ACT Landscaping Work on The Quote Yard
Start with a 6-month free trial. After trial, plans from $25/month or PAYG from $8 per job lead. Full details at thequoteyard.com.au/pricing-for-tradies.
Landscaper Jobs ACT 2026 - Get Construction, Softscape & Design Leads
Looking for more landscaping work in the ACT? On The Quote Yard, homeowners, builders and owners corporation managers may post projects for full backyard transformations, retaining walls, paving and driveways, decking and pergolas, pool surrounds and fencing, turf and artificial grass, drainage and irrigation, and commercial grounds work. Leads reach you across Canberra from Belconnen and Gungahlin through the inner north and south to Woden, Weston Creek, Tuggeranong and Molonglo, you quote the customer direct, and every dollar you win stays yours. Whether you build structural hardscape or run a softscape and design practice, the platform reaches customers actively seeking prices. Jobs range from a single turf laying through to a full backyard rebuild.
Information on this page is general only - check current requirements with the relevant authorities.
Landscaping Job Categories - ACT 2026
| Job Category | Typical Scope | What Governs It |
|---|---|---|
| Full backyard transformation | Levels, retaining, paving, turf, planting, lighting and irrigation | Tree protection zones restrict excavation across much of the site |
| Retaining walls | Timber, concrete sleeper, block and stone walls with drainage | Height triggers building approval and engineering design |
| Paving and driveways | Concrete, pavers, exposed aggregate, crossovers and paths | Frost heave and clay movement both act on rigid surfaces |
| Decking and pergolas | Timber and composite decks, pergolas, screens, outdoor structures | Height and area determine the approval pathway |
| Pool surrounds and fencing | Coping, paving, screening, compliant barriers and gates | Barrier standards and certification apply |
| Turf and artificial grass | Soil preparation, levelling, cool season turf, synthetic installation | Autumn and spring are the establishment windows |
| Drainage and irrigation | Subsurface drainage, agricultural lines, automatic irrigation, pits | Frost reaches shallow lines; mains connection is licensed plumbing |
| Commercial and institutional work | School grounds, aged care, office precincts, common property | Higher public liability limits; access clearances |
Landscaping Licensing in the ACT
Landscaping is not licensed as an occupation in the ACT, so no landscaping licence exists and horticultural work carries no trade credential. Structural landscaping is different, because building work contracted directly with an owner requires a construction occupations licence held by a builder, and that reaches retaining walls, decks, pergolas and paving attached to a dwelling. The obligation that catches landscapers hardest sits elsewhere again: the Territory protects trees more tightly than any state and defines damage broadly enough to include ground disturbance near a regulated tree. Access Canberra issues construction occupations licences and handles tree protection approvals.
Licence and permit requirements by activity and location are listed at ABLIS, with workplace safety through WorkSafe ACT. Tax obligations sit with the ATO, employment conditions with the Fair Work Ombudsman, national safety guidance with Safe Work Australia, and business registration through business.gov.au.
How The Quote Yard Works for ACT Landscapers
How Canberra landscaping projects are posted and matched
The Quote Yard brings ACT landscapers together with homeowners, builders and owners corporation managers publishing projects directly. Somebody describes what they want done to the site, ticks the services involved, and posts it. Landscapers covering that district receive an alert, weigh whether the project suits their capacity, and price it to the client without anybody sitting in between. Every enquiry starts with a person after a figure, though at this scale the plan is frequently still forming. How the platform operates for each occupation is set out at find tradie jobs Australia.
Setting up your landscaper profile
Fifteen minutes covers a profile properly. Nominate the services you take on, define your districts, and upload a photo of your credentials and insurance. Landscaping spans a wider band than most trades here, running from a single turf laying through to a terraced rebuild with retaining and drainage, so a narrow listing hides you from work you would happily take. Design capability is worth flagging separately because Canberra clients ask for it more than most. Clients verify who they are hiring through how to check tradie licence and insurance.
Check the trees before you price the job
No other jurisdiction makes this the first question, but in the ACT it is. Regulated trees are defined by measurable thresholds and the protection zone around them restricts excavation, trenching and machinery access, which means a mature tree can determine what is buildable on a site before anything else is considered. Establishing that position at first contact instead of after a design is drawn saves weeks. The same move also stops you committing to a programme that cannot lawfully happen. Leasehold title sits underneath every project in the Territory.
Transparent pricing and no commissions
Your first six months cost nothing across whichever services and districts you nominate. After that, membership runs from $25 monthly or from $8 per lead where projects arrive unevenly. Nothing is taken from what you win, so a $55,000 backyard rebuild carries the same platform fee as a $900 turf job. That reverses the arrangement percentage-based services operate under.
ACT Landscaping Work in 2026: What's Available
Mature trees on established blocks
Canberra was planted deliberately and heavily, and the inner and mid-century suburbs now carry mature trees on almost every block. Ignoring a protection zone is how careless operators end up facing a penalty. For a landscaper a mature tree is a constraint before it is an amenity, because the protection zone around a regulated tree reaches further than most clients assume and it governs where a retaining footing, a drainage run or a paved area can actually go. Working with what has to stay, instead of assuming it can go, is the skill this market rewards. Species choice on those streets was made by planners rather than owners, which is why whole avenues share one form. Anybody quoting a garden nearby inherits that canopy as a fixed condition.
Frost, freeze and what it does to hardscape
Canberra records more frosts than any other capital, and water that gets into a pavement, a wall or a joint expands when it freezes. That produces heave, spalling and joint failure that a coastal landscaper never has to design against. Concrete and mortar both carry genuine minimum placement temperatures here, which compresses the wet trades season. Programming those elements around the coldest weeks is a decision made in autumn and not in July. Repetition does the damage rather than any single cold night. Detailing copied from a coastal project fails here for exactly that reason.
Mid-century gardens reaching replacement
The town centre suburbs were built out through the sixties and seventies and their original landscaping has now reached the end of its life. Failed timber retaining, cracked concrete paths, tired planting and drainage that was never adequate all come up together on the same properties. That produces full transformation work, not piecemeal repair. Landscaping services are at landscaping ACT.
Design as a saleable service
Canberra clients ask for a plan more often than clients in comparable markets, partly because the tree, lease and approval questions make an ad hoc approach risky. A landscaper who can produce a considered design and then build it captures both halves of the project. It also justifies a higher figure without argument because the client can see what they are buying. Design work is at garden design and landscape design ACT.
Institutional and commercial grounds
Canberra carries an office, education and institutional building stock disproportionate to the city's size, and those sites commission landscape construction and grounds renewal on planned cycles. Owners corporation common property adds a further stream with committee approval and a sinking fund behind it. Both pay to terms and schedule well ahead. Access clearances apply on many of those properties. Procurement on those sites runs to programme and pays to agreed terms. Induction and access approval usually precede any physical work.
Types of Landscaping Work Available in the ACT
Full backyard transformations
A complete transformation combines levels, retaining, paving, structures, turf, planting, lighting and irrigation into one contract, and it is the highest value residential work a Canberra landscaper takes. Sequencing decides profitability, since drainage and services go in before anything is capped and retrofitting either is expensive. Tree protection frequently dictates the layout before aesthetics get a say. Staging the work so a client sees progress keeps a long project comfortable.
Retaining walls
Retaining runs from timber sleeper edging through concrete sleeper and block systems to stone and terraced arrangements. Drainage behind the wall matters more than the facing material and is where most failures originate, and freeze cycling punishes a wall that holds water. Height triggers building approval and engineering design, and excavation for footings is exactly the activity that reaches a tree protection zone. Wall work is at retaining wall builders ACT.
Paving, driveways and crossovers
Concrete, pavers and exposed aggregate cover paths, patios, courtyards and driveways, with base preparation determining survival more than the surface material does. Clay movement and frost heave both act on rigid surfaces, so base depth and subsurface drainage need more attention here than on a sandy coastal site. A crossover reaches Territory land at the verge and carries its own requirements. Driveway work is at paving and driveway installation ACT.
Decking, pergolas and outdoor structures
Timber and composite decking, pergolas and screens sit in the structural half of landscaping and carry approval thresholds based on height and floor area. Bushfire construction levels reach decking material and detailing along the urban edge and through the rural districts. Frost and a wide temperature swing work on outdoor fixings harder than a mild climate does. Pergola work is at pergola builders ACT.
Turf, artificial grass and planting
Cool season turf dominates Canberra lawns and establishes best in autumn and spring rather than through midsummer heat or winter cold, which narrows the useful laying window at both ends. Preparation, levels and drainage decide the outcome long before the turf arrives. Artificial grass suits shaded courtyards and rentals where natural turf struggles. Lawn installation projects appear under turf laying and natural lawn installation ACT.
Drainage, irrigation and lighting
Subsurface drainage, agricultural lines, automatic irrigation and low voltage lighting are the systems clients notice only when they fail. On Canberra clay drainage is the more important of the two and the more commonly skipped. Shallow irrigation lines and above-ground fittings both suffer frost damage that a warmer city never sees. Drainage work is at drainage ACT.
Pool surrounds, fencing and screening
Coping, paving, screening and compliant barriers around a pool all interact with the barrier rather than sitting beside it, so a planting bed or a stacked material pile inside a non-climbable zone breaks compliance. Certification is checked, not assumed. Fencing and screening work sits alongside it on most projects. Pool fencing is at pool fencing installation ACT.
Trees, Leases and Approvals
Regulated trees and the protection zone
The Territory defines regulated trees by measurable thresholds covering height, trunk circumference and canopy spread, so the test is something you can assess standing on the site rather than a species list. Around each one sits a protection zone, and work inside it can constitute damage even where nothing is cut. Trenching for drainage or irrigation, excavating a retaining footing, laying a paved area and running machinery over the root zone all fall inside that definition. Penalties attach to whoever carried out the work, not only to the owner who requested it. Those figures are checkable on site before anybody commits to a design.
Why this governs landscape design
A mature tree can determine what is buildable on a Canberra block before levels, drainage or aesthetics are considered at all. Redesigning around a tree discovered at excavation stage costs far more than establishing the position during the first site visit. Clients rarely know their own status and appreciate being told by somebody who checked. Being the operator who raises it is a reason to be chosen, not a reason to lose the job. Establishing that at the outset avoids redrawing a plan somebody has already paid for.
Leasehold land and the purpose clause
Land in the ACT is held under Crown lease rather than freehold, with a purpose clause setting out what the site may be used for. That reaches landscaping where a project involves a secondary structure, a change of use or works beyond what the lease permits. A lease variation carries its own timeframe and cost and sits ahead of everything else. Operators arriving from a state background are caught by this repeatedly.
Building approval for structural landscaping
The Territory has no local councils, so building approval comes from a licensed building certifier rather than a council surveyor. Retaining walls above a specified height, decks above a specified height and structures over a certain floor area all reach that pathway, and engineering design goes with it. Determining early which elements need approval keeps a programme realistic. Building work contracted directly with an owner also needs a construction occupations licence.
Nature strips and verge work
The verge outside a Canberra house is Territory land instead of the occupier's, which reaches driveway crossovers, verge planting and anything growing there. A client asking you to remove a street tree or reshape a verge may be asking for something that is not theirs to authorise. Crossover work carries its own requirements at the boundary. Checking before quoting is a short call.
Bushfire prone areas and outdoor construction
Designated bushfire prone land covers much of the urban edge and the rural districts, and the construction level assigned to a site reaches decking, screening, subfloor enclosure and landscape elements close to a dwelling. Material selection to that level costs less designed in than replaced afterwards. Planting close to a house falls inside the same considerations. Confirming that on site beats assuming it from a plan. Owners rarely raise it themselves, so the question has to come from you.
ABN, GST and Long Service Leave
ABN registration and PAYG withholding
Whether you trade alone, in partnership or through a company, an ABN is needed and the Australian Business Register issues it at no cost. Engage anybody who does not hold one and top-rate withholding becomes your responsibility as the payer. That applies from the first labourer or subcontractor you bring onto a site. Recording ABNs at engagement rather than at invoicing avoids the problem entirely.
GST and project turnover
Landscape construction at project scale passes the $75,000 threshold on a handful of jobs, so timing, not eligibility is the practical question. Materials, plant hire and subcontractor invoices all carry input credits against what you collect. Deposits and progress payments both include GST, which affects what reaches your account each month. The requirement is administered by the ATO.
Taxable payments reporting
Construction businesses lodge an annual report of payments made to contractors, and a landscaper engaging excavator operators, concreters or fencers sits inside that obligation. What you report is checked against each contractor's own return. Capturing the details as work happens turns lodgement into paperwork, not a reconstruction. Discrepancies surface at the matching stage rather than years afterwards. Keeping contractor details current through the year removes the July scramble.
Portable long service leave
Building and construction workers in the Territory accrue long service entitlements that follow them between employers and engagements instead of resetting each move. Registration and reporting duties attach to employers in the industry. Movement between employment and contracting is normal in landscaping, which is exactly the situation the scheme was designed for. The cost of checking is trivial against the cost of being wrong. It belongs in the quote rather than in a conversation afterwards.
Insurance for ACT Landscapers
Public liability insurance
Public liability is required by every builder, owners corporation manager and commercial principal, and residential clients increasingly ask before work begins. Houses typically want $5 million to $10 million of cover, while institutional, commercial and common property contracts push that to between $10 million and $20 million. Damage to underground services during excavation is the claim landscapers make most often. Machinery damage to driveways, fences and adjoining property runs a close second.
Tree damage as a distinct ACT exposure
Damaging a regulated tree carries a statutory penalty beyond any replacement cost, and root damage from trenching or machinery is the version most likely to reach a landscaper. Whether a policy responds to a statutory penalty is a question worth asking your broker specifically. Certainty about approvals before excavation is the only reliable control. No state carries an equivalent exposure.
Plant, tools and hired equipment
Excavators, compactors, saws and vehicles represent serious capital, and hired plant carries its own damage liability that a tool policy does not cover. Theft from site and from vehicles is the commonest claim and a frequent exclusion at once. Reading the storage wording is what determines whether an overnight loss is paid. Experience shortens that assessment considerably. Nothing about it is obvious from the street.
Workers compensation and income protection
Take on staff in the Territory and workers compensation cover is required, with an apprentice counting from their first shift. Neither a sole trader nor a working director has cover for their own injury under that scheme, which matters in work this physical. Award wages for employees are published by the Fair Work Ombudsman. A photograph taken at the time answers it later. Most operators skip the step and pay for it eventually.
Contracts, Payment and Getting Paid
Written contracts on transformation work
A full backyard project reaches a value where a written contract is not optional, and it should name the stages, the materials, the exclusions and what triggers each payment. Landscape briefs expand more readily than most trades because a client can see the site changing and imagine more. Naming what is outside the price protects the relationship as much as the margin. Verbal agreement on a figure that size protects neither side. Deposit limits and progress payment rules apply to residential work of that scale.
Scoping against the ACT unknowns
Tree protection and the lease position both belong in the contract and not in a conversation. State what the price assumes about tree protection and who bears the cost if an approval or a redesign proves necessary. Written down, each turns a later argument into a variation with a number attached. An owner who discovers either constraint mid-project blames whoever failed to raise it. Both are checkable before a design is drawn.
Ground conditions and rock
Excavation on Canberra clay and the Hills fringe turns up rock, fill, buried construction waste and old services that no site visit reveals. An allowance stated in the quote, with a rate for what exceeds it, is fairer than an argument at the machine. Photographing what comes out settles it immediately. The figure moves with the site rather than the size of the job. Judgement here comes from having been caught once.
Progress payments and deposits
Staged payments tied to defined milestones keep a long project funding itself rather than funding it from your own working capital. Material deposits on stone, pavers and timber fall due before any of it is installed. Owners corporation and commercial payers run to a defined cycle whatever your invoice states.
Security of payment under builders
Territory legislation provides a route to chase progress payments that avoids the court system. Once your claim is served the other party has a defined period to reply with a payment schedule, and an inadequate response exposes them to adjudication. Windows are short and unforgiving. Guidance sits at subcontractor jobs.
Safety Risks and What to Watch Out For
Excavation and buried services
Striking a live cable, gas main or water service turns a routine day into an emergency, and plans show approximate positions with depths that vary from what is drawn. Hand digging to find a service first is the only reliable safeguard. Canberra clay behaves quite differently wet and dry, and an unsupported face can fail without warning.
Machinery on sloping ground
Excavators and compactors on the slopes of the Hills fringe and the older suburbs roll more readily than operators expect, particularly with a load raised. Frost on a slope in the early morning changes traction entirely. Ground conditions should decide the plant rather than what happens to be on the trailer.
Cold, frost and winter site work
The Territory records more frosts than any other capital, so frozen ground, icy surfaces and numb hands are routine winter conditions, not exceptional ones. Your hands lose strength well before your brain registers it. Muscles that have not warmed are why backs go on the first lift of a cold morning.
Manual handling and repetitive load
Pavers, sleepers, stone and soil are all heavy and handled repeatedly across a day, not once. Backs, shoulders and knees wear from the volume rather than from any single lift. Mechanical handling and two-person lifts cost nothing against a career-ending injury.
Silica dust and cutting
Cutting pavers, blocks and concrete generates respirable crystalline silica, and the controls are water suppression or on-tool extraction and not a dust mask. Cutting in an enclosed courtyard concentrates the exposure. Anybody routinely in that exposure group needs health monitoring.
Practical Tips for Winning Better ACT Work
Make tree assessment part of your first visit
Measuring the trunk and pacing the canopy takes minutes and determines what is possible on the site. Clients who have watched two other landscapers ignore the question remember the one who raised it. That approach also keeps you clear of a penalty that follows whoever did the work, not whoever asked for it.
Sell design before you sell construction
A paid design establishes what the project actually is, filters the clients who were never going to proceed, and puts you in front for the build. Canberra clients ask for plans more readily than most markets because the approval questions make an improvised approach risky. It also lets you price properly instead of guessing.
Programme wet trades around the frost
Concrete and mortar carry genuine minimum placement temperatures, and pouring into conditions the specification does not allow produces a result that fails later with your name on it. Scheduling those elements for the warmer months while planning planting, structures and preparation for the cold ones keeps a crew working. That decision belongs in autumn.
Put drainage in before anything covers it
Canberra clay sheds water rather than absorbing it, and retrofitting drainage under a finished paved area means removing the paving. Landscapers who present drainage as a headline item instead of burying it in a total win the clients who have already had one failure. The same move also protects your own work from the problem that caused theirs.
Photograph everything you excavate
Rock, fill, buried waste, old services and the state of an adjoining driveway all become disputes unless recorded at the moment they appear. A dated image supports a variation and clears you of a pre-existing condition. Take them before the machine moves rather than afterwards.
Build a commercial and institutional stream
Schools, aged care operators, office precinct managers and facilities managers commission landscape construction and grounds renewal on planned cycles unrelated to residential demand. Canberra's institutional base is disproportionate for a city this size and it steadies a book through a slow domestic period. Access clearances and higher insurance limits apply on those properties.
Canberra District Market Overview
Inner north and inner south
The oldest suburbs sit on generous blocks with the heaviest mature planting in the Territory, which makes tree protection a live question on nearly every project. Value per job runs highest here and clients expect design and not a quote off a walkthrough. Some precincts carry heritage considerations affecting what can be altered outside.
Belconnen, Woden and Weston Creek
The mid-century town centres deliver the largest volume of transformation work, on blocks where the original landscaping has reached the end of its life all at once. Failed timber retaining, cracked paths and inadequate drainage come up together. Blocks are large enough that full rebuilds are realistic, not cosmetic.
Tuggeranong, Gungahlin and Molonglo
Tuggeranong's eighties and nineties gardens are entering their first replacement cycle. Gungahlin and Molonglo run newer housing on tighter blocks, where courtyard treatments, artificial turf, decking and small-space design dominate over structural earthworks. Higher density brings common property landscaping alongside detached housing.
Rural districts and the urban edge
Rural leases, Hall, Tharwa and properties fringing the reserves run on acreage with slope, rock and bushfire considerations that a suburban site never presents. Access for plant is the first constraint instead of the last. Getting there and setting up cost more than a suburban equivalent suggests.
Technical Standards for ACT Landscapers
Freeze and thaw on paving and walls
Water that enters a pavement, a joint or a wall and then freezes expands, which lifts pavers, spalls concrete surfaces and opens mortar joints over successive winters. Sealed, well-drained and correctly bedded work survives it while work that holds water does not. That failure mode simply does not occur in a coastal city, so detailing copied from a Sydney job underperforms here.
Concrete and mortar in cold conditions
Placement runs against genuine minimum temperature limits through a Canberra winter, and curing behaves unlike the specification assumes when conditions are cold. Strength gain slows and early frost on a fresh surface causes lasting damage. Programming pours and wet trades around the coldest weeks is the practical answer.
Reactive clay and base preparation
Much of Canberra sits on clay that moves with seasonal moisture change and sheds water instead of absorbing it. Base depth, compaction in layers and subsurface drainage decide whether a paved area survives, far more than the surface material does. Retaining wall footings follow site classification and not a standard detail.
Retaining wall drainage and design
Behind every retaining wall the drainage layer, aggregate and outlet do more than the facing material, and hydrostatic pressure is what pushes a wall over. Freeze cycling makes trapped water actively destructive rather than merely heavy. Height thresholds trigger engineering design and building approval, and terracing is not a way around them.
Cold climate planting and turf establishment
Cool season turf establishes in autumn and spring, and laying into midsummer heat or a frost window wastes the client's money. Planting timed for after the frost window establishes better than anything planted through it. Species selection has to allow for genuine frost and not the light touch a coastal palette expects. Mulch moderates soil temperature through both extremes here. Bed preparation jobs are listed under mulching and garden bed preparation ACT.
Frequently Asked Questions - Landscaper Jobs ACT
Do I need a licence to landscape in the ACT?
How do tree protection zones affect a landscaping job?
What does frost do to hardscape here?
Does the Crown lease affect landscaping?
When does a retaining wall need approval?
Why does drainage matter so much on Canberra sites?
When should turf and planting go in?
How should I handle rock and unknown ground?
What insurance do I need as a landscaper?
How does the free trial work?
Landscaping Specialties on The Quote Yard
Customers post landscaping work by specialty, and each of these carries projects across the ACT.
Find Trade Work Across the ACT
Protecting Yourself as a Subcontractor
Contracting landscaping work beneath a builder or principal contractor instead of direct with an owner moves a set of risks squarely onto a ACT operator. The head contractor's cover stops at their liability, so a ACT landscaper carries their own, with the certificate produced before starting on site. A ACT landscaper needs liability at the specified figure, cover for excavators, compactors and hired plant, and an income policy, none of which any principal provides.
Reduce every landscaping engagement to writing before starting, including short ones for ACT clients you have known for years, because earthworks that grew once the machine was already on site is what turns into an argument once the invoice lands. A brief note works, covering included landscaping work, excluded work, the figure, payment timing under the ACT terms, and the route for a variation. Getting the ACT principal to acknowledge it by email takes a minute and resolves any later dispute.
A ACT landscaper is better keeping the record live than piecing it together when challenged. Record the site and the neighbour's frontage before plant arrived, whatever came out of the ground, and the finished work, with a running note of attendance and work performed on each ACT property. Security of payment legislation applies in the ACT and hands a landscaper a statutory path to progress claims, worth reading before the day it matters. Where money is significant or clauses look odd on a ACT landscaping contract, legal review is inexpensive by comparison.
General Information Only
This page provides general information only and is not professional advice of any kind. Details may change, so always verify with the relevant authorities and seek professional independent advice where needed.
Ready to Win More Landscaping Work in the ACT?
Sign up free on The Quote Yard and start receiving landscaping project leads. Full backyard transformations, retaining walls, paving and driveways, decking and pergolas, pool surrounds and fencing, turf and artificial grass, drainage and irrigation, commercial grounds work and 200+ services with projects posted.
Sign Up Free and Find Landscaping WorkTradie Job Leads In ACT – New Leads Posted Daily
| State | Territory | Job Leads | Major Cities |
|---|---|---|---|
| ACT | Australian Capital Territory | ACT Job Leads | Canberra, Belconnen, Tuggeranong, Gungahlin |
Find Landscaping Work Across the ACT
Browse landscaping work by district across the ACT. The Quote Yard lists full backyard transformations, retaining walls, paving, driveways and crossovers, decking, pergolas and outdoor structures, turf, artificial grass and planting, drainage, irrigation and lighting, pool surrounds, fencing and screening, commercial and institutional grounds work and 200+ services.
▶ Central Canberra 16 areas
Inner North
Inner South
▶ Belconnen 10 areas
Belconnen Districts
▶ Woden & Weston 15 areas
Woden Valley
Weston Creek
▶ Tuggeranong 9 areas
Tuggeranong Districts
▶ Gungahlin 9 areas
Gungahlin Districts
▶ Queanbeyan & Region 7 areas
Surrounding
Reviewed by The Quote Yard Editorial Team
How The Quote Yard Works for Tradies
The Quote Yard is a job lead platform that connects licensed landscapers and garden contractors with customers posting work across Australia. We do not perform any trade work ourselves. You quote directly with the customer. Always ensure your licence, insurance, and scope of work are current before accepting any job.