Looking for a Painter in Hobart?

Tell us your suburb, what needs painting inside and out, the wall surfaces, the storeys and the year the house was built. We will share that brief with local painters, so each quote you get covers identical work.

Get Free Painting Quotes

Hobart Painting Price Guide

Single room, walls only$300 - $500
Room with ceiling$400 - $650
Three bedroom interior$4,500 - $9,000
Ceiling repaint, per sq m$12 - $25
Painter, per hour$50 - $80
Single storey exterior$5,000 - $12,000
Two storey exterior$8,000 - $18,000
Weatherboard exterior$6,000 - $15,000
Heritage cottage exterior$8,000 - $18,000
Paint stripping, per sq m$40 - $120

These figures are 2027 estimates drawn from Tasmanian painting price guides. Your price depends on the age and state of the old paint, the surfaces, the height and slope of the site, and any lead, asbestos or heritage steps the house needs.

Repainting a Weatherboard or Brick Home in Hobart? Compare Painter Quotes

Hiring a painter in Hobart is simpler once you know what your walls are built from and roughly how old their paint is. Tasmanian price guides put one room, walls only, at about $300 to $500 for 2027, and a full three bedroom interior at $4,500 to $9,000. A weatherboard exterior, meaning a house clad in overlapping timber boards, is estimated at $6,000 to $15,000. Steep blocks often make the back of a house taller than the front, which changes how a painter reaches the upper walls. Tasmania had no painter licence when we checked, so check the ABN and ask for a certificate of currency for public liability cover instead. A painting contract priced at $20,000 or more must be in writing, and its deposit is capped by law. Houses built before 1970 may carry lead paint, which should never be dry sanded without testing and dust control. Homes built before 1990 may also hide asbestos sheeting under old paint, so have it tested before anyone scrapes or water blasts. Works on a state heritage listed place need the Heritage Council's approval, although repainting can often go through a minor works approval. Bare sandstone and brick are best left unpainted, as the state heritage guidelines advise. A scaffold where someone could fall more than 4 metres must be put up by a licensed scaffolder. Leftover paint can go to the Paintback bin at The Tip at McRobies Gully. Post the job free on The Quote Yard and we will pass your brief to local painters around Hobart for quotes.

Hobart Painting Work Covered

Painting work across Hobart runs from a single bedroom in a Sandy Bay unit to a weatherboard cottage on a steep West Hobart street or a heritage listed brick house. We can connect you with local painters who all price the same written brief for your home.

Get Free Quotes

At a Glance - Hiring a Painter in Hobart, 2027 Estimates

Job Price Range How It Is Charged What Drives It In Hobart Who Can Do It
Single room, walls only $300 - $500 Whole room Patching and colour change Painter, no TAS licence needed
Room with ceiling $400 - $650 Whole room Ceiling height and stains Painter
Three bedroom interior $4,500 - $9,000 Whole house Trim, colours and furniture Painter
Ceiling repaint $12 - $25 per sq m Per square metre Cracks and water marks Painter, plasterer for cracks
Door, both sides $80 - $150 Per door Old enamel and hardware Painter
Single storey exterior $5,000 - $12,000 Whole house Surface and old paint Painter
Two storey exterior $8,000 - $18,000 Whole house Slope, height and scaffold Painter, licensed scaffolder
Weatherboard exterior $6,000 - $15,000 Whole house Scraping and board repairs Painter, carpenter for repairs
Brick and render exterior $4,500 - $10,000 Whole house Cracks and earlier coatings Painter or renderer
Fascias and gutters only $1,200 - $3,000 Whole job Rust and length of run Painter
Heritage cottage exterior $8,000 - $18,000 Whole house Paint system and detail Heritage painter
Paint stripping $40 - $120 per sq m Per square metre Layers and lead content Painter with lead controls

What Pushes a Hobart Painting Price Up

What is involved
Old houses carry many layers of paint, and loose or cracked layers must come off before new paint will hold.
Lead paint on houses built before 1970 slows preparation, because dust has to be contained and collected. Stripping guides add 50 to 100 per cent where lead is confirmed.
Sloping blocks turn single storey fronts into taller backs, which can mean a scaffold. Scaffold hire is priced on quote.
Heritage houses may need matching colours and breathable paints, and heritage guides put the premium at about 30 to 60 per cent.
Ask each painter to list preparation, primer, topcoats, scaffold and waste on separate lines. That layout lets you see which quote left out a step before you compare the totals.

Booking a Painter for a Hobart House

A painter prepares and coats the walls, ceilings, timber and metal of a building, and on an older Hobart house most of the price goes into preparation. Typical jobs here include a weatherboard cottage, clad in overlapping timber boards, on a hillside street, an early brick house with timber verandahs or a rendered unit near the water. Render is the thin cement coating trowelled over brick or block walls, and it takes paint differently from bare brick or timber. The kinds of painting work done around the state are listed in the Tasmanian guide to painting services, so this page stays with hiring well under local rules. Those rules touch lead paint, asbestos, heritage listings, work at height and home building contracts priced at $20,000 or more.

Begin with a written list of the rooms, walls and outside surfaces you want painted, and the finish you have in mind for each one. Photograph flaking paint, cracked render, soft timber, mould spots and water stains, because those decide how long preparation will take. Note the year the house was built, since that single fact tells a painter whether lead paint and asbestos need checking first. Say whether the place is heritage listed, whether it sits in a strata complex and how steeply the block falls away. If most of the work is outside on timber and masonry, the Tasmanian exterior painting guide explains the common surfaces in more depth. A brief that answers these points keeps every quote on the same footing and saves the painter a second visit.

Hobart Painter Prices Worth Checking Before You Book, 2027

The Tasmanian painting guides published by The Quote Yard estimate a standard room, walls only, at about $300 to $500 for 2027, or $400 to $650 with the ceiling. A full interior for a three bedroom home is estimated at $4,500 to $9,000, depending on ceiling height, trim and the number of colours. Hourly labour for a painter is put at $50 to $80, which is how small touch ups and repair jobs are often charged. Doors painted on both sides are estimated at $80 to $150 each, and a single feature wall at $150 to $400. None of these guides gives a separate figure for Hobart, so the Tasmanian estimates are the fairest starting point for a city budget.

Outside work varies more, with a single storey house estimated at $5,000 to $12,000 and a two storey house at $8,000 to $18,000. Weatherboard homes are estimated at $6,000 to $15,000, while brick and render exteriors come in at about $4,500 to $10,000. Heritage work costs more again, with a cottage exterior estimated at $8,000 to $18,000 and a Victorian era terrace at $12,000 to $25,000. Scaffold hire, lead paint testing and asbestos surveys have no published Tasmanian estimate, so each of them is priced on quote.

Painters commonly quote a fixed price for a whole room or house, and charge by the hour only for small or uncertain jobs. A fixed price suits you when the scope is clear, because the risk of slow progress then stays with the painter. An hourly rate suits small touch ups, but ask for an estimate of the hours and a cap that cannot be passed without your approval. Paint is either included in the price or bought by you, and that choice should be written on the quote. If the painter supplies the paint, ask which product range is allowed for, since a cheaper range lowers the price without showing it.

Painting Job 2027 Estimate (TAS) Basis Price Drivers
Single room, walls only $300 - $500 Whole room Room size and patching
Room with ceiling $400 - $650 Whole room Ceiling height and stains
Three bedroom interior $4,500 - $9,000 Whole house Trim, colours and furniture
Ceiling repaint $12 - $25 per sq m Per square metre Cracks and water marks
Door, both sides $80 - $150 Per door Old enamel and hardware
Feature wall $150 - $400 Per wall Colour depth and coats
Single storey exterior $5,000 - $12,000 Whole house Surface and condition
Two storey exterior $8,000 - $18,000 Whole house Height and access
Weatherboard exterior $6,000 - $15,000 Whole house Scraping and timber repair
Brick and render exterior $4,500 - $10,000 Whole house Cracks and earlier coatings
Heritage cottage exterior $8,000 - $18,000 Whole house Paint system and fine detail
Heritage colour research $300 - $800 Per house Paint samples and records
Scaffold, lead test, asbestos survey Priced on quote Per job Height, rooms and samples

Painter, Plasterer, Carpenter or Roofer: Who Comes First

Many Hobart painting jobs uncover work that belongs to another trade, and booking those trades first saves paying for paint twice. Cracked lath and plaster ceilings, older ceilings of thin timber strips covered in lime plaster, are work for a Hobart plasterer before painting. Rotten weatherboards, sills and fascias, the boards fixed along the roof edge to hold the gutter, need cutting out and replacing with sound timber. Rusted roof iron or leaking flashings, the metal strips sealing roof joins, should go to a Hobart roofer, so water stops getting in behind the new paint. Soft, hollow timber with mud trails can mean termites, and a Hobart pest controller can inspect before repairs are sealed in.

Timber repairs are usually quickest with a Hobart carpenter, who can match old board profiles and leave the new timber ready to prime. Primer is the first coat on bare material, made to soak in and give the following coats something to grip. Light fittings and power points that must come off the wall are a job for a Hobart electrician, not the painter. Writing the order of trades into the brief stops each one waiting on the next and keeps the painter's start date firm.

Sorting Out Who to Call First

Problem and who to call
Flaking paint on sound walls or timber: call a painter directly and ask who scrapes and removes the old paint.
Cracked ceilings or loose plaster: a plasterer goes first, then the painter once the patches have dried.
Rotten boards, sills or fascias: a carpenter makes the repairs, then the painter applies primer and topcoats.
A rusted roof or leaking gutters: a roofer fixes them before the exterior painting so water stops at its source.
If the house was built before 1990, have any fibre cement sheeting, eaves lining or old vinyl tested before preparation starts. WorkSafe Tasmania says homes built before the mid 1980s are highly likely to contain some asbestos.

No Painter Licence in Tasmania, and Who Regulates Building Work

When we checked, the old CBOS division, or Consumer, Building and Occupational Services, had been split into two new agencies on 1 October 2026. These are Consumer Affairs Tasmania and Building Standards Tasmania, and old CBOS forms now point to them, while the CBOS website licence search listed builders, electricians, plumbers and gas fitters. Painting was not on that list, so a painter needs no Tasmanian licence to repaint your home. That makes your own checks more important, starting with the business name and the ABN, the eleven digit Australian Business Number given to a registered business. An ABN can be confirmed as active on the national ABN Lookup website before you accept a quote.

Ask every painter for a certificate of currency, a one page document from an insurer proving that a policy is active on the date shown. Public liability cover pays out if the painter damages your property or injures someone, such as spray drifting onto a neighbour's car. A painter who employs staff should also hold workers compensation cover, which pays for injuries to those workers. A trade qualification in painting and decorating shows training, even though no licence is needed to use it. A painter who claims a builder licence as well should have it confirmed on the CBOS website licence search before you rely on it. That matters if the job grows into structural repairs that only a licensed builder may carry out.

Past work tells you more than any certificate, so ask to see two or three repaints on houses of a similar age. Look closely at window sills, door edges and fascias, since those show whether the preparation was done properly. A painter who can explain how lead or heritage requirements were handled on earlier jobs is likely to plan yours with the same care. Ask too how long they expect their exterior work to last before it needs a maintenance coat.

Task Licence Required in Tasmania Usually Done By Worth Checking
Interior and exterior repainting None when we checked Painter ABN, insurance, written scope
Paint stripping on lead paint No licence, WorkSafe duties apply Painter with lead controls Dust control and clean up
Erecting scaffold above 4 metres Scaffolding class of high risk work licence Scaffold business Licence class on the card
Removing asbestos sheeting Asbestos removal licence in most cases Licensed asbestos removalist Licence and clearance paperwork
Replacing rotten weatherboards None for minor non-structural repairs Carpenter Insurance and scope of repairs
Moving light fittings or power points Electrical licence Licensed electrician Licence on the CBOS website search
Structural repairs or additions Builder licence Licensed builder Licence class and work category

Low Risk Work, Notifiable Work and the $20,000 Contract Rules

Tasmania's Building Act 2016 sorts building work by risk, from low risk work through notifiable work to work that needs a building permit. Notifiable work is medium risk work, such as a house extension, checked by a building surveyor, a licensed building professional, rather than through a council permit. Building Standards Tasmania guidance says some minor repairs and maintenance of existing homes may be done by an owner or other competent person, with no permit. When we checked, the official list of work categories put non-structural repairs and maintenance, including wall finishes and cladding, in the lowest risk group. Repainting a house sits comfortably inside that group, so it needs no building permit and no notice to council. Replacing a structural part, such as a rotten verandah beam, is different and should be checked with a building surveyor first.

Home building contracts priced at $20,000 or more fall under a separate law, the Residential Building Work Contracts and Dispute Resolution Act 2016. Its definition of residential building work includes painting and decorating the inside and outside surfaces of a home, alongside maintenance and renovation. When the Act applies, the contract must be written, and when we checked the deposit could be no more than 10 per cent under $50,000, or 5 per cent at $50,000 or above. Statutory warranties, the promises the law writes into each such contract, say materials will be suitable and the work done with reasonable care and skill. The full text is on the Tasmanian legislation website, and Building Standards Tasmania notes a cooling off period, a window to cancel, of at least five business days.

Which Rules Apply to Your Painting Job

Job size and rules
Repainting rooms or outside walls is low risk maintenance work, with no building permit or notification needed when we checked.
A painting contract priced at $20,000 or more needs a written contract and statutory warranties, with a deposit of no more than 10 per cent under $50,000 and 5 per cent at $50,000 or above.
A smaller painting job still deserves a written quote, and the Australian Consumer Law guarantees still apply to it.
Structural repairs found during preparation should be checked with a building surveyor before the work goes any further.
Statutory warranty claims under the Act must be started within six years of practical completion, which is the day the job is done. Keep the contract, invoices and stage photos for at least that long.

Heritage Register Places, Council Precincts and Exterior Colours

Hobart has many older houses, and heritage controls come from two separate lists that work in different ways. Places judged important to the whole state go on the Tasmanian Heritage Register, which the Heritage Council looks after under the Historic Cultural Heritage Act 1995. Local heritage places and heritage precincts, meaning streets or areas protected for their shared character, are listed by the council under the Tasmanian Planning Scheme, the statewide planning rules. One house can appear on both lists, so check each of them before choosing a new colour scheme. City of Hobart officers can tell you whether a property is on the state register, and the council has heritage studies for Battery Point, West Hobart and North Hobart.

For a place on the state register, any works need Heritage Council approval, but painting is among the low impact works suited to a minor works approval, a quicker sign off. Heritage Tasmania guidelines say repainting previously painted surfaces can qualify when the colours suit the character of the place. They also expect the original kind of coating to be used again, such as lime wash, a traditional coating of slaked lime and water. Paint removal qualifies only where the method will not damage old fabric, which rules out harsh abrasives. Painting historic surfaces that have never been painted, including masonry, may need a full permit application lodged through the council. Heritage Tasmania advisers offer free advice by phone before you lodge anything, which is worth using before colours are ordered.

For local listings, the Local Historic Heritage Code, the planning scheme rules for locally listed places, exempts some painting from needing a planning permit. When we checked, the exemption covered repainting an exterior surface that had been painted or rendered before, in a colour similar to the existing one. A bold colour change on a locally listed house or within a heritage precinct may therefore need a planning permit, the council's approval to develop, first. Ask the painter to note the heritage status on the quote, and see the Tasmanian heritage painters guide for period paint systems.

Colour research for a heritage house is estimated at $300 to $800 in Tasmanian guides, and it usually starts with small scrapes through the paint layers. Each scrape shows the earlier colours in order, which helps you choose a scheme that suits the age of the house. An application to the council or Heritage Tasmania is clearer when it includes those findings and the proposed colour samples. Keep the research report with the house papers, because the next owner or painter will find it useful.

Heritage Checks Before a Colour Change

Situation and next step
On the Tasmanian Heritage Register: contact Heritage Tasmania about a minor works approval before painting outside.
Local heritage place or precinct, same colours: the repainting exemption may apply, but confirm it with the council.
Local listing with a new colour scheme: ask the council whether a planning permit is needed before work starts.
Bare sandstone or face brick: leave it unpainted, since the heritage guidelines advise against coating it.
Removing paint with harsh abrasives can strip the face from soft sandstone and old brick. Ask for the removal method in writing before any work starts on a listed house.

Sandstone, Brick, Render and Weatherboard Paint Systems

A paint system is the full set of coats a surface receives, from cleaning and primer through undercoat, which evens out colour, to the topcoat you see. Weatherboard needs loose paint scraped back, bare timber primed and gaps filled before two topcoats, with any split boards replaced first. Sandstone and soft old brick need coatings that let moisture escape, and the heritage guidelines prefer lime washes and silicate paints for that reason. Silicate paint is a mineral paint that bonds chemically with masonry instead of forming a plastic skin over it. The guidelines also advise against waterproof or water repellent paints on masonry in most cases, as trapped damp can lift paint and stone.

Cement render on later houses is usually painted with exterior acrylic, a water based paint that stays flexible as walls move slightly. Hairline cracks in render are filled and primed first, while wide or moving cracks may point to a structural problem for a builder to inspect. Salt bloom, the white powder that appears on damp masonry, must be brushed off and its water source fixed before paint will hold. Galvanised, or zinc coated, iron, steel railings and old cast iron lace need rust removed and a metal primer before any topcoat. Where rendered walls are cracked or drummy, meaning hollow when tapped, the Tasmanian guide to render repairs explains what a renderer fixes before the painter arrives. Matching each surface to its own system is the clearest sign a painter has looked closely at the house.

Timber sash windows, the sliding windows hung on cords and weights in many old houses, need extra care before painting. Old putty, the soft compound that holds the glass in its frame, often cracks and must be cut out and replaced first. The sliding edges and cords should not be painted thickly, or the windows will stick shut once the paint dries. Window frames and sills often carry the oldest paint layers on the house, so test them for lead before any sanding begins. A painter who prices the windows one by one, rather than as a lump sum, has usually looked at each of them.

Surface Where You See It Usual Paint System Ask the Painter
Weatherboard Timber cottages and houses Scrape, prime bare timber, two acrylic topcoats How many boards need replacing
Sandstone Early houses, walls and steps Leave bare, or lime wash or silicate if painted before Which breathable product is proposed
Face brick Brick houses never painted Usually left unpainted Whether repointing, renewing mortar joints, comes first
Painted brick or render Later and altered houses Crack repair, masonry primer, acrylic topcoats How cracks will be treated
Timber windows and doors Sash windows and panelled doors Sand, prime, enamel or acrylic gloss Lead test before sanding
Metal roofs, gutters and lace Corrugated iron and cast iron Rust treatment, metal primer, topcoats Rust treatment method

Lead Paint on Pre-1970 Hobart Houses

WorkSafe Tasmania notes that paint containing lead was used in many Australian homes before 1970. Lead paint is low risk while it stays intact, but it becomes a hazard as it flakes or when it is sanded, scraped or burned. Even small amounts of dust or chips from minor repairs can harm health, and young children are more sensitive to lead than adults. Tasmanian public health advice also says women should not be exposed to lead while pregnant or breastfeeding. For a home built before 1970, ask for a lead test of the old paint layers before the preparation is priced.

When we checked, WorkSafe Tasmania listed sanding as a lead process and required health monitoring for workers doing lead risk work. Lead risk work means a task likely to raise a worker's blood lead level, so the painting business must assess each job. For you, the signs of a careful painter are wet scraping, plastic sheeting under the work and sanders connected to a dust extractor. A HEPA filter, a very fine filter that traps tiny particles, should be fitted to any vacuum used for the clean up. Heat guns on low settings and chemical strippers raise less dust than dry sanding, although each has its own risks. Tasmanian guides estimate paint stripping at 50 to 100 per cent more where lead has been confirmed.

Clean up matters as much as the preparation on a house with lead paint. Ask for drop sheets to be misted and folded inward at the end of each day, so dust is not shaken loose. Paint chips should be picked up from garden beds and paths daily, rather than left until the last day. Gutters and downpipes near the work can collect fine chips and are worth checking at the finish. A final wet wipe and a HEPA vacuum of window sills and floors inside are the usual last steps.

Lead Paint Checks for an Older Home

What to ask
Ask whether the painter will test the old paint layers on a house built before 1970.
Ask how dust will be contained, such as plastic sheeting, sealed doorways and wet methods.
Ask how chips and dust will be collected each day and where that waste will go.
Plan for children and anyone pregnant to stay away while old paint is being disturbed.
Never let anyone dry sand or water blast old paint on a pre-1970 home before it has been tested. Lead dust settles into soil, carpet and gutters, and it is hard to clean up afterwards.

Asbestos Eaves, Fibre Cement and the Water Blaster Rule

WorkSafe Tasmania rates asbestos as highly likely in a house built before the mid 1980s, and still likely in one built up to 1990. In homes it turns up in bathrooms, kitchens, behind tiles, in sheds and carports, in meter boxes and in some gutters and roof sheeting. Painters often meet it as flat fibre cement sheeting, known as fibro, on eaves linings under the roof overhang, gable ends and wet area walls. WorkSafe Tasmania says asbestos in good condition that is unlikely to be disturbed can be left in place and monitored. A residential asbestos survey by a licensed asbestos assessor will show where it is before any preparation starts.

The national Asbestos Safety and Eradication Agency warns against cleaning asbestos materials with high pressure water or compressed air. It also lists sanding, scrubbing and water blasting among the abrasive methods to avoid on asbestos. Any pressure cleaning before painting an older house should therefore list which surfaces are excluded until they are tested. Where sheeting is damaged or must come off, WorkSafe Tasmania advises having it removed by a licensed asbestos removalist. Removal then comes before painting, and the removalist's clearance paperwork should be kept with the house records.

Before Anyone Pressure Cleans or Sands

Checks before preparation
Find the build year, and the year of any renovations, before a painter prices the preparation.
Have suspect eaves, cladding and wet area sheeting tested or included in a survey.
Agree that no asbestos surface is water blasted, sanded or scraped hard during the job.
Book a licensed removalist if damaged sheeting has to come off before the painting starts.
If you are unsure, treat the material as asbestos until a laboratory says otherwise. That is the approach WorkSafe Tasmania itself recommends to home owners.

Ladders, Scaffolds and Steep Blocks Under WorkSafe Tasmania Rules

Many Hobart houses sit on sloping blocks, so a house that is single storey at the street can be two storeys or more at the back. Under WorkSafe Tasmania guidance, work with a risk of a person falling more than 2 metres is high risk construction work. Before that work starts, the business must prepare a safe work method statement, or SWMS, a written plan of each hazard and its control. The guidance favours working from the ground or a solid platform first, then fall prevention, then harness systems as a last resort. Extension ladders are meant for getting on and off a work area, not for long spells of painting from the top rungs. Ask each painter how they will reach the highest wall and whether their SWMS covers that method.

Scaffolding work, meaning putting up, altering or taking down a scaffold, needs a high risk work licence when someone could fall more than 4 metres. WorkSafe Tasmania sets out basic, intermediate and advanced scaffolding classes, each one covering more complex types of scaffold. Many painters hire a scaffold business for two storey jobs, and that hire is priced on quote as no Tasmanian estimate is published. Fragile roofs, such as cement sheeting, rusty iron and skylights, are a known fall risk when painters work on gutters and fascias. Roof coating is a separate trade, and the Tasmanian roof painting guide estimates it at $35 to $55 a square metre.

Steep sites raise access questions that are best settled before the painter books a start date. A ladder or scaffold base set on a sloping path or garden bed needs levelling, and the quote should allow time for that. Some back walls can only be reached from a neighbour's yard, so ask the neighbour for permission well ahead of the work. Put any agreement about access, hours and protecting their garden into a short email. Narrow side paths may also limit the size of scaffold that fits, which affects both the price and the method. A site visit is the only reliable way for a painter to judge these points on a hillside block.

Situation WorkSafe Tasmania Rule What the Painter Should Have What to Ask
Interior walls and ceilings General duty to manage risks Stable steps or platforms Floor protection plan
Outside walls with a fall over 2 metres High risk construction work A SWMS before work starts A copy of the SWMS
Scaffold where a fall could exceed 4 metres Scaffolding licence needed Licensed scaffolder to erect it The licence class held
Work near fragile roofing Recognised fall hazard Edge protection or a roof plan How fragile areas are avoided
Extension ladders For access and exit only Platform or scaffold for long tasks Where ladders will be used

Sanders, Compressors and EPA Tasmania Hours of Use

Painters use sanders, compressors for spray guns and pressure cleaners, and each of these can bother neighbours on closely built streets. When we checked, EPA Tasmania hours for power tools and compressors used at homes were 7am to 6pm on weekdays. On Saturdays the hours were 9am to 6pm, and on Sundays and public holidays they were 10am to 6pm. Quiet tasks such as hand brushing and masking can happen at other times, although most painters keep to the same day anyway. Telling neighbours the dates of noisy preparation also gives them time to move cars out of reach of spray drift.

Airless spraying, where a pump forces paint through a fine tip at high pressure, is fast on large walls but sends mist a long way. Ask the painter how they will mask windows, cars, fences and neighbouring walls before any spraying starts. On a windy day a careful painter will switch to brush and roller rather than risk overspray on the house next door. Spray work close to a boundary is worth raising with neighbours along with the noisy preparation dates.

Leftover Paint, Paintback at The Tip and Wash Water

The City of Hobart waste guide sends unwanted paint to the Paintback bin at The Tip at McRobies Gully or at the South Hobart Tip Shop. Paintback is an industry scheme that collects unwanted paint and its packaging so the paint can be treated or recycled. When we checked, the limit was 100 litres a visit, in containers of 20 litres or less with clear labels. Tins needed to be more than half full to go to Paintback, while empty, dry tins could go in the recycling bin. Old paint chips from a pre-1970 house should be bagged as they are collected and kept out of the garden and the drains.

Brush and roller wash water must never be tipped into a gutter, kerb or yard grate, because stormwater drains run to local creeks and the River Derwent. The City of Hobart asks residents not to tip chemicals into stormwater drains and to take waste to a proper facility. Water based paint can be rinsed into a bucket and left to settle, so the solids dry out and go with the rubbish. Solvent based paint and thinners need a waste drop off, and the quote should say how the painter will handle both.

Item Where It Goes Conditions When We Checked Who Handles It
Leftover liquid paint Paintback bin at The Tip or South Hobart Tip Shop Up to 100 litres a visit, tins of 20 litres or less Painter or owner
Empty dry paint tins Kerbside recycling bin Empty and dry Owner
Wash water from water based paint A settling bucket, never a drain Solids dried before binning Painter
Asbestos sheeting offcuts The Tip at McRobies Gully Two layers of thick black plastic, up to 25 kg Licensed removalist for larger amounts
Lead paint chips and dust Bagged as collected Kept out of soil and drains Painter
Drop sheets and masking tape General waste once dry Free of wet paint Painter

Paints, Primers and Fillers to Name on a Hobart Quote

Writing the exact product into the quote lets you compare like with like and check the maker's own application instructions. Dulux makes the Weathershield exterior range and the Wash&Wear interior range for walls that need regular cleaning. Taubmans makes All Weather exterior paint, Endure interior wall paint and 3-in-1 Prep, a combined primer, sealer and undercoat. Wattyl makes Solagard exterior paint, I.D Advanced interior paint and Killrust coatings for metal surfaces. Haymes makes an Ultra Premium paint range along with MetalPlus coatings for gutters, railings and roofing iron. British Paints makes interior and exterior paints, enamels and a Paint and Prime range for quicker repaints.

Porter's Paints makes specialty finishes such as French Wash and Lime Wax for interiors with an aged look. KEIM makes mineral silicate paints, including the Soldalit and Innostar lines, which suit the breathable coatings heritage guidelines prefer. Resene makes wood stains, primers, sealers and undercoats, sold here through its Australian company. Cabot's makes Aquadeck and Natural Decking Oil for outdoor timber, along with Timbercolour deck and exterior paint. Intergrain makes decking oils and timber stains, and the Tasmanian deck painting guide estimates deck coating at $35 to $70 a square metre.

Feast Watson makes Prooftint stains and timber floor varnish for interior boards that form part of a repaint. Selleys makes No More Gaps gap filler and Spakfilla Rapid wall filler for the small repairs done before painting. Rust-Oleum makes primers, stains and sealers, and its Australian site also carries the Zinsser primer brand. Festool makes sanders and M class dust extractors, a filter rating for medium hazard dust, which catch fine particles at the tool. Ask which primer, undercoat and topcoat will go on each surface, and how many coats of each, so quotes can be lined up properly.

Product Details Worth Writing Down

What to record
The maker, product name and sheen level, meaning how shiny the dried paint looks, for each surface.
The primer or sealer chosen for bare timber, new plaster, metal and stained areas.
The number of coats for each surface, and every colour name with its colour code.
Any breathable mineral or lime product proposed for old masonry or sandstone.
Keep a labelled sample of each colour once the job is done. It makes later touch ups simple and helps the next painter match the finish.

Getting a Hobart Home Ready for the Painters

Move furniture away from the walls, take down pictures and curtains, and pack small items into a room the painters will not need. Out in the yard, cut shrubs back clear of the cladding and shift pot plants, so drop sheets and ladders have space on narrow paths. Cool mornings and evening dew are common in Hobart, and most paint makers print a minimum air and surface temperature on the tin. Ask the painter how they will time each exterior coat so it dries before dew or rain arrives. Agree on the use of a toilet, water and power, and where tins and equipment will be stored overnight.

Mould on bathroom and laundry ceilings is common in older homes with poor airflow, and paint alone will not hide it for long. The painter should kill and clean the mould, let the surface dry, then apply a sealer and a paint made for wet areas. An exhaust fan that vents outside helps the new paint last, and it is best fitted before the painting starts. Ask whether the mould treatment is included in the room price or charged as an extra item.

Plan for pets and children to stay clear of wet paint and of any preparation on older surfaces. If you are moving soon, a Hobart removalist can be booked after the painting ends, so fresh walls are not scuffed. Garden beds or paving beside the house are best left to a Hobart landscaper until the outside coats are dry. Keep windows open where you can, and ask for low odour paint in any bedroom that will be slept in that night.

Task When Why It Matters
Move furniture and take down pictures The day before Gives clear access to every wall
Remove curtains and blinds The day before Keeps paint and dust off fabric
Trim plants and clear paths A week before Room for ladders and drop sheets
Tell neighbours about noisy days A few days before Fewer complaints about sanders
Confirm lead and asbestos results Before the start date Sets the safe preparation method
Agree storage for tins and gear The first morning Keeps rooms and paths usable
Arrange care for pets and children Each work day Keeps them away from wet paint and dust

Deposits, Progress Payments and Raising a Problem in Tasmania

When we checked, the deposit could be no more than 10 per cent for contracts under $50,000 and no more than 5 per cent at $50,000 or above. On a smaller job, a modest deposit linked to a written list of materials is the safer choice. Progress payments should follow finished stages, such as preparation complete or the first topcoat on, rather than set dates. Ask for each invoice to show the stage reached, the amount paid so far and the balance still owing. Keep the quote, the product list, the colour codes and the stage photos together in one folder.

When a problem appears, talk to the painter about it, then send the details in writing with photos and a reasonable time to reply. Under the Australian Consumer Law, which sets nationwide consumer guarantees, services must be supplied with acceptable care and skill. Consumer Affairs Tasmania handles consumer complaints and can help assess the issues, but it cannot rule like a court or force compensation. Building Standards Tasmania offers free mediation for contracts of $20,000 or more signed from 1 January 2017, with a neutral person guiding the talks. It begins once a notice of dispute, a written statement of the problem, has been served on the other party. If mediation fails, that Act lets a dispute go to TASCAT, the state tribunal for civil disputes, through its civil and consumer stream.

What to Look Out For on an Older Hobart House Repaint

A cheap quote that leaves out preparation, primer or a second topcoat soon costs more once those items come back as variations. A variation means any change to the agreed work or price, so insist that each one is signed off in writing first. Check that the quote lists each surface, the paint system for it and the number of coats. Be wary of any quote for a pre-1970 house that plans to dry sand or pressure clean without testing for lead and asbestos first. Ask who supplies the scaffold, who removes the waste and whether heritage colours or approvals have been considered.

Ask how long the job will take and how weather days are handled, since exterior coats need dry conditions to cure properly. Look for a written hourly rate for extra repairs found during preparation, such as rotten timber hidden under old paint. Payments are safest when each one matches a finished stage, and a large sum up front is a warning sign. Unit owners should check with the body corporate, the owners' group that runs a strata complex, before booking strata painting on outside walls.

What a Thorough Painting Quote Shows

On a thorough quote
The business name and its active ABN, plus a current certificate of currency for public liability cover.
Each room or wall listed, with its surface, paint system and number of coats.
Lead and asbestos steps for older houses, and how dust and paint chips will be handled.
Scaffold, repairs, waste and clean up, each one priced on its own line.
An agreed rate for any extra repairs uncovered once the old paint comes off.
A quote showing only one total should be broken down into items before you sign it. With only one total, there is no way to tell which painter included primer and a second coat.

Getting Hobart Painting Quotes That Price the Same Surfaces

Send every painter the same brief, with room sizes, photos, the build year, any heritage listing and the finish you want. Insist on a site inspection before any price is given, because soft timber and loose paint rarely show up clearly in photos. Have every painter set out preparation, primer, topcoats, scaffold and waste as their own priced items. Then compare the quotes one item at a time, and look at the totals last. A dearer quote that already covers lead testing and proper timber repairs can work out cheaper once the gaps in the others are filled.

Check the proposed start date, the number of days set aside for preparation and coats, and whether the painter will be on site every day. Ask what happens when rain or heavy dew stops exterior work, and whether those days push the finish date back. Confirm who books the carpenter, plasterer or electrician if their work is needed, and who sets the order they work in. For a sloping block, ask how the painter will reach the back walls and whether a scaffold is part of the price. Keep the accepted quote, colour codes and invoices together after the job. That record helps with any warranty claim and with the next repaint many years later.

A repaint often sits inside a bigger round of work on the house, and the same written notes can brief those other trades too. A new path or driveway beside freshly painted walls can go to a Hobart concreter once the painting is finished. Stained or patchy ceilings are covered in the Tasmanian ceiling painting guide, and room by room work in the interior painting guide. Post that brief as a free job on The Quote Yard, and we will send it to local painters around Hobart for written quotes.

Painters Across Hobart

Painting prices on this page are Tasmanian estimates that apply across Hobart, from the city and Sandy Bay to the eastern shore, Glenorchy and Kingston. Steep or narrow sites may need extra access equipment, which painters price on quote after a site visit.

▶ Hobart 30 areas
Hobart CBD Battery Point Sandy Bay South Hobart West Hobart North Hobart New Town Lenah Valley Mount Stuart Moonah Glenorchy Claremont Berriedale Rosetta Montrose Bellerive Howrah Lindisfarne Rosny Park Lauderdale Sandford Kingston Blackmans Bay Taroona Margate Brighton Bridgewater Sorell Richmond New Norfolk
▶ Launceston 26 areas
Launceston CBD East Launceston West Launceston South Launceston Newstead Norwood Kings Meadows Youngtown Prospect Riverside Trevallyn Summerhill Legana Grindelwald Exeter Beaconsfield Beauty Point Rosevears Hadspen Carrick Longford Perth Evandale Scottsdale Lilydale George Town
▶ Devonport & Burnie 26 areas
Devonport East Devonport Spreyton Miandetta Latrobe Port Sorell Shearwater Hawley Beach Ulverstone Turners Beach Penguin Burnie Somerset Wynyard Boat Harbour Sisters Beach Stanley Smithton Wivenhoe Cooee Park Grove Montello Sheffield Railton Westbury Deloraine
▶ Huon Valley 22 areas
Huonville Ranelagh Franklin Port Huon Geeveston Dover Southport Cygnet Lymington Gardners Bay Woodbridge Middleton Snug Kettering Bruny Island Alonnah Grove Glen Huon Judbury Lower Longley Leslie Vale Pelverata
▶ East Coast 22 areas
St Helens Scamander Beaumaris Binalong Bay Stieglitz Pyengana Fingal Mathinna Bicheno Coles Bay Swansea Orford Triabunna Maria Island Buckland Dolphin Sands Cranbrook Apslawn Seymour Falmouth Four Mile Creek Gray

Hobart Painter FAQ

Does repainting my Hobart house need a building permit?
No, repainting an existing house is treated as low risk maintenance work in Tasmania. Building Standards Tasmania guidance says minor repairs and maintenance of existing homes need no building permit and no licensed builder. The official list of work categories includes wall finishes and cladding in that lowest risk group. Heritage listings are a separate question, so check them before you change the outside colours.
Can I change the exterior colour of a heritage listed house?
Possibly, but you need to check which list the house is on first. Any place on the state heritage register needs Heritage Council approval, and repainting often goes through a minor works approval. For locally listed houses, the planning scheme exempts repainting only in a colour similar to the existing one. A clearly different colour scheme may need a planning permit from the council. Heritage Tasmania offers free advice by phone before you lodge anything.
Should a painter test for lead before preparing my house?
Yes, if the house was built before 1970, because lead paint was common in Australian homes before then. Sanding, scraping and burning off old paint can release lead dust that harms young children and pregnant women. A test of the old layers tells the painter whether dust control and wet methods are needed. Ask for the testing and the clean up method to be written on the quote.
Is it safe to pressure clean an older house before painting?
Not until any fibre cement sheeting has been checked for asbestos. The national asbestos agency warns against cleaning asbestos materials with high pressure water or compressed air. WorkSafe Tasmania says homes built before the mid 1980s are highly likely to contain some asbestos. Have suspect eaves and cladding tested, and keep them off the pressure cleaning list until the results are back. Lead paint on pre-1970 houses also needs testing before any water blasting.
Who puts up scaffolding for a two storey repaint?
A scaffold with a possible fall of over 4 metres must be put up by a worker holding the right scaffolding licence. WorkSafe Tasmania issues basic, intermediate and advanced scaffolding licence classes. Many painters hire a scaffold business for this, and the cost is priced on quote. Ask whether the scaffold is included in the painting price or charged separately.
What must a painting contract of $20,000 or more include in Tasmania?
It must be in writing, and when we checked, the deposit could be no more than 10 per cent for contracts under $50,000 and no more than 5 per cent at $50,000 or above. Statutory warranties apply, including suitable materials and work done with reasonable care and skill. Building Standards Tasmania says these contracts carry a cooling off period of at least five business days. Warranty claims must be started within six years of practical completion. Free mediation through Building Standards Tasmania is also available if a dispute arises.
What hours can painters run sanders and compressors near neighbours?
When we checked, EPA Tasmania hours for power tools and compressors at homes were 7am to 6pm on weekdays. Saturday hours were 9am to 6pm, and Sunday and public holiday hours were 10am to 6pm. Quiet work such as masking and brushing can be done outside those hours. Telling neighbours the noisy days in advance helps avoid complaints.
Where do I take leftover paint in Hobart?
The City of Hobart waste guide sends leftover paint to the Paintback bin at The Tip at McRobies Gully or the South Hobart Tip Shop. When we checked, Paintback took up to 100 litres a visit in containers of 20 litres or less. Tins needed clear labels and had to be more than half full. Empty, dry tins can go in the recycling bin instead. Never pour paint or wash water into a stormwater drain.
Can sandstone or face brick be painted?
It can be, but the heritage guidelines advise against painting unpainted brick or stone. Paint changes the look of the wall and can trap moisture, which may damage soft sandstone. On a heritage listed place, coating bare historic masonry for the first time may need a full permit application. Where masonry was painted before, lime wash or silicate paint lets moisture escape better than ordinary acrylic. Ask the painter which breathable product they propose before agreeing to the quote.

Hobart Painting Specialists

For Trades & Contractors - TAS

Painting jobs in Hobart often turn up work for other trades, such as rotten weatherboards, cracked ceilings or rusted roof iron. Links to that follow-up work across Tasmania sit below, along with jobs for trades looking for new clients.

Ready to Book a Painter in Hobart?

Post your job with the rooms, outside surfaces, photos and the year your house was built, and we will connect you with local painters across Hobart. Compare written quotes that price the same surfaces before you book.

Get Free Painting Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 27 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

We service all regions including Hobart, Launceston, and regional areas. Verify licences at CBOS Tasmania.
Prices are 2027 estimates based on current Tasmanian painting price guides. Your final price will depend on the surfaces, the age and state of the old paint, the height and slope of the site and any lead, asbestos or heritage steps, so compare written quotes that show preparation, coats, scaffold and waste separately.
Need a painter in Hobart?Get free Hobart painter quotes Post a Job – It's Free