Looking for a Bathroom Renovator in Perth?

Tell us the suburb, the room size and whether any fixtures are moving, and we will connect you with renovators taking work in your area.

Get Bathroom Quotes

What a Perth Bathroom Renovation Costs

Full renovation, metropolitan Perth$18,000 to $35,000
Cosmetic refresh, waterproofing untouched$7,000 to $13,000
Waterproofing as its own quote line$900 to $2,200
Tiling labour, standard format$70 to $130 per m2
Toilet relocated, slab cut and repoured$1,200 to $2,800
Linear channel drain instead of a round waste$450 to $1,000 extra
Frameless shower screen, made to measure$1,500 to $3,400
Exhaust fan ducted outside instead of the roof$250 to $600 more
Asbestos removal from an older bathroom$1,500 to $4,000
Waterproofing rectification two years later$7,000 to $15,000

Bathroom prices spread widely because room size, access and how many fixtures move vary so much from house to house, so treat every figure here as indicative only. Have waterproofing itemised as its own line on each quote you collect, since bundling it into the tiling price is how the item that matters most gets hidden. Ask for the tile, tapware and vanity allowances in dollars as well, because that is what tells you your real spend before anything becomes a variation.

Find Bathroom Renovator Perth WA - What to Check and Get Quotes

Waterproofing is the defect behind most bathroom disputes in Perth, it is covered by AS 3740:2021 Waterproofing of domestic wet areas, and it is buried under tiles within two or three days of being finished. Nobody can see afterwards how far the membrane turned up the wall, whether the internal corners were reinforced, or whether it was dressed into the floor waste flange. The single most useful thing you can do on your own renovation is photograph that membrane on the day it is finished and before the tiler arrives. Capture each wall with a tape measure in frame, every internal corner, the floor waste, every tap and shower penetration, and the membrane container itself. Those photographs cost nothing, take about ten minutes, and are the only record that will ever exist of that layer. A full renovation across metropolitan Perth runs an indicative $18,000 to $35,000, while stripping and redoing failed waterproofing later runs an indicative $7,000 to $15,000. Waterproofing is not a separately licensed trade in Western Australia, so the membrane product, the coat count and your photographs carry the weight instead. Ask which membrane is specified and how many coats. This guide covers falls and drains, slab on sand construction, moving fixtures, the trade sequence, tiles and substrate, hard water, extraction, selections, strata bathrooms, who holds the contract, quotes, compliance, disputes and costs.

Finding a Bathroom Renovator in Perth and Across Western Australia

Write your own scope before ringing anybody, naming the room size, whether fixtures are moving, your tile and tapware allowances and the access to the room. Ask every renovator who applies the waterproofing membrane and have that answer given by email rather than on site. We can connect you with Perth renovators who quote against the same written scope.

Get Free Quotes

At a Glance - Supervising a Perth Bathroom Renovation

Step What It Involves Typical Timeframe What Decides It
Confirm the floor and the waste positions Slab on ground, sewer connection marked An afternoon Coring against trenching
Write your own scope Room size, fixtures, allowances, access An afternoon Three quotes against one job
Settle the selections Tiles, tapware, vanity, screen, fan Two to four weeks Lead times, not taste
Confirm who holds the contract Builder managing trades or a trade subcontracting Ten minutes Who answers when it leaks
Check registration on the public register Builder, plumber and electrician numbers Ten minutes What you can verify yourself
Photograph the membrane Walls, corners, waste, penetrations, container Ten minutes The day waterproofing finishes
Walk the room at completion Torch, spirit level, written defects list About an hour Silicone, falls, grout, screen
Keep one folder Contract, variations, certificates, photographs Ongoing What any later process reads

Two moments decide whether a Perth bathroom renovation ends well. The first is the day the waterproofing membrane is finished, which is the only chance anybody will ever have to photograph the layer that causes most disputes. The second is practical completion, when the defects list has to be written down rather than discussed on site. Request the program broken into weeks with each trade named against its days, because that document shows whether anybody has planned it.

How to Supervise It Before and During the Job

Start with the floor and the waste positions, because those two facts set a Perth bathroom budget before any finish does. Almost all Perth housing is slab on ground over the sand of the Swan Coastal Plain, so the suspended timber bathroom floor common in the eastern capitals is rare here. Falls are ground or screeded into concrete rather than built up over joists, and moving a waste means cutting and repouring the slab instead. Coring a single hole runs an indicative $250 to $600, while trenching across a room and repouring runs an indicative $1,000 to $2,800. Find the existing sewer connection and have it marked on the floor before you settle Settle who holds the contract next, since bathroom work in Perth is sold both by registered building contractors managing trades and by tilers or bathroom specialists subcontracting the rest.

Waterproofing is not a separately licensed trade in Western Australia, so there is no waterproofing licence to ask for and the useful questions are about the standard, the product and the record. Building and Energy, which sits within the Department of Local Government, Industry Regulation and Safety, publishes a searchable register of registered contractors on the Western Australian Government website. Plumbing work must be carried out by a licensed plumbing contractor and tradesperson, and electrical work by a licensed electrical Pin down the standards that apply to the parts of the room you will never see again. AS 3740:2021 Waterproofing of domestic wet areas governs the membrane in a house or an apartment, AS 3958.1-2007 Ceramic tiles Part 1 Guide to the installation of ceramic tiles covers the tiling over it, and the AS/NZS 3500 series covers plumbing and drainage, with AS/NZS 3500.2 governing sanitary plumbing and drainage.

Those documents are published and sold by Standards Australia, and the National Construction Code published by the Australian Building Codes Board is what calls many of them up. Name those standards in your written scope so every quote is priced the same way. Deal with the permit question before demolition rather than after the walls are open. Building work generally requires a building permit under the Building Act 2011 unless the Building Regulations 2012 exempt it, and both are published on Western Australian Legislation. Replacing fixtures, linings and finishes within an existing bathroom often falls outside a permit, while removing or altering a wall, resizing the room or creating a new wet area can bring one into play. Your local government building surveyor can confirm your own case in a short phone call that costs nothing.

Asbestos in wall sheeting or floor backing is common in houses built before 1990 and must be handled under the requirements of WorkSafe Western Australia, at an indicative $1,500 to $4,000 for a bathroom. Last, keep the paperwork in one place and know where a dispute would actually go. Under the Home Building Contracts Act 1991 a written contract is required for fixed price home building work valued between $7,500 and $500,000, the maximum deposit is 6.5 per cent of the contract price, and home indemnity insurance applies to permit work valued above $20,000. Building and Energy can take a building service complaint about regulated building work, Consumer Protection handles consumer guarantee and contract matters, and the State Administrative Tribunal of Western Australia hears matters that proceed beyond that stage. An independent building consultant report runs an indicative $650 to $1,600 and leak detection testing an indicative $380 to $950. Your membrane photographs sitting beside.

Costs on this page are indicative for metropolitan Perth. Room size, access, slab work and how many fixtures move are what shift them most. Have waterproofing itemised as its own line on every quote, and photograph the membrane before the tiler starts.

Finding a Bathroom Renovator in Perth, Decision by Decision

Sand under the slab is where a Perth bathroom quote really begins, because the waste positions were fixed when the concrete was poured. Costing a bathroom renovation here turns on whether the plumber cores one hole or saws a trench across the floor. The membrane is the other half of that story, since bathroom waterproofing is applied, cured and then covered by a tiler inside about three days. Ten minutes with a phone camera on that one afternoon is the cheapest insurance on the job.

Budget bands only help once you know which Perth bathroom you actually own. A 1970s Willetton or Riverton room of about four square metres, fixtures left alone, sits near an indicative $18,000. Add a relocated pan, large format tiles and a made to measure screen, and the same room reaches an indicative $35,000. Have waterproofing services quoted as its own figure, which on a room that size is an indicative $900 to $2,200.

Labour rather than the tile itself is where format shows up on the invoice. Expect bathroom tiling at an indicative $70 to $130 per square metre while the setting out stays simple. Anything over 600 mm demands a flatter bed and lifts that by an indicative $25 to $60 per square metre. Flatness comes out of the screed, the mortar bed laid below the tiles, so that hidden layer decides how well large format sits. Cuts are what cost money, so tiling services pricing climbs again for mosaic, herringbone or penny round.

A mosaic shower floor on its own is an indicative $600 to $1,500 of extra labour. Drainage fall is the constraint that settles every layout question in a Perth bathroom. Bathroom renovation plumbing turns expensive the moment a waste has to travel, because the slab must be cut, trenched and repoured. Budget an indicative $1,200 to $2,800 for the pan, and an indicative $700 to $1,500 for a shower or a basin. The rough in stage, when pipes and cables go in before the walls are closed up, is when all of that gets committed. Mark the existing sewer connection on the floor first, since that one point governs what is even achievable.

If the suite is merely dated, toilet repairs and a replacement pan avoid the drainage work altogether. Mineral scale shows on glass long before it shows anywhere else in the room. Ask about a factory coating while ordering through shower screen installation, an indicative $150 to $400 spent before the unit ever arrives. Grout and silicone hold moisture, so mould removal and prevention is a short term fix wherever the fan is the real fault. Perth bathrooms built in the 1960s and 1970s commonly discharge into the roof cavity instead of through the eave.

Moving that termination outside is an indicative $250 to $600 and is the item worth arguing for. Extraction is usually inherited from whatever light fitting was there before, which is how undersized fans survive renovations. Specify heat lamp and fan installation as its own line and name the extraction rate in litres per second. Timers and humidity sensors cost an indicative $90 to $240 and prevent more damage than any cleaning product.

Order joinery early, because vanity and basin installation on a custom unit needs three to eight weeks allowed in the program. Not every leaking shower justifies gutting the room back to the slab. Shower regrouting and leak repairs buys genuine time where the membrane is sound and only the grout has gone. Damp skirting next door, a tide mark above the hob or a stained ceiling underneath all say otherwise. Running a laundry renovation alongside the bathroom shares the trenching and the tiler mobilisation. Price the two rooms as separate lines so either can be shelved without a requote.

Whole house renovation services quotes are where the waterproofing figure quietly vanishes into a lump sum. Demand demolition, rough in, sheeting, membrane, screed, tiling and fit off as seven visible numbers. Licensing detail on the plumbing side sits in the find a plumber in Perth guide. Apartments through Perth CBD, East Perth, South Perth and Scarborough add a shared stack and a strata company over the top of all of it. Approval there takes four to eight weeks, with access and protection at an indicative $1,600 to $4,500.

Why The Membrane Decides How Long The Room Lasts

More bathroom disputes in Perth trace back to the membrane than to any other single defect. AS 3740:2021 Waterproofing of domestic wet areas is the document that governs the membrane in a house or an apartment. Stripping and redoing failed waterproofing later runs an indicative $7,000 to $15,000 on a small room. The most useful thing a Perth owner can do on their own job takes about ten minutes.

Walk into the bathroom on the day the membrane is finished and before the tiler arrives with a single sheet of board. Photograph it then, because that is the only window anybody will ever have. Photograph each wall with a tape measure held in the frame, so the turn up height is provable later. Shoot every internal corner and every wall to floor junction, where a bond breaker, fillet or reinforcing tape should be visible.

Capture the floor waste with the membrane carried into the flange rather than stopping short of it. Ask who applies the membrane before you sign anything, and get the answer by email. Many Perth bathrooms are waterproofed by the tiler as part of the tiling price, which is legal and sometimes done well. Have the membrane priced as its own line so you can see what was allowed for it.

What To Photograph Before The Tiler Starts

Ten minutes The only record of that layer
What to capture
Each wall with a tape measure in frame, showing the turn up height.
Every internal corner and every wall to floor junction close up.
The floor waste with the membrane carried into the flange.
Each tap body, mixer spindle and shower outlet, sealed.
The tiled hob or the level entry threshold at the shower.
The membrane container, recording product, batch and coats.

Waterproofing is covered by AS 3740:2021 Waterproofing of domestic wet areas, and it vanishes under tiles within two or three days of being finished. Rectifying a failed membrane later means lifting tiles, screed and membrane together, which runs an indicative $7,000 to $15,000 on a small Perth bathroom. Photographs taken on the day cost nothing and are the only evidence of what that layer looked like before it was covered. Keep them in the same folder as the contract, the variations and the plumbing paperwork, because that folder is what any later process reads.

Photograph the membrane the day it is finished. Before any tiling.

Grading To The Waste, And Water That Sits In The Wrong Place

Every wet area floor has to move water across to the outlet rather than hold it. Standing water in a shower base is a grading fault, and owners routinely blame the tiles for it. Rectification of that kind runs an indicative $4,500 to $9,500 on a bathroom of about four square metres. Grading inside a shower is steeper than the fall across the rest of the room. Channel drains add an indicative $450 to $1,000 over a standard round waste once screeding is counted. Tile insert grates on their own run an indicative $200 to $480.

Test your own floor before spending money on anybody's opinion. Tip a cup of water onto the tiles just outside the shower and watch it for a full minute. Water heading toward the doorway, or stopping dead in the middle of the room, tells you the floor was never graded. Inside the shower, look for a permanent damp patch or a tide mark away from the waste.

Item What It Involves Indicative
Standard round floor waste Fall graded to a single point Included in most quotes
Tile insert grate Grate filled with matching tile $200 to $480
Linear channel drain One plane of fall across the shower width $450 to $1,000 extra
Level entry shower Steeper grade over a short distance $400 to $1,200 extra
Correcting a fall after tiling Tiles, screed and membrane all lifted $4,500 to $9,500

Slab On Sand Construction And Why Perth Bathrooms Rarely Sit On Timber

Almost all Perth housing is slab on ground over the sand of the Swan Coastal Plain. The suspended timber bathroom floor that dominates period housing in the eastern capitals is genuinely rare here. Falls, meaning the slope that carries water to the drain, are therefore ground or screeded into concrete rather than built up over joists and sheeting. Working in concrete changes what the plumber does rather than removing the work. Coring a single hole for a new waste runs an indicative $250 to $600 depending on access and slab thickness. Cutting a trench across a room and repouring it runs an indicative $1,000 to $2,800 including the concrete repair.

Original 1960s and 1970s bathrooms of about four square metres through Morley, Bentley, Riverton, Willetton and Balga are the classic Perth renovation. Those rooms are small, the fixtures sit tight against the walls, and the drainage was set when the slab was poured. Newer estates at Baldivis, Butler and Harrisdale sit on slab as well, with waste positions that are generally easier to work with. Rear additions on older character stock sometimes sit on a separate slab, a low timber floor or a mix of both. Pull up a corner of the vinyl or lift a floor grate and look at what the fixtures are actually standing on.

Work Why It Is Needed Indicative
Coring the slab for a new waste Single penetration, good access $250 to $600
Saw cutting and trenching Waste relocated across the room $1,000 to $2,800
Screeding falls into concrete Formed on the slab, not over joists Included in most quotes
Slab repair found at strip out Old patching or a failed previous trench $600 to $2,000
Underfloor heating over screed Laid before tiling, cannot be retrofitted $1,200 to $3,000

Moving Fixtures And What It Costs In Plumbing

Fixture positions move a Perth bathroom budget harder than any finish you choose. Keeping the toilet, the shower and the vanity where they are keeps the drainage work to a connection rather than a relocation. Every fixture that moves needs new drainage with continuous fall back to the existing sewer connection. Allow an indicative $1,200 to $2,800 to relocate a toilet, which makes the pan the dearest fixture to move. Showers and vanities move more cheaply at an indicative $700 to $1,500 each, because basin and shower wastes are smaller and shallower.

Water lines are the easy part, since pipe can be run in the wall or the ceiling without touching the slab. Have the layout you want and the layout that keeps the toilet in place priced side by side. That comparison usually lands somewhere between an indicative $1,500 and $4,000 of difference across the whole job. Seeing both numbers is what lets you decide whether the new layout is worth the money.

Fixture What Decides The Cost Indicative
Toilet pan relocated Drainage fall and slab cutting $1,200 to $2,800
Shower waste relocated Shallower waste, shorter run $700 to $1,500
Vanity and basin moved Basin waste and water lines $700 to $1,400
Bath removed for a larger shower Waste capped, floor made good $600 to $1,600
Same layout, new fixtures only Connections rather than relocation Lowest cost option

Trade Order, Curing Times And What Holds A Job Up

Bathroom work is compressed and strictly sequential, leaving almost no room to improvise. Strip out comes first, then the plumbing and electrical rough in, then wall sheeting, the membrane, the screed, tiling and finally fit off. Missing products hold up far more Perth bathrooms than slow trades ever do. A tiler cannot start without tiles, a plumber cannot fit off without the tapware, and a screen cannot be measured until the tiles are on. Order every selection before the strip out and have the boxes sitting in the garage where you can count them. Ask to see the program broken into weeks, with each trade named against its days. A renovator who can produce that list has planned the job, and one who cannot has not.

The Order A Bathroom Has To Be Built In

Three to five weeks Strip out to fit off
The build order
Demolition, strip out and rubbish removal from the room.
Plumbing and electrical rough in, done before any lining goes up.
Wall sheeting rated for a wet area, fixed and sealed.
Waterproofing applied, cured, and photographed before tiling.
Screed to form the falls, then wall and floor tiling.
Fit off, silicone, then the screen measured and installed.

Every trade has to finish before the next one can start, so a single day lost anywhere pushes the whole program behind it. Products that have not arrived hold up far more Perth bathrooms than slow trades, which is why selections belong before the strip out. A program split into weeks with each trade named against its days shows whether anybody has actually planned it. Shower screens are measured to the finished tiles, so allow two to four weeks between the measure and the installation on a made to measure unit.

Order everything before the strip out. Count the boxes yourself.

Tile Format, Grout And The Substrate Beneath Them

Format decides the labour bill on a Perth bathroom far more than the material price does. Standard format work sits at an indicative $70 to $130 per square metre over a substrate prepared to AS 3958.1, the installation standard for ceramic tiles. Tiles over 600 mm demand flatter walls and floors, which adds an indicative $25 to $60 per square metre. Mosaic, herringbone and penny round work multiply the number of cuts and the amount of setting out. Mosaic across a small shower floor is an indicative $600 to $1,500 of extra labour on its own.

Pattern work on a feature wall adds an indicative $400 to $1,200 depending on the layout and the tile. Get the tile allowance in dollars per square metre so you know what you can actually choose. What goes behind the tiles matters as much as the tile itself and gets discussed far less. Wet area wall sheeting has to be a product rated for the location, fixed at the stated centres and sealed at the joints. Insist the sheeting product is named on the quote rather than described as waterproof board.

Choice What It Affects Indicative
Standard format tiling labour Straightforward setting out $70 to $130 per m2
Large format above 600 mm Needs a flatter wall and floor $25 to $60 per m2 more
Mosaic shower floor Many more cuts and joints $600 to $1,500 extra
Pattern or herringbone feature wall Setting out and waste $400 to $1,200 extra
Tiles supplied Stock through to imported stone $35 to $90 per m2

Hard Water In Perth, And What It Does To Fittings, Screens And Grout

Mineral scale on tapware, shower screens and grout is one of the most common complaints about Perth bathrooms. Water Corporation publishes drinking water quality data by scheme, including hardness, and the figure differs between supplies rather than applying to the whole state. Groundwater supplies carry more dissolved mineral than surface or desalinated water, which is why hardness is reported scheme by scheme. Scale is a maintenance problem rather than a structural one, and it shapes what fittings are worth buying.

Deposits spot glass, dull chrome and build up inside aerators and shower roses. Choose tapware with a replaceable aerator, which Caroma and similar Australian ranges support with spares, and a shower rose with rubber nozzles that can be rubbed clean by hand. Scale shows on shower glass first, and there it is hardest to reverse. A factory applied protective coating on new glass runs an indicative $150 to $400 and is worth asking about while the screen is being ordered. Squeegeeing the glass after each shower does more than any cleaning product bought afterwards.

Scale On Tapware, Screens And Grout

Maintenance cost What is worth buying, and what is not
Fitting choice
Why it matters here
Replaceable aerator
Unscrews and clears in two minutes
Rubber nozzle shower rose
Deposits rub off by hand
Protective coating on new glass
$150 to $400 while the screen is ordered
Epoxy grout instead of cement
$15 to $35 per m2 more installed
Whole house softener
$2,500 to $5,000, a separate decision

Water Corporation publishes drinking water quality data scheme by scheme, including hardness, so check your own supply rather than accepting one figure for all of Perth. Groundwater sources carry more dissolved mineral than surface or desalinated water, which is why reported hardness differs between schemes across the metropolitan area. Scale is a maintenance problem rather than a structural one, and it decides which tapware and shower fittings are worth the money. Choose outlets you can reach and clean by hand, because decorative fittings that cannot be reached block and then stay blocked.

Buy fittings you can clean. Squeegee the glass.

Extraction And Condensation

A hot shower in a small bathroom releases litres of water vapour into a room that cannot shed it. That moisture condenses on cold tiles, glass and ceilings, then feeds mould in the grout and the silicone. Test the fan you already have with a single square of toilet paper. Hold it flat against the running grille and let go, because a fan moving useful air will hold the paper without your hand.

A fan that drops the paper is undersized, blocked, badly ducted or all three at once. Find out where the duct terminates, which is the question that matters most in older Perth housing. Many 1960s and 1970s bathrooms through Bentley, Morley and Balga have a fan that discharges into the roof space. Ducting through to an eave vent or a roof cowl costs an indicative $250 to $600 more and is the better money.

Getting The Moisture Out Of The Room

Cheapest prevention A fan that actually moves air
What to check
What good looks like
Toilet paper test
Held against the grille by the fan alone
Duct terminating outside
$250 to $600 more than into the roof
Fan sized to room volume
Rate stated in litres per second
Fan positioned near the shower
Collects steam rather than missing it
Run on timer or humidity sensor
$90 to $240 added to the job

Returning mould after cleaning is almost always an extraction fault rather than a cleaning fault, so regrouting without fixing the fan buys about one year. Many 1960s and 1970s bathrooms through Bentley, Morley and Balga have a fan discharging into the roof space instead of outside the house. That arrangement moves the moisture into ceiling insulation and roof timbers rather than removing it, which trades one problem for a worse one. Have the extraction rate stated in litres per second on the quote, with the duct termination named as an eave vent or a roof cowl.

Ask where the duct ends. Have it stated on the quote.

Selections And Lead Times

Selections are decisions about products, and they set the program as much as they set the budget. Tiles, tapware, the vanity, the screen, the toilet suite and the fan all have to be chosen before the strip out. Stock items from a Perth plumbing merchant such as Reece can be picked up the same week, while indent and custom items run three to eight weeks. A bathroom waiting on a vanity costs you the trades you had booked rather than only the time. Have every allowance expressed in dollars rather than as a brand or a description. Tiles commonly appear as an indicative $35 to $90 per square metre supplied, with imported stone and large format well above that.

A tapware set runs an indicative $400 to $1,500, and a custom vanity an indicative $1,800 to $5,000. Knowing the allowance is what tells you your real spend before anything becomes a variation. Order shower screens after the tiling rather than before, because they are measured to the finished surface. Semi frameless screens off the shelf run an indicative $750 to $1,600 installed, and frameless screens made to measure an indicative $1,500 to $3,400. Allow two to four weeks between the measure and the installation on a made to measure screen. That gap is normal and should be in the program rather than discovered at the end.

Selection Lead Time Indicative
Stock tiles from a Perth warehouse Same week $35 to $90 per m2
Tapware set One to three weeks $400 to $1,500
Custom vanity Three to eight weeks $1,800 to $5,000
Semi frameless screen off the shelf One to two weeks $750 to $1,600
Frameless screen made to measure Two to four weeks after tiling $1,500 to $3,400

Apartment And Strata Bathrooms, And What The By Laws Control

Apartment stock in Perth CBD, East Perth, South Perth and Scarborough carries constraints a house does not. The waste cannot simply be moved, because it connects to a shared stack serving the apartments above and below. Floor levels are set by the slab and there is often no depth available to build up a new fall. Those two facts rule out most layout changes before any design conversation starts. Strata by laws control what you may alter and what approval you need before starting. Work affecting common property, the structure, waterproofing or the services generally needs approval from the strata company.

Waterproofing is commonly treated as common property in an apartment, which brings the strata company into a decision an owner might assume was theirs. Read your own by laws and the strata plan before you commission a design. Allow four to eight weeks for strata approval and build that time into the program rather than the contingency. Many schemes also set rules on working hours, lift bookings, protection of common corridors and waste removal. High rise access and protection add an indicative $1,600 to $4,500 to an apartment bathroom over the same work in a house. Ask whether the renovator has worked in your building or in buildings of that type before.

Who Holds Your Contract, And Who Answers For The Finished Room

Bathroom work in Perth is sold two ways and the difference matters more than the price. A registered building contractor holds the contract, manages the trades and answers for the finished room. A tiler, a plumber or a bathroom specialist may instead hold the contract and subcontract the trades they do not perform. Ask directly who holds the contract, who applies the membrane and who is on site each day. Ask whether the plumbing and electrical work is done by licensed contractors engaged by that person or arranged by you separately.

A job where you engage four trades yourself leaves you coordinating the sequence and carrying the risk at every handover. Registration status is worth checking on the public register rather than taking from a letterhead. Building and Energy maintains a searchable register of registered building contractors, building practitioners and licensed plumbing and electrical contractors. Write down the number you are given and look it up yourself, which takes a couple of minutes. A reluctance to give you a number in writing is the answer to the question.

Builder Managing Trades Against A Trade Subcontracting

Ask first Who answers when the room leaks
Arrangement
What it means for you
Registered building contractor
Holds the contract, manages the trades
Bathroom specialist or tiler
Holds the contract, subcontracts the rest
You engaging each trade
Cheapest, and you carry every handover
Who applies the membrane
The question most owners never ask
Registration number in writing
Check it yourself on the public register

Both arrangements produce good Perth bathrooms and both produce bad ones, so the useful question is who answers when water appears in the next room. Building and Energy maintains a searchable register of registered building contractors and of licensed plumbing and electrical contractors. Write down the number you are given and look it up yourself, because a letterhead is not evidence of anything at all. Request two or three recent Perth bathrooms you can look at, since anybody doing this weekly will have addresses from the last few months.

Get the number in writing. Then check it yourself.

What A Bathroom Quote Has To Itemise

A single lump sum tells you nothing about what is included or where the money sits. Demolition and rubbish removal, plumbing rough in, electrical rough in, wall sheeting, waterproofing, screed, tiling and fit off all belong as separate lines. Expect the waterproofing line to run an indicative $900 to $2,200 on a bathroom of about four square metres. Allowances for tiles, tapware, the vanity and the screen should appear as dollar figures rather than as names. An allowance stated in dollars is what lets you walk into a showroom and know whether you are spending extra.

Exclusions matter as much as inclusions and are where the surprises live on a Perth renovation. Ask every renovator to quote against the same written scope rather than against a conversation. Write the scope yourself, naming the room size, whether fixtures are moving, the allowances and the access. Three quotes against one document is the only way to find out whether a price is high rather than simply different.

The Lines A Bathroom Quote Has To Show

Three quotes Against one written scope
What each quote must itemise
Demolition, strip out and rubbish removal from site.
Plumbing rough in, and electrical rough in, priced separately.
Wet area wall sheeting, with the product named on the quote.
Waterproofing as its own line, an indicative $900 to $2,200.
Screed and falls, then wall and floor tiling labour.
Fit off, silicone, and the allowances stated in dollars.

Waterproofing bundled into the tiling price is the most common way a quote hides the item that decides the life of the room. Allowances stated in dollars are what let you walk into a showroom and know whether you are about to spend extra money. Exclusions matter as much as inclusions, and asbestos removal, slab repair, painting and screens are the ones commonly left out. Under the Home Building Contracts Act 1991 the maximum deposit on a WA home building contract is 6.5 per cent of the contract price.

Allow a contingency of an indicative 10 to 15 per cent.

Licensing And Compliance, Brief And Practical

Waterproofing is not a separately licensed or registered trade in Western Australia, which surprises most owners. There is no waterproofing licence to ask for, so the useful questions are about the standard, the product and the record. Ask whether the work is applied to AS 3740:2021, which membrane system is specified, an Ardex, Mapei or Sika for example, and how many coats are allowed for. Plumbing and electrical work are licensed, and that is where the enforceable paperwork lives. Plumbing work must be carried out by a licensed plumbing contractor and tradesperson, and the AS/NZS 3500 series governs the installation, with AS/NZS 3500.2 covering sanitary plumbing and drainage. Electrical work needs a licensed electrical contractor, who issues the electrical safety certificate.

Builder registration depends on the value of the work and whether a building permit is required. A registered building contractor is required where the work needs a building permit, is valued at $20,000 or more, and is in a defined area of the state. Home indemnity insurance is required for home building work requiring a building permit and valued above $20,000. Whether a bathroom renovation needs a building permit depends on what you are changing. Building work generally requires a permit under the Building Act 2011 unless the Building Regulations 2012 exempt it, so replacing fixtures, linings and finishes within an existing bathroom often falls outside a permit while removing or altering a wall does not. Your local government building surveyor can confirm your own case in a short phone call, and that call is free.

What To Do When It Goes Wrong

Put the problem in writing with dated photographs and ask for a written response by a stated date. Keep every message in one email thread rather than spreading it across phone calls, text messages and site conversations. A written record is what any later process reads, and a verbal agreement on site is worth very little afterwards. Raise the defect as soon as you notice it rather than waiting to see whether it gets worse. Your membrane photographs are the single most valuable thing in the file at this point. A leak at a wall to floor junction, a stain on the other side of a wall or a damp skirting in the next room all point at the same layer.

Those shots tell an assessor what the membrane looked like before the tiles went on. Building and Energy can take a building service complaint about regulated building work, including about a registered building contractor. Consumer Protection handles consumer guarantee and contract matters, and the State Administrative Tribunal of Western Australia hears matters that proceed beyond that stage. Take advice before withholding payment, because doing it wrongly can weaken an otherwise strong position.

Step What It Gives You Indicative
Written complaint with dated photographs A record any later process will read No cost
Your own membrane photographs Evidence nobody else holds No cost
Independent building consultant report An opinion on cause and rectification $650 to $1,600
Leak detection testing Where the water is actually entering $380 to $950
Rectification of failed waterproofing Tiles, screed and membrane replaced $7,000 to $15,000

Indicative Perth Costs

Across metropolitan Perth a complete bathroom, stripped back and rebuilt to fit off, sits at an indicative $18,000 to $35,000. The lower end suits a 1960s or 1970s bathroom of about four square metres with stock tiles and no fixtures moved. Premium work with stone, custom joinery and imported tapware passes $45,000 on many Perth jobs. A cosmetic refresh that leaves the waterproofing untouched runs an indicative $7,000 to $13,000.

That work covers new tapware, a vanity, a toilet suite, painting, a new screen and sometimes regrouting. Nothing in a refresh addresses the membrane, so it is the right choice only where the existing waterproofing is sound. Individual lines are worth knowing because they are what you compare between quotes. Waterproofing runs an indicative $900 to $2,200, tiling labour an indicative $70 to $130 per square metre, and a channel drain an indicative $450 to $1,000 extra. Each fixture relocated adds an indicative $700 to $2,800 depending on whether it is the toilet. Asbestos removal from an older Balga or Bentley bathroom adds an indicative $1,500 to $4,000.

Scope What It Covers Indicative
Full renovation, metropolitan Perth Strip out to fit off $18,000 to $35,000
Cosmetic refresh, membrane untouched Tapware, vanity, toilet, paint, screen $7,000 to $13,000
Premium finishes and custom joinery Stone, imported tapware, large format Past $45,000
Asbestos removal from an older bathroom Sheeting or floor backing $1,500 to $4,000
Apartment access and protection Lifts, corridors, waste removal $1,600 to $4,500

What To Look Out For, And Practical Tips For Getting Quotes

Watch for a quote that does not name waterproofing as its own line with its own price. Treat a refusal to give a registration or licence number in writing as an answer in itself. Be wary of a verbal promise about the program with no week by week list behind it. Question any deposit request above the 6.5 per cent maximum that applies to a WA home building contract. Walk away from a renovator who discourages you from photographing the membrane or from being on site that day. Push back on allowances described as a brand or a quality rather than as a figure in dollars.

Query an apartment job quoted without any mention of strata approval or the shared waste stack. A price dramatically below the other two needs a stated reason for the difference. Write your own scope before you ring anybody, which is the single most useful preparation available. Send the same document to three renovators and ask each for an itemised quote against it. Ask each of them who applies the membrane and what happens if the room leaks in two years.

What To Look Out For On A Perth Bathroom Quote

Compare properly Three itemised quotes, one written scope
What to check
Why it matters
No waterproofing line
The item most likely to cost again
No registration number in writing
Nothing you can check yourself
Allowances as brands, not dollars
You cannot tell what you can spend
Deposit above 6.5 per cent
Over the maximum for a WA contract
Apartment job with no strata mention
Approval takes four to eight weeks
A price far below the other two
Something has been left out of it

Write your own scope before ringing anybody, naming the room size, the fixture positions, the allowances and the access to the room. Send the same document to three renovators, because three prices against one scope is the only way to tell high from merely different. Ask each of them who applies the membrane and what happens if the room leaks in two years, and get the answer by email. Settle where the bin goes, how the trades get water and power, and which toilet the household uses for three weeks.

One written scope. Three itemised quotes. Nothing verbal.

Bathroom Renovators Across Perth and Western Australia

Renovators across metropolitan Perth and the wider state, from original 1960s and 1970s bathrooms of about four square metres through Morley, Bentley, Riverton, Willetton and Balga to character homes in Mount Lawley, Subiaco and Fremantle, apartment stock in Perth CBD, East Perth, South Perth and Scarborough, and newer estates at Baldivis, Butler and Harrisdale. Pick your area below to see what the local housing stock usually means for falls, waste positions and slab work.

▶ Perth Inner City 17 areas

CBD & Surrounds

Perth CBD Northbridge East Perth West Perth

Inner North

Subiaco Leederville Mount Lawley Highgate

Inner South

South Perth Victoria Park Como

Western Suburbs

Cottesloe Nedlands Crawley Dalkeith Applecross
▶ Greater Perth 26 areas

Northern Suburbs

Joondalup Wanneroo Ellenbrook Butler Morley Scarborough Karrinyup

Southern Suburbs

Fremantle Rockingham Baldivis Cannington Canning Vale Willetton

Eastern Suburbs

Midland Armadale Bassendean Byford Claremont

Perth Hills

Kalamunda Mundaring Gooseberry Hill Lesmurdie Helena Valley Darlington Glen Forrest Parkerville
▶ South West 25 areas

Peel

Mandurah Pinjarra Waroona Dwellingup Warnbro Safety Bay Secret Harbour

Bunbury Region

Bunbury Busselton Australind Harvey Collie Capel Donnybrook

Margaret River Region

Margaret River Dunsborough Augusta Cowaramup Yallingup

Great Southern

Albany Denmark Manjimup Pemberton Bridgetown Walpole Mount Barker
▶ Regional Western Australia 30 areas

Pilbara

Karratha Port Hedland Newman Tom Price Dampier Paraburdoo Marble Bar

Kimberley

Broome Kununurra Derby Halls Creek Fitzroy Crossing

Goldfields

Kalgoorlie Esperance Coolgardie Norseman Laverton Leonora

Mid West

Geraldton Carnarvon Meekatharra Kalbarri Exmouth Coral Bay

Wheatbelt

Northam Narrogin Merredin Moora York Toodyay

Finding a Bathroom Renovator in Perth - FAQ

What should I photograph before the tiler starts in my bathroom?
Photograph the finished waterproofing membrane on the day it is completed and before any tiling begins. Take each wall with a tape measure held in the frame, so the turn up height is provable later. Shoot every internal corner and every wall to floor junction, because that is where a bond breaker, fillet or reinforcing tape should be visible. Capture the floor waste with the membrane carried into the flange rather than stopping short of it. Photograph each penetration separately, so the tap bodies, the mixer spindle and the shower outlet all appear sealed. Finish with a shot of the membrane container, which records the product, the batch and the number of coats. Those photographs are the only record that will ever exist of that layer.
How much does a bathroom renovation cost around Perth?
A full bathroom renovation across metropolitan Perth runs an indicative $18,000 to $35,000 from strip out to fit off. The lower end suits an original 1960s or 1970s bathroom of about four square metres with stock tiles and no fixtures moved. The upper end covers a larger room, relocated fixtures, large format tiles and a made to measure frameless screen. A cosmetic refresh that leaves the waterproofing untouched runs an indicative $7,000 to $13,000. Premium work with stone, custom joinery and imported tapware passes $45,000 on many Perth jobs. Every one of those figures is indicative and moves with access, slab work and the selections you make, so compare itemised quotes rather than totals.
How do I tell whether my bathroom floor has a fall problem?
Tip a cup of water onto the tiles just outside the shower and watch it for a full minute. Water heading toward the doorway, or stopping dead in the middle of the room, tells you the floor was never graded properly. Inside the shower, look for a permanent damp patch or a tide mark away from the waste. Check whether the floor waste grate sits proud of the surrounding tiles, because a raised grate holds water around its rim after every shower. Falls are formed in the screed beneath the tiles, so correcting one means lifting tiles, screed and membrane together. Rectification of that kind runs an indicative $4,500 to $9,500 on a small Perth bathroom.
How do I tell if my bathroom extraction is actually working?
Hold a single square of toilet paper flat against the running fan grille and let go of it. A fan moving useful air will hold the paper in place without your hand, and a fan that drops it is undersized, blocked or badly ducted. Next, find out where the duct terminates, because many 1960s and 1970s bathrooms through Bentley, Morley and Balga vent into the roof space rather than outside. That arrangement moves the moisture into ceiling insulation and roof timbers instead of removing it from the house. Look at how far the fan sits from the shower itself, since a unit at the far end of the room never collects the steam. Ducting through to an eave vent or a roof cowl costs an indicative $250 to $600 more.
Do I need a building permit for a bathroom renovation in Western Australia?
It depends on what you are changing rather than on the word renovation. Building work generally requires a building permit under the Building Act 2011 unless the Building Regulations 2012 exempt it. Replacing fixtures, linings and finishes within an existing bathroom often falls outside a permit, while removing or altering a wall, resizing the room or creating a new wet area can bring one into play. Your local government building surveyor can confirm your own case in a short phone call, and that call costs nothing. Ask the question before demolition rather than after, because retrospective approval is slow and expensive. Plumbing and electrical work carry their own licensing requirements regardless of whether a building permit is needed.
Is waterproofing a separately licensed trade in Western Australia?
Waterproofing is not a separately licensed or registered trade in Western Australia, which surprises most owners. There is no waterproofing licence to ask for, so the useful questions are about the standard, the product and the record. Ask whether the membrane is applied to AS 3740:2021 Waterproofing of domestic wet areas, which product is being used, and how many coats are allowed for. Building and Energy, which sits within the Department of Local Government, Industry Regulation and Safety, oversees building services in this state and maintains the public register of registered contractors. Many Perth bathrooms are waterproofed by the tiler as part of the tiling price, so ask who applies it and get the answer by email.
What does it cost to move the toilet in a Perth bathroom?
Allow an indicative $1,200 to $2,800 to relocate a toilet, which makes the pan the dearest fixture to move. The cost sits in the drainage rather than the water lines, because a pan connector needs continuous fall back to the sewer. Almost all Perth housing is slab on ground, so relocating a waste means saw cutting, jackhammering and repouring concrete. Coring a single hole runs an indicative $250 to $600, while trenching across a room and repouring runs an indicative $1,000 to $2,800. Showers and vanities move more cheaply at an indicative $700 to $1,500 each. Ask for the layout you want and the layout that keeps the toilet in place priced side by side.
Why does mineral scale keep coming back on my tapware and shower screen?
Mineral scale is one of the most common complaints about Perth bathrooms and it is a maintenance problem rather than a structural one. Water Corporation publishes drinking water quality data scheme by scheme, including hardness, so check your own supply rather than accepting a single figure for all of Perth. Groundwater sources carry more dissolved mineral than surface or desalinated water. Choose tapware with a replaceable aerator and a shower rose with rubber nozzles that can be rubbed clean by hand. A protective coating on new shower glass runs an indicative $150 to $400 and is worth asking about while the screen is on order. A whole house softener runs an indicative $2,500 to $5,000 and is a separate decision.
What has to be itemised on a bathroom quote before I compare prices?
Demolition and rubbish removal, plumbing rough in, electrical rough in, wet area wall sheeting, waterproofing, screed, tiling and fit off all belong as separate lines. Waterproofing bundled into the tiling price is the most common way a quote hides the item that decides the life of the room, and that line should run an indicative $900 to $2,200. Allowances for tiles, tapware, the vanity and the screen should appear as dollar figures rather than as brand names. Exclusions matter as much as inclusions, and asbestos removal, slab repair, painting and screens are commonly left out. Tiling labour usually appears at an indicative $70 to $130 per square metre. Allow a contingency of an indicative 10 to 15 per cent.
What should I do first if my new Perth bathroom leaks or has defects?
Put the problem in writing with dated photographs and ask for a written response by a stated date. Keep every message in one email thread rather than spreading it across phone calls and site conversations, because a written record is what any later process reads. Building and Energy can take a building service complaint about regulated building work, Consumer Protection handles consumer guarantee and contract matters, and the State Administrative Tribunal of Western Australia hears matters that proceed beyond that stage. An independent building consultant report runs an indicative $650 to $1,600 and leak detection testing an indicative $380 to $950. Take advice before withholding payment, since doing it wrongly can weaken an otherwise strong position.

Bathroom and Wet Area Services Across Western Australia

For Trades & Contractors - SA

Bathroom renovators, waterproofers, tilers and plumbers looking for work around Perth can see current jobs on the Western Australian leads board, or register to receive local enquiries as they come in.

Ready to Get Bathroom Quotes?

Tell us the suburb, the room size and whether any fixtures are moving, and we will connect you with renovators taking work in your area.

Get Bathroom Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 20 October 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

Service availability may vary in regional WA. Verify licences at WA Building and Energy.
Costs are indicative for metropolitan Perth in October 2026. Room size, whether fixtures move, tile selection and the condition of what is behind the walls move them most.
Need work done? Get free quotes. Post a Job – It's Free