Planning an Exposed Aggregate Pour in Queensland?
Tell us your suburb, the area in square metres, photos of the ground and kerb, the stone colour you like and whether old concrete must come out. Concreters then work from one shared description, which keeps every price tied to the same slab.
Queensland Exposed Aggregate Price Guide
These figures are 2027 estimates for exposed aggregate work in Queensland. Your price depends on the stone, the slope, the soil, the access for the truck and whether a council crossover, a pump or the removal of an old slab is part of the job.
Queensland Exposed Aggregate Concreters for Hire: Stone Choices, Sealing and Costs
Exposed aggregate is concrete with its top film of cement washed away, so the stones in the mix show at the surface. Queensland price guides put it at about $130 to $200 a square metre for 2027, against roughly $80 to $130 for plain concrete. A double driveway of about 40 square metres is estimated at $5,500 to $8,500, and sealing the finished surface usually costs extra. Breaking out an old slab, building a council crossover and pumping concrete up a steep block are usually priced as separate items. Most of the look comes from the stone, so ask to see the local quarry colours your concreter can order before choosing. The wash that reveals the stone must happen at the right moment, so the crew's timing on the day matters as much as the price. When we checked, building work valued over $3,300 needed a licence from the Queensland Building and Construction Commission (QBCC). Home warranty insurance does not apply to a driveway or path built by itself, which puts extra weight on a clear signed agreement. State environment law lists cement washed off to expose aggregate as a water contaminant, so the wash water must stay out of street drains. In Brisbane, building or changing a residential driveway needs a council permit, and other councils set their own driveway rules. Sewer covers and water meters must stay easy to reach once the new slab is finished. List the job free on The Quote Yard, and concreters near you in Queensland can send written prices for the pour.
At a Glance - Exposed Aggregate in Queensland, 2027 Estimates
| Job | Price Range | How It Is Charged | What Drives It In Queensland | Who Can Do It |
|---|---|---|---|---|
| Exposed aggregate slab | $130 - $200 per sq m | Supplied and laid per square metre | Stone, slope and access | Licensed concreter over $3,300 |
| Brisbane exposed driveway | $130 - $180 per sq m | Supplied and laid per square metre | Kerb access and crossover | Licensed concreter |
| Plain concrete, for comparison | $80 - $130 per sq m | Supplied and laid per square metre | Base work and thickness | Licensed concreter |
| Double driveway, about 40 sq m | $5,500 - $8,500 | Whole job | Removal and pump needs | Licensed concreter |
| Darling Downs exposed driveway | $115 - $180 per sq m | Supplied and laid per square metre | Travel and plant distance | Licensed concreter |
| Exposure premium over plain | $30 - $80 per sq m | Added to the plain rate | Retarder, washing and sealing | Concreter |
| Breaking out an old slab | $40 - $80 per sq m | Each square metre | Mesh, thickness and access | Concreter or demolition crew |
| Council kerb crossover | $2,500 - $8,000 | Whole crossing | Council standard and gradient | Concreter with council permit |
| Sealing a decorative finish | $15 - $40 per sq m | Per square metre | Sealer type and coats | Concreter or sealing business |
| Concrete pump | $900 - $1,800 | Per pour | Distance from the kerb | Pump hire through the concreter |
| Soil test | $400 - $800 | Per test | Reactive clay on the block | Soil tester or engineer |
| Seeded stone or patch matching | Priced on quote | Per job | Stone supply and batch | Concreter |
What Pushes an Exposed Aggregate Price Up
What Exposed Aggregate Means on a Queensland Driveway
Exposed aggregate concrete is an ordinary slab whose top skin of cement paste is removed so the stones in it show at the surface. Aggregate is the crushed rock, gravel and sand that make up most of any concrete mix. In a decorative mix the coarse stones are chosen for colour and shape, because they become the finished face of the slab. The result is a pebbly, textured surface found on Queensland driveways, front paths, patios and outdoor living areas. Plain slabs, footings and general pours are covered in the state guide to concreting services, so this page keeps to the stone, the reveal and the rules around it. Pebble finishes near water have their own barrier and grip questions, which the guide to concrete pool surrounds works through.
Queensland concreters usually reach the finished look in one of two ways, and both end with a careful wash. In the first, the decorative stone is already in the truck mix, and the surface is sprayed with a retarder, a liquid that slows the setting of the top layer. In the second, called seeding, extra stones are scattered over a fresh plain slab and pressed in before the surface is exposed. Either way the crew later washes or brushes off the soft paste, and the timing of that wash decides how much stone shows.
A pebble face is one of several decorative choices, and it helps to compare them before booking anyone. Patterns pressed into fresh concrete with rubber mats are explained under stamped concrete, while pigment tinted slabs are covered under coloured concrete. A tired slab that is still sound can sometimes take a new top layer through concrete resurfacing instead of being broken out. Exposed aggregate suits people who want texture and grip, and a surface that hides tyre marks and fallen leaves better than smooth grey concrete. It is harder to patch invisibly later, so the stone and the layout deserve more thought than they would on a plain slab.
Exposed aggregate is laid by concreters, and the work runs through the same steps as any outdoor slab until the final wash. The ground is dug and compacted, timber or steel edging called formwork is set out, and steel mesh is placed on small stands called chairs. Concrete is then placed, levelled and treated so the stone can be revealed, after which joints are cut and the surface is sealed. Each of those stages can go wrong in a way that only shows later, which is why this guide asks for so much in writing.
Exposed Aggregate Prices in Queensland for 2027
Queensland price guides estimate exposed aggregate at about $130 to $200 a square metre for 2027, laid on a prepared base. Around Brisbane, the estimate for a driveway is about $130 to $180 a square metre. Plain broom-finished concrete sits at about $80 to $130, so the stone and the reveal add roughly $30 to $80 a square metre. A double driveway of about 40 square metres is estimated at $5,500 to $8,500 in an exposed finish. Around Toowoomba and the Darling Downs, guides put exposed driveways at about $115 to $180 a square metre, and the state guide to driveway installation compares other surfaces. These are 2027 estimates, and the final figure turns on access, slope, soil and the stone you choose.
Several extras sit outside the square metre rate and should appear as separate lines. Removing an old slab is put at $40 to $80 a square metre, and a council kerb crossover, the section from your boundary to the road, at $2,500 to $8,000. Where the truck's delivery chute cannot reach the back of the block, a concrete pump adds about $900 to $1,800. Jobs under 20 square metres often carry a minimum charge of $1,500 to $2,500, a point the Brisbane concreter guide also makes. Seeded stone, a sample panel and matching an older pebble slab are all priced on quote, since they depend on stone supply and labour.
| Item | Typical Cost, 2027 | Charged By | What Changes It |
|---|---|---|---|
| Exposed aggregate, statewide | $130 - $200 per sq m | Laid complete | Stone choice and access |
| Brisbane driveway | $130 - $180 per sq m | Laid complete | Kerb gradient and crossover |
| Darling Downs driveway | $115 - $180 per sq m | Laid complete | Distance to the batch plant |
| Plain concrete, for comparison | $80 - $130 per sq m | Laid complete | Base and thickness |
| Double driveway, about 40 sq m | $5,500 - $8,500 | Whole job | Removal, pump and slope |
| Thicker slab, 125 to 150 mm | Add $15 - $30 per sq m | Extra on top of the slab rate | Vehicle loads and council standard |
| Steel reinforcement | $8 - $20 per sq m | Each square metre | Mesh size and bar |
| Old slab break-out and removal | $40 - $80 per sq m | Each square metre | Mesh inside the old slab |
| Spoil removal | $250 - $400 per load | Per truck load | Volume of soil dug out |
| Exposed driveway sealing | $1,000 - $3,000 | Whole driveway | Area and number of coats |
| Stripping a failed sealer | $10 - $25 per sq m | Each square metre | Old coating type |
| Seeded stone topping | Priced on quote | Per job | Stone supply and labour |
Picking a Stone From Queensland Quarry Ranges
The stone is the reason to choose this finish, so look at real samples before anyone books a truck. Boral makes its exposé exposed aggregate concrete for South East Queensland using aggregates from local quarries, in colours such as Pearl, River Red, Salt and Pepper and Ocean Floor. Holcim makes Geostone decorative concrete from natural Australian stone, offered with exposed, polished, honed (lightly ground) and coloured finishes. Heidelberg Materials makes imagecrete exposed, part of a decorative concrete range that also covers coloured and polished floors. Boral publishes separate ranges for South East Queensland, Far North Queensland and the Darling Downs, so colours differ with your location.
Wagners makes ready mix and decorative concrete from batch plants, the depots where concrete is mixed, running from the Gold Coast to the Sunshine Coast and west to Toowoomba. Neilsens makes concrete and quarry products as an independent Queensland supplier, and it lists an exposed concrete range. A sample board is only a guide, and Boral warns that some variation in appearance may occur from batch to batch. Ask the concreter to order the whole pour from one plant on one day, and to keep the delivery dockets that name the mix. Those dockets make it far easier to order a close match if part of the driveway is ever replaced. Photograph the sample board you approve as well, with its name visible, and attach that photo to the signed quote.
Stone shape changes how the surface feels as much as how it looks. Rounded river pebbles feel smoother under bare feet, while crushed stone has sharper faces that give a rougher, grippier texture. Smaller stones pack closely and read as an even speckle, while larger stones show more individual colour and more cement between them. The depth of exposure matters too, because a light wash shows the tops of the stones and a heavier wash shows more of each one. Agree the depth by pointing to a finished slab or a sample, rather than relying on words such as light or medium.
Questions to Settle About the Stone
| Maker | Range Named on Its Site | What the Maker Says | What to Ask |
|---|---|---|---|
| Boral | exposé exposed aggregate | Aggregates from South East Queensland quarries | Which regional range applies to you |
| Holcim | Geostone | Natural Australian stone in exposed and other finishes | Which colours the local plant pours |
| Heidelberg Materials | imagecrete exposed | Part of a colour, polished and exposed range | Whether the range is offered near you |
| Wagners | Decorative and architectural concrete | Plants from the Gold Coast to Toowoomba | Which plant is closest to the job |
| Neilsens | Exposed concrete | Independent Queensland concrete supplier | Current colour samples to view |
Colour also changes once the slab is sealed, so look at samples both dry and wet before choosing. A wet sample gives a rough idea of how a film-forming sealer will deepen the tones of the stone. Ask which colours in the range hide oil drips, dust and red soil best, since the concreter will have seen many finished drives age. Think about the colour of the house, the roof and the garden beds, since the driveway is often the largest hard surface on the block. If you cannot decide, ask the concreter for addresses of finished jobs in your area that you can view from the street.
Retarder, Wash-Off Timing and Queensland Building Hours
Sika makes Sika Rugasol C, a liquid retarder sprayed onto freshly placed concrete once the bleed water has gone and before the surface starts to set. Bleed water is the thin film of water that rises to the top of a new slab soon after it is placed. According to Sika's data sheet, the soft paste is brushed off after roughly 2 to 12 hours, depending on the mix, humidity, temperature and wind. The stone is then washed with clean water and a curing compound is applied, which slows moisture loss so the concrete keeps gaining strength. Washing too early can loosen stones, while washing too late leaves a cloudy cement film that is hard to shift. The crew judges that window on the day, which is why experience counts for more with this finish than with plain concrete.
Under Brisbane City Council rules at the time of writing, audible building noise was barred from 6.30pm to 6.30am on Monday to Saturday, and on Sundays and public holidays. Council also named concrete pouring as noisy work that builders should discuss with nearby residents before it starts. Because the wash can come many hours after the pour, an early start helps keep pumps, vibrators and pressure washers inside permitted hours. Other councils set their own building noise rules, so ask the concreter which hours apply at your address.
On a seeded job, the crew places a plain mix, scatters the chosen stone by hand and presses it in with a float, a flat finishing tool. Seeding lets a small path or patio use a stone that is not offered in a ready mix from the local plant. It takes more labour for each square metre, which is one reason seeded work is usually priced on quote. Ask how much stone will be ordered, since running short halfway through leaves bare patches that cannot be fixed later. Ask too whether the seeded area will be poured on the same day as the rest, so the wash timing stays consistent.
| Stage | Typical Timing | Who Does It | What to Watch |
|---|---|---|---|
| Base, formwork and mesh checked | Day before or early morning | Concreter | Levels, falls and mesh on chairs |
| Concrete placed and levelled | Early in the working day | Concreter | Truck access and pump position |
| Retarder sprayed on | After bleed water clears | Concreter | Even cover across the slab |
| Paste brushed and washed off | Per the retarder data sheet | Concreter | Wash water held on site |
| Curing compound applied | Straight after the wash | Concreter | Product named on the quote |
| Control joints saw-cut | As the concreter schedules | Concreter or saw cutter | Dust and slurry controls |
| Sealer applied | As the sealer maker directs | Concreter or sealing business | Temperature limits on the label |
Pour day also needs room for a heavy truck, and sometimes a pump, close to the front of the block. Move cars off the driveway and street frontage the night before, and tell neighbours who share a kerb or a narrow street. Old paths, garden edges and lawn beside the work area can be cracked or rutted by barrows and hoses, so agree how they will be protected. If the truck must cross an existing slab, ask whether boards will be laid to spread the load. Keep children and pets well away from the chute, the pump line and the wet surface until the wash is over. Leave a garden tap free for the crew, because the reveal needs a steady supply of clean water.
Cement Wash Water and the Contaminant Rules
Washing off the retarder creates grey, gritty water full of fine cement, and it runs wherever the slope sends it. Schedule 10 of the Environmental Protection Regulation 2019 lists building materials, including cement and concrete, as prescribed water contaminants. When we checked, the schedule gave cement washed to create an exposed aggregate treatment as a worked example of that item. A prescribed water contaminant is a substance that must not be released into roadside gutters, stormwater drains or waterways. Council guidance says allowing polluted wastewater into those places is an offence under the Environmental Protection Act 1994. Councils and the state environment department both enforce these rules on building sites, so the wash plan belongs in the written quote.
Most crews hold the wash water behind a temporary bund, a low barrier of sandbags or soil, so it cannot reach the kerb. The water can then be pumped into drums or a settling container, so the cement fines sink to the bottom. The settled solids are dried and taken away with the building waste rather than tipped onto the verge or into a drain. If the yard already sends roof and surface water to a kerb outlet, a plumber who handles stormwater drainage can show where those pipes run. Ask who sweeps the footpath and road at the end of the day, because tracked slurry should be swept up, not hosed away.
Soil is a problem on the days before the pour as well, because dug ground washes easily in a storm. Logan City Council lists soil and sediment from building and development sites among the pollution types it deals with. Ask the concreter how loose spoil, the soil dug out for the base, will be stockpiled, covered or removed while the base is open. A strip of turf or a sediment fence, a low fabric barrier that traps mud, along the low side of the block keeps mud out of the gutter until the slab is down.
Wash Plan to Settle Before the Truck Comes
The QBCC Concreting Licence and Contract Levels
The Queensland Building and Construction Commission (QBCC) concreting class allows a contractor to place formwork, fix reinforcement and pour concrete. That formwork holds the wet concrete in shape until it sets, and the mesh inside controls cracking. When we checked, the QBCC said building work valued over $3,300 must be done by a contractor holding the right licence. For home warranty purposes, the QBCC counts materials, labour and GST in that value, so most driveways pass it easily. Ask to see the licence card or the digital licence on the contractor's phone, and check the name and class on the QBCC register.
Contracts follow the same value lines, and the paperwork changes as the price rises. Below $3,300 no written contract is required, although the QBCC still recommends a written record of what was agreed. A Level 1 contract, for work from $3,301 to $19,999, must be written, dated, signed and agreed before work begins. It must describe the work, state the price and completion date, and include a notice about your cooling-off rights, a short period to change your mind. For $20,000 or more, a Level 2 contract adds a start date, a price change warning and the QBCC Consumer Building Guide before signing. Within five business days of signing, you should receive a complete copy of the contract signed by both sides.
| Contract Value | Contract Type | Maximum Deposit | What Else Applies |
|---|---|---|---|
| $3,300 or less | No contract required | 20 per cent | Written record still recommended |
| $3,301 to $19,999 | Level 1 contract | 10 per cent | Cooling-off notice and signed copy |
| $20,000 or more | Level 2 contract | 5 per cent | Consumer Building Guide before signing |
| Progress payments | Both levels | Not applicable | Must match the work completed |
Deposits are capped too, at 10 per cent of the price for Level 1 work and 5 per cent for Level 2 when we checked. Each progress claim has to reflect work already finished on site, not a date reached on the calendar. For a decorative driveway, sensible stages are excavation and base, the pour and wash, then sealing and clean-up. Paying ahead of the contract schedule can weaken your position if the job stalls or the work is defective.
Pebble Driveways, Paths and the Limits of Home Warranty
The Queensland Home Warranty Scheme is insurance set up by state law that covers most residential building work valued at more than $3,300. When we checked, the QBCC listed driveways, paths, fences and landscaping among items that need no home warranty insurance when done on their own. If those items are part of a bigger building project, they are covered only for non-completion, not for defective work. So a stand-alone pebble driveway relies on the contract, the contractor's licence and the consumer law if something goes wrong. That gap is a good reason to agree the stone, thickness, mesh, falls and sealer in writing before the first payment.
If a defect appears, the QBCC says the first step is to raise it with your contractor. Its Standards and Tolerances Guide, the published benchmark for acceptable building work, is the first reference for deciding whether cracking, ponding or loose stones fall outside accepted limits. The QBCC also runs an early mediation and conciliation pathway, where a neutral officer helps both sides agree on a repair. Under the Australian Consumer Law, which protects buyers nationally, the ACCC expects a service business to use acceptable care and skill in its work. Keep the quote, the dockets, and photos of the base, mesh and wash in one folder, since that record carries weight in any dispute. If the business stops responding, the QBCC can tell you which complaint or dispute pathway suits the problem.
| Situation | Home Warranty Position | What Protects You | Paperwork to Keep |
|---|---|---|---|
| Driveway or path on its own | No home warranty insurance needed | Contract, licence and consumer law | Contract and stage photos |
| Driveway within a new home build | Non-completion cover only | Builder contract and licence | Builder contract and schedule |
| Patio slab under a new roofed structure | Check with the QBCC | Contract and licence | Approval documents if any |
| Repair of an existing pebble slab | Depends on value and scope | Written quote and licence over $3,300 | Quote, invoice and photos |
Council Driveway Permits and a Pebble Face at the Kerb
In Brisbane, anyone who wants to build, repair or modify a residential driveway must apply to council for a permit. Council describes a residential driveway as one that gives car access to a single detached house, while other driveways need a commercial permit. For a fully assessed application, the site plan should show the proposed finish, such as broomed or exposed aggregate concrete. When we checked, the permit stayed valid for 12 months, and council's target for deciding a complete application was 20 working days. Allow for that time before locking in a pour date, because the crossing is often poured on the same day as the driveway. The crossing sits on council land, so a mistake there can mean council asks for it to be broken out and rebuilt.
Council's technical standards for driveways listed two preferred finishes, stencilled concrete and broom-finished concrete. They required a solid, non-slip surface, with concrete 125 millimetres thick and graded N25, meaning a strength of 25 megapascals, the unit used for concrete strength, at 28 days. Expansion joints, the foam-filled gaps that let sections of slab move, had to be 10 millimetres thick and run the full depth, using closed-cell, cross-linked polyethylene foam. The steepest allowed slope was 1 in 4 inside the boundary and 1 in 6 outside it, and tiles, gravel and bluestone were not permitted. Ask whether the pebble finish can run past your boundary, or whether the section to the kerb must change finish, a point the paving and driveway guide raises for pavers too.
| Item | Standard When We Checked | What It Means for You | Who Confirms It |
|---|---|---|---|
| Permit | Needed to build, repair or modify | Apply before booking the pour | Brisbane City Council |
| Preferred finish | Stencilled or broom finished | Ask about a pebble face near the kerb | Council assessment |
| Concrete thickness | 125 mm, N25 strength | Quote should match or exceed it | Concreter |
| Expansion joints | 10 mm full-depth closed-cell foam | Joint product named on the quote | Concreter |
| Slope inside boundary | No steeper than 1 in 4 | Steep blocks may need redesign | Concreter and council |
| Slope outside boundary | No steeper than 1 in 6 | Kerb levels set the design | Council standard drawings |
| Permit life | 12 months from issue | Pour before it lapses | Brisbane City Council |
Councils elsewhere in Queensland set their own crossover rules, standard drawings and fees, and they can differ from Brisbane in finish and thickness. Guides estimate council application and inspection fees at about $200 to $800, separate from building the crossing itself. If an electric gate will sit across the new drive, plan the conduit before the pour, and talk to a business that does automatic gate installation about footing positions. Ask your concreter to lodge the permit or show you the approval, and keep a copy with the contract.
Clay Soils, Falls and Joints Under a Pebble Surface
The QBCC notes that most Queensland homes are built on clay soils, and that wet and dry seasons can cause sudden swelling and shrinking. Reactive clay is soil that changes volume as its moisture changes, and that movement can lift or crack a slab laid on it. A crack across a pebble surface is harder to hide than one in plain concrete, because a patch rarely matches the stone. Ask whether a soil test is worthwhile, since guides estimate one at about $400 to $800. Where the ground needs cutting, filling or compacting, an excavation and earthmoving crew may prepare it before the concreter arrives.
The QBCC says problems with driveways and paths remain among the most common types of defective building work reported to it. Its guidance calls for uniform, well-compacted ground with all soft spots removed before concrete is placed. It also warns about steel mesh that drops to the bottom of the slab, where it does little to control cracking. ARC makes reinforcing bar and mesh that it describes as Australian made, and spacers called chairs hold the mesh at the right height. Isolation joints are soft strips that separate the slab from walls and other rigid structures, so movement does not pass between them. Fosroc makes Expandafoam, a closed-cell polyethylene joint filler used in concrete and masonry pavement joints.
Falls are the gentle slopes that carry water off a slab, and the QBCC says paths and driveways should fall away from the home. Small changes in level can leave water pooling at slab edges and entering weep holes, the small gaps at the base of brick walls. Paths must also keep clear of damp-proof courses, the moisture barrier near the base of a brick wall, and must not bridge termite barriers, so ask a termite inspection business where your barrier runs. Where water collects against the house, a subsoil drainage line, a buried slotted pipe that carries groundwater away, may be needed before the new slab goes down.
Trees matter as well, because roots draw moisture from clay and can make the ground shrink unevenly under a slab. The QBCC suggests planting thirsty trees well away from the home and warns that removing a well-established tree can also cause ground movement. If a large tree sits beside the planned driveway, ask an arborist about its roots before the formwork goes in. Roots cut during excavation should be cut cleanly rather than torn, and the concreter should not pile spoil around the trunk. Planning the slab edge and the garden bed together saves breaking out concrete later to deal with a lifting root.
Base and Joint Checks Before the Truck Arrives
Sewer Covers, Water Meters and Buried Services
Water and sewerage in South East Queensland are run by different providers depending on the council area. When we checked, Urban Utilities served Brisbane, Ipswich, Lockyer Valley, Scenic Rim and Somerset, and Unitywater served Moreton Bay, Sunshine Coast and Noosa. Councils supplied these services in the Logan, Redland and Gold Coast areas. Urban Utilities' asset protection standards require a clear zone open to the sky extending 1 metre around the edge of a sewer maintenance cover. A maintenance cover is the lid over an access point to the sewer, often found in front or back yards.
Unitywater asks owners not to cover or bury maintenance holes, and not to lower, raise or move them without approval. Where a cover must change height, the water business does that work, so ask early rather than pouring around it. Water meters must stay easy to reach and read, with a lid that lifts off freely after the new slab is finished. The free Before You Dig Australia enquiry service shows network plans before digging, but those plans are indicative only and may miss pipes inside the boundary. For private lines such as house drains and garden taps, a skilled locator or a business offering plumbing services can mark them first.
| Area | Water and Sewer Provider | Check Before the Pour | Who to Ask |
|---|---|---|---|
| Brisbane, Ipswich, Lockyer Valley, Scenic Rim, Somerset | Urban Utilities | 1 metre clear zone around sewer covers | Urban Utilities |
| Moreton Bay, Sunshine Coast, Noosa | Unitywater | Covers left uncovered and at their set height | Unitywater |
| Logan, Redland, Gold Coast | Local council | Council rules for covers and meters | Your council |
| Any block | Network owners through BYDA | Free plans before any digging | BYDA enquiry |
| Pipes inside the boundary | Owner | Private drains, taps and conduits marked | Plumber or locator |
A new slab is also the cheapest moment to lay sleeves, the empty pipes that let cables or hoses pass under concrete later. Garden lights, a gate motor or an irrigation line across the drive all need a path under the slab, and outdoor lighting installation is far simpler with one in place. Any fixed wiring through those sleeves must be installed by a licensed electrician once the slab is finished. Mark each sleeve end with a peg and a photo, because the stone surface gives no clue where they run.
Cutting Control Joints Without Spreading Silica Dust
Control joints are straight grooves cut into the slab so that shrinkage cracks form along neat lines rather than at random. Many crews cut them with a concrete saw after the slab has hardened enough to hold a clean edge. Cutting, sawing and grinding concrete can release respirable crystalline silica, a very fine mineral dust that damages lung tissue over time. A WorkSafe Queensland code of practice on silica dust in construction commenced on 1 May 2023 and applies to all construction work. Its controls include water suppression, on-tool dust extraction and suitable respiratory protection for workers at risk. Husqvarna makes floor saws for groove cutting and floor cutting of concrete slabs, and the crew should explain how theirs is fitted for dust control.
Keep children and pets indoors while joints are being cut, and close windows on the side of the house facing the work. Wet cutting produces slurry as well, and that slurry belongs in the same contained wash plan as the exposure water. Ask whether the joints will be cut by the concreter or a separate saw cutter, and whether that visit is in the price. Joint spacing should be marked on a drawing, so you can see where the lines will fall across the stone.
| Task | What It Releases | Control to Ask For | Your Part |
|---|---|---|---|
| Saw-cutting control joints | Silica dust or wet slurry | Water feed or on-tool extraction | Keep people and pets away |
| Grinding a high edge | Fine silica dust | Extraction fitted to the grinder | Close nearby windows |
| Breaking out an old slab | Dust and rubble | Water spray while breaking | Move cars and outdoor furniture |
| Washing off the retarder | Cement wash water | Bund and settling container | Check the gutter stays clean |
| Sweeping up at day end | Dry dust | Damp sweeping or vacuum | Ask about the clean-up method |
Sealers in Strong Sun: What the Data Sheets Say
Dulux Avista makes an exposed aggregate concrete sealer, a solvent-based, semi gloss clear coating for new and older exposed surfaces. Its technical data sheet rates its resistance to UV light, the part of sunlight that breaks down many coatings, as very good. The same sheet says not to apply the sealer below 8°C or above 35°C, and it allows foot traffic after 24 hours. Vehicles should stay off for at least five days with that product, so plan parking before the sealing day. It also warns that sealing exposed aggregate on an incline may make the surface slippery, particularly when wet. Crommelin makes DiamondTough clear sealers aimed at paving and concrete surfaces, and it presents itself as an Australian manufacturer.
Boral suggests resealing decorative concrete every few years to keep it looking its best. Dulux Avista advises a cross hatch test if a surface was sealed more than two years ago, which means scoring a small grid and checking whether tape lifts the old coat. Guides estimate sealing a decorative finish at $15 to $40 a square metre, and the state guide to driveway sealing compares sealer chemistry in more depth. Boral advises against harsh chemicals and high-pressure washing on exposed concrete, while Kärcher's driveway guide says exposed aggregate can handle higher pressure settings. Kärcher makes pressure washers and the T 7 Plus surface cleaner, so test any machine on a hidden corner before cleaning the whole drive. For heavy stains or mould before a reseal, a concrete and paver cleaning business can assess the surface first.
Sealer Points Taken From Maker Data
Sealers broadly fall into two groups, and the choice changes both the look and the upkeep of a pebble surface. Film-forming sealers sit on top of the concrete and add sheen, which deepens the stone colour but can wear in tyre tracks. Penetrating sealers soak into the surface and leave the stone looking close to natural, with little or no shine. Guides estimate sealing a whole exposed driveway at about $1,000 to $3,000, depending on area and the number of coats. Whichever type you choose, ask whether the first coat is included in the main price or listed as a separate stage.
Widening an Older Pebble Driveway Without a Patchwork Look
A common Queensland job is widening an existing exposed driveway, or adding a path or a parking pad beside it. New concrete rarely matches an old pebble slab exactly, because the quarry face, the batch and years of sun all change the look. Many owners choose a deliberate contrast instead, such as a plain border or a saw-cut line that separates old from new. Cleaning and resealing the old slab at the same time often brings the two surfaces closer in tone. Cracked edges and lifted sections in the existing slab can go to a concrete repair specialist before the new pour is planned.
Where the old driveway must come out, guides estimate break-out and removal at $40 to $80 a square metre. Broken concrete is heavy, so check whether the crew takes it away or whether you need skip bin hire for the rubble. Rusting steel and flaking concrete on an old carport slab can point to concrete cancer, which needs its own repair plan. Ask for any matching attempt to be trialled on a small panel first, with the cost of that panel shown on the quote.
| Option | How It Looks | Cost Basis | Best For |
|---|---|---|---|
| Same mix, butt-jointed | Close but rarely identical | Priced on quote | Recent slabs from a known plant |
| Plain concrete border | Clear frame between old and new | Plain concrete rate | Older or faded pebble slabs |
| Contrasting stone colour | Deliberate two-tone design | Exposed aggregate rate | Wide extensions and parking pads |
| Clean and reseal both | Tones drawn closer together | Sealing rates per square metre | Any join between old and new |
What to Look Out For on a Queensland Exposed Aggregate Job
A cheap quote that leaves out the base, the crossover or the sealer stops being cheap once those items return as variations. A variation means any change to the scope or the price, so insist on seeing it signed off on paper before the crew carries it out. Look for the stone colour, the supplier, the slab thickness and the mesh written on the quote, not just the words exposed finish. Check that the wash water plan is described, since grey water in the gutter is an offence rather than a small housekeeping matter. Be wary of anyone who asks for a deposit above the QBCC limits, or who cannot show a concreting licence for work over $3,300. Check whether the council permit, the joint cutting and the clean-up are included or listed as extras.
Ask how the crew will handle a sudden storm on pour day, and whether a lost pour is rescheduled at their cost or yours. On sloping blocks, ask how the low edge will be retained, and whether a retaining wall is needed before the slab goes in. Payment stages should match finished work, with the largest amount paid only after the wash and the clean-up are done. Ask for the sealer data sheet and the curing product name, so you know when cars can return.
Watch for a quote that relies on photos alone, since nobody can judge clay, fill or a buried sewer cover from a picture. Be cautious if the concreter says no permit is needed for a driveway that reaches the kerb, and check with your council directly. A crew that plans to wash the surface late in the evening may run into building noise limits, so ask about the start time. Ask what happens to leftover concrete in the truck, because it should go back to the plant rather than into your garden. A short, clear answer to each of these questions is a good sign that the concreter has done this finish many times.
Marks of a Thorough Exposed Aggregate Quote
Getting Exposed Aggregate Quotes That Name the Stone and the Sealer
Give each concreter an identical written outline listing the slab size, the stone you like, and photos of the ground and kerb. Mark the sewer cover, water meter, downpipes and any old slab on a simple sketch of the block. Ask each concreter to visit before quoting, because slope, soil and truck access rarely show clearly in photos. Ask all of them to split their price the same way, with base work, concrete, exposure, joints, sealing, removal and the crossover on separate lines. Compare the quotes one line at a time, since a higher total that includes sealing and the permit may be the better value. Where two quotes name different stone colours, view both on real slabs before deciding on price alone.
Check the proposed pour date, how long the job will take, and when you can walk and drive on the new surface. Confirm in writing who applies for the driveway permit, who books the pump, and who removes the rubble. Ask for a drawing that shows joint positions and falls, since both are hard to change once the concrete arrives. Store the signed contract, the delivery dockets, the progress photos and every invoice in one folder or one email thread. Those papers settle arguments if a defect shows up, and a future buyer will want to know how the driveway was built.
A new pebble driveway often leads to other outdoor work, and the sketch and photos you prepared will serve those trades as well. Fresh edges between the slab and the lawn can be finished with garden edging installation, and a Brisbane landscaper can rebuild beds disturbed by the work. Once your outline is ready, list the job on The Quote Yard and local Queensland concreters can respond with written prices. Compare their written quotes line by line before you choose who pours your exposed aggregate.
Exposed Aggregate Concreters Across Queensland
Exposed aggregate estimates on this page apply across Queensland, from Brisbane and the Gold Coast to Toowoomba, Townsville and Cairns. Stone colours depend on the nearest batch plant, and blocks far from a plant can carry extra delivery costs, so ask each concreter to show travel separately.
▶ Brisbane Inner City 20 areas
CBD & North
Inner East
Inner South
Inner West
▶ Greater Brisbane 37 areas
Brisbane Suburbs
Ipswich
Logan
Moreton Bay
Redlands
▶ Gold Coast & Surrounds 23 areas
Central Gold Coast
Southern Gold Coast
Northern Gold Coast
▶ Sunshine Coast 15 areas
Coastal
Noosa
Hinterland
▶ Far North Queensland 17 areas
Cairns & Northern Beaches
Port Douglas & Daintree
Atherton Tablelands
Cassowary Coast
▶ Whitsundays & Central Coast 16 areas
Townsville Region
Whitsundays
Mackay Region
▶ Fraser Coast & Wide Bay 17 areas
Fraser Coast
Bundaberg Region
South Burnett
Central Queensland
▶ Darling Downs & Outback 17 areas
Darling Downs
Western Downs
Outback Queensland
Queensland Exposed Aggregate FAQ
Where does the grey wash water go on pour day?
If my new pebble driveway cracks badly, will home warranty insurance pay?
Can the stones run all the way to the kerb in Brisbane?
What is the most I should pay upfront on a $15,000 pebble driveway?
Will my driveway look exactly like the sample board at the supplier?
What happens if the wash-off would run past the permitted building hours?
My sewer cover sits in the middle of the planned driveway. What now?
Will a gloss sealer make my sloping driveway slippery?
Should my family stay inside while the joints are cut?
Which QBCC licence should the concreter show for an exposed aggregate pour?
Queensland Concreting Specialists
Related Services
For Trades & Contractors - QLD
A new exposed slab in Queensland can lead straight into work for plumbers, landscapers, wall builders and gate installers. Trades hunting for that kind of local work will find Queensland job boards listed below.
Ready to Book an Exposed Aggregate Concreter?
Post your job with the area, photos and stone colour, and we will connect you with local concreters across Queensland. Compare written quotes that price the same pour before you book.
Get Free Concreting QuotesAbout This Guide
This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Looking for more services across Queensland? View all available trade services.
Reviewed by The Quote Yard Editorial Team
How The Quote Yard Works
We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.