Planning an Office Fitout?
Tell us the floor area, how many people it needs to hold, whether the tenancy is bare shell or an existing office, and when the lease starts. We'll connect you with Victorian fitout contractors.
Typical Office Fitout Costs VIC
Indicative 2026 Victorian estimates. Base building condition, services capacity, after hours access and specification level move the rate substantially. Most fitout work requires a building permit issued by a registered building surveyor before it starts.
Office Fitout Services VIC 2026 - Get Quotes
The two things that derail a Victorian office fitout are both decided before anybody picks a carpet. The first is the building permit, because altering walls, ceilings, exits or anything connected to the fire systems is building work under the Building Act 1993, and a registered building surveyor has to issue a permit before the work starts. The second is the make good clause in the lease, which commonly obliges a tenant to strip the fitout back out at the end of the term, and which is far cheaper to negotiate at signing than to argue about five years later. Between those two sit the practical decisions about services capacity, accessibility, acoustics and how many people the floor can actually hold. Melbourne's older CBD and inner suburban stock adds its own complications, since services designed for a 1980s working pattern struggle with modern desking densities. Costs run from around $450 a square metre for a refresh to well past $2,600 for a bare shell built from nothing, before furniture is counted. Post your job on The Quote Yard to reach fitout contractors across Victoria.
At a Glance - What Drives the Cost
| Factor | Cheaper End | Dearer End | Why |
|---|---|---|---|
| Starting condition | Existing office, reusable | Bare shell, no services | Everything built from scratch |
| Services capacity | Base building adequate | Upgrades to power or air | Switchboards, plant, ducting |
| Enclosed rooms | Mostly open plan | Many offices and meeting rooms | Partitions, doors, services |
| Building age | Modern tower | Older or heritage stock | Access, compliance upgrades |
| Hours | Normal working hours | Nights and weekends | Penalty rates, dock bookings |
| Specification | Standard finishes | Joinery and feature work | Custom fabrication |
Settle the Make Good Before You Sign
Most Victorian commercial leases contain a make good clause requiring the tenant to hand the premises back in a defined condition once the term ends, and that definition is where the money sits.
Returning a tenancy to base building condition means stripping out everything the fitout ever installed, which on a 500 square metre floor runs into tens of thousands of dollars at a moment when the business is also paying for its new premises. A clause requiring return to the condition at handover, with fair wear and tear excepted, is a very different obligation. Photographic condition reports taken at handover settle later arguments quickly, and many disputes come down to nobody having taken them.
The negotiating points worth raising before signing are whether the incoming fitout can stay, whether a capped cash settlement can replace physical make good, and what happens if the landlord relets to a tenant who wants the fitout retained. Commercial construction across a wider project sits with commercial builders, and the finishing trades with commercial painting contractors.
Permits and the Building Surveyor
Fitout work is building work, and treating it as decoration is where tenants get into trouble. The Building Act 1993 and the Building Regulations 2018 set the framework, and a registered building surveyor sits at the centre of it. A building permit is generally required where the work alters the structure, changes the layout of walls or ceilings, affects exits or paths of travel, or touches any essential safety measure such as sprinklers, detection, exit signage or emergency lighting. Replacing carpet, repainting and installing loose furniture usually sit outside that. The grey area is partitioning, which frequently does require a permit because new walls change egress distances, sprinkler coverage and the way a floor is occupied. The relevant building surveyor assesses the documentation, issues the permit, carries out inspections during the work and signs off at the end.
The permit itself states whether completion requires an occupancy permit or a certificate of final inspection, and the distinction matters to the program. A tenant occupying a space before the required approval has been issued is committing an offence, which is a poor way to start a lease. Two further approvals catch people out. A change of use, such as converting an office tenancy into a cafe or a medical suite, changes the building classification and can trigger both a planning permit from the council and upgrade requirements under the code. And landlord consent is nearly always required under the lease before any work begins, with the landlord's own conditions sitting on top of the statutory ones. Building surveyor and permit questions across wider projects sit with commercial builders.
| Work | Permit Usually Needed | Why |
|---|---|---|
| Repaint and recarpet | No | No change to structure or exits |
| New partition walls | Usually yes | Egress, sprinklers, occupancy |
| Altering exit doors | Yes | Essential safety measure |
| New or relocated sprinkler heads | Yes | Fire system alteration |
| Suspended ceiling replacement | Often yes | Detection and services affected |
| Change of use | Yes, plus planning | Classification changes |
Essential Safety Measures
Essential safety measures are the systems a building relies on in an emergency, and a fitout interacts with nearly all of them. Getting this wrong creates both a compliance problem and a genuine safety risk. The list covers sprinklers, smoke and thermal detection, exit signs, emergency lighting, fire hose reels, hydrants, extinguishers, exit doors, fire dampers and paths of travel to exits. A new partition can block a sprinkler head's spray pattern, isolate a detector, obscure an exit sign or push a travel distance beyond what the code allows, and none of those are visible problems to somebody looking at a floor plan for aesthetics. Victorian building owners carry ongoing obligations to maintain these systems and keep records of inspection and testing, with the measures and their required standards recorded on the occupancy permit or the relevant determination.
A fitout that alters any of them has to be documented so those records stay accurate, and the building surveyor will look for exactly that at sign off. The practical consequence for a tenant is that the fire services trades are not an afterthought to be squeezed in at the end. Sprinkler modifications, detection changes and exit sign relocations need designing alongside the partition layout and booking early, because the contractors who do this work are specialists and are often the constraint on the program. Building regulation in Victoria is administered by the Building and Plumbing Commission, and workplace duties during the work by WorkSafe Victoria.
How a Fitout Project Actually Runs
Fitout projects follow a fairly consistent sequence. Knowing it helps a tenant work out where the real decisions and the real money sit. Briefing and space planning come first, establishing headcount, the mix of open plan and enclosed space, meeting room numbers, and the support spaces a business needs. A test fit drawn against a specific tenancy is the most useful early document, since it shows whether the floor plate actually accommodates the brief before a lease is signed.
Many tenants run test fits across two or three shortlisted tenancies while still negotiating, which is exactly the right point in the process to be doing it. Documentation follows, covering the layout, finishes, joinery, lighting, services coordination and everything the builder and the surveyor need. The building permit application gets prepared at this stage. Skimping on documentation is the most reliable way to produce a fitout full of variations, as anything left undrawn gets resolved on site at a price nobody agreed in advance.
Construction then runs to a program that usually looks like demolition and strip out, services rough in, partitions and ceilings, then finishes, joinery and furniture. A typical suburban office of 300 to 600 square metres takes six to twelve weeks on site once permits are in hand, with the permit process itself adding two to six weeks ahead of that. Handover covers the surveyor's sign off, commissioning of services, the defects period and the manuals covering how the installed systems are run. The faults that emerge over the first months are the contractor's to fix, so treat that period as part of the job rather than treating the final invoice as the end of the relationship.
| Stage | What Happens | Typical Duration |
|---|---|---|
| Brief and test fit | Headcount against floor plate | 1 to 3 weeks |
| Design and documentation | Drawings, finishes, services | 3 to 8 weeks |
| Permit application | Surveyor assessment | 2 to 6 weeks |
| Strip out and rough in | Demolition, services | 2 to 4 weeks |
| Partitions and finishes | Walls, ceilings, floors | 3 to 6 weeks |
| Handover and defects | Sign off, commissioning | 1 to 2 weeks, then 12 months |
Melbourne Office Stock and What Each Type Brings
The building a tenancy sits in shapes a fitout as much as the brief does, and Melbourne's office market spans several distinct types. Premium and A grade towers in the CBD and Docklands offer modern services, raised access floors in many cases, generous lift and dock facilities and base building systems designed for contemporary occupant densities. The trade off is process, as building management rules, induction requirements, dock bookings and after hours access procedures all add administrative time, and the landlord's own fitout guidelines often specify approved contractors for services work. B grade CBD stock, much of it built through the 1970s and 1980s, is where most cost surprises live. Services capacity was designed for a very different working pattern, floor to ceiling heights are tighter, base building air conditioning frequently struggles with modern desking densities, and asbestos may be present in older elements, which matters the moment a ceiling or a riser is opened. Converted warehouses and period buildings through Cremorne, Richmond, Collingwood, Fitzroy and South Melbourne are popular for their character and bring exposed structure, limited services, heritage controls in some cases, and acoustic challenges that hard surfaces make worse. Suburban office parks through Mount Waverley, Box Hill, Tullamarine and the growth corridors generally offer easier access, on grade loading, parking and lower rents, with simpler base building systems that are often easier to modify. Regional centres including Geelong, Ballarat and Bendigo have their own mix of period main street buildings and newer stock. One piece of advice holds across every one of these building types. Get a contractor or building surveyor into the specific tenancy before the lease is signed, because the answer to whether a floor plate suits a business is never available from a marketing brochure. Air conditioning capacity in older buildings is assessed by commercial air conditioning contractors.
Services, Capacity and What the Base Building Gives You
The base building sets limits a fitout cannot design around, and discovering them late is expensive. Lease negotiation is the cheapest moment to establish what those limits are. Electrical capacity comes up first. An existing tenancy switchboard has a finite rating, and a business moving from paper based work to dense desking with monitors, kitchen appliances and server equipment can exceed it. Upgrading a tenancy board is manageable, while upgrading the supply from the street is a different order of cost and time entirely, so the answer belongs in the due diligence, not the construction phase.
Air conditioning follows the same logic. Base building systems are designed for an assumed occupant density and an assumed layout, and enclosing rooms out of an open floor changes air distribution completely. A meeting room built where a single supply diffuser once served open plan will be uncomfortable within a fortnight, and fixing it afterwards means opening a finished ceiling. After hours air conditioning availability and the cost of it also belong in the lease discussion, as a business running late will otherwise discover the charge on its first invoice.
Data, communications and the kitchen fill out the list. Cabling is cheap during construction and disruptive afterwards, so running spare capacity to likely future positions is sensible. Kitchens and end of trip facilities need water and waste, which in an upper level tenancy means finding a path to existing plumbing, and that path does not always exist. Mechanical work sits with commercial air conditioning contractors, and the electrical scope with electrical services providers.
Accessibility and Paths of Travel
Accessibility requirements apply to fitout work and are not optional, and they reach beyond the parts of the tenancy actually being altered. Designing them in costs almost nothing, while retrofitting them costs a great deal. The technical requirements come from AS 1428.1, which covers door widths and clearances, circulation space, corridor widths, counter heights, sanitary facilities, luminance contrast at stair nosings and glazing, and tactile indicators where hazards exist. The Disability Discrimination Act 1992 sits behind all of it as a separate federal obligation that applies regardless of whether a permit was issued, which is why a tenant cannot simply argue that a surveyor approved the drawings. Where building work is carried out, the requirements commonly extend to the affected part of the building and to the principal path of travel to that part.
A fitout can therefore trigger upgrades outside the tenancy itself, in the lift lobby, the entry or the shared amenities, and whether the tenant or the landlord pays for that is a question the lease may not answer neatly. Raising it early avoids a standoff at permit stage. The practical design points are unglamorous and easy to get right at the drawing stage. Doorways need adequate clear width once the door and hardware are accounted for, corridors need passing and turning space, at least one accessible meeting room and workpoint makes a real difference, reception counters need a lowered section, and glazed doors and full height glass need contrast marking so nobody walks into them. Partitioning and internal carpentry sits with cabinet making and joinery contractors.
Designing for How the Office Is Actually Used
Working patterns have changed enough that briefing a fitout on last decade's assumptions wastes both money and floor area. The most common error now is designing one desk per employee for a workforce that attends three days a week, which produces a floor that is two thirds empty on Monday and Friday and still feels crowded on Wednesday. Measuring actual attendance before briefing, using access card data or a simple count over several weeks, gives a far better basis than a headcount from a payroll system. Demand for meeting space has shifted furthest of all. Large boardrooms sit idle while small rooms for two or three people are permanently booked, and video calls need rooms that work acoustically and visually for one person as often as for a group. A practical mix is more small rooms than a traditional brief would suggest, several of them sized for a single person taking a call, along with enclosed focus space for concentrated work that open plan cannot provide. Storage requirements have collapsed in most professional offices as paper has gone, and freeing that area for usable space is straightforward. Kitchens and social space have gone the other way, because the reason people come to an office is largely the other people in it, and a generous kitchen does more for attendance than most other interventions. End of trip facilities including showers, lockers and bike storage now influence tenancy selection directly, and whether the base building provides them is worth establishing early because retrofitting them into a tenancy needs plumbing and space that may not exist. Finally, build in flexibility, as demountable partitions, generous cabling capacity and a furniture system that can be reconfigured cost slightly more initially and avoid a second fitout when the business changes. Joinery and built in storage is fabricated by cabinet making and joinery specialists.
Acoustics, Lighting and Air Quality
The complaints that arrive a month after a fitout are almost always about noise, glare or stuffiness rather than about how anything looks. Acoustics cause the most trouble. Open plan floors with hard finishes reflect sound, and a meeting room whose partitions stop at the suspended ceiling instead of continuing to the underside of the slab, leaking conversation into the space next door. Specifying full height partitions for rooms that need confidentiality, insulating them properly and paying attention to door seals and the path over the ceiling grid costs far less during construction than remediation does afterwards.
Carpet, acoustic ceiling tiles and soft surfaces do the rest, and ceiling work of that kind sits with plastering and gyprock repairs contractors. Lighting deserves the same attention. Office lighting should suit screen based work, not simply be bright, which means controlling glare and avoiding reflections, and daylight is valuable provided it does not put the afternoon sun directly onto a bank of monitors. Zoning and sensors cut running costs and are trivial to include at rough in stage, with the switchboard capacity to support them checked by switchboard upgrade electricians. Meeting rooms used for video calls need thought about where the light falls on faces.
Air quality and comfort round it out. Enclosing rooms changes air distribution, densifying desking raises the heat load, and both show up as complaints within weeks. Low emission finishes, adhesives and furniture cut the initial odour that puts people off a new space for its first few weeks, and they are increasingly specified as standard. Where a tenancy is being reoccupied immediately, that specification is worth insisting on. Flooring selection across commercial buildings sits with commercial flooring contractors.
| Complaint | Usual Cause | Fix at Design Stage |
|---|---|---|
| Meetings overheard | Partitions stop at ceiling | Full height, sealed, insulated |
| Open plan too noisy | Hard finishes everywhere | Carpet, acoustic ceiling, screens |
| Screen glare | Lighting and window position | Zoning, diffusers, blinds |
| Rooms stuffy | Air distribution unchanged | Mechanical redesign |
| Strong smell for weeks | High emission products | Low emission specification |
| Too hot at desks | Density above design load | Capacity check before layout |
Make Good and Lease End Obligations
Make good is the single most commonly underestimated cost in commercial tenancy, and it is negotiated at the wrong end of the relationship. Reading the clause carefully before signing is worth more than any amount of argument later. The obligation varies enormously in scope. Return to base building condition means removing partitions, ceilings, floor coverings, joinery and cabling, reinstating services to their original configuration and repainting, which for a mid sized tenancy runs from $160 to $420 per square metre. Return to the condition at commencement, fair wear and tear excepted, may require little more than repairs and a clean.
Those two clauses look almost identical on a page and differ by tens of thousands of dollars in practice. Several practical measures reduce the exposure. Take a full photographic condition report at handover and have the landlord acknowledge it, as without one the argument becomes a contest of recollections. Keep the fitout drawings and the permit documentation, which prove what was installed and when.
Ask whether the landlord will accept a cash settlement in place of physical works, a common and often cheaper resolution for both parties, and try to have the clause allow the fitout to stay where the landlord agrees at the time. Timing carries its own trap. Make good works usually have to be finished before the lease runs out, not afterwards. That means arranging access, permits where the strip out affects services, and contractors, all while the business is also packing up and moving into somewhere else. Six months of lead time on that planning is sensible, not excessive, for most tenants. Contractors who handle rubbish removal take the strip out waste away, and larger volumes need skip bin hire arranged separately.
Getting the Order of Operations Right
Sequencing decides whether a fitout lands on time or slips past the lease start.
The order in which a fitout happens is largely fixed by physics and by the permit process, and tenants who understand it make far better decisions about when to sign a lease. Work backwards from the date the business must occupy. Handover and sign off need a week or two at the end for the surveyor's final inspection, commissioning of mechanical and fire systems, post construction cleaning and the furniture installation, and that period compresses badly if anything earlier has slipped. Construction itself runs six to twelve weeks for a typical suburban office, longer for larger floor plates or where the base building needs upgrading. Before any of that, the building permit has to be issued, which takes two to six weeks depending on the surveyor's workload and the quality of the documentation submitted, and incomplete drawings are the usual cause of delay at this stage. Design and documentation take three to eight weeks ahead of the permit application, and the brief and test fit a further one to three weeks before that. Added together, a straightforward fitout needs roughly four to six months from first conversation to occupation, and a complex one considerably more. Two practical consequences follow. A lease signed with a commencement date twelve weeks away will almost certainly mean paying rent on an unusable tenancy, which is why rent free or fitout periods are negotiated into commercial leases in the first place. And the items with the longest lead times, meaning custom joinery, specialist glazing, imported furniture and anything requiring fabrication, need ordering during documentation rather than after construction starts. Coordination across the trades on the ground is typically managed by commercial builders.
Space Planning and How Much Area You Need
Getting the area right carries the longest financial consequences of any decision here, since it sets the rent for the whole term. A square metre too many is paid for every month for five or ten years. Australian offices have historically been planned at roughly 10 to 15 square metres per person including circulation, meeting rooms and support space, with denser layouts reaching 8 to 10 and more generous professional offices sitting at 15 to 20. Those figures remain a reasonable starting point, but they assume everybody attends at once. A workforce attending three days a week does not need a desk each, and planning on that basis leaves a business renting floor area it never uses. The better approach starts with measured attendance, not a headcount from payroll.
Access card data over a few weeks shows the real peak, and planning to that peak with a modest buffer produces a floor that works on the busiest day without carrying dead space on the quietest. Shared and bookable desking suits some teams and irritates others, so the decision belongs with the people who will live with it and not with whoever is signing the lease. Then check the plan against the building. Column grids, core positions, window lines and base building services all constrain where partitions can sensibly go, and a layout drawn without reference to them produces rooms with a column in the middle or no air supply. A test fit on the actual floor plate settles all of this in a week, and it is the single most useful thing a tenant can commission before signing anything. It costs a fraction of one month's rent.
| Layout Type | Area Per Person | Suits |
|---|---|---|
| Dense open plan | 8 to 10 m2 | Call centres, high density teams |
| Standard open plan | 10 to 13 m2 | Most professional offices |
| Mixed open and enclosed | 13 to 16 m2 | Legal, finance, consulting |
| Generous or client facing | 16 to 20 m2 | Partner offices, showrooms |
| Shared desking model | 6 to 9 m2 | Hybrid attendance patterns |
| Add for large meeting suite | Extra 10 to 20 per cent | Client heavy businesses |
Joinery, Furniture and Long Lead Items
Partitions and ceilings rarely hold a fitout up. The ones that hold a project up are predictable enough to plan around, and they are usually ordered later than they should be. Custom joinery leads the list, covering reception desks, kitchen cabinetry, built in storage and feature elements, all fabricated to order and needing drawings signed off well before they are wanted on site. Lead times of six to twelve weeks are normal and longer for complex work, so the joinery package usually gets released during documentation, well before construction starts.
A delayed reception desk holds up an entire handover. Changing a joinery detail once fabrication has begun costs real money. Furniture sits outside most fitout contracts and carries its own long lead times, particularly for imported task chairs and sit stand desking. It is also a substantial budget in its own right at $900 to $3,500 per workstation, which surprises tenants who assumed it was included.
Australian manufacturers including Schiavello, Zenith Interiors and UCI supply much of the Victorian commercial market, and local fabrication generally beats imported stock on lead time when a date is fixed. Ordering early and paying for a few weeks of storage beats delaying occupation. Glazing, doors and specialist items complete the picture. Glass partitions and internal glazed doors are made to measure, so they cannot be ordered until partition framing is set out and measured on site, which puts them on the critical path near the end. Audio visual equipment, access control hardware and signage all need ordering earlier than instinct suggests, and camera and access systems are installed by CCTV and security camera installation specialists. Where cabling for these systems is involved, it is installed by data cabling installation contractors during rough in.
Energy, Waste and Tender Requirements
Environmental requirements appear in more Victorian fitout briefs each year, and several of them save money instead of adding to it. Three of them come up repeatedly in Victorian tenders. Efficient fittings with zoning and occupancy sensors cut running costs measurably against a floor lit uniformly through the working day, and the additional cost at installation is modest. Daylight harvesting, where fittings near windows dim automatically, suits Melbourne's variable conditions better than a fixed installation does. Material choices come next in the brief.
Low emission adhesives, paints, carpets and board products reduce the strong smell that makes a new fitout unpleasant for weeks, and they are frequently mandated in projects targeting a sustainability rating. Recycled content, product certifications and take back arrangements at end of life appear in tenders regularly enough that suppliers now publish the documentation as standard. Contractors most often fall short on waste handling. A strip out generates a large volume of material, much of it recyclable, including metal stud, ceiling tile, carpet and cardboard, and separating it on site costs little where the contractor plans for it. Asking for a waste management approach in the tender response is a reasonable request, and the answer tells you a good deal about how organised a contractor actually is. Commercial waste obligations, including where demolition material may lawfully go, are administered by EPA Victoria.
Medical, Professional and Specialist Suites
Some tenancies carry requirements an ordinary office fitout never encounters, and the difference shows up in both the permit and the price. How the building code classifies the space drives most of that difference. Medical and allied health suites come up most often in Victoria. Consulting rooms need acoustic separation that genuinely works, because patient confidentiality is a professional obligation rather than a preference, and that means full height insulated partitions with sealed doors instead of the usual partial height walls. Hand basins in consulting rooms need plumbing that may not exist on an upper floor, surfaces need to be cleanable and impervious in treatment areas, and waiting areas need enough circulation space for prams and wheelchairs.
Changing a tenancy from office to medical use also alters the building classification, which brings both a planning permit question for the council and potential upgrade requirements for the building itself. Assessing the base building belongs at the start, as discovering it after a lease is signed removes every option a tenant had. Other specialist uses follow the same pattern. Childcare, food preparation, laboratories and training facilities all bring their own regulatory overlay, and each changes what the building surveyor is assessing. The practical rule is that any use other than straightforward office work needs the classification question answered before anything else happens. Where food service is involved, the fitout intersects with the floor and surface requirements covered under epoxy flooring for food premises.
What an Office Fitout Costs in Victoria
Rates are quoted per square metre of tenancy area, and the spread is wide. The term covers everything from new paint through to a complete build. A cosmetic refresh keeping the existing layout runs $450 to $900 per square metre, covering paint, floor coverings, some lighting and minor works. A standard fitout of an existing office with layout changes sits at $900 to $1,700.
A full fitout of a bare shell tenancy, where partitions, ceilings, lighting, services distribution and everything else is built from nothing, runs $1,400 to $2,600. High specification or client facing space with substantial joinery, feature finishes and audio visual integration runs $2,600 to $4,200 and beyond. The supporting costs slip out of budgets easily. Design and documentation runs 5 to 12 per cent of the build cost, the building permit and surveyor $2,600 to $9,000 depending on complexity, and loose furniture $900 to $3,500 per workstation, which is a separate budget from the fitout itself and frequently a large one.
Audio visual, security systems and the relocation itself all sit outside most fitout contracts, and each needs its own line in the budget rather than being discovered late. Two things reliably reduce the number. Reusing what is already there, including partitions in serviceable positions, the existing ceiling grid and base building lighting, saves both cost and program time. And designing to the floor plate instead of against it, meaning accepting the column grid and the existing services positions, avoids expensive work that delivers very little. Painting scope across the tenancy is priced by commercial painting contractors.
| Line Item | Victoria 2026 | Often Missing From a Cheap Quote |
|---|---|---|
| Building permit and surveyor | $2,600 - $9,000 | Assumed not required |
| Fire services modifications | $3,000 - $25,000 | Excluded as provisional |
| Electrical capacity upgrade | $5,000 - $40,000 | Capacity never checked |
| Mechanical redesign | $8,000 - $60,000 | Rooms enclosed regardless |
| After hours access charges | Varies by building | Landlord charges direct |
| Loose furniture | $900 - $3,500 per desk | Separate budget entirely |
| Fitout Type | Victoria 2026 | What It Covers |
|---|---|---|
| Cosmetic refresh | $450 - $900 per m2 | Paint, floors, minor works |
| Standard fitout | $900 - $1,700 per m2 | Layout changes, existing office |
| Bare shell fitout | $1,400 - $2,600 per m2 | Everything built from scratch |
| High specification | $2,600 - $4,200 per m2 | Joinery, feature finishes, AV |
| Design and documentation | 5 to 12 per cent | Drawings and permit package |
| Make good | $160 - $420 per m2 | Strip out at lease end |
Working in an Occupied or Adjoining Tenancy
Plenty of fitouts happen around people who are still working, and the arrangements for that belong in the contract rather than in an optimistic assumption. Getting them wrong produces complaints from staff and from neighbouring tenants alike. Staging is the usual answer, dividing the floor so one area is completed while the business operates in another, then swapping. It adds time and cost through double handling but avoids the expense of temporary premises. The alternative is a decant into swing space or a short overlap between two leases, which is cleaner for the program and more expensive in rent. Noise and disruption need managing whichever way it goes.
Core drilling, demolition and anything involving hammering are usually restricted to before or after business hours by the building's own rules, and neighbouring tenants have standing to complain to the landlord. Dust control matters a great deal where a tenancy shares air handling with adjoining spaces, and a contractor who seals the returns and runs proper extraction avoids complaints that would otherwise land on the tenant instead of on them. Building access is its own logistical exercise in a Melbourne tower. Loading dock bookings, service lift allocations, security inductions and after hours access procedures all constrain how much material reaches the floor, and a contractor who has worked in the building before is genuinely worth more than one who has not. Post construction cleaning before occupation is handled by commercial cleaning contractors.
Choosing a Fitout Contractor
The market splits into design and construct firms that handle everything, and separate designers and builders engaged individually. Both work well once the tenant understands which arrangement they have. A design and construct arrangement gives one point of accountability and usually a faster program, at the cost of the designer and builder being the same commercial interest. Engaging a designer separately produces documentation that can be tendered to several builders, which tends to sharpen pricing and gives independent oversight during construction, at the cost of time and a second fee.
For a straightforward tenancy the first suits most tenants, while for larger or more complex projects the second is generally worth it. Registration and insurance form the baseline checks. Commercial building work in Victoria should be carried out by a registered building practitioner in the appropriate class, and the registration is checkable. Confirm public liability cover with a sum insured appropriate to the building, confirm workers compensation is in place, and ask to see the safety documentation any commercial landlord will require before granting site access to the floor.
Then interrogate the quote itself instead of the presentation around it. Ask what is excluded, what is provisional, and what assumptions have been made about the base building. Those three answers explain most of the difference between two prices that otherwise look comparable. Ask who applies for the permit and who pays the surveyor. Ask for references from tenants whose fitouts are two or three years old, since that reveals how the joinery, the finishes and the door hardware have actually held up under daily use. Trade coordination across the whole project typically falls to commercial builders running the program.
| Ask This | A Good Answer | A Warning Sign |
|---|---|---|
| Who obtains the building permit | Named, with the fee stated | Says none is needed |
| What is provisional in this price | Listed with assumptions | Nothing identified |
| Have you checked services capacity | Measured or allowed for | Assumed adequate |
| How will fire services be handled | Specialist engaged early | Left until the end |
| Can I see a fitout three years on | Arranged readily | Only handover photographs |
| What does the defects period cover | Stated in writing | Vague or absent |
What to Look Out For
The most expensive mistake is signing a lease before anybody has tested whether the tenancy suits the business. The fitout then spends money working around a floor plate that was never right. Be cautious about a quote that does not mention the building permit, since either the contractor has not understood the scope or the cost is about to arrive as a variation. Treat with caution provisional sums covering fire services, mechanical and electrical, which are exactly the items that move. Watch for partitions specified to ceiling height where confidentiality matters, and for a program that leaves the services trades until the finishes are in.
Keep the documentation together, meaning the permit, the certificate issued at completion, the as built drawings, the operating manuals handed over at completion, and the warranties. Photograph the tenancy at handover from the landlord and again at completion of the fitout, then store both sets somewhere that survives staff turnover. Those records settle the make good question when you eventually hand the space back, and their absence is what turns that conversation into a dispute. Consumer and contract guidance is published by Consumer Affairs Victoria, with the relevant construction standards from Standards Australia.
How to Get Comparable Quotes
Provide the floor plan with the area marked, then state the headcount the space has to hold and the split between open plan and enclosed rooms. Those two numbers shape the price more than the finishes do. Say what condition the tenancy is in now, whether there is an existing fitout and whether any of it can stay. Note the building, the floor level and whether after hours access is available, along with the lease commencement date that sets the deadline.
Mention any known constraint, including base building services limits, heritage controls or landlord conditions already issued. Then ask every contractor to price the same documented scope, stating separately what they have allowed for the building permit, fire services, mechanical changes, electrical capacity and furniture. Ask for the program in weeks with the permit period shown separately, as that is the part most often left out of an optimistic timeline. Where make good on the outgoing premises is also required, ask for that as a separate quote, and note that flooring is frequently priced independently through flooring services contractors.
Office Fitouts Across Victoria
We connect you with fitout contractors across Victoria for tenancy fitouts, office refurbishments, partitioning and workplace upgrades, medical and professional suites, and make good works, from the Melbourne CBD and Docklands through Southbank, Richmond, Cremorne and the inner suburban office markets, out to the suburban business parks, Geelong, Ballarat, Bendigo and regional Victoria.
▶ Inner Melbourne 20 areas
Inner North
Inner East
Inner South
▶ Greater Melbourne 17 areas
Eastern Suburbs
South East
▶ North & West 20 areas
Northern Suburbs
Western Suburbs
▶ Bayside & Peninsula 20 areas
Bayside
Mornington Peninsula
▶ Geelong & Surf Coast 19 areas
Geelong
Bellarine Peninsula
Surf Coast
▶ Gippsland 18 areas
Bass Coast
West Gippsland
Latrobe Valley
East Gippsland
▶ Yarra Valley & Ranges 16 areas
Yarra Valley
Dandenong Ranges
▶ Regional Victoria 35 areas
Goldfields
Macedon Ranges
Murray
North East
High Country
South West
Office Fitout FAQs - VIC 2026
What does an office fitout cost in Victoria?
Do I need a building permit for a fitout?
Who issues the permit?
Can we occupy before sign off?
What are essential safety measures?
How long does a fitout take?
What is make good?
How much does make good cost?
Does accessibility apply to a fitout?
Why do meeting rooms leak sound?
Should we use design and construct?
What should we check before signing a lease?
Commercial Fitout Specialists - Victoria
Related VIC Services
For Tradies - VIC
Are you a tradie? Browse current paid job leads on the VIC tradie job leads board, where homeowners and rental providers across Melbourne and regional Victoria post real projects. Fitouts bring builders, carpenters, electricians and finishing trades onto one program, so you can explore builder jobs, carpenter jobs and electrician jobs in Victoria, or see the full range of tradie job leads posted to The Quote Yard platform.
Planning an Office Fitout in Victoria?
Post your job and compare Victorian contractors on what they have allowed for permits, fire services and base building capacity.
Get Office Fitout QuotesAbout This Guide
This page provides guidance information only and is not professional advice of any kind. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Looking for more services across Victoria? View all available trade services.
Reviewed by The Quote Yard Editorial Team
How The Quote Yard Works
We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.