Looking for a Bricklayer in Brisbane?

Tell us your suburb, what you want built or repaired, the rough length and height of the wall, and whether it sits on a boundary or a retaining wall. We will pass that description to local bricklayers across Brisbane, so every quote you receive prices the same job.

Get Free Bricklaying Quotes

Brisbane Bricklaying Price Guide

Bricklayer day rate$700 - $850
Bricks laid, labour only$1,400 - $2,200 per 1,000
Brick fence or garden wall$400 - $700 per metre
Single skin garden wall, about 1 m by 5 m$1,500 - $4,000
Brick veneer for an extension$250 - $450 per m²
Repointing worn mortar joints$80 - $150 per m²
Damaged bricks cut out and replaced$300 - $1,500 per area
Block retaining wall under 1 m$3,500 - $8,000
Modular block retaining$450 - $800 per m²
Engineer's report for a wall$800 - $3,000

These are typical Brisbane price ranges for 2026. Your price depends on the bricks chosen, the footings, access to the work, and whether the job needs building approval, engineering or a heritage exemption.

Hire a Bricklayer Brisbane QLD - Get Local Quotes

Brisbane has a long run of face brick houses, meaning bare brick with no render or paint. They range from interwar homes with rendered front fences to lowset brick veneer houses on slabs, where a single layer of brick covers a timber or steel frame. Local bricklayers do plenty of repair and fence work on these homes as well as new builds. Bricklaying jobs over $3,300, counting labour, materials and GST, need a contractor holding a Queensland Building and Construction Commission (QBCC) licence. Council height rules matter as well, because a fence, a screen and a retaining wall are measured together once they pass 2 metres. Prices here are typical 2026 city ranges for normal working hours, before approval fees or engineering. The bricks, the footings and the access for a barrow can each move the total as much as the labour does. Post your job on The Quote Yard and we will connect you with local bricklayers across Brisbane who can quote on it.

Brickwork Jobs We Cover in Brisbane

Bricklayers across Brisbane take on everything from a few cracked bricks in an old fence to new garden walls, letterbox piers and veneer for home extensions. Tell us about the job once, and the local bricklayers we connect you with will all quote from that same brief.

Get Free Quotes

At a Glance - Brisbane Brickwork Prices 2026

Job Price Band How It Is Charged What Changes It in Brisbane Who Can Do It
Bricklayer labour $700 - $850 per day Day or half day Job size and travel across the city QBCC licensed bricklayer over $3,300
Labourer to mix and carry $400 - $600 per day Day rate Access and the number of bricks Bricklayer's crew
Bricks laid, labour only $1,400 - $2,200 per 1,000 Per 1,000 bricks Corners, piers and patterned work Licensed bricklayer
Brick fence or garden wall $400 - $700 per metre Per linear metre Height, piers, capping and footing Licensed bricklayer
Single skin garden wall, about 1 m by 5 m $1,500 - $4,000 Fixed price Brick range and footing depth Bricklayer, or the owner up to $11,000
Brick veneer for an extension $250 - $450 per m² Per square metre Openings, lintels and scaffold Bricklayer working for the builder
Repointing $80 - $150 per m² Per square metre Joint depth and mortar match Licensed bricklayer
Damaged bricks replaced $300 - $1,500 per area Per repair area Finding a matching brick Bricklayer
Block retaining wall under 1 m $3,500 - $8,000 Fixed after site visit Drainage, backfill and length Licensed bricklayer or wall builder
Modular block retaining $450 - $800 per m² Per square metre of wall face Height and loads behind the wall Licensed bricklayer or wall builder
Engineer's report for a wall $800 - $3,000 Fixed fee Wall height and soil testing Registered structural engineer

What Pushes a Brisbane Brick Job Up

What is involved
Building a fence on top of a retaining wall can take the total past the 2 metre approval height. The quote then needs a fee for a building certifier, who issues the approval, and an engineer's check.
Matching the bricks and mortar on an older house takes time and samples. Reclaimed or discontinued bricks can cost far more than a current range.
Narrow side access means bricks cannot be dropped on a pallet beside the wall. Every brick, bag of cement and load of sand then has to be carried in by hand.
Heritage listed homes may need an exemption certificate before repairs start. That paperwork adds time to the start date and sometimes a sample panel to the price.
Have every bricklayer list labour, bricks, mortar, footings and waste removal on separate lines, and name the brick maker and range. Quotes set out that way are far easier to weigh against each other.

Hiring a Bricklayer Across Brisbane

Bricklayers in Brisbane typically charge $700 to $850 a day, while longer jobs can be quoted as a price per 1,000 bricks laid or as a fixed sum. That labour price comes on top of the cost of bricks, mortar, steel and concrete footings, so two quotes for the same wall can look very different. Queensland treats bricklaying as licensed work, and you can compare other masonry jobs done around the state in our guide to bricklaying and blockwork services in Queensland. If you are weighing brick veneer against double brick, that guide compares the two, while this page deals with choosing a bricklayer and agreeing a fair job.

Writing a clear brief saves time for you and for every bricklayer who comes to look at the job. Describe what the wall or fence is for, its rough length and height, and whether it sits on a boundary, on top of a retaining wall or close to the house. Photos of the existing brickwork help a bricklayer judge the brick type, the mortar colour and the joint style before the visit. Mention the access, because a barrow path along a narrow side passage takes more labour than a pallet dropped beside the work. Say whether the bricks will be new, reclaimed from the site or chosen from a maker's range, since each choice changes the timing.

What Common Brisbane Brick Jobs Cost

Brick fences and garden walls in Brisbane cost $400 to $700 per linear metre, set by height, piers and footings. For a single skin garden wall, meaning a wall one brick thick, about 1 metre high and 5 metres long, expect $1,500 to $4,000 with a simple footing. Brick veneer, a single outer layer of brick tied to a timber or steel frame, costs about $250 to $450 per square metre for extension work. Repointing, where worn mortar is raked out of the joints and replaced, costs $80 to $150 per square metre. Replacing a patch of damaged bricks costs about $300 to $1,500 for each area, depending on how hard a match is to find. The table below sets out typical 2026 ranges for normal working hours, before council or engineering fees.

Retaining walls cost more than garden walls because they hold back soil as well as their own weight. Under 1 metre, a block retaining wall costs $3,500 to $8,000. Modular block systems, interlocking blocks that hold the soil back by their own weight, cost about $450 to $800 per square metre of wall face. Walls above 1 metre fall outside Brisbane's building exemption and can also be built by specialist retaining wall builders. When the job needs a labourer to mix mortar and carry bricks to the wall, that adds $400 to $600 a day.

The price per 1,000 bricks laid is the figure bricklayers use to compare labour on bigger jobs. Brisbane rates run at $1,400 to $2,200 per 1,000 bricks, with the bricks themselves supplied separately. Straight runs of plain wall sit toward the lower end, while piers, corners, arches and patterned work push the rate up because each brick takes longer to place. Cutting around windows and doors and setting lintels, the steel or concrete beams that carry brickwork over an opening, also adds time. With the rate per 1,000 and the number of bricks both on the quote, you can check the labour figure yourself.

Job Brisbane Band How It Is Charged What Moves It
Bricklayer, per day $700 - $850 Day or half day Size of the job
Labourer, per day $400 - $600 Day rate Access and brick numbers
Bricks laid, labour only $1,400 - $2,200 per 1,000 Per 1,000 bricks Piers, corners and cuts
Brick fence or garden wall $400 - $700 per metre Per linear metre Height and capping
Garden wall, about 1 m by 5 m $1,500 - $4,000 Fixed price Brick range and footing
Brick veneer for an extension $250 - $450 per m² Per square metre Openings and scaffold
Repointing $80 - $150 per m² Per square metre Joint depth and colour match
Damaged bricks replaced $300 - $1,500 per area Per repair area Matching brick supply
Block retaining wall under 1 m $3,500 - $8,000 Fixed after site visit Length and drainage
Modular block retaining $450 - $800 per m² Per square metre of face Height and loads behind it
Engineer's report for a wall $800 - $3,000 Fixed fee Height and soil testing

Day Rates, Fixed Prices and QBCC Deposit Limits

Small repairs, such as replacing a few cracked bricks or rebuilding a short section of fence, are often charged by the day or half day. Larger jobs suit a fixed price, because you know the total before work starts and the bricklayer carries the cost if the job takes longer than planned. Some bricklayers quote labour only and leave you to buy the bricks, sand and bagged cement from makers such as Cement Australia or Boral, while others supply everything and add a margin. Labour only can look cheaper on paper, but you then carry the cost of short deliveries, broken bricks and extra trips to the supplier. The quote should say plainly which arrangement is on offer, so the totals can be compared fairly.

Queensland limits how much a contractor can take before work starts, and the QBCC sets the caps by the value of the job. Deposits are capped at 20 per cent for work up to $3,300, 10 per cent from $3,301 to $19,999, and 5 per cent for Level 2 contracts of $20,000 or more. On a larger contract, a deposit of up to 20 per cent is allowed only where customised or prefabricated work made off site makes up more than half the contract price. Later payments must match the work actually done, and the contractor cannot claim more than half the contract price until at least half the onsite work is finished. The deposit counts toward that half, so a large deposit leaves less room for progress claims early in the job. The Queensland Building and Construction Commission publishes these limits with worked examples.

For a brick fence, a staged payment plan might tie payments to the finished footings, the completed brickwork and the final clean down. Each stage should be something you can see and check, such as a footing poured to the agreed depth or a run of piers built to height. Holding back a fair final payment gives the bricklayer a reason to return for small items, such as touching up joints or removing pallets. Calendar dates make poor payment triggers, since rain can stop bricklaying for days at a time.

How a Brisbane Brickwork Quote Is Built

$700 to $850, a day for a bricklayer in Brisbane, before materials and any labourer
Line on the quote
What it covers
Labour
Day rate, per 1,000 bricks or a fixed sum
Materials
Bricks, sand, cement, ties and steel by quantity
Footings
Digging, concrete and reinforcing bars
Clean up
Offcuts, pallets and cleaning the finished face

The brick count on the quote should match the wall area being priced.

Tie each progress payment to finished work, not to a calendar date.

Keep the deposit within the QBCC cap for the contract value, and pay each later stage only when that part of the wall is built.

What the Bricklaying and Blocklaying Licence Class Allows

The QBCC issues a licence class called bricklaying and blocklaying, and a contractor needs it for that work once the value passes $3,300, counting labour, materials and GST. The scope covers brick and block construction including preparing the surface, laying glass blocks, building masonry stairs and laying segmental paving, which means pavers set as separate units. It also allows the bricklayer to fit prefabricated window and door frames into the brickwork. Work outside that class, such as carpentry or plumbing, can only be done as incidental work when the total job value stays at $3,300 or less. On a bigger job that needs other trades, those trades need their own licences, or a builder holding a wider licence runs the whole job. You can search a licence and its class for free on the QBCC website before you accept a quote.

Owners can do some brickwork themselves, because the QBCC allows an owner to carry out work on their own property up to $11,000 without a licence. That covers a keen owner building a low garden wall or a letterbox pier, as long as the job does not need approval or engineering the owner cannot arrange. Work above $11,000 needs an owner builder permit or a licensed contractor, and the permit carries its own conditions. The home warranty scheme described further down protects work done by a licensed contractor, not the owner's own labour. Owners can still hire a licensed bricklayer for one part of the project, such as the footings or the corners, under a written contract for that part.

Licence class also matters for jobs that mix brickwork with other building work. Brick extensions and new garages involve framing, roofing and approvals, so the contract for home extensions of that kind sits with a builder holding a wider licence class. A low freestanding fence or a repair to an existing wall can go straight to a bricklayer holding the masonry class. Block retaining walls fall inside the masonry class, although engineering and drainage may bring in other professionals. Searching the licence on the QBCC website shows whether the business can lawfully sign the contract.

Job Who Can Contract Licence Check Good to Know
Brickwork up to $3,300 Any capable tradesperson No QBCC licence needed Keep a written record of the job
Brickwork over $3,300 Bricklaying and blocklaying licensee Class shown on the QBCC search Contract and deposit rules apply
Owner's own work up to $11,000 The owner No licence needed No contractor to hold to account
Owner's own work over $11,000 Owner builder with a permit Permit from the QBCC Permit conditions apply
Glass blocks, masonry stairs and segmental paving Bricklaying and blocklaying licensee Inside the class scope Licence needed above $3,300
Extension with framing and a roof Builder with a wider licence Builder licence class Bricklayer works as a subcontractor

Level 1 and Level 2 Contracts for Brickwork

Queensland sorts domestic building contracts by value, and the paperwork you should receive changes at each step. Jobs under $3,300 need no written contract, although the QBCC suggests keeping a written record and offers a two page template for small building projects. From $3,301 to $19,999 the agreement is a Level 1 contract, and from $20,000 it becomes a Level 2 contract with extra content. A brick fence across a full frontage can cross that $20,000 line, so check which contract type applies before you sign.

A Level 1 contract must name both parties, show the contractor's licence number, give the site address and describe the work. It must also state the price or how it will be worked out, the home warranty premium, the completion date, any plans and a notice of your cooling-off rights. The contractor must give you a fully signed copy of the whole contract within five business days. Level 2 contracts add the QBCC Consumer Building Guide, which you should receive before signing, plus a start date and a price change warning on the first page of the schedule. They also have to state the statutory warranties, such as materials being new and suitable and the work complying with the plans and the law. Allowances for items such as bricks not yet chosen should carry a realistic dollar figure, since a low allowance makes the total look cheaper than it will be.

Brickwork plans can change on site, for example when a different brick is chosen or a footing has to go deeper than drawn. Any change should be written down and signed before the extra work starts, with the price and any extra time stated. If the crew strikes rock, old footings or a buried pipe, they should stop and explain the problem instead of carrying on and billing for it later. Photos taken at the time back up the written change if the final account is disputed. Keep every signed change with the contract, because those papers form the record of what you agreed to pay.

Paperwork by Contract Value

Five business days for the contractor to hand over a fully signed copy of a Level 1 or Level 2 contract
Job value
What you should receive
Up to $3,300
No contract required, written record advised
$3,301 to $19,999
Level 1 contract with a cooling-off notice
$20,000 or more
Level 2 contract and the Consumer Building Guide
Any level over $3,300
Home warranty premium shown in the contract
Check that the licence number on the contract belongs to the same business named on the QBCC licence search.

Home Warranty Time Limits for Masonry Defects

The Queensland Home Warranty Scheme covers most residential building work valued over $3,300, and that includes brickwork done by a licensed contractor. The contractor collects the premium and pays it to the QBCC, and you should then receive a notice of cover by email. The time limits depend on whether a defect is structural or non-structural, and the two periods differ greatly in length. For structural defects, cover runs for 6 years and 6 months from the earliest of paying the premium, signing the contract or starting work. If the build takes longer than six months, cover runs for 7 years from the contract date. You have three months from noticing a structural defect to lodge the claim.

Non-structural defects have a much shorter time limit, and it is easy to miss. The defect must be noticed within six months of the work being completed, and the claim lodged within seven months of completion. Stained mortar, chipped bricks or uneven joints may fall into this group, so look over new brickwork closely during the first months. Cracks that point to footing movement, or a wall that starts to lean, may fall into the structural group instead, and the QBCC assesses which category applies when a claim is made. A structural engineer's report helps when the cause of a crack is unclear, and it guides any wall crack repair that follows.

Defect Type Cover or Notice Period Lodge the Claim What to Keep
Non-structural defect Noticed within 6 months of completion Within 7 months of completion Completion date and dated photos
Structural defect 6 years and 6 months Within 3 months of noticing Contract and notice of cover
Structural defect, build over 6 months 7 years from the contract date Within 3 months of noticing Start and finish dates
Work up to $3,300 Outside the scheme threshold Raise with the tradesperson directly Written quote and invoice
Owner's own labour No contractor to claim against Not part of a contractor claim Plans and any approvals

The Two Metre Combined Height Rule for Walls and Fences

Brisbane City Council requires building approval for a fence more than 2 metres above the natural ground surface. The height includes screens, fences and retaining walls together, so a 1.2 metre brick fence built on a 900 millimetre retaining wall counts as 2.1 metres. That matters on sloping front yards, where a wall levels the garden before the fence goes on top. Fencing that forms part of a regulated pool barrier also needs building approval.

Natural ground means the land level before any filling or cutting, not the finished lawn level. On a block that was filled years ago, the starting point for the measurement may need a surveyor or certifier to confirm. Any quote for a fence on a retaining wall should state the total height above natural ground. If the total passes 2 metres, a building certifier, the licensed professional who issues building approvals, has to approve the design before work starts. Neighbourhood plans and overlays in City Plan can add planning rules when a new house is built, so a fence built with a new home may face extra checks. The Brisbane City Council planning line on 07 3403 8888 can confirm which rules apply to a particular address.

Masonry on top of a wall also adds load that an older wall may not have been designed to carry. An engineer may need to check that the existing wall can take the weight of new masonry and the wind pushing on the fence. Where the old wall already leans or cracks, it may need retaining wall repairs or a rebuild before a fence goes on top. Boundary fences shared with a neighbour fall under Queensland's dividing fence law, which sets how the cost of fencing in Queensland is split between owners. Agree the height, material and position with the neighbour in writing before any bricks are ordered.

Measuring Height the Council's Way

2 metres of screen, fence and retaining wall combined, above natural ground, before building approval is needed
Situation
How it is measured
Fence on its own
From natural ground at the base
Fence on a retaining wall
Wall and fence heights added together
Screen on top of a fence
Screen counted in the total
Pool barrier
Approval needed when part of a regulated pool
Have the quote show the wall height, the fence height and the total above natural ground as three separate figures.

When a Low Garden Wall Skips Building Approval

Under Brisbane City Council rules, a retaining wall must meet four conditions to avoid building approval. There must be no surcharge loading over the zone of influence, meaning no extra weight such as a driveway, shed or house footing sitting in the ground the wall holds back. The total height of the wall and the soil it retains must be no more than 1 metre above natural ground. The wall must also be at least 1.5 metres from a building or another retaining wall, and it must not form part of a pool fence. Failing any one of these tests means the wall needs a building application approved by a building certifier.

Planning approval is a separate test from building approval, and a wall can need one without the other. In all zones, a retaining wall needs no development application if it is under 1 metre, set back from every boundary, and stepped or terraced so that plants can soften its look. Walls built hard on the boundary line therefore miss the planning exemption, even when they are low enough for the building one. Terraced garden beds, meaning two low walls with planting between them, must still sit 1.5 metres apart to stay inside the building exemption.

The 1.5 metre rule changes how bricklayers set out walls near a house. A low brick wall that retains soil within 1.5 metres of the house misses the building exemption, even when it is only knee high. Soil built up against a house wall can also cover the weep holes, small gaps near the base that let water drain out of the cavity behind the bricks. Keeping retaining walls clear of the house avoids both problems and keeps the job simpler to approve. For walls that do need engineering, a structural engineer prepares the design and the certifier checks it. Engineering reports for walls of this kind typically cost $800 to $3,000, and approval fees come on top.

Four Tests for a Low Retaining Wall

Test
What council asks for
Loads behind the wall
No surcharge over the zone of influence
Height
Wall and retained soil no more than 1 metre
Distance
At least 1.5 metres from a building or another wall
Pools
Not part of the fencing for a pool
All four tests must be met to skip building approval, and the planning exemption is checked separately.

Matching a Front Fence to an Interwar Brick House

Brisbane's interwar suburbs include brick and rendered houses in styles such as Spanish Mission, Old English or Tudor Revival, Art Deco and Functionalist. The council's guide to traditional fencing styles shows the kind of front fence that suits each one. Spanish Mission houses suit a brick fence in rough cast render, a coarse textured coating, sometimes topped with terracotta tiles or fitted with panels of upright bars, called palisade panels, between the piers. The guide pairs Tudor Revival houses with a brick fence and stone piers, and shows Art Deco fences as low walls with rough cast infill and smooth rendered posts. Functionalist houses suit a low brick or rendered brick fence with plain lines. Knowing these patterns lets a bricklayer quote a fence that looks as if it was built with the house.

Height matters as much as style in these streets, and the guide gives clear figures. Interwar front fences were typically 1200 millimetres high, while Victorian fences ranged from 1200 millimetres, the most common height, up to 1500 millimetres. In front of a 1930s house, a tall solid brick fence hides the facade and changes the look of the street. The guide notes that piers and bases were painted in the colour of the window and door frames unless they were unpainted stone or brick. Unpainted face brick keeps the original look of the house, and paint is hard and costly to remove, so weigh that up before booking brick painting.

Matching bricks and mortar for a fence on an older house takes more care than new work. Mortar colour, brick size and the joint profile, meaning the shape of the finished mortar joint, all show when a new fence sits beside the original house. Austral Bricks and PGH Bricks & Pavers both make face brick ranges in reds, creams and blends that can be compared against an old wall. Building a small sample panel, a short test section of wall, lets you approve the brick and joint before the full fence goes up.

House Style Fence Shown in the Guide Finish Bricklaying Note
Victorian Rendered brick piers with cast or wrought iron panels Piers in the joinery colour Height from 1200 to 1500 mm
Spanish Mission Brick fence in rough cast render Terracotta tiles or palisade panels Render needs a skilled finisher
Old English or Tudor Revival Brick fence with stone piers Face brick and stone Stone piers may need a stonemason
Art Deco Low fence with rough cast infill Smooth rendered posts and piers Two render textures on one fence
Functionalist Low brick or rendered brick fence Plain lines Long straight runs need accurate setting out
Interwar houses in general Front fence about 1200 mm high Can be the same material as the house Check heritage controls first

Heritage Listed Homes and Exemption Certificates

Some Brisbane houses are local heritage places protected by the Heritage overlay in City Plan 2014. Work with more than a minor impact on the cultural significance of the place needs development approval before it starts. Minor work with no impact or only a minor impact may be eligible for an exemption certificate instead of a full application. Council's Local Heritage Places website lets you search a property by address and read its history, period and style.

Brick repairs on a listed house can fall into the minor works group, but the decision belongs to council, not to the bricklayer. Repointing, replacing a few damaged bricks or rebuilding a short run of fence to match are the kinds of jobs to raise with council before any mortar is mixed. State heritage places are assessed by the Queensland Government, not council, so check which register lists the house. Quotes for a listed property should allow time for the certificate in the start date and price any matching samples separately. Hard modern cement mortar can damage soft old bricks, so find out which mix the bricklayer plans to use on older walls.

Before Repairing a Listed House

Listing or work
What applies
Local heritage place
Heritage overlay in City Plan 2014
Minor repair work
An exemption certificate may apply
Larger change
Development approval needed first
State heritage place
Assessed by the Queensland Government
Search the address on the heritage register before you book a bricklayer, so the paperwork is known from the start.

Solid Brick Walls Where Overland Flow Runs

Brisbane City Plan 2014 maps flood planning areas from FPA1, where flooding is very likely, through to FPA5, where there is no recent flooding but some potential for it. There is also a separate local overland flow category, covering land where, in council's words, water may rise quickly and move with speed but will recede quickly. For development other than houses, council's flood provisions say it will be designed to not increase flooding impacts on neighbouring properties. That aim matters for brickwork, because a solid wall across a flow path can hold water back on one side and push it toward a neighbour. Anyone building on a mapped flow path should therefore check the overlay before settling on a solid wall. City Plan mapping on the council website shows whether a flood overlay applies to an address.

Some designs let water through while keeping the look of masonry. Brick piers with open infill panels, gaps left at the base of a wall or a fence set above a raised footing can allow flow to pass. Where water collects behind a wall, drainage work such as pits and subsoil pipes can carry it away to the stormwater system. Overland flow questions are best put to the certifier or engineer early, since a redesign after the footings are poured costs more. Questions about switchboard heights and suburb flood history belong with an electrician, so read our guide to hiring an electrician in Brisbane.

Brickwork that has been under floodwater needs checking before anyone repaints or repoints it. Mud trapped in a cavity can block weep holes, and soaked clay under footings can settle as it dries out. Clearing weep holes and raking out damaged joints is bricklaying work, but cracking that keeps growing needs an engineer. Keep photos and dates of any flood damage, because insurers and engineers will ask for them.

Category What Council Says For New Building Wall Planning Note
FPA1 Very likely flooding, very deep or fast water Strictest assessment of new builds Get advice before any solid wall
FPA2 Likely flooding, deep or fast water May need a high-set, stronger design Talk to the certifier early
FPA3 Likely flooding, deep or moderate to fast water May need building on stumps Consider open panels between piers
FPA4 Likely flooding, shallow or slow water Minimum floor heights Keep weep holes and drains clear
FPA5 No recent history, some potential No flood code rules for houses Standard drainage behind walls
Local overland flow Water may rise and move fast, then recede quickly Minimum floor heights for houses Avoid pushing water onto neighbours

Silica Dust When Bricks and Pavers Are Cut

Cutting bricks, blocks and pavers releases respirable crystalline silica, a fine dust that can scar the lungs when it is breathed in. Queensland's code of practice for managing that dust in construction commenced on 1 May 2023 and covers bricks, blocks, tiles, mortar and concrete. It covers masonry saws, handheld saws, walk behind saws and core saws, and it points to dust controls that stop the dust forming in the first place. In practice that means water fed cutting or a saw with on-tool extraction, a vacuum shroud fitted around the blade. Workplace Health and Safety Queensland publishes the code and notes that it is under review after changes to the rules for crystalline silica substances.

Any bricklayer doing construction work with a risk of silica exposure needs a safe work method statement (SWMS), a written plan of the hazards and controls for the task. Respiratory protective equipment, such as a fitted mask, is required when other controls cannot keep exposure below the workplace exposure standard. Workers who need that equipment for 30 days or more in a year must have health monitoring. Husqvarna and Stihl make petrol cut off saws with water attachments for wet cutting. Makita, Hilti and Festool make power tools or dust extractors with shrouds that capture dust at the blade. Dry cutting in a tight back yard also coats the neighbour's windows and car, so a wet cutting station is a fair thing to request in the quote.

The national ban on engineered stone that began on 1 July 2024 does not cover bricks, blocks, pavers or mortar, so these products can still be used and cut. The dust rules above still apply to them, because clay and concrete masonry also contain crystalline silica. Safe Work Australia sets the national workplace exposure standard that the Queensland code refers to. You are not running the worksite, but you can still find out how cutting will be done and where the slurry will go. Slurry should be collected and taken away, not hosed into the street drain.

Dust Controls to Expect on Site

1 May 2023 the date Queensland's silica code of practice for construction commenced
Control
What it looks like
Cutting method
Water fed saw or on-tool extraction
Written plan
SWMS for work with a silica risk
Masks
Fitted respirator when other controls fall short
Health checks
Monitoring when masks are needed 30 or more days a year
Keep children and pets indoors while bricks are being cut, even when a wet saw or extraction is in use.

Choosing Bricks and Mortar Colours Before Work Starts

Brick choice affects the price, the lead time and how well new work blends with the old. Brickworks, which owns Austral Bricks, runs a design studio at 27 James Street in Fortitude Valley where you can look at its current ranges and catalogue. PGH Bricks & Pavers has a locator on its website for its selection centres and distributors, so call ahead to check opening hours and what is on display. Full size bricks seen in daylight show colour better than a photo on a screen.

Bricks are fired in batches, and colour can vary from one batch to the next. Ordering enough bricks for the whole job in one delivery, plus a small allowance for breakage and cuts, keeps the colour even across the wall. While laying, the bricklayer should blend bricks from several packs so any shade difference is spread out instead of showing as a band. Set aside leftover bricks for later repairs, since the same batch may not be available again. Mortar colour changes the look of a wall as much as the brick, and coloured oxides added to the mix can lighten or darken the joints. The bricklayer should note the cement, the oxide and the mix on the quote so a later repair can match.

Not every wall needs clay brick, and the right material depends on the job. Concrete block suits retaining and core-filled walls, where steel bars and concrete are placed in the hollow cores to make the wall stronger. Hebel makes lightweight autoclaved aerated concrete (AAC) panels and blocks, a light material that is cut and glued rather than laid in thick mortar beds. Rendered block can give a solid fence the look of a smooth rendered house, with the finish applied as rendering and texture coating work. Dulux AcraTex makes render and texture coatings for masonry, and drummy render, meaning render that has lifted and sounds hollow when tapped, calls for render repairs instead.

Choice What to Confirm Why It Matters Who Decides
Brick range and colour Maker, range name and batch Later repairs need a match You, with the bricklayer's advice
Mortar colour Oxide colour and mix Joints change the whole look You and the bricklayer
Joint profile Shape of the finished joint Must match existing work Bricklayer, checked on the sample
Brick quantity Bricks per square metre plus spares Short orders cause colour bands Bricklayer
Sample panel Small section approved before laying Avoids rebuilding a disliked wall You
Brick, block or AAC Material suited to the job Cost, strength and finish differ Bricklayer or engineer

Trades That Work Alongside a Brisbane Bricklayer

Some brick jobs need other trades before and after the bricklayer arrives. Footings for fences and walls may be poured by the bricklayer, but large slabs and driveways go to a concreter, so finding a concreter in Brisbane may be a separate step. Downpipes and stormwater lines that pass under a new wall need a licensed plumber or drainer, so plan on hiring a plumber in Brisbane before the footings go in. Gate motors, letterbox lights and garden power built into brick piers need a licensed electrician to wire them. Electrical conduit for that wiring should be set in the pier before the bricks go up rather than cut into finished brickwork later. Booking the order of trades in writing avoids paying one trade to undo another's work.

Before any digging, lodge a free request with Before You Dig Australia to find the cables and pipes recorded near the work. Older sheds, eaves and fence panels near a brick job can contain asbestos cement sheeting, which needs testing and licensed asbestos removal. Termite barriers around the house must stay intact, so a new wall should not bridge the slab edge or cover the inspection zone. Skip bins for broken bricks, old mortar and soil are another line to check, since some bricklayers include removal while others leave it to you. Agree who books each trade, who pays them and whose insurance covers their part of the work.

Owners planning a large brick project may decide a builder should manage it. The builder then holds the contract, books the bricklayer and the other trades, and takes responsibility for the finished result. That arrangement adds a margin but leaves the coordination to the builder, so weigh that margin when finding a builder in Brisbane. For a fence or garden wall alone, hiring the bricklayer directly keeps the cost down and makes the bricklayer alone responsible for the work.

Work Who Does It Licence or Check When It Happens
Footings for fences and walls Bricklayer or concreter Check the licence class Before the first course of bricks
Stormwater under a wall Plumber or drainer QBCC plumbing and drainage licence Before the footings
Power in brick piers Electrician Queensland electrical licence Conduit before laying, wiring after
Design of walls over 1 m Structural engineer Registered Professional Engineer of Queensland (RPEQ) Before approval
Building approval Building certifier Licensed certifier Before work starts
Asbestos removal Licensed removalist Asbestos removal licence Before demolition

Faulty Brickwork, QBCC Complaints and QCAT

Problems with new brickwork are best raised in writing with the contractor first, with photos, the contract and the dates you noticed each issue. Give the contractor a reasonable time to inspect and fix the work, and keep a copy of every message. If the problem is not fixed, the QBCC can take a complaint about defective or incomplete work done by a licensed contractor. Home warranty claims follow the time limits set out earlier, so lodge early instead of waiting for the contractor to answer. A building dispute can then go to the Queensland Civil and Administrative Tribunal, known as QCAT, once both sides have been through the QBCC's dispute resolution process.

Some faults need action before any dispute is settled. Any brick fence or wall leaning toward a footpath, driveway or neighbour's yard should be kept clear and checked by an engineer without delay. Cracks that keep widening over weeks suggest that something below ground is moving, and photos with a ruler beside the crack record the change. Where footings have moved, structural repairs such as underpinning, which deepens the footings, may be needed before any brickwork is rebuilt. Damage to a neighbour's property during the job is a matter for the contractor's public liability insurance, so keep the insurer's certificate showing current cover with the contract. An independent building inspection gives you a neutral report to rely on if the contractor disputes the defect.

Warning Signs in a Brisbane Brickwork Quote

A brickwork quote should describe the wall well enough that you could hand it to another bricklayer. Look for the length, height and thickness of the wall, the brick maker and range, the mortar colour and the joint finish. Footing size, depth and reinforcement should be written down, along with who pays if rock or old footings are found. The quote should also say who arranges and pays for any certifier, engineer or exemption certificate. Work built to AS 3700 or AS 4773, the Standards Australia standards for masonry structures and for masonry in small buildings, gives you a clear benchmark if a fault appears.

Some warning signs in a quote need checking before you sign anything. Deposit requests above the QBCC cap for the contract value break the rules and are a reason to look elsewhere. Pricing a fence on a retaining wall with no mention of the combined 2 metre height, or a retaining wall over 1 metre with no certifier or engineer, leaves out the approval step. Check any quote with no licence number, or with a number that belongs to a different business, on the QBCC search before going further. Allowances for bricks far below the price of the range you chose make the total look cheaper than the final bill.

Price gaps between quotes for the same wall can come from footings, materials and site work rather than the laying rate. One bricklayer may allow for a continuous footing with steel bars, while another plans a shallower footing that may not suit reactive clay, soil that swells when wet and shrinks when dry. Removal of the old fence, rubbish and spoil from the footing trench is another cost that can be missing from a cheap quote. Cleaning down the finished face to remove mortar smears should be listed too, with the cleaning method named. Bostik and Sika make flexible sealants for articulation joints, the planned vertical gaps that let a long wall move without cracking, so check those joints are priced. With a price that holds for 30 days and a stated start window, you can plan the rest of the job around it.

Lines Every Brisbane Brick Quote Should Show

What is involved
Labour, bricks, mortar, footings and waste removal each shown on their own line.
The brick maker, range and quantity, with a spare allowance for cuts.
Footing width, depth and steel written down, not left as a lump sum.
The total height above natural ground for any fence on a retaining wall.
The licence number and class matching the business on the QBCC search.
Articulation joints, cleaning down and how wet cutting slurry will be handled.

Deposit requests above the QBCC cap for the job's value.

A retaining wall over 1 metre priced with no approval or engineer named.

Quotes far below the others can leave out the footing steel, the approval steps or the cost of matching bricks.

Lining Up Brisbane Bricklaying Quotes That Match

Comparable quotes start with every bricklayer pricing the same written job. Send each one the same sketch with measurements, the chosen brick or a sample, the mortar colour and photos of the site and access. Say whether the job is on a boundary, on a heritage listed property or in a mapped overland flow path, since each of those can change the price. Three quotes give a fair comparison for a typical fence or garden wall, and a site visit is needed for anything more than a small repair. Ask each bricklayer how long the price holds and when they could realistically start.

For fences, retaining walls and paving, comparing a bricklayer with a specialist can be useful. A fencer quoting fence and gate installation may also build in brick or block, and paths beside new walls can go to paving and driveway installation crews. On an upper storey where full brick is too heavy, brick cladding systems using thin brick slips can give a similar look. Comparing these options against a bricklayer's price shows which route gives better value.

Keep the paperwork together once the job is finished. That means the contract, any signed changes, the home warranty notice of cover, approvals and engineering, and the final invoice. Write down the brick maker, range and batch, and the mortar mix and colour, so a future repair can match. Note the completion date, because the six month window for noticing non-structural defects starts from that day. A future buyer's inspector may ask for the approval and engineering on any wall above 1 metre. Spare bricks stored flat and dry under cover will be ready for the next repair.

Bricklayers Across Brisbane

Bricklaying prices on this page apply across Brisbane. Jobs close to the main centres rarely carry a travel charge, while outer suburbs and fringe areas sometimes do.

▶ Brisbane Inner City 20 areas

CBD & North

Brisbane CBD Fortitude Valley Spring Hill Kelvin Grove Red Hill Paddington

Inner East

New Farm Teneriffe Newstead Bulimba Hawthorne

Inner South

South Brisbane West End Highgate Hill Woolloongabba Kangaroo Point

Inner West

Toowong Milton Auchenflower St Lucia
▶ Greater Brisbane 37 areas

Brisbane Suburbs

Indooroopilly Carindale Sunnybank Chermside Aspley Nundah Clayfield Mount Gravatt Eight Mile Plains Kenmore The Gap Forest Lake

Ipswich

Ipswich Springfield Lakes Redbank Plains

Logan

Loganholme Logan Central Beenleigh Woodridge Browns Plains Springwood Shailer Park Daisy Hill

Moreton Bay

North Lakes Redcliffe Caboolture Strathpine Petrie Deception Bay Bribie Island Morayfield

Redlands

Cleveland Wynnum Manly Victoria Point Capalaba Redland Bay
▶ Gold Coast & Surrounds 23 areas

Central Gold Coast

Southport Surfers Paradise Broadbeach Benowa Carrara Nerang Labrador Runaway Bay

Southern Gold Coast

Burleigh Heads Palm Beach Currumbin Miami Mermaid Beach Coolangatta Varsity Lakes Mudgeeraba Robina

Northern Gold Coast

Coomera Upper Coomera Helensvale Hope Island Pimpama Ormeau
▶ Sunshine Coast 15 areas

Coastal

Maroochydore Mooloolaba Caloundra Coolum Beach Alexandra Headland Kawana Waters Birtinya

Noosa

Noosa Peregian Beach Sunshine Beach

Hinterland

Buderim Nambour Sippy Downs Montville Maleny
▶ Far North Queensland 17 areas

Cairns & Northern Beaches

Cairns Palm Cove Trinity Beach Gordonvale

Port Douglas & Daintree

Port Douglas Mossman Kuranda Cooktown

Atherton Tablelands

Atherton Mareeba Ravenshoe Yungaburra

Cassowary Coast

Innisfail Mission Beach Babinda Tully Cardwell
▶ Whitsundays & Central Coast 16 areas

Townsville Region

Townsville Magnetic Island Charters Towers Ayr Ingham Home Hill

Whitsundays

Airlie Beach Cannonvale Proserpine Bowen Collinsville Hamilton Island

Mackay Region

Mackay Sarina Moranbah Clermont
▶ Fraser Coast & Wide Bay 17 areas

Fraser Coast

Hervey Bay Maryborough Rainbow Beach

Bundaberg Region

Bundaberg Bargara Childers Gin Gin Agnes Water

South Burnett

Gympie Kingaroy Nanango Murgon

Central Queensland

Gladstone Rockhampton Yeppoon Biloela Emerald
▶ Darling Downs & Outback 17 areas

Darling Downs

Toowoomba Warwick Stanthorpe Gatton Dalby Goondiwindi

Western Downs

Roma Chinchilla Miles St George

Outback Queensland

Longreach Mount Isa Charleville Barcaldine Winton Cloncurry Cunnamulla

Brisbane Bricklayer FAQ

How much can a Brisbane bricklayer ask for as a deposit?
The QBCC caps deposits at 20 per cent for work up to $3,300, 10 per cent for $3,301 to $19,999 and 5 per cent on Level 2 contracts of $20,000 or more. Later payments must match the work done, and no more than half the price can be claimed before half the onsite work is finished. The deposit itself counts toward that first half of the price. Any request above these caps is a good reason to look for another bricklayer.
Can I build my own brick garden wall without a licence?
Yes, the QBCC allows an owner to carry out work on their own property up to $11,000 without a licence. Work above that amount needs an owner builder permit or a licensed contractor. Whoever lays the bricks, a wall that needs building approval or engineering still needs those steps.
Does a low brick planter wall beside my house need approval?
In Brisbane, a retaining wall misses the building approval exemption if it sits within 1.5 metres of a building or another retaining wall. It must also hold back no more than 1 metre of soil and carry no surcharge load such as a driveway. That means a low planter built against the house can need a building certifier's approval.
How long do I have to report a defect in new brickwork?
Under the Queensland Home Warranty Scheme, a non-structural defect must be noticed within six months of completion and claimed within seven months. Structural defects are covered for 6 years and 6 months, or 7 years where the build took more than six months. Structural claims must be lodged within three months of noticing the defect.
What kind of front fence suits an interwar brick house?
Brisbane City Council's traditional fencing styles guide shows rough cast render brick fences for Spanish Mission houses and brick fences with stone piers for Tudor Revival houses. Art Deco and Functionalist houses suit low rendered or brick fences with plain lines. Interwar front fences were typically 1200 millimetres high, so a tall solid fence can look out of place.
Do I need council permission to repair brickwork on a heritage listed house?
Local heritage places are protected by the Heritage overlay in City Plan 2014, so check with council before starting. Minor work with little or no impact may be eligible for an exemption certificate, while larger changes need development approval. State heritage places are assessed by the Queensland Government instead of council.
Can a bricklayer cut bricks without water or dust extraction?
Queensland's silica code of practice, in force since 1 May 2023, points to wet cutting or on-tool extraction to stop the dust forming. Husqvarna and Stihl make cut off saws with water attachments for this kind of work. Construction work with a silica risk requires a safe work method statement, and masks are needed when other controls fall short.
Where can I look at brick ranges in Brisbane before choosing?
Brickworks, which owns Austral Bricks, has a design studio at 27 James Street in Fortitude Valley. PGH Bricks & Pavers has an online locator for its selection centres and distributors. Call ahead to confirm opening hours, and bring a photo of your existing brickwork for comparison.
What paperwork should I get for a brick job over $20,000?
A job of $20,000 or more needs a Level 2 contract and the QBCC Consumer Building Guide, which you should receive before signing. The contract must show the licence number, the price, start and completion dates, the warranty premium and the statutory warranties. You should also receive a fully signed copy within five business days.
Can a bricklayer also lay pavers and glass blocks?
Yes, the QBCC bricklaying and blocklaying licence class includes laying glass blocks, building masonry stairs and laying segmental paving. It also covers fitting prefabricated window and door frames into brickwork. Other trades such as carpentry are allowed only as incidental work when the whole job stays at $3,300 or less.

Brisbane Brickwork Specialists

For Trades & Contractors - QLD

Brick jobs in Brisbane can call on other trades for the parts a bricklayer does not do. Stormwater under a new wall needs a licensed plumber, power in brick piers needs an electrician, and slabs and driveways can go to a concreter. These are the services booked alongside bricklaying work across the city.

Compare Brisbane Bricklaying Quotes

Tell us your suburb, what you want built or repaired and the rough size of the wall, and compare quotes from local Brisbane bricklayers who are all pricing the same job.

Get Free Bricklaying Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 30 October 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All Queensland tradies are required to hold appropriate QBCC licences. Verify at the Queensland Building and Construction Commission.
Prices are estimates based on typical Brisbane bricklaying rates in 2026. Your final price will depend on the bricks chosen, access and the footings needed, so compare written quotes that list labour, materials and any engineering separately.
Need work done? Get free quotes. Post a Job – It's Free