Looking for a Landscaper in Perth?

Tell us the suburb and roughly what the yard needs, and we will connect you with landscapers taking work in your area.

Get Landscaping Quotes

What a Perth Landscaping Job Costs

Small courtyard, 25 to 40 m2, finished$8,000 to $20,000
Suburban backyard rebuild on sand$30,000 to $75,000
Perth Hills block with rock and retainingPast $100,000
Soil conditioning mix delivered$60 to $140 per m3
Wetting agent program, yearly$150 to $400
Zoned reticulation for a suburban yard$1,800 to $5,500
Limestone retaining wall face$350 to $650 per m2
Paving supplied and laid on compacted base$75 to $150 per m2
Six wheeler load of sand removed and tipped$300 to $650
Wheelbarrow only access, added labour20 to 40 per cent more

Perth landscaping prices spread widely because soil improvement, reticulation and the volume of sand leaving site vary so much from block to block, so treat every figure here as indicative only. Have the soil improvement rate per square metre and the paving base depth in millimetres stated on each quote, because those two lines decide whether the garden survives its first full summer. Reticulation priced with a station count rather than as a lump sum is the third entry worth insisting on. A quote missing all three has priced only the part of the job you can see.

Find Landscaper Perth WA - What to Check and Get Quotes

One thing decides a Perth landscaping job before anything decorative goes in, and it is not the paver you choose. The Swan coastal plain is deep sand, so water and nutrients drain straight through instead of staying where roots can reach them. Blocks at Baldivis, Butler, Ellenbrook, Harrisdale and Aubin Grove often carry metres of it. Soil improvement, wetting agents and reticulation therefore decide whether a planting scheme survives its first Perth summer, and a quote silent on all three is not comparable to one that addresses them. Ground changes across the metropolitan area, with limestone close to the surface through Cottesloe, City Beach and Hillarys, and heavier loam over rock in the hills at Kalamunda, Mundaring and Lesmurdie. Access decides much of the rest, since narrow infill lots at Scarborough, Doubleview, Innaloo and Morley lose machine access and put every load of sand into a barrow. A small courtyard runs about $8,000 to $20,000 finished and a suburban backyard rebuild about $30,000 to $75,000, both indicative. Two rostered watering days a week, one run before 9am or after 6pm, and no sprinklers from 1 June to 31 August shape any Perth design. Garden bores face the same roster rather than sitting outside it. This guide covers sand, soil, reticulation, the watering roster, bores, limestone, paving, soakwells, planting, lawn, trees, spoil, staging, quotes and warning signs.

Finding a Landscaper in Perth and Across Western Australia

Write down what the yard has to do before ringing anybody, then hand the same page and the same photographs to three landscapers. Soil improvement rates and reticulation station counts are the two entries that separate a designed job from a priced guess on Perth sand. Dig a couple of test holes and run a water test first, because the result belongs on every quote request. We can connect you with Perth landscapers who quote against the same written brief.

Get Free Quotes

At a Glance - Getting Comparable Perth Landscaping Quotes

Step What It Involves Typical Timeframe What Decides It
Dig your own test holes Three holes to 300 mm, photograph each Twenty minutes Sand, limestone or laterite
Run a drainage and wetting test Fill a hole, then wet dry sand Ten minutes Drainage rate and repellency
Confirm your watering roster Check rostered days and the winter dates One phone call Water Corporation allocation
Decide on a garden bore Cost, licensing and iron in the water Before design Garden area and aquifer
Measure the access Narrowest point of gate and side passage Half an hour Machine access or barrows
Get a measured plan Levels, areas, planting schedule, retic layout Two to six weeks Slope and complexity
Price sand removal separately Cubic metres, truck movements, tip fees In the quote Volume swell and access
Compare three written quotes Same stages, same quantities, same order One email Soil rates and base depth

Three numbers tell you whether a Perth landscaping quote was designed or guessed. The first is the soil improvement rate in kilograms or litres per square metre, because sand without amendment holds neither water nor nutrients for long. The second is the paving base depth in millimetres, since loose sand under a thin base produces dips and lipped edges within a few years. The third is the reticulation station count, which shows whether lawn and garden beds were zoned separately or thrown onto one line. A quote naming none of the three has not been thought through, however good the finishes sound on the page.

How to Specify It Before You Get Quotes

Start with the ground rather than with a look you have saved. Dig three holes to 300 mm across the yard, photograph the sides, then fill one with water and time how long it takes to drain. Coastal plain sand often empties in under five minutes, which identifies water retention rather than drainage as your problem. Site classification for anything structural comes from AS 2870, published by Standards Australia, and clean sand profiles commonly classify as Class A with little expected ground movement. Filled or disturbed lots classify as Class P instead, which changes footing design and cost. Knowing that letter before you quote saves an argument later.

Settle the water question next, because every planting decision sits on top of it. Households on the Perth and Mandurah scheme water network are allocated two rostered watering days each week, with sprinklers permitted once before 9am or after 6pm. A winter sprinkler switch off then runs from 1 June to 31 August each year across Perth and the South West. Confirm your own rostered days and the current rules with Water Corporation before any design work begins, since these rules have been revised over the years. Plant groups with matching water needs so each reticulation zone can be set correctly. Deal with a garden bore before reticulation is designed rather than after.

A domestic bore drawing the shallow watertable for a modest garden generally needs no licence, though the Department of Water and Environmental Regulation licenses bores in proclaimed groundwater areas above set thresholds. Those thresholds take in irrigating 0.2 hectares or more, commercial use, and drawing from a deeper confined aquifer. Garden bores remain subject to the two day roster and the winter switch off, so a bore lowers the bill without lifting the rules. Available pump flow and pressure also determine how many heads each zone can carry.

Check approvals and standards before anybody digs or builds. Earth retaining structures are covered by AS 4678, which the National Construction Code published by the Australian Building Codes Board picks up for residential work. Many Perth local governments require a building permit for a retaining wall above roughly 500 mm, though the trigger height is set locally rather than statewide. Engineering design is generally expected once a wall passes about a metre or retains a driveway. Ring your own council first, because permit fees and engineering both belong inside the quote you are comparing.

Last, deal with contracts, licensing and the written record. Consumer Protection publishes what a home building work contract has to contain in Western Australia, including deposit limits and variation requirements. Builder registration and plumbing licensing are administered through Building and Energy, which matters once the work takes in structures or a scheme water connection. Backflow prevention under AS/NZS 3500.1 and stormwater under AS/NZS 3500.3 are both licensed plumbing work. Keep the plan, the quotes, the photographs and every variation in one place. Those documents are what you would rely on if a wall leans or a paved area sinks.

Costs on this page are indicative for metropolitan Perth. Soil improvement, reticulation, retaining height and the volume of sand leaving site move them most. Have the soil rate per square metre and the paving base depth in millimetres stated on every quote.

Finding a Landscaper in Perth, Stage by Stage

Sand is the first thing a Perth landscaper has to price, and rates for landscaping across Western Australia swing on how much ground work a quote actually carries. Water and dissolved nutrients drop straight past the root zone on the coastal plain. Before anybody walks your block, the Perth landscaping cost page puts a rough bracket around the job. Whether that planting is still alive next February comes down to soil improvement and reticulation. Three landscapers looking at a bare sand block will each imagine a different yard, so garden design earns its own separate fee.

Budget $800 to $2,500 for a concept and $2,500 to $6,000 for a documented set, indicative. Open trenches are also the cheap moment for reticulation installation and repairs, well before any paving arrives. Sand trenches dig fast, whereas cutting into a finished surface later can double that same figure. Where the garden is large, a bore changes the running cost, and garden bore installation and repairs runs roughly $7,000 to $14,000 installed. Iron rich bore water stains limestone, paving and render, so filtration is a real decision. Levels follow, and limestone retaining walls are priced by wall face area rather than by lineal metre.

Expect engineering once a wall passes about a metre, and ask your council about the permit height. Loose sand is unforgiving beneath a thin base, which is where paving and driveway installation quotes diverge most. Get the base material, its depth in millimetres and the compaction passes written down. Roof and surface water goes underground here, so soakwell installation is sized against the area draining into the pits. Required storage volume is set by your local government, so ask before that line is priced. Lawn on sand needs real preparation, and lawn mowing and garden maintenance is the cost that continues long after the build.

Turf supplied and laid runs about $14 to $30 per m2 on properly prepared ground, indicative. Where shade or traffic defeats a real lawn, artificial turf installation runs $70 to $140 per m2 including the base. Both options still need a compacted base, so preparation never disappears from the quote. Edges matter more in sand than in clay, and garden edging installation keeps mulch and soil from migrating onto paving. Limestone, steel and concrete edges all work, and each carries a different maintenance habit.

Hedges need the same water planning as everything else, so hedge trimming and pruning belongs in the maintenance budget from day one. Screening plants on sand want drip line rather than spray, which also suits the roster. A mature tree decides what the rest of the yard can be, so price tree lopping and arborist services before any trench goes in near it. Through Subiaco, Mount Lawley, Nedlands and Fremantle, root zones run well outside the canopy line.

Paving cannot cross an old stump either, which puts stump grinding and removal ahead of surface work. Permit rules for pruning and removal differ between local governments, so ask your own council first. On a block that drops away, decking can undercut the combined cost of cut, fill and a retaining wall. Excavation gets expensive quickly where limestone sits close to the surface in the western suburbs. Low walls around garden beds are a separate trade, so limestone garden retaining walls get priced apart from structural work. Hills blocks at Kalamunda, Mundaring and Lesmurdie differ again on soil, rock and machine access.

Perth Sand And Why It Changes Everything About A Garden

The Swan coastal plain is deep sand, and that single fact reorders every garden priority. Blocks at Baldivis, Butler, Ellenbrook, Harrisdale and Aubin Grove carry metres of pale sand. Water poured onto that profile disappears within minutes, taking dissolved nutrients down with it. Gardens in the eastern capitals push water away, while a Perth garden fights to hold some. Not every metropolitan block behaves that way, so find out what you have.

Hills suburbs at Kalamunda, Mundaring and Lesmurdie sit on heavier loam over granite and laterite. Rock breaking rather than soil building drives the cost on those blocks. Through the western suburbs and the coast at Cottesloe, City Beach and Hillarys, limestone sits shallow. Coastal sand also carries salt spray and wind on top of its drainage behaviour. Each ground produces a different price for exactly the same drawing.

Testing your own ground takes twenty minutes and costs you nothing. Dig a hole 300 mm deep in two or three separate spots. Look at what comes out at each level, and photograph the sides. Fill one hole with water and time how long it takes to vanish. Coastal plain sand often drains in five minutes, which names water retention as your problem.

What Your Ground Actually Is

Before any design The ground sets the price
What you have
Where it turns up
Deep coastal plain sand
Baldivis, Butler, Ellenbrook, Harrisdale
Limestone near the surface
Cottesloe, City Beach, Hillarys
Loam over granite and laterite
Kalamunda, Mundaring, Lesmurdie
Filled or disturbed sand
Common on subdivided infill lots
Sand with salt spray exposure
Narrows the planting list further

Deep sand on the Swan coastal plain drains so freely that holding water becomes the design problem. Limestone within a spade depth through the western suburbs changes excavation pricing completely. Perth Hills blocks on laterite hold water better but cost more to dig and to terrace. Filled sand on a subdivided lot can hide buried rubble, so ask what the quote allows for. Dig two test holes to 300 mm yourself, because that step tells every quoting landscaper the same thing.

Test your own ground first. It explains most of the price gap.

Soil Improvement, Wetting Agents And What Actually Holds Water

Improving sand means adding material that grips water and nutrients for roots to use. Bentonite clay, composted organic matter, zeolite and the Western Australian blend Soil Solver are specified most often. Rates matter more than brand names, so get kilograms per square metre in writing. An improved bed wants 100 mm of amended soil worked in, not mounded on top. Quality soil conditioning mix delivered runs about $60 to $140 per cubic metre, indicative.

Wetting agents fix a separate problem that sand develops over dry years. Repellent sand sheds water sideways, so irrigation runs straight past the root zone. Granular or liquid products restore absorption for roughly three to six months. Budget around $150 to $400 a year on a suburban Perth yard, indicative only.

Diagnosing repellency yourself is simple and worth doing before accepting a quote. Pour a cup of water onto dry sand and watch the first ten seconds. Water beading or running off sideways confirms the sand has turned repellent. Dig down afterwards and check whether sand below 50 mm is still bone dry. A dry layer under a wet surface is the classic Perth signature. Have soil improvement and wetting agent priced as separate lines, with rates stated.

Item What It Does Indicative
Soil conditioning mix delivered Holds water and nutrients in sand $60 to $140 per m3
Bentonite clay or Soil Solver Adds water holding capacity to sand $8 to $20 per m2
Composted organic matter Feeds soil biology and holds moisture $50 to $110 per m3
Granular wetting agent Restores absorption in repellent sand $150 to $400 a year
Coarse mulch at 75 mm depth Cuts evaporation between watering days $45 to $90 per m3

Reticulation Installed While The Ground Is Open

Reticulation is no optional extra in Perth, and earthworks is the cheapest moment to install it. Trenching open sand is quick compared with cutting into finished paving and turf. A zoned domestic system for a suburban yard runs $1,800 to $5,500 installed, indicative. Adding the same system after the paving is down can easily double that. Design decides running cost more than hardware does, so examine how zones group.

Lawn needs pop up spray heads such as Toro or Hunter, while beds do better on low flow drip line. Mixing both on one zone means one of them always gets the wrong amount. How many stations the controller has is worth asking before you sign. Buried valve boxes are the fault nobody can reach three years later. Several details belong in the quote rather than left to assumption. Name the controller make, whether Hunter, Rain Bird or Holman, plus the station count and the master solenoid.

Backflow prevention protects the drinking supply and is covered by AS/NZS 3500.1. Scheme water connections need that protection, and a licensed plumber does that work. Find out whether the price includes commissioning, meaning every station run and adjusted. A system handed over uncommissioned wastes water and leaves dry patches by February.

Component What It Covers Indicative
Zoned domestic system installed Trenching, mainline, heads, controller $1,800 to $5,500
Drip line to garden beds Low flow watering at the root zone $9 to $20 per m
Pop up spray zone for lawn Higher flow, lawn areas only $450 to $1,200 per zone
Controller, such as Hunter or Toro Station count and accessible valve boxes $350 to $1,100
Retrofit after paving is laid Cutting and repairing finished surfaces Up to double

The Sprinkler Roster, Waterwise Rules And How They Shape A Design

Perth has run a scheme water sprinkler roster for many years. Households on the Perth and Mandurah network get two rostered watering days each week. Sprinklers may run once on a rostered day, before 9am or after 6pm. Allocated days depend on your property, so confirm the current roster with Water Corporation. Fines apply for watering outside the roster, so design around the rule.

A winter sprinkler switch off then removes sprinkler watering for three months. Dates run from 1 June to 31 August across Perth, Mandurah and the South West. Hand watering sits outside the sprinkler definition, worth confirming for your own system. Newly planted lawn or garden can qualify for a temporary exclusion while establishing. Apply for that exclusion before the turf arrives rather than after it browns off. Check the current position with Water Corporation, because these rules have been revised.

Two watering days a week changes design in ways a borrowed eastern plan ignores. Plants with similar water needs belong together so each zone runs correctly. Deep mulch at 75 mm holds moisture between rostered days better than extra sprinklers. Any landscaper quoting should explain how the design performs on two watering days.

How The Roster Shapes What You Can Plant

Confirm first Water Corporation sets the current roster
What applies in Perth
Perth and Mandurah households get two rostered watering days each week.
Sprinklers may run once on a rostered day, before 9am or after 6pm.
Your allocated days depend on the property, so confirm them before designing.
Winter sprinkler switch off runs from 1 June to 31 August each year.
Newly planted lawn and garden can apply for a temporary exclusion.
Garden bores are covered by the same roster and the same winter switch off.

Two rostered watering days a week is the constraint that most separates a Perth planting design from an eastern one. Sprinkler watering is limited to one run before 9am or after 6pm on a rostered day. Evaporation and mulch depth therefore matter more here than an extra sprinkler head. The winter switch off between 1 June and 31 August removes sprinkler watering entirely. Garden bores are covered by that switch off alongside scheme water supply. Confirm the current roster and dates with Water Corporation, because these rules have been revised.

Two days a week. Design the garden around that number.

Garden Bores, When One Is Worth It And What It Involves

A garden bore draws from the shallow superficial aquifer under much of the coastal plain. Installed cost for a domestic bore around Perth runs $7,000 to $14,000, indicative. That covers drilling, casing, a pump and connection into the reticulation system. Running cost is pump electricity rather than metered water, which attracts larger blocks.

Bore water is often iron rich, and staining on limestone and paving follows. Allow for filtration or accept the staining, because retrofitting treatment costs more. Licensing is the part most people get wrong, so check rather than assume. A domestic bore drawing the shallow watertable for a modest garden usually needs no licence. The Department of Water and Environmental Regulation licenses bores in proclaimed groundwater areas. That applies where you irrigate 0.2 hectares or more, use water commercially, or tap a confined aquifer.

Bores face the same watering rules as scheme water, which surprises many buyers. Garden bores get two rostered days a week and the same before 9am or after 6pm window. The winter switch off from 1 June to 31 August applies to bores as well. Owning a bore lowers your water bill without giving unlimited watering freedom. Decide on a bore before reticulation design, since pump flow sets the zone sizes.

Whether A Garden Bore Earns Its Cost

Installed $7,000 to $14,000 indicative
Item
What to check
Drilling and casing
Depth depends on the local watertable
Pump and pressure system
Flow and pressure set your zone sizes
Iron in the water
Staining on limestone, paving and render
Licensing threshold
0.2 hectares, commercial use, confined aquifer
Still rostered
Two days a week and the winter switch off

A domestic garden bore around Perth runs roughly $7,000 to $14,000 installed, which is indicative. Licensing catches people out, so check your position before anybody starts drilling. The Department of Water and Environmental Regulation licenses bores in proclaimed groundwater areas. Iron rich bore water stains limestone, paving and render, so decide on filtration early. Settle the bore question first, since pump flow and pressure determine each zone size.

A bore cuts the bill, not the roster.

Limestone Retaining Walls, The Perth Material Of Choice

Limestone is the default retaining material in Perth because it is quarried locally. Reconstituted limestone blocks are the common product, dry stacked or mortared by height. Installed cost runs roughly $350 to $650 per square metre of wall face, indicative. Wall face area rather than lineal metres is the proper basis, so check which a quote uses.

Height drives both engineering and approval, and quotes diverge most right here. Earth retaining structures are covered by AS 4678, picked up by the National Construction Code. Engineering design is generally expected once a wall passes about a metre. Many Perth local governments need a building permit above roughly 500 mm, though thresholds differ.

Ring your own council first, because this is a local matter rather than one statewide rule. Drainage behind a limestone wall is the item a cheap quote leaves out. Clean aggregate, geotextile fabric and an agricultural drain line are standard practice. Sand running through an unfilled joint leaves voids and a slumping bed above. Get the backfill specification and the drain line written into the quote.

Height What It Needs Note
Under about 500 mm Often no building permit, check council Thresholds vary locally
Around 500 mm to 1 m Building permit commonly required Ask your local government
Over about 1 m Engineering design generally expected Covered by AS 4678
Retaining a driveway or structure Engineered without exception Price it as its own item
Any height on a boundary Neighbour agreement and setbacks Resolve before quoting

Paving And The Compacted Base Beneath It In Sand

Paving on sand succeeds or fails on the base, the line buyers never read. Compacted crushed limestone is the usual Perth base, laid and compacted in layers. A domestic pedestrian area wants 100 mm of compacted base, a driveway 150 mm or more. Clay, concrete and limestone pavers laid run $75 to $150 per square metre, indicative.

Base depth in millimetres and compaction passes, meaning how often the plate runs over it, both belong on the written quote. Loose sand under paving moves, showing up as dips, lipped edges and failed joints. Edge restraint matters more in sand, because pavers with no edge spread outward. Concrete haunching or a proper edge course keeps the field tight for decades. Joint sand washing out is the early warning, and it is cheap to spot.

Checking existing paving yourself takes minutes and tells you a great deal. Crouch at one corner and look along the surface for waves and dips. Push a long screwdriver into a joint and see how far it sinks. Tap several pavers with a rubber mallet and listen for a hollow note. Hollow sound and a sinking screwdriver both point to voids under the bedding. Paving that moved within three years sat on an under built base.

Area Compacted Base Indicative
Pedestrian paths and patios About 100 mm crushed limestone $75 to $150 per m2
Driveway and vehicle crossover 150 mm or more, compacted in layers $90 to $180 per m2
Edge restraint or haunching Concrete edge holding the field tight $25 to $55 per m
Exposed aggregate concrete Poured, reinforced and finished $110 to $200 per m2
Relaying failed paving Lifting, rebuilding base, resetting $55 to $110 per m2

Soakwells And Where Surface Water Goes

Perth sends roof and surface water into soakwells rather than a street drain network. Precast concrete soakwells are standard, sized to the area draining into them. Local governments set required storage, often as a volume per square metre of hard surface. Your council can tell you its requirement before anybody prices the stormwater work. Costs scale with size, depth and access to the pit location.

A 900 mm diameter soakwell supplied and installed runs $500 to $900, indicative. An 1,800 mm unit runs closer to $1,200 to $2,200 depending on depth. New paving or a patio usually triggers extra capacity, since hard surface increased. Budget $2,000 to $6,000 for soakwells on a typical Perth job, again indicative.

Stormwater pipe sizing, grades and discharge are covered by AS/NZS 3500.3. Diagnosing a failed soakwell is something you can do after heavy winter rain. Walk out during a downpour and look for water surcharging from a grate. Water standing against a wall two hours after rain indicates the pit is full. Lift an accessible lid afterwards and look for sand washed in below.

Size Where It Suits Indicative
600 mm diameter Small patio or single downpipe $350 to $600
900 mm diameter Standard domestic downpipe run $500 to $900
1,200 mm diameter Larger roof or paved area $750 to $1,500
1,800 mm diameter Driveway or whole of roof capacity $1,200 to $2,200
Whole job allowance Pits, pipework and connections $2,000 to $6,000

Planting That Survives A Dry Perth Summer

Plant selection on sand rewards species that already cope with free draining soil. Western Australian natives from the local sand plain need far less input once established. Mediterranean species also perform, so olives, rosemary and lavender appear widely. Groups with matching water needs let each reticulation zone be set correctly. A planting schedule naming species, pot size and quantity belongs in every quote.

Smaller stock usually beats advanced stock on sand for cost and survival. Tube stock and 150 mm pots at roughly $6 to $20 each establish quickly, indicative. Advanced 45 litre bags at $150 to $400 each carry higher first summer losses. Advanced planting earns its cost for screening or shade you cannot wait for. Mulch is the cheapest water saving measure available on a Perth block.

Coarse chunky mulch at 75 mm depth cuts evaporation and slows drying out. Fine mulch mats down and sheds water, so specify a coarse grade instead. Bulk mulch delivered runs about $45 to $90 per cubic metre, indicative. Find out whether the quote includes a mulch top up after the first year.

Stock What It Gives You Indicative
Tube stock Cheapest, establishes fastest in sand $3 to $7 each
150 mm pots Good balance of cost and presence $6 to $20 each
200 mm to 300 mm pots Visible structure within one season $25 to $70 each
45 litre bags Instant screening, higher failure rate $150 to $400 each
Planting schedule in writing Species, pot size and quantity fixed No substitution

Lawn Against Artificial Turf, And What Each Really Costs To Keep

Lawn on Perth sand works given the right variety and real preparation. Couch and kikuyu dominate because they handle heat, sun and wear on the coastal plain. Soft leaf buffalo tolerates the shade that narrow infill blocks create along fences. Turf supplied and laid on prepared ground runs $14 to $30 per square metre, indicative. Preparation on sand means soil improvement and wetting agent, not raking the surface.

Skipping preparation produces a lawn that browns off in its first February. Artificial turf removes watering and mowing for a higher upfront cost. Supplied and installed pricing lands between $70 and $140 per square metre, indicative. A compacted base and drainage layer are still needed, so preparation remains.

Surface temperature in full Perth sun is the practical complaint owners report. Comparing running costs over ten years is the honest way to choose. Natural lawn costs water, fertiliser from a supplier such as Baileys, mowing and occasional repair. Artificial turf costs brushing, infill top up and replacement at ten to fifteen years. Having both options priced on one quote helps if you cannot decide. Many Perth yards end up with a smaller real lawn and paving elsewhere.

Item Natural Lawn Artificial Turf
Supplied and installed $14 to $30 per m2 $70 to $140 per m2
Base preparation needed Soil improvement and wetting agent Compacted base and drainage layer
Watering Two rostered days a week None at all
Ongoing work Mowing, fertiliser, repairs Brushing and infill top up
Replacement horizon Renewed in patches as needed About ten to fifteen years

Established Trees, Root Zones And What You May Not Touch

Established trees are usually the most valuable feature in an older Perth garden. Street trees through Subiaco, Mount Lawley, Nedlands and Fremantle sit under council control. Pruning or removing a street tree generally requires consent, and penalties are real. Your local government can confirm that before a quote assumes a tree goes.

Trees on your own land can also be protected, depending on local planning. Some Perth councils keep significant tree registers or require approval above a set size. No single statewide rule covers this, so the answer comes from your council. Protection of trees on development sites is covered by AS 4970, pruning by AS 4373.

An arborist report on one established tree runs $450 to $1,100, indicative. Working around a retained tree costs more than working around nothing. Root zones extend well past the canopy edge, particularly where sand lets roots travel. Permeable paving or a suspended deck over roots beats a concrete slab. Have the structural root zone marked before any reticulation trenching is priced.

Designing Around A Tree You Cannot Remove

Ask first Council consent varies by local government
What to allow for
Street trees in Subiaco, Mount Lawley, Nedlands and Fremantle sit under council control.
Pruning or removing a street tree generally needs consent from your local government.
Some councils keep significant tree registers covering trees on private land.
Root zones reach well past the canopy edge, especially through open sand.
Permeable paving or a suspended deck suits a root zone better than concrete.
An arborist report on one established tree runs $450 to $1,100 indicative.

An established tree is usually the most valuable thing in an older Perth garden. It is also the easiest thing to damage during a landscaping job on open sand. Street trees in Subiaco, Mount Lawley, Nedlands and Fremantle are controlled by the council. Protection of trees on development sites is covered by AS 4970 and pruning by AS 4373. Roots travel further through loose sand than through clay, reaching across a whole yard. Have the structural root zone marked before anybody prices reticulation trenching.

Ring the council before the quote assumes the tree goes.

Spoil And Sand Removal, The Item Most Often Underestimated

Excavated sand has to go somewhere, and disposal is the line buyers overlook. Loosened sand swells by roughly 15 to 25 per cent once out of the ground. A small cut fills more truck space than the hole suggests to the eye. Cost here is truck movements and tip fees rather than labour hours.

Clean sand disposes cheaper than sand mixed with rubble, roots or old fill. Pricing moves with volume, access and what the material contains. A six wheeler load of clean sand removed and tipped runs $300 to $650, indicative. Bulk excavation across a terraced job runs $1,500 to $7,000 depending on depth. Contaminated or mixed spoil can double those disposal figures without warning.

Cubic metres, truck movements and tip fees belong separately on the quote. A lump sum labelled site clearance hides the number you need to compare. Access decides much of this cost on narrow infill blocks after subdivision. Scarborough, Doubleview, Innaloo and Morley have rear lots where machine access disappears. Barrowing sand to a skip adds twenty to forty per cent to the labour. Measure your narrowest gate and send photographs to everyone quoting the job.

Sand Removal, The Underestimated Line

Per truck load $300 to $650 indicative
Driver
What it means
Volume swell
Loosened sand gains 15 to 25 per cent
Truck movements
Six wheeler loads, each priced separately
Tip fees
Clean sand costs less than mixed fill
Contaminated spoil
Rubble or old fill can double disposal
No machine access
Barrowing adds 20 to 40 per cent labour

Excavated sand swells by roughly 15 to 25 per cent once it has been loosened. A modest cut therefore produces more truck volume than the hole suggests. Cost here is truck movements and tip fees rather than labour hours on site. Narrow infill lots at Scarborough, Doubleview, Innaloo and Morley often lose machine access. Insist on cubic metres, loads and tip fees separately, because a lump sum hides the comparison.

Cubic metres, loads and tip fees. Separately, in writing.

Staging A Yard Across Two Or Three Seasons

Staging works well in Perth provided the order follows machine access. Earthworks, retaining and soakwells belong first while a machine still reaches the rear. Reticulation mainlines and electrical conduit go in during the same open trenching. Paving and limestone edges follow once structural items are finished and compacted.

Soft landscaping belongs last, and in the right part of the year. Autumn and early spring planting gives roots time before the heat arrives. Turf laid midsummer needs far more water and may breach the roster anyway. Every landscaper quoting stage one should see the whole plan. Spreading cost across seasons is legitimate, though some savings are false.

Leaving reticulation until after paving means cutting and repairing finished surfaces. Deferring soil improvement to buy better plants reverses the only ratio that matters. A staged quote should price each stage separately on one specification. Staging also shows you which stage to trim if the total lands high.

What A Landscaping Quote Has To Break Down

A comparable quote is itemised by area and by trade, not one figure. Each zone of the yard should carry its own price and its own scope. Soil improvement and wetting agent need rates per square metre stated. Paving needs base depth in millimetres, base material and compaction method named. Reticulation needs station count, controller make and whether commissioning is included. Spoil removal needs cubic metres, truck movements and tip fees separately.

Several buried assumptions change the price if they turn out wrong. Machine access to the rear yard is the first, so have it stated. Whether existing fencing comes out and goes back is the second. What happens to sand coming off site is the third.

A quote silent on all three has shifted that risk onto you. Payment and paperwork deserve the same attention as the specification. A staged payment schedule should follow completed work rather than calendar dates. Request a current public liability certificate and check the Australian Business Register. Keep the plan, quotes, photographs and every variation in one place.

What Makes Two Perth Quotes Comparable

Ask for Itemised by area and by trade
Line item
What it must state
Soil improvement rate
Kilograms or litres per square metre
Wetting agent
Product, rate and whether reapplied
Paving base
Depth in millimetres and compaction passes
Reticulation
Station count, controller, commissioning
Spoil removal
Cubic metres, loads and tip fees

Two Perth quotes compare only once soil improvement rates and base depth appear as numbers. Reticulation priced as one lump with no station count cannot be measured against anything. Spoil removal belongs on its own line with cubic metres and truck movements stated. Machine access, fencing removal and sand disposal are the three assumptions that move a total. Tie the payment schedule to completed stages and keep every variation in writing.

Rates and depths in numbers. Then compare.

Permits, Retaining Approval And Fencing, Kept Brief

Three approvals come up most often on a Perth landscaping job. Retaining walls above a council set height, commonly around 500 mm, need a building permit. Front and dividing fences above a set height usually need planning approval. Removing a street tree or listed significant tree needs consent, varying by council.

Site classification matters where a structure sits, and AS 2870 governs slabs and footings. Clean sand profiles on the coastal plain often classify as Class A, little movement. Filled or disturbed sites classify as Class P, which changes footing design and cost. Perth Hills blocks on laterite and rock sit differently again from coastal sand.

Whether any structure needs engineering, and who pays for it, belongs in writing. Who regulates what is worth knowing before you sign anything. Building permits sit with your local government, administered through Building and Energy. Consumer Protection publishes what a home building work contract must contain. Ring your own council first, because several thresholds are set locally.

What To Look Out For, And Practical Tips For Getting Quotes

Some warning signs appear before any work starts, and they are easy to spot. A quote with no soil improvement or wetting agent line priced the visible half. Paving quoted without base depth in millimetres leaves the main variable undefined. Reticulation offered as one lump with no station count compares to nothing. Pressure for a large deposit before materials are ordered is reason to pause. Other signs show up in how a business handles your questions.

Vagueness about who holds the plumbing or electrical licence is a genuine concern. Reluctance to put the planting schedule in writing precedes smaller plants arriving. Refusal to say where excavated sand goes shifts a real cost onto you. Practical steps make three quotes genuinely comparable rather than three numbers. Write what each area of the yard has to do, then photograph the access.

Dig your test holes, run the water test, and note the result for everyone. Have all three price the same written scope, in the same stage order. Each should explain how the design works on two rostered watering days. The answer separates a Perth design from a plan drawn for somewhere else.

What To Look Out For Before You Sign

Watch for The lines a thin quote leaves out
What a weak quote looks like
No soil improvement or wetting agent line anywhere on the quote.
Paving priced with no base depth stated in millimetres.
Reticulation offered as one lump sum with no station count.
Vagueness about who holds the plumbing or electrical licence.
Reluctance to put the planting schedule into writing.
Pressure for a large deposit before any material is ordered.

A quote missing soil improvement and wetting agent has priced only the visible half. Paving without a stated base depth leaves out the variable that decides longevity. Reluctance to write the planting schedule down usually precedes smaller plants arriving. Reticulation on scheme water needs backflow protection fitted by a licensed plumber. Treat pressure for a large upfront deposit as a reason to slow the process down.

A thin quote is cheap because it left things out.

Landscapers Across Perth and Western Australia

Landscapers across metropolitan Perth and the wider state, from deep sand estates at Baldivis, Butler, Ellenbrook, Harrisdale and Aubin Grove, through narrow infill lots at Scarborough, Doubleview, Innaloo and Morley where machine access disappears, to limestone country in the western suburbs at Cottesloe and City Beach and heavier loam over rock in the hills at Kalamunda, Mundaring and Lesmurdie. Pick your area below to see what the local soil, water and access usually mean for a garden job.

▶ Perth Inner City 17 areas

CBD & Surrounds

Perth CBD Northbridge East Perth West Perth

Inner North

Subiaco Leederville Mount Lawley Highgate

Inner South

South Perth Victoria Park Como

Western Suburbs

Cottesloe Nedlands Crawley Dalkeith Applecross
▶ Greater Perth 26 areas

Northern Suburbs

Joondalup Wanneroo Ellenbrook Butler Morley Scarborough Karrinyup

Southern Suburbs

Fremantle Rockingham Baldivis Cannington Canning Vale Willetton

Eastern Suburbs

Midland Armadale Bassendean Byford Claremont

Perth Hills

Kalamunda Mundaring Gooseberry Hill Lesmurdie Helena Valley Darlington Glen Forrest Parkerville
▶ South West 25 areas

Peel

Mandurah Pinjarra Waroona Dwellingup Warnbro Safety Bay Secret Harbour

Bunbury Region

Bunbury Busselton Australind Harvey Collie Capel Donnybrook

Margaret River Region

Margaret River Dunsborough Augusta Cowaramup Yallingup

Great Southern

Albany Denmark Manjimup Pemberton Bridgetown Walpole Mount Barker
▶ Regional Western Australia 30 areas

Pilbara

Karratha Port Hedland Newman Tom Price Dampier Paraburdoo Marble Bar

Kimberley

Broome Kununurra Derby Halls Creek Fitzroy Crossing

Goldfields

Kalgoorlie Esperance Coolgardie Norseman Laverton Leonora

Mid West

Geraldton Carnarvon Meekatharra Kalbarri Exmouth Coral Bay

Wheatbelt

Northam Narrogin Merredin Moora York Toodyay

Finding a Landscaper in Perth - FAQ

How much does landscaping cost around metropolitan Perth?
A small courtyard of 25 to 40 m2 commonly lands between $8,000 and $20,000 fully finished. A standard suburban backyard rebuild taking in paving, limestone edges, reticulation, lawn and planting runs roughly $30,000 to $75,000. A sloping Perth Hills block needing rock excavation and engineered retaining passes $100,000 without much difficulty. Labour sits around $60 to $95 per hour per person, and a two person crew with a loader and truck about $900 to $1,400 a day. Every one of those figures is indicative only. The three items moving them most on a Perth block are soil improvement, reticulation and the volume of sand leaving site.
How do I tell whether my sand has turned water repellent?
Pour a cup of water onto dry sand in a garden bed and watch it closely for ten seconds. Water that beads on the surface or runs away sideways confirms the sand has become repellent. Dig down with a trowel immediately afterwards and feel the sand below 50 mm. Dry sand sitting underneath a wet surface is the classic Perth signature of repellency. Repeat the test in two or three beds, because the result often varies across one yard. Fixing it means a granular or liquid wetting agent at roughly $150 to $400 a year, which is indicative. Have that treatment named as its own quote line rather than assumed.
How many days a week can I use sprinklers in Perth?
Households on the Perth and Mandurah scheme water network are allocated two rostered watering days each week. Sprinklers may run once on a rostered day, either before 9am or after 6pm, to limit evaporation. Your allocated days depend on the property, so confirm the current roster with Water Corporation before any design work. A winter sprinkler switch off then runs from 1 June to 31 August each year across Perth and the South West. Garden bores are covered by the same roster and the same winter switch off. Newly planted lawn or garden can apply for a temporary exclusion while it establishes. Rules have been revised over the years, so check the current position rather than relying on memory.
Do I need a licence for a garden bore in Perth?
A domestic garden bore drawing from the shallow watertable to irrigate a modest garden generally does not require a licence. A licence from the Department of Water and Environmental Regulation is needed in a proclaimed groundwater area in several situations. Those situations include irrigating 0.2 hectares or more, using the water for any commercial purpose, or drawing from a deeper confined aquifer. Bores are not exempt from watering rules either, so expect two rostered days a week and the winter switch off. Confirm your own position with the department rather than assuming a bore sits outside the rules. Check whether your local government also has anything to say about bore installation on your block.
What does reticulation cost to install in Perth?
A zoned domestic reticulation system for a suburban Perth yard commonly runs $1,800 to $5,500 installed, which is indicative. Drip line to garden beds sits around $9 to $20 per metre and a pop up spray zone for lawn around $450 to $1,200. Controllers from Hunter, Rain Bird or Holman plus the solenoid valves usually account for $350 to $1,100. Installing while the earthworks trenches are still open is far cheaper than retrofitting afterwards. Retrofit through finished paving and lawn can approach double the original figure once cutting and repair are counted. Scheme water connections need backflow protection under AS/NZS 3500.1, fitted by a licensed plumber. Ask whether commissioning is included, meaning every station run and every head adjusted.
How do I tell whether paving was laid on a proper base?
Crouch at one corner of the paved area and look along the surface at eye level. Waves, dips or a lip at any edge within three years of laying point to a thin base. Push a long screwdriver into the joint sand between pavers and note how far it goes before meeting firm material. Tap several pavers with a rubber mallet and listen for a hollow note, which indicates voids underneath. Check whether water ponds anywhere after rain instead of running away to an edge. A domestic pedestrian area should sit on about 100 mm of compacted crushed limestone, and a driveway on 150 mm or more. Relaying failed paving runs roughly $55 to $110 per m2, indicative.
Do limestone retaining walls need a building permit in Perth?
That depends on your local government, and there is no single statewide height to quote you. Many Perth councils require a building permit for a retaining wall above roughly 500 mm, while others set the trigger differently. Walls close to a boundary or retaining for an adjoining property can need approval at lower heights again. Engineering design is generally expected once a wall passes about a metre, or where it retains a driveway or structure. Earth retaining structures are covered by AS 4678, which the National Construction Code picks up for residential work. Ring your own council before accepting any wall price, since the permit cost and the engineering fee both belong in the quote.
What does a garden bore cost and is one worth having?
A domestic garden bore around Perth commonly runs $7,000 to $14,000 installed, which is indicative and varies with depth and access. That price usually covers drilling, casing, a pump and pressure system, and connection into the reticulation. Running cost becomes pump electricity rather than metered scheme water, which is why larger blocks consider one. Payback depends entirely on how much garden and lawn you are actually watering. Bore water is frequently iron rich, and staining on limestone walls, paving and render is permanent without filtration. Settle the bore decision before reticulation is designed, because available pump flow and pressure determine zone sizes. Remember the roster still applies, so a bore lowers the bill without lifting the restrictions.
Can I remove a street tree outside my house?
Street trees are the property of the local government, so removal or pruning generally requires council consent. Established street trees through Subiaco, Mount Lawley, Nedlands and Fremantle are commonly protected, and penalties for unauthorised work are real. Trees on your own land can also be covered, because some Perth councils keep significant tree registers or require development approval above a set size. No statewide rule covers either situation, so the answer comes from your own council. Ask before any quote assumes a tree is coming out, since that assumption can change the whole design. Protection of trees during works is covered by AS 4970 and pruning by AS 4373. An arborist report on one tree runs about $450 to $1,100, indicative.
Why is sand removal so expensive on a Perth block?
Loosened sand swells by roughly 15 to 25 per cent once it comes out of the ground. A modest cut therefore fills more truck space than the size of the hole suggests. Cost on this line is truck movements and tip fees rather than labour hours on site. A six wheeler load of clean sand removed and tipped commonly runs $300 to $650, which is indicative. Bulk excavation across a terraced job runs $1,500 to $7,000 depending on depth and access. Sand carrying rubble, roots or old fill can double those disposal figures without warning. Narrow infill lots at Scarborough, Doubleview, Innaloo and Morley often lose machine access, adding 20 to 40 per cent to labour.

Landscaping and Garden Services Across Western Australia

For Trades & Contractors - SA

Landscapers and garden contractors looking for work around Perth can see current jobs on the Western Australian leads board, or register to receive local enquiries as they come in.

Ready to Get Landscaping Quotes?

Tell us the suburb and roughly what the yard needs, and we will connect you with landscapers taking work in your area.

Get Landscaping Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 20 October 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

Service availability may vary in regional WA. Verify licences at WA Building and Energy.
Costs are indicative for metropolitan Perth in October 2026. Access for machinery, sand depth and retaining requirements, how much material has to leave the site, and the hard landscaping proportion move them most.
Need work done? Get free quotes. Post a Job – It's Free