you. This is exactly the coordination a supply and install arrangement takes off your hands, and it is a large part of what the premium buys.
Set out accuracy is unforgiving because the module arrives at a fixed dimension. Piers or a slab must be positioned to receive it precisely, since nothing can be adjusted while several tonnes hangs from a crane. Ask your concreter directly whether they have pegged out for a module before, because the tolerance is tighter than ordinary footing work and the answer matters. Nothing can be adjusted while several tonnes hangs in the air. Piers or a slab must be positioned to receive the module precisely as drawn, with no scope to shift anything on the day.
Services should be trenched and stubbed up in exactly the right positions before delivery day, ready to connect immediately. Water, sewer, power and stormwater all have to meet the module at defined points, and discovering on the day that a stub is two metres from where it needs to be is an expensive discovery. Trenching and drainage belong with stormwater drainage plumbing. Mark those service positions precisely against the module drawings rather than approximately.
The access path and the crane standing area need clearing in advance. That may mean removing a section of fence, pruning or removing a tree with council approval, relocating a clothesline or a shed, and ensuring the ground the crane will stand on is firm enough. None of this is difficult and all of it takes time to organise, which is why it belongs on a programme rather than on the morning. Ground protection may be needed where the machine stands on grass or paving. Removing a fence section, pruning a tree or relocating a shed all take time to organise.
Tell your neighbours the date well in advance and again the week before. A conversation costs nothing and prevents a car being parked exactly where the outriggers need to go. A crane and a semi trailer occupying the street for half a day affects everyone in it, including the people who need to leave for work at eight. Most people will happily move a car if asked a week beforehand and resent being asked on the morning.
After the Crane Leaves
The dwelling looks entirely finished when it lands and it is not, which surprises most households watching. One to three weeks of site work follows, covering service connections, the module to footing junction, subfloor skirting, steps and a landing, any decking, external works and a round of touch ups where transit and handling have marked things. Budget the time as well as the money. One to three weeks of work follows before anyone can move in, and none of it is visible from the street.
Connecting services is licensed work and involves inspections. A plumber connects water, sewer and stormwater, an electrician connects the switchboard and tests the installation, and both produce compliance paperwork that forms part of the final approval. Should the existing house switchboard need upgrading for the additional load, that is separate work worth establishing early. Find out at the outset whether the existing board can carry another dwelling, since upgrading a switchboard is separate work with its own cost and timing. Both trades produce compliance paperwork that forms part of the final approval, so neither can be skipped or done informally.
The perimeter where the module meets the footing needs closing properly and it is where problems concentrate. Skirting or infill panels close off the subfloor, ventilation to that space has to be maintained, and flashing and sealing at the junction keep water out. This is site work rather than factory work, and the quality of it determines whether the dwelling has a dry subfloor in five years. Subfloor ventilation has to be maintained rather than sealed off. Flashing and sealing at that junction are what keep water out of the subfloor for the life of the building.
Steps, a landing and a compliant handrail are needed wherever the floor sits above the surrounding ground, which on a modular dwelling is usually more than a step or two. None of that is included in the module price. Lift the floor a metre off the ground and the entry stops being a doorstep and becomes a structure, with a compliant handrail and a landing that has to be built and paid for. Establish the finished floor height early in the process, since it drives every one of those decisions.
The final inspection and the occupation certificate follow completion of all of this rather than the craneage. Nobody may lawfully occupy the dwelling until the certificate is issued, and the sustainability commitments have to be delivered and verified. Households sometimes plan a move for the week after delivery and find themselves a fortnight early, and the build sequence generally is set out at granny flat construction. Arrange any tenancy start or family move for after the certificate rather than alongside it, since the two rarely coincide.
When Modular Is the Wrong Answer
A rear yard behind a two storey house on a narrow street is the classic case where modular struggles. The crane needs a long reach at height, which means a large machine, which needs a big setup area on a street that has none, plus traffic control and possibly a road occupancy permit. It can usually be done and the cost sometimes exceeds the saving that attracted you to modular in the first place. Price both methods properly before assuming modular is the cheaper one. The cost of doing it properly sometimes exceeds the saving that attracted you to modular in the first place, which is worth knowing early.
Overhead power across the frontage can end the option entirely. Where mains run along the street at the point the crane must lift, exclusion zones may make the lift unlawful without the lines being isolated or covered, which involves the network operator and adds both cost and delay. Establish what is overhead before you go any further. Check what is above the street before you look at any floor plan. Isolation or covering arranged through the network operator adds both cost and lead time, and neither is a same week proposition.
Steeply sloping sites suit site building better in most cases. A module wants a level plane at a fixed height, so a falling block needs tall piers, bracing, retaining and substantial steps, while a site built dwelling can step down the slope and use the fall. The substructure on a steep block frequently costs more than the delivery saving that drew you to modular in the first place. A site built dwelling can step down a slope in a way a module cannot.
Very tight or irregular blocks favour a design drawn for the site. On an awkwardly shaped envelope, a building constrained to transportable rectangles wastes area that a bespoke plan would use, and on a block where every square metre matters that waste is significant. Floor area constraints are covered at 60 sqm granny flats. Wasted area matters most on precisely the blocks that have least of it to spare, which is precisely where a plan drawn for the site earns the fee it costs.
Heritage streetscapes and conservation areas can also point away from modular. Where the council expects particular materials, roof forms and detailing to respond to the surrounding character, a standard module may not satisfy that expectation and modifying one erodes the efficiency you were buying. The merit route in those areas is described under granny flat approval. Modifying a standard module erodes the efficiency you were buying, and past a certain number of changes the whole exercise stops making sense.
What Drives the Price
Crane reach and module weight together set the largest variable. A short lift from the kerb onto a front or side yard uses a modest machine for half a day, while a long reach over a roofline needs a far larger unit, more setup time and often a street closure. Ask for the crane assessment in writing with the machine size named rather than accepting an allowance. A short lift from the kerb uses a modest machine for half a day, which is the cheapest version of this whole operation.
Transport scales awkwardly with distance rather than proportionally. Permits, pilot vehicles, escort requirements and restricted travel hours all attach as a load moves further and through more jurisdictions, so a module going five hundred kilometres costs considerably more than five times a hundred kilometre run. Find out where each supplier manufactures before you line their numbers up. Some suppliers absorb delivery within a set radius and charge beyond it, so ask where that boundary falls relative to you.
Site access works vary from nothing to five figures. A wide clear frontage with a low fence needs no preparation, while a site requiring fence removal and reinstatement, tree pruning under council approval, temporary ground protection for the crane and relocation of existing structures can reach twelve thousand dollars. Walk the access route with the supplier and price the work before signing. Fence removal and reinstatement, tree pruning under council approval, temporary ground protection and relocating a shed all add up quickly.
Ground conditions drive the substructure exactly as they would for any dwelling. Soil classification determines the footing system, slope determines the pier height and bracing, and rock complicates both the footings and the service trenches. The residential slabs and footings standard from Standards Australia sets the classification, and you want it established before ordering a module. Rock complicates the footings and the service trenches together, so one difficult finding affects two separate trades.
Whether the supplier coordinates the whole delivery or you do changes both the cost and the risk. A supplier managing transport, craneage, footings and connections charges a margin for it and owns the sequencing problem, while a household coordinating separately pays trade rates and owns the consequences when one party is late. Contract structure is examined at prefab granny flat costs. Be honest about your own availability before choosing the cheaper path, since somebody has to be free to answer the phone on a weekday.
Modular Delivery Across Sydney
Manufacturing capacity sits close to Sydney, which takes distance off the table for most metropolitan households. What decides the delivered figure is almost entirely access, and the variation between two neighbouring streets can exceed the variation between two suburbs on opposite sides of the city. Access rather than distance separates one metropolitan quote from another, much as it does for excavation on the same block. Two neighbouring streets can differ by more than two suburbs on opposite sides of the city do.
| Sydney Area | Delivery & Install | Main Obstacle |
|---|---|---|
| Inner & Eastern Suburbs | $14,000-$30,000 | Street width, wires |
| North Shore & Northern Beaches | $13,000-$28,000 | Trees and slope |
| Western Sydney | $6,000-$14,000 | Rarely constrained |
| Hills & North West | $7,000-$16,000 | Generous frontages |
| South & Sutherland | $8,000-$20,000 | Mixed street types |
Western and south western Sydney is where modular delivery works most easily in the state. Streets are wide, frontages are generous, blocks are level, overhead services are frequently underground in newer estates, and factories are close by. Households there commonly pay near the bottom of every range, which is a large part of why so many modular dwellings end up in those areas. Newer estates frequently have services underground, which removes the overhead constraint entirely. Wide streets, generous frontages, level blocks and nearby factories all pull in the same direction there.
The older inner suburbs are where modular most often proves impractical rather than merely expensive. Terrace and semi frontages, parking on both sides, overhead wires, mature street trees and two storey neighbours combine to make a lift into a rear yard difficult or impossible. Get an assessment before paying anything, because a module you cannot install is a serious problem rather than an inconvenience. Assess the route end to end before paying a deposit on anything factory built.
Modular Delivery in Regional NSW
Regional New South Wales is where modular construction genuinely earns its place, and the reason has more to do with trades than with money. The saving may be modest while the certainty of a completion date is not. Where a local builder is booked many months ahead and subcontractors travel from the nearest city, a dwelling built elsewhere and delivered complete removes the constraint that would otherwise decide your timeline. A predictable programme has real value when somebody is waiting to move in, which is the situation described under granny flats in NSW.
| Regional Area | Delivery & Install | Main Obstacle |
|---|---|---|
| Newcastle & Hunter | $7,000-$16,000 | Nearest manufacturing |
| Central Coast | $8,000-$18,000 | Canopy overhangs |
| Wollongong & Illawarra | $9,000-$20,000 | Steep approaches |
| Regional cities | $12,000-$24,000 | Kilometres travelled |
| Rural & remote | $16,000-$35,000 | Driveway condition |
Transport becomes a serious line item beyond a few hundred kilometres. The further a load travels the more it collects: paperwork, accompanying vehicles, hours it may not move and nights parked up somewhere. A run to the far west or the northern rivers bears little relation to a metropolitan delivery. Insist the figure is quoted to your gate rather than to the nearest township, because the difficulty usually lives in the last few kilometres rather than in the first four hundred that looked straightforward on a map.
Rural properties throw up obstacles that suburban ones do not. Cattle grids with weight limits, farm gates too narrow for a wide load, creek crossings that soften after rain, overhanging trees along a driveway and turning space at the end all need checking. Have the operator drive the final approach rather than assessing it from an aerial photograph. An aerial photograph shows none of these things. Weight limits, narrow farm gates and overhanging branches all need checking on the ground rather than assumed from experience elsewhere.
Crane availability in regional areas is worth confirming early. A machine large enough for the lift may travel from a regional centre or from Sydney, which adds mobilisation cost and limits the dates available. A crane travelling a long distance sets the delivery date by its own availability rather than yours, so book well ahead of the date you actually want. Book well ahead where the machine must travel a long way. The delivery date can end up set by the machine's availability rather than by your preference, so book well ahead.
What to Look Out For
Get a crane assessment before you pay a deposit. It determines whether the module can physically reach the position you want, what size machine is required and therefore what the lift costs, and in constrained streets whether it is possible at all. This costs very little relative to a deposit and answers the question that decides the entire project. It costs very little relative to the deposit you are about to pay, and the same logic applies to the checks at granny flat rules. It answers the one question that decides whether the entire project is viable.
Establish what is overhead before anything else in an older suburb. Exclusion zones apply between cranes and live electrical lines, and low voltage mains across the frontage can make a lift unlawful without isolation or covering arranged through the network operator. That takes time and money and it is far better known at the outset. This is the question that most often ends a modular project outright. Exclusion zones apply between cranes and live electrical lines, and they are enforced rather than treated as guidance.
Somebody should physically drive the route before anyone commits to a date. Roundabouts, low branches, bridge clearances, weight restricted culverts and tight corners all stop oversize loads, and on rural properties the final few hundred metres of driveway is the most common failure point. Ask whether permits and escorts sit inside the quoted transport figure or arrive separately afterwards, since the difference can run to thousands. Confirm who pays for oversize permits and pilot vehicles.
Make sure the footings and services are genuinely ready for the delivery date. Concrete needs curing time, an inspection is required before pouring, set out has to be within millimetres, and service stubs must be exactly where the module expects them. Buy the module alone and this choreography becomes your responsibility. The guarantees attaching to work done with due care and skill are administered by the ACCC. Set out has to be within millimetres rather than approximately correct. Reinforcement is signed off first, the concrete then wants its curing days, and none of that can be compressed to suit a delivery date.
Budget the one to three weeks after craneage rather than treating delivery as completion. Service connections, the perimeter junction, subfloor skirting, steps, a landing, external works and touch ups all follow, and nobody may occupy the dwelling until the occupation certificate is issued. Contractor licensing in this state is administered by NSW Fair Trading. Delivery day is a milestone rather than the finish line, and treating it as completion causes real disappointment.
What to Look for in a Quote in NSW
A modular delivery quote should describe the logistics rather than quote a lump sum. It should state the module dimensions and weight, name the crane size assumed and the reach it is based on, confirm whether traffic control or a road occupancy permit is included, state whether transport permits and escorts are inside the figure, list what access works are allowed for, identify who joins a two module unit, and set out what site work follows craneage. Machine size and the access allowance are the two lines that tend to be absent. Anything less transfers the risk of a wrong assumption to you. Machine size, the reach it is based on, permits, access works and the site work following craneage all belong in that document.
Put the same evidence in front of each supplier. Photograph the frontage, the side path, the spot you have in mind and whatever runs overhead. Mark the distance from kerb to position on a site plan. Include the soil report if you have one, and list every tree, fence and structure standing in the way. Photographs produce a price and paragraphs produce an allowance. Consistent information produces comparable numbers, and inconsistent information produces a spread that tells you nothing.
A supplier who wants to visit before quoting is telling you they intend to do the job properly. Someone who asks to see the frontage, measures the setback to the intended position, looks up at the wires and asks about the neighbours has understood what the project actually involves. Anyone pricing the lift as a round allowance without attending has quietly moved that risk onto you. Reluctance to attend the site is worth weighing. Someone who quotes craneage as a round allowance without seeing the site has quietly passed the risk of being wrong to you.
Nail down the lift, the route and the sequence before a contract is in front of you. Confirm the lift is achievable and priced on a named machine, have the route driven, check what is overhead, agree the footing and delivery dates in sequence, and tell the neighbours. Suppliers operating nationally are listed on the granny flat builders hub. Everything about a modular build depends on that one day going to plan.
Modular Granny Flats Across NSW
We connect homeowners with modular granny flat suppliers, crane operators, transport contractors and site preparation trades across NSW, whether you are in Greater Sydney, Newcastle, Wollongong, the Central Coast, the Hunter or regional New South Wales.
▶ Sydney Inner City 18 areas
▶ Greater Sydney 25 areas
Western Sydney
South Western Sydney
Northern Sydney
The Hills District
Inner West
St George
▶ Sydney Coastal 23 areas
Northern Beaches
Eastern Suburbs
Harbour Suburbs
Sutherland Shire
▶ Hunter & Central Coast 19 areas
Central Coast
Hunter Valley
Port Stephens
▶ Illawarra & South Coast 18 areas
Illawarra
Shoalhaven
Sapphire Coast
▶ North Coast 19 areas
Mid North Coast
Coffs Coast
Northern Rivers
▶ Blue Mountains & Highlands 17 areas
Blue Mountains
Southern Highlands
▶ Regional NSW 21 areas
Central West
Riverina
New England
Far West
Modular Granny Flat FAQs - NSW 2026
How much does delivery and installation cost?
Why does craneage vary so much between similar sites?
Can overhead power lines stop the delivery?
How is the transport route assessed?
What has to be ready before the module arrives?
Is the dwelling finished when the crane leaves?
What happens where the dwelling arrives in two modules?
When is modular the wrong choice?
How long does the factory take?
Why does a module need such a big crane for its size?
Granny Flat Specialists - NSW
Related NSW Services
For Builders & Trades - NSW
Are you a licensed builder or trade contractor? Browse current job leads on the NSW job leads board, with relevant work including granny flat builder jobs Australia-wide and builder jobs Australia-wide.
Considering a Modular Granny Flat in NSW?
Post your job and connect with modular granny flat suppliers, crane operators and site preparation trades across NSW, across Greater Sydney, Newcastle, Wollongong, the Central Coast, the Hunter and regional New South Wales.
Get Modular QuotesAbout This Guide
This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Looking for more services across New South Wales? View all available trade services.
Reviewed by The Quote Yard Editorial Team