Queensland Building Work on The Quote Yard
Start with a 6-month free trial. After trial, plans from $25/month or PAYG from $8 per job lead. Full details at thequoteyard.com.au/pricing-for-tradies.
Builder Jobs QLD 2026 - Get Residential & Commercial Building Leads
Looking for more building work as a licensed builder in Queensland? On The Quote Yard, homeowners, developers, body corporate managers and businesses may post projects for extensions and additions, raise and build under work, full home renovations, new custom homes, character home restoration, cyclone rated construction, flood and storm rebuild and commercial fit-out. Receive matched leads across Brisbane and Ipswich, the Gold Coast, the Sunshine Coast, Toowoomba, Rockhampton, Townsville, Cairns and the Darling Downs, quote directly to clients and keep 100% of what you win with no commission taken. Whether you hold a low rise, medium rise or open builder licence, the platform connects you with clients seeking prices for building work. Jobs range from one extension through to a full raise and build under.
Information on this page is general only - check current requirements with the relevant authorities.
Building Project Categories - Queensland 2026
| Project Category | Typical Scope | Licensing and Insurance |
|---|---|---|
| Extensions and additions | Rear extensions, deck and outdoor rooms, structural alterations, roof extensions | Builder licence; Home Warranty above $3,300; building approval by certifier |
| Raise and build under | House raising, new subfloor structure, ground level enclosure and fit-out | Builder licence; character overlay approvals where the house is protected |
| Full home renovation | Whole-house reconfiguration, services renewal, kitchens, bathrooms, external work | Builder licence; domestic building contract requirements apply by value |
| New custom homes | Single dwelling construction from siteworks through to final certificate | Builder licence; Home Warranty per project; wind classification governs design |
| Character home restoration | Pre-1947 timber and tin restoration, VJ lining, verandahs, casement windows | Character residential overlay controls demolition and external change |
| Cyclone rated construction | Construction to region C and D wind loads north of the designated line | Fixing certification checked at inspection; engineering design required |
| Flood and storm rebuild | Insurance funded reinstatement, raising to flood levels, resilient materials | Builder licence; insurer scope and reporting requirements apply |
| Commercial fit-out | Office, retail and hospitality fit-out, partitioning, services coordination | Licence class must match the building; higher public liability limits |
Builder Licensing in Queensland
Queensland builders need a licence for building work valued above $3,300, in the class matching the work, whether Builder Low Rise, Medium Rise or Open. Beneath that figure a licence is not required, though statutory warranties and work health and safety duties still apply, and specialist trades such as electrical and plumbing need their own licence at any value.
Home Warranty Scheme insurance attaches at the same $3,300 threshold, and licence holders must satisfy minimum financial requirements to keep the licence.
The Queensland Building and Construction Commission administers both the licence and the scheme.
Workplace safety is administered by WorkSafe Queensland. Tax obligations sit with the ATO, employment conditions with the Fair Work Ombudsman, national safety guidance with Safe Work Australia, standards with Standards Australia, and business registration through business.gov.au.
How The Quote Yard Works for Queensland Builders
How Queensland building projects are posted and matched
The Quote Yard connects licensed Queensland builders with homeowners, developers, body corporate managers and businesses posting projects directly. Somebody outlines what they want built, ticks the services involved, and publishes it. Builders covering that area receive an alert, weigh the project against their licence class and current capacity, and price it to the client with nobody sitting in between. Every enquiry starts with a person actively seeking prices, though some are still weighing whether to proceed at all. The platform's mechanics across every trade appear at find tradie jobs Australia.
Setting up your builder profile
Expect around a quarter of an hour to build a profile. Select your trade and the services you actually take on, mark coverage by suburb, postcode or radius, and upload a photo of your QBCC licence along with your insurance details. Credential checking is covered at how to check tradie licence and insurance.
Qualifying leads before you estimate
Pricing a building project consumes days, so filtering before committing that time protects the business. A client with drawings, a building approval and finance arranged is a different prospect from one with an idea and a number they heard somewhere. Asking about design stage, approval status and funding in the first call costs nothing.
Transparent pricing and no commissions
Six months of free access covers every category and area you nominate. Once it ends, membership runs from $25 monthly, or from $8 per lead where projects arrive irregularly. No share of contract value is taken, which weighs heavily at builder scale.
A $680,000 new home carries the same platform fee as a $7,500 deck, where a percentage service would take a five-figure sum from the same job.
Queensland Building Work in 2026: What's Available
Raise and build under
Lifting an existing house and building in underneath is a distinctly Queensland renovation path with no real equivalent in the southern states. The dwelling goes up on jacks, new stumps or piers are installed at the required height, a subfloor structure is framed, and the new ground level is enclosed and fitted out as living space. It suits the elevated timber housing that dominates Brisbane's older suburbs and it delivers substantial additional floor area without extending the footprint. Services relocation and certifier coordination run alongside the structural work. Few builders offer it, which keeps competition thin.
Character home restoration
Brisbane's character residential overlay protects thousands of pre-1947 timber and tin houses, controlling demolition and external change across whole suburbs. For builders that creates a continuous restoration market: VJ board replacement, bullnose verandah reconstruction, casement window repair, stump replacement and sympathetic extension to the rear where the streetscape is preserved. The approval pathway is more involved than standard renovation and it needs allowing for in the programme. Demolition applications are refused more often than granted.
Flood and storm rebuild
Queensland produces more weather-driven reconstruction than any other state. Flood events across Brisbane, Ipswich and the regional centres generate insurance-funded reinstatement running for years afterwards, while cyclone events in the north damage structures at a scale that supports rebuild programmes rather than individual jobs. Resilient materials and raising to flood planning levels increasingly form part of the scope. Related work is at insurance repair tradie work.
South East Queensland growth
Interstate arrivals keep estate construction moving through Ipswich, Logan, Redland, Moreton Bay and the northern Gold Coast. Project builders dominate detached housing in those corridors, while independent builders find custom builds for clients wanting more than a standard plan and the renovation work that follows as earlier releases mature. New build work is listed at new home build tradie jobs.
Body corporate and high-rise maintenance
Queensland's apartment stock across Brisbane, the Gold Coast and the Sunshine Coast is large relative to the state's population, and body corporate managers commission remediation and maintenance across whole buildings. Balcony and waterproofing rectification, facade repair and common property upgrades all fall to builders. Committee approval cycles and levy funding lengthen the decision process considerably.
Types of Building Projects Available in Queensland
Extensions and outdoor rooms
Extension work is the highest volume residential category in Queensland, and the climate shapes it. Covered outdoor rooms, decks and alfresco areas form part of most projects rather than sitting as extras. Tying new structure into elevated timber housing means dealing with stumps, uneven floors and framing that has moved over decades. Clients frequently remain in occupation, which shapes the programme.
Raise, build under and restumping
House raising is a specialised operation involving a raising contractor, engineering design for the new subfloor structure, and coordination with services and certifiers. The building work that follows is substantial: new stumps or piers, subfloor framing, enclosure, and a full fit-out at ground level. Restumping on its own is a related market driven by timber stumps reaching end of life. Carpentry on these projects is at carpenter jobs.
Full home renovation
Whole-house renovation brings structural work, services renewal, wet areas and external work into one contract without the advantage of a clean site. Termite damage, rotted subfloor timbers and non-compliant earlier work turn up during demolition as a matter of course. Provisional sums and prime cost items need setting at realistic figures, because the difference between allowance and actual is where these contracts sour. A contingency for what the demolition uncovers is prudence rather than pessimism.
New custom homes
Custom home construction runs from siteworks and footings through frame, lock-up, fit-out and final certificate. Wind classification drives the structural design and it varies dramatically across the state. Termite management measures must be designed in rather than added later, and the site classification governs footing design on reactive soils. Concreting work is at concreter jobs.
Cyclone rated construction in the north
Building above the designated line means working to region C or D wind loads, where the structural requirements exceed anything in the south. The load path from roof sheeting through to footings must be continuous and every connection is specified and certified. Engineering design is required rather than deemed-to-satisfy solutions in many cases, and fixing certification is checked at inspection. Southern experience does not transfer without adjustment. Material supply and specialist trades both need planning at distance.
Flood resilient rebuild
Rebuilding after a flood event frequently means raising the dwelling, relocating services above the flood planning level, and specifying materials that survive inundation. Insurance scope documents govern what is funded and what is not, and the gap between a reinstatement scope and a resilient rebuild is a conversation the builder usually has to lead. Reporting and payment cycles are set by the insurer rather than negotiated.
Body corporate and commercial work
Body corporate projects involve occupied buildings, a committee rather than a single decision maker, and funding through levies or a loan. Commercial fit-out covers office, retail and hospitality with fire and acoustic requirements and certifier involvement throughout. Access restrictions and after-hours work are standard on both. Related work is at commercial construction jobs.
QBCC Licensing, Warranty and Compliance in Queensland
Builder licence classes
Queensland issues builder licences by class, running from Builder Low Rise through Medium Rise to Open, with the class determining the building height and complexity you may take on. A Builder Restricted licence covers defined structures only. The classes track building categories rather than contract value, so a project outside your class is outside it regardless of how small the contract is. A company licence must nominate an individual as licensee nominee.
The $3,300 threshold and Home Warranty
Building work valued above $3,300 including labour and materials requires a licence, which captures almost anything a builder would quote. The same figure triggers the Queensland Home Warranty Scheme on residential construction work, with the premium paid before work commences and the notification lodged with the QBCC. Because the two thresholds coincide, most licensed residential work taken directly from an owner attracts the insurance as well.
Minimum financial requirements
Queensland ties licence retention to financial capacity in a way most states do not. Reporting obligations scale with annual turnover, with lower categories requiring an annual declaration and higher revenue bands requiring signed financial statements prepared to a specified standard. Permitted turnover is capped against your net tangible assets. A builder growing faster than the balance sheet crosses a category boundary and creates a licensing problem rather than only a cash flow one.
Project trust accounts
Queensland requires head contractors on eligible projects to hold subcontractor money in a project trust account rather than mixing it with working capital, with a retention trust account alongside it where retention is held. The regime has been extended in stages to progressively smaller contract values and to private sector work. Setting up and administering the accounts is an obligation with penalties attached rather than an optional protection. Confirm whether a project falls inside the current scope before contracting.
Building approvals and certifiers
Building approvals in Queensland are issued by private building certifiers rather than by councils, and the certifier inspects at defined stages through construction. Form certificates from engineers and installers feed into the approval and the final certificate cannot issue without them. Planning approval is a separate process again, applying in character residential overlays, flood overlays and various other controls across the state.
Character residential overlays
Brisbane and several other councils apply character residential overlays protecting pre-1947 housing, controlling demolition and external change across whole suburbs. Removing or substantially altering a protected dwelling requires planning approval that is refused more often than granted. For builders this shapes what is possible on a site before design begins, and raising a house to build underneath is frequently the compliant path where demolition is not.
ABN, GST and QLeave for Queensland Builders
ABN registration and PAYG withholding
An Australian Business Number is required by every builder and by every subcontractor engaged. Where a subcontractor supplies no ABN, you must withhold PAYG at the top marginal rate from the payment and remit it, an obligation falling on you rather than on them. Recording an ABN at engagement rather than chasing it at payment is what works. The requirement is published by the ATO.
Business structure and the licensee nominee
Most Queensland builders trade through a company given contract values and warranty exposure. The licence is held by the company but an individual must be nominated as licensee nominee, and that person carries obligations personally.
GST and progress claiming
GST registration is compulsory well below builder turnover levels, so the question is cash flow management rather than whether to register. Compulsory registration begins once turnover passes $75,000, a line crossed on a single Queensland contract. Progress claims fall due for GST in the activity statement period they are issued, whether or not the client has paid. Builders treating progress payments as available working capital find the shortfall at quarter end.
QLeave levy and portable long service
Queensland administers portable long service leave for building and construction through QLeave, covering employees along with many working subcontractors. A QLeave levy is payable on building work above a prescribed value before construction starts, and it is a project cost belonging in the estimate rather than an afterthought. The levy is separate from the contributions made for individual workers.
Insurance for Queensland Builders
Queensland Home Warranty Scheme
Home Warranty cover is statutory on residential construction work above $3,300, arranged per project through the QBCC with the premium paid before work commences. It responds where the contractor fails to complete the work or the work proves defective, protecting the owner rather than the builder. Because the threshold is so low, it applies to a far wider range of residential work here than the equivalent scheme does in other states.
Public liability and contract works
Public liability at builder scale generally means $10 million to $20 million, with body corporate, commercial and government projects specifying the higher end. Contract works insurance covers the project during construction, and in Queensland that matters more than almost anywhere because a summer storm can destroy a week of framing overnight. Flood exposure on a partly completed structure is a real consideration in the estimate.
Professional indemnity and design risk
Taking design and construct work means taking design liability, and professional indemnity has to cover it. On cyclone rated construction the exposure is sharper, because a departure from engineered detail carries structural consequences rather than cosmetic ones. Even on standard housing, substituting a detail or proposing a solution can transfer design risk without you intending it. Confirm in writing who carries design responsibility at contract stage.
Workers compensation and subcontractor cover
Employing anybody in Queensland requires a WorkCover Queensland policy, with premiums set by industry classification and wages paid. A subcontractor deemed a worker pulls you into the scheme whatever the engagement said. Collecting certificates of currency from every subcontractor before they start is the practical protection. Employment conditions are published by the Fair Work Ombudsman.
Contracts, Payment and Dispute Resolution in Queensland
Domestic building contracts by value
Domestic building contracts here are regulated by value, with level one and level two carrying different prescribed terms above their respective figures. Renovation and new home contracts routinely reach the higher tier. Using a standard industry contract rather than drafting your own is sensible, because omissions in prescribed content are held against the builder rather than the owner. Naming the exclusions prevents most later argument.
Security of payment and adjudication
Queensland's security of payment framework operates alongside the trust account regime, and as head contractor you receive payment claims from subcontractors and must respond with a payment schedule inside a defined period. Failing to respond adequately exposes you to adjudication on the full claimed amount. Diarising the response deadline the day a claim arrives is the practical discipline. General guidance is at subcontractor jobs.
Statutory warranties and defect liability
Statutory warranties attach to domestic building work and cannot be contracted out of. The QBCC operates a direction to rectify process, and a direction issued against a builder appears on the licence record and can affect future licensing. That makes engaging properly with a defect complaint materially different from ignoring it, because the consequence extends beyond the individual job.
Variations, provisional sums and prime cost items
Variations must be documented in writing before the work proceeds, and undocumented variations are difficult to recover on domestic contracts. Provisional sums and prime cost items need setting at realistic figures rather than attractive ones, because the gap between allowance and actual cost is where client relationships fail.
Dispute resolution pathways
Domestic building disputes run through the QBCC's early dispute resolution and direction to rectify processes before reaching the tribunal. Commercial matters take the adjudication or court route depending on the sum involved. Contemporaneous records, dated photographs and written variation approvals decide the outcome when a matter escalates beyond a site conversation. Organised documentation materially improves the outcome.
Site Safety Obligations and Risks
Principal contractor duties
Above the prescribed project value the builder becomes principal contractor, taking on duties no trade contractor carries. Those include a written safety management plan, controlling site access and induction, and coordinating the safety of every trade on site. Workplace Health and Safety Queensland inspects without notice. That duty stays with you whatever a subcontract says.
Heat management on site
Queensland builders manage heat exposure that southern states rarely approach, and it is a coordination duty rather than a personal one. Roof spaces, unventilated subfloors and exposed framing decks through summer reach conditions where heat illness develops within minutes. Early starts, scheduled breaks and shaded rest areas are practical site controls, and they belong in the programme rather than in a toolbox talk.
Working at heights and elevated housing
Falls remain the leading cause of construction fatalities, and Queensland's elevated timber housing puts workers at height even on single storey projects. As principal contractor you carry fall protection across every trade, including edge protection, scaffold adequacy and void protection. Raising work adds temporary structural stability to the risk picture.
Asbestos and pre-1990 housing
Any Queensland building constructed before 1990 should be assumed to contain asbestos until testing establishes otherwise, and on renovation the builder carries the identification and management duty. Queensland's postwar fibro stock is heavily affected. A register and management plan are required where it is present, and larger quantities and all friable material need a licensed removalist you engage. A day spent testing beats an exposure nobody can reverse.
Flood contamination and storm response
Flood restoration brings hazards ordinary construction does not, because floodwater carries sewage and chemical contamination and materials that dried out after an earlier event get disturbed again. Storm response work happens under time pressure with damaged structures of uncertain stability. Assessing before entering rather than afterwards is the discipline that keeps people out of hospital.
Practical Tips for Winning Better Queensland Projects
Understand the financial requirements before you grow
Minimum financial requirements catch out more Queensland builders than any other obligation, because they bite exactly when the business is going well. Crossing a category boundary triggers heavier reporting and a net tangible asset test against your permitted turnover. Engaging an accountant familiar with the thresholds before you approach one is far cheaper than resolving a licence issue afterwards. A good year is exactly when the threshold arrives.
Specialise in raise and build under
Raising work is a genuine Queensland specialisation with limited competition, because it requires coordinating a raising contractor, engineering design and a full ground level fit-out. The elevated timber housing stock across Brisbane's older suburbs guarantees demand, and character overlay controls frequently make raising the compliant alternative to demolition. Clients researching the option find few builders who do it well.
Register for insurance and storm response work
Queensland generates more weather-driven reconstruction than any other state, allocated through insurance builders, loss assessors and restoration companies rather than won through individual quotes. Panel registration is a documentation exercise that then delivers work arriving in volume after every event. The trade-off is rigid reporting and payment cycles set by the insurer.
Learn the character overlay pathway
Builders who understand what a character residential overlay permits and refuses can advise a client at the earliest conversation rather than after a wasted design fee. That knowledge wins the project, because an owner who has been told a rear extension is achievable while demolition is not will stay with the builder who explained it. The approval process is longer and it belongs in the programme from the start.
Set provisional sums truthfully
Understating provisional sums wins contracts and loses relationships, because the client meets the real number at selection stage and concludes they were misled. Honest allowances cost some jobs and save every relationship. On renovation work the exposure compounds, since termite damage and rotted subfloor timbers appear during demolition and each discovery moves the figure again.
Build a commercial and institutional stream
Schools, aged care operators, childcare providers and facilities managers commission construction and refurbishment on cycles unrelated to the housing market, which steadies a book that would otherwise follow residential demand. Programmes are fixed and invoices are paid to terms. Clearances apply where students or residents remain on site during the work.
Queensland Regional Market Overview
Brisbane and Ipswich
Brisbane carries the largest share of Queensland building demand and splits between character housing and growth construction. The inner and middle ring from Paddington through Ashgrove, Coorparoo, Camp Hill and Wilston holds thousands of protected pre-1947 houses generating restoration, raising and build under work at premium rates. Ipswich and the western corridor add estate construction on reactive clay that drives footing design. Brisbane leads are at tradie jobs Brisbane.
Gold Coast and Sunshine Coast
Both coasts combine apartment and body corporate remediation, holiday accommodation upgrades and continuing population growth. Building managers and committees control access to a large share of the work, and levy funding lengthens the decision cycle. Coastal exposure shortens the life of external finishes, which sustains a steady replacement stream. Leads sit at tradie jobs Gold Coast and tradie jobs Sunshine Coast.
Townsville, Cairns and the north
North Queensland construction runs under cyclonic wind requirements that southern builders never encounter, with engineering design and fixing certification checked at inspection. Cyclone events generate concentrated rebuild demand running for years afterwards. Material supply requires planning rather than a run to the merchant, and specialist trades are thinner on the ground. Work in the far north is listed at tradie jobs Townsville and tradie jobs Cairns.
Regional and rural Queensland
Smaller markets with light competition and long travel run through Toowoomba and the Darling Downs, the Wide Bay, Central Queensland and the mining centres. Toowoomba's reactive black soil drives footing design and generates continuing releveling work on older housing. Resource town demand tracks project cycles rather than population, which makes forward workload harder to predict than in the south east.
Standards and Compliance for Queensland Builders
National Construction Code and the Queensland Development Code
Volume Two covers houses and small buildings while Volume One governs apartments and commercial construction. A state development code sits over the national requirements here, adding provisions rather than replacing anything. Those provisions cover matters including sustainable buildings and water savings targets. Standards are published by Standards Australia.
Wind classification and cyclonic design
Queensland spans a wider range of wind regions than any other state, and the classification determines bracing, tie-down and connection specification throughout the structure. Above the designated line the requirements step into cyclonic territory, where engineering design replaces deemed-to-satisfy solutions in many cases. Assuming a regional default instead of assessing the actual site is where this most often goes wrong. Getting the classification wrong produces structural failure rather than a defect.
AS 3660 termite management
Queensland carries the highest termite pressure in Australia and AS 3660 sets the management requirements every project must satisfy. Physical and chemical barriers, inspection zones, clearance between ground and timber, and the treatment of penetrations all fall within scope. Termite management must be designed in at the outset rather than retrofitted, and a slab or deck that bridges an inspection zone creates a defect. Pest work is at pest control jobs.
Reactive soils and footing design
Site classification governs footing and slab design, and Queensland carries highly reactive soils through Ipswich, Toowoomba and the western Brisbane suburbs. Classification comes from geotechnical investigation rather than assumption, and building on a classification that proves wrong is expensive to remedy. Articulation requirements exist for a reason and building over them causes the cracking they were designed to prevent.
Waterproofing and defect exposure
Waterproofing failure tops every defect list for both frequency and cost, and the builder wears it regardless of who applied the membrane. Failures cluster at wet areas, balconies, planter boxes and wherever two trades meet. On body corporate remediation it is usually the reason the project exists. Inspecting and photographing membrane work before it is covered is the cheapest control available. Related trades are at waterproofer jobs.
Frequently Asked Questions - Builder Jobs QLD
What licence do I need to build in Queensland?
What are minimum financial requirements?
How do project trust accounts work?
What is raise and build under work?
How does the character residential overlay affect building work?
What changes when building in cyclonic regions?
How much insurance do I need?
Is flood and storm rebuild work worth pursuing?
Why does termite management matter so much here?
How does the free trial work?
Trades You Will Coordinate on Queensland Projects
Every trade on a Queensland site answers to the builder, and each of these categories carries work posted by clients and by builders seeking subcontractors.
Find Trade Work Across Queensland
Protecting Yourself as a Subcontractor
Once a developer or principal contractor sits between a Queensland builder and the client, exposures land on you that would otherwise rest elsewhere. Because the principal's insurance protects only the principal, a builder working in Queensland needs an independent policy, and it gets checked before entry. Add to whatever liability figure a Queensland contract sets: cover for levels, lasers and site tooling, plus income replacement, since a sole trader falls outside workers compensation.
Set the engagement down before you begin any building work in Queensland, no matter how well you know them, since a variation agreed across a bonnet and never written up is what ends up disputed. Length is not the point: what the building scope includes, what it excludes, the price or rate, when money is due in Queensland, and how a change gets agreed. A one line email back from the Queensland contractor costs nothing then and decides it later.
Record things while the building work is live across Queensland, because reconstruction later convinces nobody. Take images of the site as you found it, everything uncovered, and each stage before it was covered, and record which days you were on the Queensland job and what got completed. Queensland operates security of payment legislation giving a building subcontractor a statutory route to progress payments, and understanding it before you need it repays the hour. Substantial building contracts and unusual terms both justify a lawyer's hour, far less than a Queensland dispute would take.
General Information Only
This page provides general information only and is not professional advice of any kind. Details may change, so always verify with the relevant authorities and seek professional independent advice where needed.
Ready to Win More Building Projects in Queensland?
Get listed on The Quote Yard free and start receiving building project leads. Extensions, raise and build under, full renovations, new custom homes, character restoration, cyclone rated construction, flood rebuild, commercial fit-out and 200+ services with projects posted.
Sign Up Free and Find Building WorkTradie Job Leads In QLD – New Leads Posted Daily
| State | Territory | Job Leads | Major Cities |
|---|---|---|---|
| QLD | Queensland | QLD Job Leads | Brisbane, Gold Coast, Sunshine Coast, Cairns |
Find Building Work Across Queensland
Browse building projects by region across Queensland. The Quote Yard lists extensions and outdoor rooms, raise and build under projects, full home renovations, new custom homes, character home restoration, cyclone rated construction, flood and storm rebuild, body corporate remediation, commercial fit-out and 200+ services.
▶ Inner Brisbane 23 areas
Inner North
Inner South
Inner West
▶ Greater Brisbane 30 areas
Northern Suburbs
Southern Suburbs
Western Corridor
Ipswich & Logan
▶ Moreton Bay 18 areas
Redcliffe & Bayside
North Lakes & Caboolture
Redlands
▶ Gold Coast 25 areas
Northern Gold Coast
Central Gold Coast
Southern Gold Coast
Hinterland
▶ Sunshine Coast 15 areas
Coastal
Inland & Hinterland
▶ Darling Downs & South West 17 areas
Toowoomba
Darling Downs
South West
▶ Central & Wide Bay 18 areas
Wide Bay
Capricornia
Mackay & Whitsunday
▶ North & Far North 19 areas
Townsville
Cairns
Far North & Gulf
Reviewed by The Quote Yard Editorial Team
How The Quote Yard Works for Tradies
The Quote Yard is a job lead platform that connects licensed builders and building contractors with customers posting work across Australia. We do not perform any trade work ourselves. You quote directly with the customer. Always ensure your licence, insurance, and scope of work are current before accepting any job.