Repainting a Strata Building on the Central Coast?
Tell us the building type, the number of lots and storeys, which walls and common areas need painting, and whether scaffolding may need to stand on a council footpath. We will pass that description to local painters, so every tender (written price) your committee receives is based on the same details.
Central Coast Strata Painting Estimates
These are 2027 estimates for the Central Coast. Your price depends on building height, the condition of the walls and timber, the access equipment, any council footpath fees, and any repairs or paint testing.
Strata Painting Central Coast NSW - Get Local Quotes
Repainting a unit block, villa complex or apartment building is a shared decision, because the walls, stairwells and lobbies belong to every owner in the scheme. The owners corporation, the legal body made up of all the lot owners, must keep that common property in good repair, and it hires and pays the painter. On the Central Coast that common property can be a two-storey walk-up (a unit block with stairs but no lift) a street back from the beach or a row of brick villas near the lakes. It can also be a taller residential building close to the Gosford city centre. The exterior repaint of a small walk-up of 6 to 12 lots is estimated at $40,000 to $120,000 for 2027, with height and wall condition deciding where a job falls in that range. Each type needs a different access method, from ladders and short scaffold runs to swing stages hung from the roof, and access is a large part of the cost. Money for the job comes from the capital works fund, the savings account that owners' regular levies build up for major repairs, or from a special levy, a one-off charge voted by the owners. Strata managers must disclose any commission a contractor pays them, and on contracts over $20,000 home building compensation cover has to be checked. Residents stay in their units through the work, so balconies, car spaces, wash days and the colour vote all need planning before painting starts. Post your job on The Quote Yard and we will connect you with local painters across the Central Coast who can quote on it.
At a Glance - Central Coast Strata Painting Estimates 2027
| Item | 2027 Estimate | How It Is Charged | What Moves It | Who Decides |
|---|---|---|---|---|
| Exterior repaint, walk-up of 6 to 12 lots | $40,000 - $120,000 | Lump sum after inspection | Height and wall condition | Owners corporation |
| Wall area, two coats | $28 - $45 per m² | Per square metre | Cracks, repairs and colour change | Owners corporation |
| Scaffolding, two-storey section | $1,500 - $4,000 | Hire for the job period | Wall length and weeks on site | Painter and scaffolder |
| Painter labour | $55 - $85 per hour | Hourly, small common area jobs | Minimum charge and hours | Committee or strata manager |
| Painter day rate | $440 - $680 per painter | Per painter, per day | Crew size | Committee or strata manager |
| Balustrades and handrails | $35 - $75 per metre | Per lineal metre | Rust removal and rail count | Owners corporation |
| Doors, both faces and frame | $90 - $180 per door | Per door | Enamel finish and hardware | Depends on who owns the door |
| Lead paint XRF screening | $200 - $500 | Per visit | Number of surfaces tested | Owners corporation |
| Interior of a 2-bedroom unit | $3,000 - $5,500 | Fixed price | Ceilings, trims and colour change | Lot owner |
| Same-colour rental repaint, 2-bedroom | $2,200 - $4,000 | Fixed price, walls only | Patching and furniture | Lot owner |
| Council footpath scaffold approval | Set by council fees | Application fee plus monthly fee | How long the scaffold stands | Central Coast Council |
What Lifts a Strata Painting Price on the Coast
Repainting Shared Buildings on the Central Coast
A strata repaint starts with a decision of the owners corporation, not with one owner ringing a painter. Every lot owner belongs to the owners corporation automatically, and it is responsible for maintaining and repairing common property such as external walls, shared stairs and lobbies. The repair duty, the quote rules and the renovation rules used on this page are published on the NSW Government website. Painters pricing this work deal with the strata committee (the owners elected to run the building day to day), a strata manager or both, so the paperwork and timeline differ from a house job. The services and finishes involved across the state are set out in our guide to strata painting and building maintenance in NSW.
The prices below are 2027 estimates built from the bands used across our Central Coast painting guides, and the full house and unit tables sit in the Central Coast painting cost guide. Painting the inside of your own unit is a separate matter, since NSW strata rules treat interior painting as cosmetic work that needs no approval. Repainting the outside of the building is common property work, so the owners corporation decides it and all owners pay for it. Anyone with a free-standing house will find the steps for their own job in hiring a painter on the Central Coast.
2027 Strata Repaint Estimates and the Share Per Lot
The exterior repaint of a small walk-up block of 6 to 12 lots is estimated at $40,000 to $120,000 for 2027, depending on the building's height and the state of its walls. Painters measure that work as wall area, and two coats with standard preparation are estimated at $28 to $45 per square metre on the Coast. Access is a large part of the total, since scaffolding for a two-storey section alone is estimated at $1,500 to $4,000, and taller buildings need more. Smaller common area jobs, such as one stairwell, are charged at $55 to $85 per hour or $440 to $680 per painter per day. Balustrades, the railings on balconies and stairs, are priced by the metre, and the repair side of that work is covered in balustrade and handrail repairs. Rates for each surface across the state are compared in painting costs per square metre in NSW.
Each owner pays a share through levies, and NSW law says levies must be charged according to each lot's unit entitlement. Unit entitlement is the share of the scheme given to each lot on the strata plan, and it also sets the weight of each owner's vote when a poll is taken. Spread evenly across 12 lots, a $40,000 repaint would cost each owner about $3,333, while a $120,000 job shared by 6 lots would come to $20,000 each. Real shares differ from those even figures according to each lot's entitlement, which appears on the strata roll, the owners corporation's register of lots and owners, and on levy notices. Statewide estimates for larger complexes are listed in strata painting costs in NSW.
| Item | 2027 Estimate | How It Is Charged | What Moves It |
|---|---|---|---|
| Exterior repaint, walk-up of 6 to 12 lots | $40,000 - $120,000 | Lump sum after inspection | Height and wall condition |
| Wall area, two coats with standard preparation | $28 - $45 per m² | Per square metre | Cracks, repairs and colour change |
| Scaffolding, two-storey section | $1,500 - $4,000 | Hire for the job period | Wall length and weeks on site |
| Painter labour | $55 - $85 per hour | Hourly, small common area jobs | Minimum charge and work hours |
| Painter day rate | $440 - $680 per painter | Per painter, per day | Crew size |
| Balustrades and handrails | $35 - $75 per metre | Per lineal metre | Rust removal and rail count |
| Doors, both faces and frame | $90 - $180 per door | Per door | Enamel finish and hardware removal |
| Lead paint XRF screening | $200 - $500 | Per visit | Number of surfaces tested |
| Ceiling only, per room | $250 - $500 | Per room | Ceiling height and cornices |
| Interior of a 2-bedroom unit | $3,000 - $5,500 | Fixed price, paid by the lot owner | Ceilings, trims and colour change |
| Share per lot, evenly split | $3,333 - $20,000 | By unit entitlement | Number of lots and entitlement |
Pricing Each Side of the Building, Allowances and Levy Due Dates
Painters pricing a strata building can give one lump sum, but a price broken down by building or elevation, meaning each face of a building, is more useful to a committee. With elevation prices, owners can stage the work, compare each painter's tender (written price offer) face by face and hold back an elevation if the levy falls short. Repairs found only after washing, such as cracked render or rotten fascias, belong in provisional sums, which are set allowances for work that cannot be priced until it is seen. Those allowances can be paired with a schedule of rates, which is a list of unit prices for extra repairs, and both are set out in the Central Coast painting cost guide. Coating prices for rendered walls across the state can be compared in render painting costs in NSW. Every allowance should be approved and recorded by the committee before the money is spent.
Day work, meaning labour charged by the hour for jobs outside the agreed scope, should be capped in the contract at a stated hourly rate. The 2027 estimate for that labour on the Coast is $55 to $85 per hour, so a tender that leaves the rate blank gives the committee no way to check later invoices. Each variation, meaning any change to the agreed work or price, should be approved in writing by the committee or strata manager before the extra work starts. Keeping a running list of approved variations with the minutes makes the final bill easier to check.
The payment calendar depends on how quickly the owners corporation can collect the money. By law, owners must receive at least 30 days to pay standard and special levies, and a special levy for urgent repairs needs at least 14 days' notice. Levies left unpaid one month after the due date attract simple interest of 10 per cent a year, which the owners corporation can vote to waive but cannot change. Where the fund falls short, the NSW Government notes that a strata finance loan can spread a special levy into smaller instalments over a longer period. Setting the start date after the levy due date means the painter's first progress claim, a bill for work done so far, can be paid on time. Retention, a small part of each payment held back until defects are fixed, protects the owners once the scaffold comes down.
Reading a Strata Painting Price
Levy notices need at least 30 days, so set the start date after the due date.
Hold retention until the committee has signed off the defects inspection.
Walk-Ups, Villa Rows, Towers and Shop-Top Buildings
Strata buildings on the Coast range from two-lot duplexes to residential towers, and the type of building changes which rules apply to a repaint. In a two-lot scheme there may be no capital works fund or 10-year plan, so duplex owners can find no money set aside when the walls need painting. Walk-up blocks, which have stairs but no passenger lift, stand two or three storeys high and are painted from scaffolding or a motorised lift, and the 6 to 12 lot estimate applies to them. Villa and townhouse complexes spread the same number of lots across several low buildings, so the crew spends more time moving gear between rows. SafeWork NSW notes that mixed residential and commercial use can mean work health and safety laws apply, which matters for buildings with shops below.
Buildings more than three storeys high raise different access and insurance questions. Scaffold work where a person could fall more than 4 metres must be done by a licensed scaffolder, and swing stages or boom lifts come into the price. New buildings rising more than three storeys are exempt from Home Building Compensation Fund (HBCF) cover, so faulty work there falls under the strata building bond scheme instead. Some sites combine several of these features, so the scope should name each building, level and surface before anyone is asked for a price.
| Building Type | What Changes for a Repaint | Likely Access | Check First |
|---|---|---|---|
| Two-lot duplex | May have no capital works fund or plan | Ladders or a short scaffold | How the two owners will share the cost |
| Walk-up of two or three storeys | Exterior estimate of $40,000 to $120,000 for 6 to 12 lots | Scaffold or boom lift | Levy timing and the 10-year plan |
| Villa or townhouse rows | Several buildings in one contract | Ladders and short scaffold runs | Which walls are common property |
| Shops below, homes above | Work health and safety laws can apply | Scaffold with a covered walkway | Trading hours and customer access |
| Building over three storeys | Licensed scaffolding, swing stages or lifts | Fixed or suspended scaffold | Roof access and crane or lift space |
| Recently completed building | Building bond or statutory warranty may apply | Depends on the defect | Completion date and the bond period |
The Duty to Repair and the Six-Year Limit on Owner Claims
The owners corporation must repair and maintain common property, and the NSW Government warns that one that fails to do so may face legal action. Any lot owner who suffers a loss because common property was not maintained can sue the owners corporation within six years of becoming aware of the loss. Peeling paint can look like a cosmetic problem, but failed coatings around balconies, window frames and parapets can let water reach a unit. Since 27 October 2025, NSW Fair Trading has had investigation and enforcement powers, including compliance notices, to make owners corporations meet that repair duty. Putting off a repaint for years can therefore turn a maintenance item into a dispute between owners.
Leaks are the point where peeling paint becomes a repair problem for the owners corporation. Where water is coming through a balcony or a wall, the waterproof membrane or the render has to be fixed before any coating goes on, and that work belongs to a waterproofer or renderer. Balcony membranes and concrete cancer, where rusting steel reinforcement cracks the concrete around it, are dealt with in hiring a waterproofer on the Central Coast. Cracked render is a separate repair that a painter may subcontract, and the renderer's side of that work is set out in render repairs. Committees that record each leak report in the minutes, with photos and dates, have a clear history if a claim is ever made. One question in the NSW Government's strata health check is whether repairs and maintenance are a regular item on the meeting agenda.
The Repair Duty in Plain Terms
Five-Yearly Plan Reviews and the Capital Works Fund
The capital works fund, also called the sinking fund, is the account that levies build up to pay for major repairs and maintenance. Every owners corporation must keep a 10-year capital works fund plan that predicts the major work the building will need and forecasts its cost. That plan must be reviewed at least every five years, and new or revised plans must use the standard form set by the NSW Government. Changes to the plan are approved at the annual general meeting (AGM), and the owners corporation must consider the plan when it estimates capital works levies. Listing the repaint in year eight of the plan gives owners time to save, while a repaint that was never listed can arrive as a special levy. Where a two-lot scheme has no plan, the two owners need their own written arrangement for shared painting costs.
New buildings start with an initial maintenance schedule, a maintenance document the developer prepares for the new scheme's common property. From 1 April 2026 that schedule must use the standard form, and the developer must give it to the owners corporation before the first annual general meeting. In multi-storey schemes, the developer must also engage an independent surveyor, someone not connected to the developer, to certify that the schedule uses the standard form. In a recently completed building, owners can compare any repaint interval in the schedule with the paint maker's own advice. Painters quoting for a plan review can price each elevation separately, which makes the next update easier.
If the fund cannot cover a repaint, owners can vote a special levy, and the NSW Government suggests instalments, early notice and a strata finance loan to ease the cost. Committees can also follow the hardship process, including payment plans, for owners who cannot pay a large levy at once. Splitting the work into stages, such as the street elevation first and the rear walls a year later, is another way to match the job to the money available. Each stage then needs its own written scope, so that later tenders can be compared with the first.
| Plan Item | Rule | What It Means for Painting | Who to Ask |
|---|---|---|---|
| 10-year capital works plan | Required for most schemes | Shows the repaint year and estimate | Secretary or strata manager |
| Plan review | At least every five years | Refresh the repaint estimate with new quotes | Strata committee |
| Standard form | Required for new and revised plans | Each painting item set out the same way | Strata manager |
| Initial maintenance schedule | Standard form from 1 April 2026 | Sets out maintenance for a new building | Developer, before the first AGM |
| Capital works levies | Set at each annual general meeting | Levies should follow the plan | Owners at the meeting |
| Two-lot schemes | May be exempt from the fund and plan | No fund may exist for a repaint | Both owners |
| Strata finance loan | An option when the fund falls short | Spreads a special levy into instalments | Owners at a general meeting |
Committee Spending, Meetings and the Two-Quote Rule
The strata committee, the strata manager or a building manager can handle small common property repairs without a meeting. The NSW Government says these are usually paid from the administrative fund, the account for day-to-day running costs. Bigger jobs may need approval at a strata committee meeting, and the owners corporation can keep some decisions for a general meeting of all owners. Costly work without enough money in the fund goes to a general meeting, because special levies are voted on by the owners corporation. Proposed levies need more than 50 per cent of votes in favour, and the agenda with estimated levies must reach owners at least 14 days before an annual general meeting. Touch-ups and small repairs between full repaints sit with the trades described in strata common area repairs.
Where an owners corporation approves work valued at $30,000 or more, it must obtain at least two independent quotes. That rule does not apply to emergency repairs, such as storm damage or a burst pipe, which have to be fixed quickly. Collecting a third quote gives the committee a wider comparison of price and scope, and the 2027 estimate for a small walk-up exterior starts above that $30,000 mark. The steps for checking each painter before the vote are set out in finding a painter on the Central Coast.
Anyone who notices peeling paint or a leak should send the request in writing to the strata secretary or strata manager, with clear details of the problem and some photos. Owners who want an upgrade can put a motion to the next strata meeting, and a new colour scheme or texture coating over plain render is a change owners may want to vote on. Scaffolding on a council footpath needs Central Coast Council approval as well, so the motion should note any approval the painter or scaffolder must obtain. Notifying owners early and checking the work before final payment are both steps in the government's own repair checklist.
Who Decides a Strata Repaint
Commissions, Referrals and the Strata Manager
A strata managing agent, the licensed business that runs a scheme's administration, can find painters, collect quotes and manage the contract for the committee. NSW law limits what that agent may receive from contractors, and the disclosure rules are strict. The agent must not request or accept a gift or benefit worth more than $60, apart from normal pay and commissions the owners corporation has approved. At each annual general meeting the agent must disclose commissions received in the past 12 months and those expected in the next 12 months, with estimated amounts. Before entering a contract that pays the agent a commission, or one with a connected person, the agent must give the owners corporation written notice of the amount and why the contract suits the owners. Penalties of up to $55,000 can apply when these disclosures are not made.
There is a separate duty for referrals, because an agent who refers the owners corporation to a painter must disclose any personal or commercial relationship with that painter. The disclosure must cover the nature and value of any rebate, discount, commission or benefit linked to the referral. Connections with suppliers must also be disclosed at each annual general meeting and recorded in the minutes. If commissions go undisclosed, the owners corporation or NSW Fair Trading can apply to the NSW Civil and Administrative Tribunal for those commissions to be paid to the owners corporation. Inviting at least one painter the committee has found itself gives owners a price that sits outside any referral arrangement.
What a Strata Manager Must Tell Owners
Your Own Unit, Your Balcony and the Front Door
Painting the interior of your own unit is cosmetic work under NSW strata rules, and cosmetic work does not need approval. The same list includes filling minor holes and cracks in internal walls, so a patch and repaint before a sale or a new tenancy can go ahead without a vote. Schemes can add more work to that list through their by-laws, so read the registered by-laws before booking. Work that changes the outside of the building is a major renovation, which only the owners corporation can approve. Painting a balcony wall or an external door in a new colour may be treated that way, so raise it with the committee before the painter arrives.
Major renovations need a special resolution at a general meeting, and that resolution passes only if no more than 25 per cent of the value of votes cast are against it. The resolution must say whether the owners corporation or the lot owner will maintain the work in future, which matters for a balcony or door painted in a colour of its own choosing. Minor renovations, such as changes to internal walls or recessed lights, need more than 50 per cent of votes cast, or a committee decision where a by-law allows it. Committees that refuse a minor renovation must give written reasons within three months of the request, and an application not refused in that time is treated as approved. For the inside of a unit, owners can read interior painting on the Central Coast, while landlords repainting between tenants can read holiday home and rental painting.
Records of approved minor renovations must be kept by the owners corporation for 10 years, which helps a later buyer see what was changed inside a lot. Tenants who want a room repainted should go through their landlord or agent, since the lot owner is the one who deals with the owners corporation. The landlord can then decide whether the job is cosmetic or needs approval before booking a painter. Keeping a note of the paint colours used inside the unit makes later patch repairs easier to match.
| Work | Approval Tier | Vote Needed | Good to Know |
|---|---|---|---|
| Painting the interior of your unit | Cosmetic work | None | By-laws can add more cosmetic items |
| Filling minor holes and cracks in internal walls | Cosmetic work | None | Suits a patch and repaint |
| Changing internal walls before repainting | Minor renovation | More than 50 per cent of votes cast | Committee may decide if a by-law allows |
| Changing the outside of the building | Major renovation | Special resolution, no more than 25 per cent against | Structural work needs 14 days written notice |
| Common property walls, stairs and lobbies | Owners corporation work | Committee or general meeting | Paid from the capital works fund or a levy |
Strata Contracts and Home Building Compensation Cover for Taller Buildings
Exterior painting over $5,000 in labour and materials, including GST, needs a licensed contractor, and the contract, deposit and cooling-off rules are covered in hiring a painter on the Central Coast. On a strata job the contract should name the owners corporation and its strata plan number as the client, not the strata manager or one owner. The tender's scope, provisional sums, access plan and resident notice plan belong in the contract as attachments, so nothing agreed during tendering is lost. Payment dates in the contract should line up with the levy due dates, since the owners corporation can only pay from money it has collected. Work over $20,000 needs a full home building contract, and the committee should read every page before it is signed for the owners corporation.
Home Building Compensation Fund cover, known as HBCF and issued through icare, protects owners if a contractor cannot finish work or fix defects because of insolvency, death, disappearance or, in some cases, licence suspension. It is required where the contract price is over $20,000 including GST, and Service NSW sets the minimum cover at $340,000 before work starts. The multi-storey exemption listed by the State Insurance Regulatory Authority covers the construction of new buildings with a rise of more than three storeys and multiple home units. Service NSW lists alterations or renovations of residential buildings of any height among the projects that need cover, so building height alone does not settle the question. Before any deposit, the committee should obtain the HBCF certificate or a written reason it is not needed. NSW statutory warranties, which are protections set by law, run for six years on major defects and two years on all other defects, and they apply even when a contract leaves them out.
Paperwork for a Strata Painting Contract
Licensed Scaffolders, Swing Stages and Boom Lifts
Access equipment can account for a large part of the gap between two strata tenders. In NSW, scaffolding work where a person or object could fall more than 4 metres must be done by someone holding a high risk work licence in the right class. The basic class covers modular scaffolds, the intermediate class adds tube and coupler scaffolds, and the advanced class adds hung and suspended scaffolds. A suspended scaffold is a working platform hung from the roof on wire ropes, the type also called a swing stage. Genie and JLG make boom lifts and scissor lifts, motorised platforms that suit low and mid-rise blocks with firm ground and room to set up the machine. Statewide comparisons of access methods by building height appear in strata painting costs in NSW.
Sloping sites and narrow driveways change the access choice on some Coast blocks. Boom lifts need a level, solid base, so a walk-up on a steep street above a lake or bay may need scaffolding instead. Scaffolding that stands on a council footpath also needs approval from Central Coast Council, and the application and monthly fees are covered in council scaffold approval and fees in the Central Coast painting cost guide. The painter's tender should name the access method for each elevation and the number of weeks each piece of equipment will stay on site.
| Access Method | Licence or Rule | Suits | Watch For |
|---|---|---|---|
| Ladders and trestles | Safe work method statement for falls over 2 metres | Single-storey villas and low walls | Garden beds and paths below |
| Modular scaffold | Basic scaffolding licence above 4 metres | Two and three storey walk-ups | Footpath approval on council land |
| Tube and coupler scaffold | Intermediate scaffolding licence above 4 metres | Stepped sites and irregular walls | Longer time to erect |
| Suspended scaffold or swing stage | Advanced scaffolding licence | Tall buildings with flat faces | Roof access and wind pauses |
| Boom or scissor lift | Safe work method statement for falls over 2 metres | Low and mid-rise blocks on firm ground | Slope and room to set up |
Safety Duties When the Building Is Mostly Homes
Safety duties on a strata job sit mainly with the painting business when the building holds only homes. According to SafeWork NSW, an owners corporation that looks after only residential common areas is generally not a person conducting a business or undertaking (PCBU), the party that holds workplace safety duties. That changes if the owners corporation employs a worker, and contractors such as painters are not its employees. The painting business carries safety duties of its own, and repair and maintenance are both listed as construction work by Safe Work Australia. Buildings with shops or offices below the units are a different case, so mixed-use committees should take advice before work starts.
Any painting task with a risk of a person falling more than 2 metres is high risk construction work, and a safe work method statement must be prepared for it. A safe work method statement, or SWMS, is a written plan that lists the hazards of a task and the controls the crew will use. Construction projects valued at $250,000 or more must have a principal contractor, who prepares a written work health and safety management plan before work begins. The 2027 estimate of $40,000 to $120,000 for a small walk-up sits below that value, while a tower or a combined repaint and repair project can pass it. Older buildings can hold lead paint and asbestos, so book testing through our guides to lead paint testing and removal and asbestos testing and inspection before any sanding or scraping. An XRF screen, a handheld X-ray fluorescence scan that measures lead in a paint layer, is estimated at $200 to $500 for 2027.
Safety Paperwork on a Strata Job
Paint Faults in a Building Less Than Two Years Old
Buildings finished in the last two years raise a different question, because the original builder may still be responsible for faulty paint. Under the Strata Building Bond and Inspections Scheme, the developer lodges a bond of 2 per cent of the contract price with the NSW Government before seeking an occupation certificate, the approval to move in. The developer must then appoint a building inspector within 12 months of the building work being finished. That inspector carries out an interim inspection between 15 and 18 months after completion and a final inspection between 21 and 24 months after completion. The bond may be used to fix defects found in those inspections, and a planned rise in the bond from 2 to 3 per cent has been deferred until 1 July 2028.
Peeling, blistering or cracking coatings that appear in the first two years should be listed for the interim inspection, not painted over at the owners' cost. Paint faults that are not part of a major defect fall under the two-year statutory warranty period for residential building work. Owners corporations with buildings up to ten years old that have serious common property defects can report them to the Building Commission NSW. Any painter asked to quote in a newer building should be told about any open defect claim, so the scope leaves out work the builder must fix.
| Stage | Timing | What Happens | Owners Corporation Step |
|---|---|---|---|
| Bond lodged | Before the occupation certificate application | 2 per cent of the contract price is held | Keep the bond details with strata records |
| Inspector appointed | Within 12 months of completion | The developer appoints a building inspector | Give the inspector a list of known faults |
| Interim inspection | 15 to 18 months after completion | Defects are identified in a report | Note any peeling or cracking coatings |
| Final inspection | 21 to 24 months after completion | Unfixed defects are costed in the final report | Check that paint defects were fixed |
| Bond paid out | After the final report | Cost of unfixed defects is paid from the bond | The owners corporation completes the repairs |
| Buildings up to 10 years old | Serious common property defects | Report to the Building Commission NSW | Keep photos, reports and dates |
Notices, Car Spaces and Colour Samples for Residents
Residents stay in their units while a strata repaint goes on, so planning the notices to residents matters as much as choosing the paint. The first notice can set out the dates, the order of elevations and the hours the crew will work, with a contact name for questions. Balconies on the elevation being painted need clearing of pot plants, furniture and washing before the crew reaches them. Kärcher makes professional high pressure cleaners, the type of machine used for the wall wash in our pressure cleaning guide, and residents should keep windows and balcony doors shut during the wash. Car spaces under a scaffold or beside a lift may need to be emptied on set days. 3M makes painter's masking tapes, and the site rules should say how soon tape and plastic come off windows once each elevation is finished.
Any new colour scheme changes how every lot looks from the street, so it suits a vote of the whole owners corporation at a general meeting. Sample panels painted on a shaded wall and a sunny wall let owners see each colour in both lights before they vote. Resene makes Lumbersider, an exterior low sheen (slightly glossy) paint, and Wattyl makes Solagard, a water-based exterior acrylic, so the specification can name an exact product in each colour. Coating systems for salt air near the beaches and lakes are compared in exterior house painting on the Central Coast. Keeping the colour names and product codes in the building records lets later touch-ups match.
| Notice Item | When | What It Covers | Resident Action |
|---|---|---|---|
| First notice | Before the scaffold arrives | Dates, elevation order, hours and contact | Plan around the work |
| Balcony clearing | A few days before each elevation | Pot plants, furniture and washing | Clear the balcony |
| Wash day | The day before the wash | Windows and balcony doors | Keep them shut |
| Car spaces | Set days near equipment | Spaces under scaffold or lifts | Move vehicles |
| Colour samples | Before the general meeting | Panels on a shaded and a sunny wall | Vote on the scheme |
| Completion | After the defects walk | Touch-up list and colour codes | Report missed spots |
When the Paint Fails or Owners Disagree
Problems with a strata repaint fall into two groups, faults in the work and disagreements between owners about the decision. Faults in the painter's work go first to the contractor in writing, with photos and the defects list from the final inspection. If the painter does not respond, a defect complaint can be lodged with NSW Fair Trading. Retention money held back under the contract gives the painter a reason to return, so the final payment should wait until the list is cleared. Painting done under a home building contract also carries the two-year and six-year statutory warranties, whatever the contract says.
Disputes between owners, such as a disagreement over the colour scheme, a special levy or a refused renovation, follow the strata dispute path. Mediation through NSW Fair Trading is compulsory for most strata disputes, and the service is free. If mediation fails, the matter can go to the NSW Civil and Administrative Tribunal, known as NCAT, whose Consumer and Commercial Division manages strata cases. The application must include the mediation certificate unless it is one of the exempt types, such as an application to appoint a strata managing agent. Any owner can also put a motion to a general meeting, which can settle a disagreement before it reaches either body. Clear minutes and a written scope leave less room for argument once the scaffold is up.
Warning Signs in a Strata Painting Tender
Each strata tender should name the product for each surface, not just a paint brand. Dulux makes AcraTex Elastomeric 201, a flexible water-based coating that stretches over fine cracks, and Haymes makes the Ultra Premium range of interior and exterior paints. Zinsser makes Cover Stain, a primer sealer, and a primer is the first coat that helps the finish grip and seals stains or porous surfaces. Sealant around windows and joints should also be named, and Sika makes Sikaflex sealants while Selleys makes No More Gaps gap filler. Listing the number of coats and the product for each one makes a tender easier to check at the end of the job.
Several gaps in strata tenders need checking before the committee votes. Prices with no access line may assume equipment the site cannot take, or leave scaffold hire to the owners. Without provisional sums for render or timber, a quote leaves the owners exposed to variations once the walls are washed. Any contract over $20,000 with nothing about HBCF cover needs an answer before a deposit is paid. Tenders supplied through the strata manager should come with the written notice of any commission or connection. Rockcote makes render and texture coatings and Crommelin makes anti-graffiti coatings, so a quote for a ground floor wall that keeps getting graffiti can name the coating to be used.
Gaps and Warning Signs
A tender with no access line for a three-storey walk-up block.
A tender that names a paint brand but no product or coat count.
Getting Strata Tenders You Can Compare Fairly
Every painter should price the same written scope, so the committee needs one before tenders are invited. The scope should list each building, elevation and common area, the surfaces in each, the repairs known so far and the colour scheme. Add the strata plan number, the number of lots and storeys, the parking available for trade vehicles and any by-law limits on work hours. Painters need to see roof edges, balconies and stairwells before pricing, so one site meeting that every tenderer can attend saves repeat visits. To check the day work rate in a tender, compare it with the statewide figures in painter hourly rates in NSW.
Set the same deadline for every painter and request prices in the same layout, with lump sum, provisional sums, schedule of rates and access shown separately. Two tenders are the legal minimum for approved work of $30,000 or more, and three give the committee a wider spread. Where a building has shops or offices, the committee may want one tender from a firm that does commercial painting in NSW. Late tenders should be set aside, or every painter should be offered the same extension.
Other painting trades a building may need, from ceilings to fences, are listed under painting services in NSW, and owners repainting their own house can check house painting costs in NSW. Committees that want roof or gutter repairs done while the scaffold is up can compare roofing costs on the Central Coast before the vote. Eaves, fascias and gutters can be priced as separate items, so the committee can accept or leave them out without asking for fresh tenders. Keep the tenders, the minutes and the signed contract together, because the next plan review will need them. The same file helps the committee answer any question from a buyer of a unit in the building.
Strata Painters Across the Central Coast
Painting prices on this page apply across the Central Coast, from the Woy Woy Peninsula and Gosford to The Entrance and the northern lakes. Homes on steep or narrow sites can need extra access equipment, which can lift the price.
▶ Gosford and Surrounds 12 areas
▶ Woy Woy Peninsula and Brisbane Water 12 areas
▶ Terrigal, Erina and the Beaches 12 areas
▶ The Entrance and Tuggerah Lakes 12 areas
▶ Northern Lakes and Warnervale 12 areas
Central Coast Strata Painting FAQ
Why is my share of the repaint levy different from my neighbour's?
Does a repaint costing more than $30,000 need more than one quote?
Does a balcony wall or front door in a new colour need a strata vote?
Does a taller building on the Coast still need HBCF cover for a repaint?
What must the strata manager tell us if a painter pays them a commission?
Our 10-year capital works plan is six years old, so is a review overdue?
What happens to paint faults in a building less than two years old?
What licence does a scaffolder need on a three-storey walk-up?
How much notice do owners get before a special levy for painting is due?
Where do owners go if they cannot agree on the new colour scheme?
Strata Painting Specialists
Related Services
For Trades & Contractors - NSW
A strata repaint on the Central Coast can bring other trades onto the same scaffold. Waterproofers fix balcony membranes before the coating goes on, electricians replace corroded light fittings on stairwells, and bricklayers or renderers repair cracked walls. These services are booked alongside strata painting across the region.
Compare Central Coast Strata Painting Tenders
Tell us the building type, the number of lots and storeys, the areas to paint and any access limits, and compare tenders from local painters pricing the same scope.
Get Free Strata Painting QuotesAbout This Guide
This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Looking for more services across New South Wales? View all available trade services.
Reviewed by The Quote Yard Editorial Team
How The Quote Yard Works
We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.