What Building Work Costs Around Perth

Volume build on a new estate, per square metre$1,500 to $2,300
Custom build, established suburb, per square metre$2,800 to $4,800
Coastal two storey build, per square metre$4,000 to $7,000
Knockdown rebuild, whole project$450,000 to $950,000
Ground floor addition, whole project$220,000 to $520,000
Sand pad with compaction testing$4,000 to $18,000
Limestone retaining, per square metre of face$300 to $500
Soil test and site classification$600 to $1,500
Engineering for one removed load bearing wall$700 to $2,000
Independent stage inspections, set of five$1,800 to $3,800

Building prices move a long way from street to street, because fall across the block, imported fill, retaining and the age of any existing house all shift them, so treat every figure here as indicative only. Total the allowances and provisional sums in any contract before you compare it against another, since those lines are estimates rather than prices.

Find Builder Perth WA - What to Check and Get Quotes

Choosing a builder in Perth comes down to one register and two documents. The register of building service providers tells you whether the person holds contractor registration from the Building Services Board, which decides who may lawfully sign your contract. The first document is the specification, where brands, models and quantities either appear or do not. The second is the allowance schedule, where every untested guess sits. A volume contract at Baldivis or Butler carrying $9,000 for tiling, $5,500 for tapware, $7,000 for site works and $6,000 for retaining holds $27,500 of guesses, and 30 per cent movement on those is $8,250 before anything goes wrong. Permit work valued at $20,000 or more needs a registered building contractor and home indemnity insurance, deposits are capped at 6.5 per cent of the contract price, and Western Australia gives you no general cooling off period once you have signed. Metropolitan Perth sits on the Swan Coastal Plain, so a Class A sand site under AS 2870 is usually a cheaper footing proposition than the reactive clay of the eastern capitals. All figures on this page are indicative for metropolitan Perth. This guide covers the ten minute checks, insurance, thresholds, contracts, allowances, fixed price, sand pads, limestone retaining, progress stages, termites, asbestos, engineering, comparing quotes, costs and warning signs.

Finding a Builder in Perth and Across Western Australia

Send three builders the identical drawings, specification, finishes schedule and soil report, and supply your own allowance figures so the allowances stop being a variable. A spread of 10 to 15 per cent on a documented $500,000 build is ordinary, while 40 per cent means somebody read the drawings differently. We can connect you with Perth building contractors who quote against the same package.

Get Free Quotes

At a Glance - Choosing a Perth Builder

Step What It Involves Typical Cost or Time What Decides It
Check the register yourself Name, number and registration kind Ten minutes Contractor rather than practitioner
Get the soil test early Site classification under AS 2870 $600 to $1,500 Footing design and pad depth
Document the work properly Drawings, specification and schedules Four to twelve weeks Whether quotes compare at all
Total the allowances Every estimate added up before signing About an hour Your real cost exposure
Read the contract clauses Price movement, delay and termination $700 to $1,800 What a lawyer finds in them
Confirm the insurance certificate Policy in your name before any money Before the deposit Contracts above $20,000
Price the excluded list Crossover, fencing, reticulation and landscaping $35,000 to $85,000 What the contract leaves out
Walk every progress stage Photographs and a written outstanding list $400 to $800 a visit What is actually finished

Two things decide whether a Perth building job goes well, and neither of them is the quoted price. The first is documentation, because three builders pricing identical drawings and specification are comparable while three builders pricing a concept sketch are not. The second is the total of allowances and provisional sums, which is the part of the contract nobody has tested and the part that moves most. A quote naming no allowances has either hidden them or was never properly prepared.

What to Settle Before You Sign Anything

Start with the register rather than with price. Building contractors and building practitioners in this state are registered by the Building Services Board under the Building Services (Registration) Act 2011, and the board is supported by Building and Energy, whose material sits on the Western Australian Government site. Building and Energy is the state building regulator and sits inside the Department of Local Government, Industry Regulation and Safety, so a page naming an older department is out of date. Match the registered entity against the entity on your contract, since that is the entity you would pursue later.

Only a registered building contractor may contract with you for residential building work valued at $20,000 or more. Settle the paperwork thresholds next, because they decide what you can demand. Residential building work needing a building permit and valued at $20,000 or more requires a registered building contractor, and that same figure brings home indemnity insurance with it. For a Class 10a private garage, shed or carport the registration threshold is $50,000 or more instead. The Home Building Contracts Act 1991, published by Western Australian Legislation at the state legislation site, covers fixed cost home building work valued between $7,500 and $500,000 and caps the deposit at 6.5 per cent of the contract price. On a $620,000 rebuild at Harrisdale that cap permits $40,300 and nothing beyond it.

Read the home indemnity insurance certificate before you pay a deposit. Your builder arranges and pays for the policy, which is issued in your name so that it transfers with the house to a later owner. Building and Energy publishes the cover at up to $200,000, or the contract value where that is lower, plus up to $40,000 for loss of deposit. Claims become available where the builder has died, disappeared or become insolvent, and claim time limits apply under the scheme rather than running indefinitely. While your builder is still trading, the rectification is a contract matter and Consumer Protection at the consumer protection site is the place to confirm the current contract rules.

Get the engineering and the soil test before you collect three quotes. Footings and slabs for houses are designed to AS 2870 with a site classification, concrete to AS 3600, timber framing to AS 1684 and structural steel to AS 4100, while wind and other actions come from the AS/NZS 1170 series published by Standards Australia at the standards body site. Deep sand across the Swan Coastal Plain commonly returns a Class A classification, which is a simpler and cheaper footing proposition than the reactive clay of the eastern capitals. Soil testing and classification for $600 to $1,500 turns a site cost provisional sum into a designed figure. Retaining walls are a separate design problem again, and earth retaining structures are designed to AS 4678. Keep the paperwork from the first phone call, because that is what decides a dispute.

Quotes, the contract, the specification, every variation, every progress claim, the insurance certificate, the building permit and dated stage photographs all belong in one folder. The National Construction Code published by the Australian Building Codes Board at the codes board site sets the technical requirements your builder has to meet, and consumer guarantees under the Australian Consumer Law sit underneath every residential building contract. Building and Energy handles building service complaints about registered providers, while the State Administrative Tribunal hears building matters and disciplinary proceedings. Write every concern down in the week it arises, because a dated written trail is what gets read later.

Costs on this page are indicative for metropolitan Perth. Fall across the block, imported fill, retaining and the age of any existing house move them most. Total every allowance and provisional sum before you compare one contract against another.

Before You Sign

Check the register and the home indemnity insurance certificate before price. Total every allowance and provisional sum in the contract, since those lines explain most of the gap between two quotes.

Get Free Quotes
Free · No obligation · WA-wide

Finding a Builder in Perth, Document by Document

Perth building jobs are mostly decided on paper well before a single truck turns up. Three documents do that deciding, being the register entry, the home indemnity insurance certificate and the allowance schedule. New houses, whether volume or one off, are covered in the builder guide. Altering a house that is already standing is covered in the renovation services guide instead. What follows here is about picking the contractor and reading the paperwork, not about construction method.

Volume building on the new estates at Baldivis, Butler, Ellenbrook, Harrisdale, Piara Waters and Aubin Grove is a different purchase from a build in an established suburb. Out there the contract is the product, since the house design barely moves and what varies is the allowance schedule, the site cost line and the inclusion list. Volume rates commonly run $1,500 to $2,300 per square metre, which is indicative only. Items such as a patio and verandah or a granny flat price better as their own quotes than as line items inside a $500,000 contract. Price each one separately, then decide what stays inside the build contract.

Infill and knockdown rebuild work through Scarborough, Doubleview, Innaloo and Morley is the busiest part of the established Perth market. A whole rebuild commonly totals $450,000 to $950,000 including demolition at $18,000 to $35,000, both indicative. Where the existing house predates 1990, asbestos removal is a licensed scope with its own cost and its own clearance certificate. Weigh a rebuild against an addition plus rewiring and a bathroom renovation on a house that will still be fifty years old afterwards. Price both properly before you commit to either one. Coastal two storey building at Cottesloe, City Beach, North Beach and Scarborough carries wind and salt exposure that changes the detailing.

Fixings, bracing, flashings and balustrades all need specifying for that exposure rather than left to habit, so a structural engineer earns the fee on this work. Rates commonly run $4,000 to $7,000 per square metre out there, which is indicative only. External timber including decking needs a coating schedule and a maintenance interval written into the contract. Ask what grade of fixing is specified before the frame is ordered.

Limestone retaining is the Perth material of choice and a trade in its own right. Limestone retaining walls in reconstituted block commonly run $300 to $500 per square metre of face at modest heights, which is indicative. Height is what brings in engineering and approval, and council approval and engineering certification is largely a matter for your own local government rather than a single state rule. Confirm the height trigger before anybody orders block, because the figure genuinely differs across the metropolitan councils.

Earth retaining structures in Perth are designed to AS 4678 by an engineer. Levels drive the site cost on most Perth blocks, and the Swan Coastal Plain makes that cheaper than it would be elsewhere. Deep sand compacts well in layers, so a pad with compaction testing commonly runs $4,000 to $18,000 depending on fall across the block. Where the fall is significant, retaining wall builders price the boundary walls before the slab can be set out. Checking the limestone retaining wall cost separately is worth the effort, since the figure often rivals the pad.

Have imported fill sand priced per cubic metre rather than as a lump sum. Character stock through Mount Lawley, Subiaco, Fremantle and Guildford brings heritage considerations and older services. Local heritage listings and character protection areas commonly limit what can be removed from the street facing part of the house. Old wiring, lead jointed drainage and unvented wet areas surface the moment linings come off, so a plumber and an electrician should both look at the house before the contract is signed. Hold a contingency of 10 to 15 per cent of contract value on any pre 1990 renovation. Have making good priced per square metre rather than left to a later variation.

Perth Hills blocks at Kalamunda and Mundaring sit on granite and laterite rather than sand, and most of that country is designated bushfire prone. AS 3959 sets a bushfire attack level that drives cladding, glazing, decking and screening choices, and the rating is assessed before the design is finalised. Rock excavation belongs in the contract as a provisional sum with a stated rate per cubic metre. Termite pressure is high across the whole metropolitan area, so termite barrier installation under AS 3660.1 should be named in the specification. Annual inspection by a pest controller commonly costs $250 to $450, which is indicative.

Registration and Insurance Checks You Can Do Yourself in Ten Minutes

Builder registration here runs under the Building Services (Registration) Act 2011. Decisions on who holds it are made by the Building Services Board. That board is supported by Building and Energy, the state building regulator. Building and Energy sits inside the Department of Local Government, Industry Regulation and Safety. Search the public register of building service providers before anything else happens.

Match the registered entity against the entity printed on your contract. Registration comes in two kinds, and the difference decides who may sign. A registered building contractor may contract with you for residential building work. A registered building practitioner holds the qualification without that contracting entitlement. Ask which one the person holds, then check the register rather than the card. Three further checks take five minutes between them and cost nothing.

Confirm the Australian Business Number is active on the public register. Then check that it matches the entity signing your contract. Request a public liability certificate of currency, commonly $10 million or $20 million. Request the home indemnity insurance certificate and read the name on it.

The Ten Minute Check Before Price Is Discussed

Costs nothing Four requests, five minutes
What to check
What good looks like
Registered entity
Matched against the contract name
Registration kind
Contractor rather than practitioner
Australian Business Number
Active and matching the entity
Public liability certificate
Commonly $10 million or $20 million
Home indemnity certificate
Your name and your address on it

Registration is granted by the Building Services Board, and the register of building service providers is public. Match the registered entity against the entity written on the contract you would have to enforce later. Only a registered building contractor may contract with you for residential building work in this state. Four requests cost nothing and take five minutes, and hesitation at any of them tells you something.

Check the register first. Discuss price second.

Home Indemnity Insurance, What It Covers and What It Does Not

Home indemnity insurance is arranged and paid for by your builder. Issue of the policy is in your name rather than the builder's. Cover is required for permit work valued above $20,000. Building and Energy publishes the limit at $200,000, or the contract value if lower.

Loss of deposit is covered separately to $40,000 on top of that figure. Claims become available where the builder dies, disappears or becomes insolvent. While your Butler or Baldivis builder still trades, the insurer will decline. Claim time limits apply under the scheme, so confirm them with Building and Energy. It is cover against your builder vanishing, rather than a house warranty.

Should a builder collapse at plate height on an Ellenbrook slab, the policy funds completion. Once that builder is still answering the phone, a leaking shower is a contract matter. Check that the certificate names your address and the correct contract value. Keep it filed with the contract for at least seven years.

Item Position Figure
Who arranges it Your builder arranges and pays for it Issued in your name
When it is required Permit work above this contract value Above $20,000
Cover limit Or the contract value where that is lower Up to $200,000
Loss of deposit Separate limit on deposit loss Up to $40,000
Claim time limits Set under the scheme, confirm before relying on them Ask Building and Energy

Contract Value Thresholds and How Your Protections Change

Thresholds decide what you can demand, so find your band first. Permit work valued at $20,000 or more requires a registered building contractor. For a Class 10a garage, shed or carport that figure is $50,000 or more. The Home Building Contracts Act 1991 covers fixed cost work between $7,500 and $500,000.

Below $7,500 and above $500,000 the Act simply does not apply. Home indemnity insurance attaches at the same $20,000 point as registration. A $19,000 bathroom in Innaloo falls below both and carries thinner protection. Adding $3,000 of tiling crosses the line and brings both requirements with it. Never let one job be split into two contracts to stay under a threshold.

Deposits are capped at 6.5 per cent of the contract price. On a $620,000 Harrisdale rebuild that permits $40,300 and nothing more. A narrow exception allows 20 per cent where off site cabinetry exceeds half the price. Confirm current figures with Building and Energy before you sign anything. Home building contract law in this state has recently been under review.

Threshold What it triggers Note
$7,500 Home Building Contracts Act 1991 starts applying Written contract territory
$20,000 Registered building contractor and home indemnity insurance Both at the same figure
$50,000 Contractor registration for a Class 10a garage or shed Higher threshold applies
$500,000 Home Building Contracts Act 1991 stops applying Negotiated terms above this
6.5 per cent Maximum deposit on the contract price $40,300 on $620,000

Reading a Residential Building Contract Before Signing

Western Australia gives you no general cooling off on a building contract. Signing is the moment your position is fixed for the whole job. Confirm the current position with Consumer Protection rather than assuming an eastern rule. Paying a lawyer $700 to $1,800 is cheap against a $600,000 contract. Price adjustment clauses let the price move, so find what can trigger one. Delay clauses decide who pays when an Ellenbrook slab waits eleven weeks.

Liquidated damages set late handover recovery, and $0 per week is common and meaningless. Termination clauses tell you what happens if the relationship fails halfway. A contract is only as specific as the drawings and specification behind it. Count the specification pages and look for brands, models, sizes and quantities. Volume contracts at Aubin Grove and Piara Waters often carry a thin inclusion list. Anything not described in those attachments is not inside the fixed price.

Read These Before You Sign Anything

No cooling off Signing fixes your position here
What to read twice
Read the price adjustment clause and find what can trigger a rise.
Read the delay and extension of time clause and see who carries the cost.
Check the liquidated damages rate, because $0 per week protects nobody.
Read the termination and suspension clause before the relationship needs it.
Count the specification pages and look for brands, models and quantities.
Total every allowance and provisional sum on a single page of your own.

Western Australia gives no general cooling off period, so the days before signing are the only open ones. Paying a lawyer $700 to $1,800 is cheap against a contract of $600,000, and both figures are indicative. A contract is only as specific as the drawings and specification attached behind the signature page. Confirm the current cooling off position and the deposit cap with Consumer Protection before relying on either.

There is no cooling off here, so read it before you sign.

How Allowances and Provisional Sums Turn Into Variations

An allowance is a contract figure standing in for something nobody has yet priced. Where the extent of work is itself unknown, that stand in is called a provisional sum. Add every allowance and provisional sum before comparing one contract against another. That total is your real exposure, and most buyers never calculate it. Volume contracts on the new estates carry the heaviest allowance loads. A Baldivis document holding $9,000 tiling, $5,500 tapware, $7,000 site works and $6,000 retaining carries $27,500 of guesses.

Movement of 30 per cent across those four lines is $8,250. Supply your own figures by pricing tiling, tapware and Monier or Bristile roof tiles yourself. Allowances turn into variations as soon as the real figure arrives. Require every variation in writing with a price and a time effect.

A verbal variation agreed at Harrisdale is the usual disputed final account. Ask what margin the builder adds, because 15 to 25 per cent is common. Keep a running total of approved variations as the job proceeds. Then the final invoice holds nothing you have not already seen.

Line Why it is a guess Indicative allowance
Tiling Area and tile choice not settled $9,000
Tapware and fittings Models not nominated $5,500
Site works Fall and fill not yet surveyed $7,000
Retaining Height and length not designed $6,000
Total untested Thirty per cent movement is $8,250 $27,500

What a Fixed Price Quote Actually Fixes

A fixed price fixes the price of work the attached documents describe. Anything undescribed sits outside it, whatever the cover page claims. Allowances and provisional sums sit inside the contract and are not fixed. Most builders mean no rise and fall clause applies to labour and materials.

That protection is genuine, and it is not the same as nothing can cost more. Exclusions are where the money hides, so read that list first. Common Perth exclusions start with the crossover, the driveway section between the kerb and your boundary. Fencing, landscaping, reticulation, flyscreens and service connections usually sit outside as well. Those items commonly total $35,000 to $85,000 on a four bedroom house.

Price the excluded list yourself before calling any total a budget. Count how often allowance, provisional and estimate appear in the document. Check whether every room names a floor finish, a tapware model, a tile size and plasterboard such as Gyprock. A quote naming no allowances has hidden them or was never properly prepared. Ask for it reissued with the allowance schedule on one page.

What a Fixed Price Quote Leaves Out

Read the exclusions Before you read the headline figure
Common exclusion
Indicative position
Vehicle crossover
Commonly $2,500 to $6,000
Driveway and paths
Priced separately on most contracts
Fencing and retaining
Often a separate trade entirely
Reticulation and landscaping
Rarely inside a building contract
Flyscreens and window treatments
Small lines that add up quickly

A fixed price fixes the price of work the attached documents describe, and nothing they leave out. Allowances and provisional sums sit inside the contract and are explicitly not fixed figures at all. Common Perth exclusions commonly total $35,000 to $85,000 on a four bedroom house, which is indicative. Most builders mean that no rise and fall clause applies to labour and materials, which is narrower.

Price the exclusion list yourself before calling any total a budget.

Building on the Swan Coastal Plain, Sand Pads and Site Classification

Most of metropolitan Perth sits on the Swan Coastal Plain, which is deep sand. Site classification under AS 2870 commonly returns Class A on these sands. Class A means little expected ground movement and a simpler footing design. Eastern states advice about reactive clay does not translate to Doubleview or Innaloo. Order the soil test early anyway, since $600 to $1,500 settles the footings.

Removing that guess from the contract is worth far more than it costs. A sand pad is engineered fill brought to level and compacted in layers. Compaction testing confirms the specified density, and that certificate belongs in your file. Request the pad depth, the fill source and the test results as contract items.

On a sloping Morley or Kalamunda block the pad is often the largest site cost. Site works on sand still generate real figures worth knowing. Sand pad construction and compaction commonly runs $4,000 to $18,000 depending on fall. Imported fill sand commonly costs $35 to $70 per cubic metre delivered and spread. Perth Hills blocks at Mundaring and Kalamunda sit on granite and laterite instead. Have rock priced as a provisional sum with a stated rate per cubic metre.

Item What it means Indicative
Class A under AS 2870 Little expected movement, sand or rock Simpler footings
Soil test and classification Settles the footing design early $600 to $1,500
Sand pad and compaction Engineered fill placed and tested in layers $4,000 to $18,000
Imported fill sand Delivered and spread, per cubic metre $35 to $70
Perth Hills rock Granite and laterite at Kalamunda or Mundaring Rate per cubic metre

Limestone Retaining, Engineering and Council Approval

Limestone is the Perth retaining material of choice and a trade in itself. Reconstituted block and natural quarried limestone are both used, and they price differently. A wall 600mm high in reconstituted block commonly runs $300 to $500 per square metre. Have retaining quoted as its own line rather than folded into a lump sum.

Approval for a retaining wall is largely a local government matter. Most metropolitan councils require a building permit above a modest height, often around 500mm. Engineering certification by a practising structural engineer is commonly required at the same point. Verify the trigger with your own local government before anybody orders block.

Earth retaining structures are designed to AS 4678, which your engineer should name. Drainage behind the wall is most often skipped and fails first. Aggregate backfill and a slotted drain to a soakwell belong in every quote. Surcharge loads change the design, so mention any driveway or pool above the wall. Walls holding a neighbour's ground raise a boundary question worth settling early. Sight along the top of an existing wall for bowing before building against it.

Item Position Indicative
Reconstituted block wall Modest height, face area rate $300 to $500 per m2
Natural quarried limestone Dearer and slower to lay Priced per project
Building permit Height trigger set by your local government Often around 500mm
Engineering certification Designed to AS 4678 by a structural engineer Commonly at the same height
Drainage behind the wall Aggregate and a drain to a soakwell The line most often skipped

Progress Payment Stages and What Should Be Finished at Each

Progress payments follow named construction stages rather than calendar dates. A common schedule runs deposit, slab, plate height, roof cover, lock up and completion. Each claim should attach to defined physical work rather than a bare percentage. Read the payment schedule beside the specification and check each stage describes something visible. A schedule front loaded to the early stages leaves you exposed if work stops.

At slab stage look for the compaction certificate and the termite system installed. At plate height check wall straightness, openings and bracing fixed as drawn. At lock up confirm every external door and window is installed and locks. At practical completion produce a written defect list rather than a driveway conversation. Independent inspections at each stage are worth their cost on a $600,000 build.

Expect $400 to $800 a visit, or $1,800 to $3,800 for a set of five. An inspector writes a report your builder has to answer in writing. Book the inspection before you authorise the payment rather than after. File every report, photograph and receipt in one folder from week one. Nothing else you spend on the build defends you half as cheaply.

What Should Be Finished Before You Pay

Walk it first Photographs before the payment
Stage by stage
At slab stage ask for the compaction certificate and the termite system.
At plate height check wall straightness, openings and bracing fixed as drawn.
At roof cover check the tie down, the sarking and the flashings.
At lock up confirm every external door and window is installed and locks.
At fit out check waterproofing, falls and the tiling against the specification.
At practical completion hand over a written defect list rather than a conversation.

Progress payments attach to named construction stages, so each claim should describe visible work. Independent stage inspections commonly cost $400 to $800 a visit, or $1,800 to $3,800 for five. Book the inspection before authorising the payment, because a written report carries real weight. A schedule front loaded toward the early stages leaves you exposed if the builder stops work.

Inspect the stage, then release the money.

Termite Management on a New Build in Perth

Termite pressure across metropolitan Perth is high, so design has to answer it. Termite management for new buildings is specified under AS 3660.1. Your contract should name the system and the installer rather than assume both. Options include a physical barrier such as Termimesh, a treated sheet such as Kordon, or a reticulated system. Ask what the durability notice fixed in the meter box will actually say.

Several design choices help you or hurt you for decades. Keep finished ground level below the slab edge so the perimeter stays visible. Avoid rendering or paving over the slab edge, which hides what matters. Garden beds and reticulation pushed against the wall bridge straight past the barrier.

Attached patios and alfresco slabs poured later commonly breach a sound system. Protection is a program rather than a single installation. Annual inspection of a Perth house commonly runs $250 to $450. Reticulated systems carry a refill cost, so ask the renewal interval and price. Older timber framed stock through Guildford and Fremantle carries higher exposure. Put the annual inspection in your calendar the week the house is handed over.

Termite Management on a New Perth House

AS 3660.1 Name the system in the contract
System
What to ask
Physical barrier
Installed at slab and penetrations
Treated sheet system
Chemically impregnated membrane
Reticulated chemical system
Refillable, ask the renewal interval
Monitored perimeter
Depends on somebody actually monitoring
Annual inspection
Commonly $250 to $450 a year

Termite management for new buildings is specified under AS 3660.1, which your contract should name. The durability notice in the meter box records the system and date for any later inspector. Keep the finished ground level below the slab edge so the perimeter stays open to inspection. Attached patios, alfresco slabs and garden beds built later are the usual way a system gets bridged.

Name the system in the contract, then inspect every year.

Pre 1990 Stock and What Opens Up Once Walls Come Off

Houses built or renovated before 1990 across Perth likely hold bonded asbestos cement. Typical locations are eaves, wall sheeting, wet area linings, fences and roofing. Renovating in Mount Lawley, Subiaco, Fremantle or Guildford usually finds some of it. A survey of a modest house commonly costs $400 to $900. Removal rules sit with WorkSafe Western Australia under the work health and safety framework.

Bonded asbestos above the regulated area threshold requires a licensed removalist. Friable material always requires a licensed removalist regardless of quantity. Removal of a small eave run commonly runs $1,500 to $6,000 with disposal. Request the control plan, the disposal receipt and a clearance certificate.

The Asbestos Safety and Eradication Agency publishes plain guidance worth reading first. Old wiring, unvented wet areas, undersized lintels and settled fill surface together. Hold a contingency of 10 to 15 per cent on any pre 1990 renovation. Ask for making good to be priced per square metre in the contract. Photograph every opened wall and ceiling cavity on the day it is exposed.

Structural Engineering and Independent Inspection

A structural engineer produces the document homeowners skip most and need most. Footings and slabs are designed to AS 2870 and concrete to AS 3600. Timber framing is designed to AS 1684 for a conventional house frame. Wind and other structural actions come from the AS/NZS 1170 series. Those standards are published by Standards Australia and cited on the engineer's drawing. Never accept a steel beam size chosen on site by anybody at all.

Perth work with a specific need for engineering is easy to list. Two storey coastal building at Cottesloe, City Beach and North Beach meets wind and salt exposure. Limestone retaining above the council height needs certified design under AS 4678. Hills blocks at Kalamunda and Mundaring sit in designated bushfire prone areas. AS 3959 sets the bushfire attack level driving construction out there.

An inspector checks that what was built matches what was drawn. Pre purchase inspections are reported against AS 4349.1 by the same people. The National Construction Code published by the Australian Building Codes Board sets the requirements. Have the engineer's drawings on site at every inspection for comparison.

Situation Standard Indicative fee
Footings and slab design AS 2870 with a site classification $700 to $2,000
Removed load bearing wall Beam sized to AS 3600 or AS 4100 $700 to $2,000
Timber framing beyond span tables AS 1684 for conventional framing Within the design fee
Limestone retaining above the trigger AS 4678 earth retaining structures Priced per wall
Hills block in a bushfire prone area AS 3959 bushfire attack level Varies with the rating

Comparing Three Builders Quoting the Same Drawings

Three quotes only help when all three price the same documents. Send each builder identical drawings, specification, finishes schedule and soil report. Supply your own allowance figures so allowances stop being a variable. Ask for the quote broken into stages and trades rather than a single total.

Across well documented Perth work a spread of 10 to 15 per cent is ordinary. Build one comparison sheet carrying the lines that actually move. Put contract sum, total allowances, exclusions, site works and build period side by side. Add the deposit requested, the variation margin and the damages rate beneath. Convert each quote to a rate per square metre of floor area. Differences of 40 per cent mean somebody read the drawings differently.

Ask each builder the same four questions and write the answers down. Which registration class do you hold, and which entity signs the contract. How many jobs are you running at Baldivis or Ellenbrook right now. Who supervises my site, and who do I ring on a Tuesday morning. Can I see two houses you finished within 10 kilometres of my block.

Putting Three Perth Quotes Side by Side

One sheet Five lines that actually move
Line
Why it matters
Contract sum
The headline, least useful alone
Total allowances
Your untested exposure
Exclusion list
What you still have to buy
Site works figure
Sand pad, retaining and crossover
Build period
Weeks, with the damages rate beside it

Three quotes only tell you something when all three price identical drawings and specification. Supply your own allowance figures so the allowances stop being a variable between three prices. A spread of 10 to 15 per cent is ordinary, while 40 per cent means somebody read it differently. Convert each quote to a rate per square metre, then ask every builder the same questions.

Same drawings, same allowances, one comparison sheet.

Indicative Perth Building Costs

Perth rates sit below the eastern capitals, partly because sand sites found cheaply. Volume building at Baldivis, Butler, Harrisdale or Aubin Grove commonly runs $1,500 to $2,300 per square metre. Custom building at Doubleview or Mount Lawley commonly runs $2,800 to $4,800 per square metre. Coastal two storey work at Cottesloe or City Beach commonly runs $4,000 to $7,000 per square metre. Every figure in this section is indicative for metropolitan Perth.

Whole project figures are more useful than rates when budgeting. A rebuild through Scarborough, Doubleview or Innaloo commonly totals $450,000 to $950,000. Demolition of an existing house commonly costs $18,000 to $35,000 on top. A substantial ground floor addition commonly totals $220,000 to $520,000. Add 8 to 12 per cent for design, documentation, engineering and permits.

Hold a contingency on any work touching an existing house. Smaller items are easier to price and easier to drop. Soil test and site classification run $600 to $1,500 across the metropolitan area. Engineering for a single opening runs $700 to $2,000 on a simple beam. Limestone retaining runs $300 to $500 per square metre at modest heights. A sand pad runs $4,000 to $18,000 and a crossover $2,500 to $6,000.

Work Where Indicative
Volume build, per square metre Baldivis, Butler, Harrisdale, Aubin Grove $1,500 to $2,300
Custom build, per square metre Doubleview, Morley, Mount Lawley $2,800 to $4,800
Coastal two storey, per square metre Cottesloe, City Beach, North Beach $4,000 to $7,000
Knockdown rebuild, whole project Scarborough, Doubleview, Innaloo $450,000 to $950,000
Ground floor addition, whole project Established metropolitan suburbs $220,000 to $520,000

Warning Signs, Including the Quote That Sits Well Below the Others

A quote well below the other two is the warning most buyers misread. Price the gap, because the money has usually come out of the specification. Check whether it carries fewer allowances or a shorter inclusion list. Look at whether site works, retaining and the crossover are quietly excluded.

A builder 25 per cent under two others has misread the drawings or plans variations. Requests for cash, or for a deposit above 6.5 per cent, are immediate warnings. Pressure to sign today and a refusal to put variations in writing follow close behind. No fixed address and a registration number not matching the contracting entity are worse again. Payment claims running ahead of completed work signal a builder in trouble.

Disputes in Western Australia have a defined path worth starting early. Building and Energy handles building service complaints about registered providers. Consumer Protection deals with contract conduct and misleading claims instead. The State Administrative Tribunal hears building matters and disciplinary proceedings. Write every concern down the same week with dates and photographs. A dated written trail gets read later, and a remembered conversation does not.

Signals Worth Acting On Straight Away

Watch for The quote well below the other two
What to watch for
A price 25 per cent under two others quoting identical drawings.
A request for cash, or for a deposit above 6.5 per cent.
Money asked for before the home indemnity insurance certificate arrives.
A registration number that does not match the contracting entity.
A refusal to put a variation in writing before the work proceeds.
Payment claims running ahead of what has actually been completed.

A quote well below the other two is usually cheaper because something left the specification. Check whether the low quote carries fewer allowances or a shorter inclusion list than the others. Building and Energy handles complaints about registered providers, and the State Administrative Tribunal hears building matters. Write every concern down in the week it arises, because a dated written trail gets read later.

Price the gap in the cheap quote before you accept it.

Practical Tips for Getting Builder Quotes

Getting useful quotes is a documentation exercise done before ringing anybody. Decide the scope in writing, with room sizes and finishes named. Spend the money on drawings first, because quotes against a sketch cannot compare. Allow four to twelve weeks for documentation on a custom Perth house.

Budget 8 to 12 per cent of build cost for design and approvals. Approach the right builders rather than as many as you can find. Volume builders at Baldivis, Butler and Ellenbrook sell a product with an inclusion list. Custom builders through Subiaco, Mount Lawley and Fremantle need real drawings to price.

Ask each how many jobs they run at once and who supervises yours. Do two things before signing and one after work begins. Have a lawyer read the price, delay, termination and variation clauses for $700 to $1,800. Total the allowances on one page and treat that sum as your exposure. Keep the contract, variations, payment claims and dated stage photographs in one place. Then write any concern down in the week it happens.

Builders Across Perth and Western Australia

Registered building contractors across metropolitan Perth and the wider state, from infill and knockdown rebuild work through Scarborough, Doubleview, Innaloo and Morley, to coastal two storey building at Cottesloe, City Beach and North Beach, to volume estates at Baldivis, Butler, Ellenbrook, Harrisdale, Piara Waters and Aubin Grove, and character stock in Mount Lawley, Subiaco, Fremantle and Guildford. Pick your area below to see what the local housing stock usually means for scope, access and site costs.

▶ Perth Inner City 17 areas

CBD & Surrounds

Perth CBD Northbridge East Perth West Perth

Inner North

Subiaco Leederville Mount Lawley Highgate

Inner South

South Perth Victoria Park Como

Western Suburbs

Cottesloe Nedlands Crawley Dalkeith Applecross
▶ Greater Perth 26 areas

Northern Suburbs

Joondalup Wanneroo Ellenbrook Butler Morley Scarborough Karrinyup

Southern Suburbs

Fremantle Rockingham Baldivis Cannington Canning Vale Willetton

Eastern Suburbs

Midland Armadale Bassendean Byford Claremont

Perth Hills

Kalamunda Mundaring Gooseberry Hill Lesmurdie Helena Valley Darlington Glen Forrest Parkerville
▶ South West 25 areas

Peel

Mandurah Pinjarra Waroona Dwellingup Warnbro Safety Bay Secret Harbour

Bunbury Region

Bunbury Busselton Australind Harvey Collie Capel Donnybrook

Margaret River Region

Margaret River Dunsborough Augusta Cowaramup Yallingup

Great Southern

Albany Denmark Manjimup Pemberton Bridgetown Walpole Mount Barker
▶ Regional Western Australia 30 areas

Pilbara

Karratha Port Hedland Newman Tom Price Dampier Paraburdoo Marble Bar

Kimberley

Broome Kununurra Derby Halls Creek Fitzroy Crossing

Goldfields

Kalgoorlie Esperance Coolgardie Norseman Laverton Leonora

Mid West

Geraldton Carnarvon Meekatharra Kalbarri Exmouth Coral Bay

Wheatbelt

Northam Narrogin Merredin Moora York Toodyay

Finding a Builder in Perth - FAQ

Which body registers building contractors in Western Australia, and how do I check one?
Builder registration in Western Australia is granted by the Building Services Board under the Building Services (Registration) Act 2011. That board is supported by Building and Energy, the state building regulator, which sits inside the Department of Local Government, Industry Regulation and Safety. Search the public register of building service providers by name or by company, then match the registered entity against the entity printed on your contract. Registration comes in two kinds, so confirm whether the person holds contractor registration or practitioner registration. Only a registered building contractor may contract with you for residential building work. Also check the Australian Business Number on the Australian Business Register and ask for a public liability certificate of currency.
At what contract value do I need a registered building contractor and home indemnity insurance?
Residential building work that requires a building permit and is valued at $20,000 or more must be carried out by a registered building contractor. For a Class 10a structure such as a private garage, shed or carport, that threshold is $50,000 or more. Home indemnity insurance attaches at the same $20,000 figure, so one number answers both questions on most jobs. The Home Building Contracts Act 1991 covers fixed cost home building work valued between $7,500 and $500,000, and does not apply outside that band. A $19,000 bathroom in Innaloo therefore sits below both thresholds and carries thinner statutory protection. Never agree to one job being split into two contracts to stay beneath a threshold.
How much does home indemnity insurance cover, and for how long?
Building and Energy guidance states that home indemnity insurance can cover loss of a deposit up to $40,000, and incomplete or defective building work up to $200,000. Cover is also limited to the contract value where that figure happens to be lower. Your builder arranges and pays for the policy, which is issued in your name so that it transfers with the house to a later owner. What the policy responds to is narrow, being the death, disappearance or insolvency of the builder. While your builder is still trading, the rectification is a contract matter and the insurer will decline. Claim time limits apply under the scheme rather than running on indefinitely, so confirm the current limits and periods with Building and Energy.
Is there a cooling off period on a Western Australian residential building contract?
Western Australia does not give you a general statutory cooling off period on a home building contract, which is a real difference from several eastern states. Signing is therefore the moment your position is fixed, so the reading has to happen beforehand rather than afterwards. Use that time on the specification, the exclusion list and the allowance schedule rather than on the headline price. Paying a lawyer $700 to $1,800 to read the price adjustment, delay, termination and variation clauses is cheap against a contract of $600,000, and both figures are indicative. Confirm the current position with Consumer Protection before you rely on it, since home building contract law in this state has been under review.
What is the largest deposit a Perth builder can ask for?
Deposits on a home building contract are capped at 6.5 per cent of the contract price under the Home Building Contracts Act 1991. On a $620,000 knockdown rebuild at Harrisdale that permits $40,300 and nothing beyond it. A narrow exception allows up to 20 per cent where off site cabinetry work makes up more than half the contract value. Your builder must also give you the home indemnity insurance certificate before asking for money on a contract above $20,000. No certificate means no deposit, which is the simplest rule on the whole subject. Any request for cash, or for a deposit above the cap, is a reason to stop and confirm the position with Building and Energy.
What does it cost to build a house in Perth per square metre?
Volume building on a new estate at Baldivis, Butler, Harrisdale or Aubin Grove commonly runs $1,500 to $2,300 per square metre. Custom building in an established suburb such as Doubleview, Morley or Mount Lawley commonly runs $2,800 to $4,800 per square metre. Coastal two storey work at Cottesloe, City Beach or Scarborough commonly runs $4,000 to $7,000 per square metre. Every figure here is indicative for metropolitan Perth and moves with specification, access and fall across the block. Add 8 to 12 per cent on top for design, documentation, engineering, permits and surveys. Then price the exclusion list separately, because the crossover, driveway, fencing, reticulation and landscaping commonly total $35,000 to $85,000.
How do I tell whether a quote is really a fixed price?
Count how often the words allowance, provisional and estimate appear across the whole document, then total every figure attached to them. That total is the part of the price nobody has tested, and movement of 30 per cent on a $27,500 allowance load is $8,250. Check whether every room names a floor finish, a tapware model and a tile size, because an unnamed item is not a priced item. Read the exclusion list before you read the headline figure, since the crossover, driveway, fencing and reticulation are commonly outside the contract. Most builders mean that no rise and fall clause applies to labour and materials, which is genuine protection and a narrower promise than the words suggest.
How do I tell whether my block needs an expensive sand pad?
Walk the block with a tape measure and a string line, and work out the fall from the highest corner to the lowest. A fall under about 300mm across a typical metropolitan lot usually means a modest pad, while a metre or more means significant imported fill and retaining. Look at the neighbouring houses and note how far their finished floor level sits above the verge. Check the retaining walls already built along the side boundaries, because a tall wall next door tells you the street was cut and filled. Sand pad construction and compaction commonly runs $4,000 to $18,000, which is indicative, so order the soil test for $600 to $1,500 before you sign anything.
Does a limestone retaining wall need a building permit and an engineer, and what does it cost?
Approval for a retaining wall in Western Australia is largely a local government matter, and the height that triggers a building permit genuinely differs across Perth. Most metropolitan councils require a permit above a modest height, often in the region of 500mm, with engineering certification at about the same point. Earth retaining structures are designed to AS 4678, and your engineer should name that standard on the drawing. Confirm the trigger with your own local government before anybody orders block. A wall 600mm high in reconstituted limestone block commonly runs $300 to $500 per square metre of face, which is indicative. Aggregate backfill and a slotted drain to a soakwell belong in every quote.
What should be finished before I release each progress payment?
At slab stage expect the compaction certificate, the correct slab dimensions and the termite management system installed under AS 3660.1. At plate height check wall straightness, window and door openings, and bracing fixed exactly as drawn. At roof cover look at the tie down, the sarking and the flashings before anything is lined. At lock up every external door and window should be installed and lockable, which is what the stage word actually means. At practical completion produce a written defect list rather than a verbal conversation on the driveway. Independent stage inspections commonly cost $400 to $800 a visit, or $1,800 to $3,800 for a set of five, both indicative.

Building Services Across Western Australia

For Trades & Contractors - SA

Builders and carpenters looking for work around Perth can see current jobs on the Western Australian leads board, or register to receive local enquiries as they come in.

Ready to Get Builder Quotes?

Tell us the suburb and what you are building, and we will connect you with registered building contractors taking work in your area.

Get Builder Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 20 October 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

Service availability may vary in regional WA. Verify licences at WA Building and Energy.
Costs are indicative for metropolitan Perth in October 2026. Scope, site access, sand pad and retaining requirements, and the number of allowances left open in the contract move them most.
Need work done? Get free quotes. Post a Job – It's Free