Looking for a Builder in Perth?

Tell us your suburb, what you want built, when the house was built and whether you already have drawings or a planning decision. We will pass that brief to registered local builders, so every quote you receive prices the same project.

Get Free Builder Quotes

Perth Building Price Guide

Small rear extension, 15 to 30 sq m$50,000 - $100,000
Single storey addition, 30 to 60 sq m$100,000 - $250,000
Second storey addition$250,000 - $600,000
Second storey, per sq m$3,500 - $5,500
One-bedroom granny flat$130,000 - $180,000
Full home renovation$200,000 - $500,000
Custom new home, per sq m$2,800 - $4,800
Knockdown rebuild, whole project$450,000 - $950,000
Soil test and site classification$600 - $1,500
Building surveyor fees$400 - $1,800

These figures are 2027 estimates for building work in Perth. Your price depends on the design, the soil and slope of the block, the finishes you choose and whether sewers, bushfire ratings or asbestos add steps.

Find a Registered Builder in Perth for Renovations, Additions and New Builds

Hiring a builder in Perth goes best when the approvals, the contract and the insurance are sorted before anyone prices the job. A small rear extension of 15 to 30 square metres is estimated at $50,000 to $100,000 for 2027, and a second storey addition at $250,000 to $600,000. A knockdown rebuild, clearing the existing house so a new one can go up on the same lot, is estimated at $450,000 to $950,000 for the whole project. Across most of the state, building work that needs a permit and is valued at $20,000 or more must be done by a registered building contractor. Since 1 July 2026, garages, carports, sheds and roofed patios valued under $50,000 no longer need one, although a permit still applies. Above $20,000 the builder must also take out home indemnity insurance in your name before taking a deposit or starting work. That cover helps if the builder dies, disappears or becomes insolvent, in other words when the company runs out of money and is wound up. The deposit on a contract covered by the Home Building Contracts Act 1991 is capped at 6.5 per cent of the price. Many single houses that meet the R-Codes, the state housing design rules, skip planning approval and go straight to a building permit. Water Corporation approval, a bushfire attack rating or asbestos testing can add steps, so raise them before anyone prepares a price. Share your brief through The Quote Yard and registered builders from across the Perth metropolitan area can send you quotes for the same job.

Perth Building Work Covered

Building jobs across Perth run from a roofed patio or a removed wall to a rear addition, a second storey, a granny flat or a full knockdown rebuild. We can connect you with registered local builders who all price the same written brief for your block.

Get Free Quotes

At a Glance - Hiring a Builder in Perth, 2027 Estimates

Job Price Range How It Is Charged What Drives It In Perth Who Can Do It
Cosmetic refresh $20,000 - $60,000 Whole job Finishes and fittings chosen Builder or renovation business
Small rear extension, 15 to 30 sq m $50,000 - $100,000 Whole job Footings and the roof join Registered building contractor
Single storey addition, 30 to 60 sq m $100,000 - $250,000 Whole job Size and new wet areas Registered building contractor
Second storey addition $250,000 - $600,000 Whole job Stairs and new structure Registered building contractor
Studio granny flat $90,000 - $140,000 Whole job Service connections Registered building contractor
Two-bedroom granny flat $170,000 - $220,000 Whole job Size and layout Registered building contractor
Volume build on a new estate $1,500 - $2,300 per sq m Per square metre Standard plans and estate rules Registered building contractor
Custom build, established suburb $2,800 - $4,800 per sq m Per square metre Design, access and neighbours Registered building contractor
Knockdown rebuild $450,000 - $950,000 Whole project Demolition, asbestos and design Registered building contractor
Double brick house demolition $16,000 - $32,000 Whole job Asbestos and site access Demolition contractor
Engineering for a removed load bearing wall $700 - $2,000 Per wall Span and loads above Structural engineer
Independent stage inspections, set of five $1,800 - $3,800 Per set Number of stages Independent building inspector

What Pushes a Perth Building Price Up

What is involved
Sandy or sloping blocks can need fill, compaction, engineered footings and retaining before any slab is poured.
A sewer or water main under the planned footprint can force a redesign or engineered piles.
Homes built before 1990 may hide asbestos in eaves, wall sheeting or roofing, which adds testing and licensed removal.
A higher bushfire attack level limits the windows, cladding and decking that can be used.
Ask every builder to price demolition, site works, footings, frame, roof, walls, finishes and allowances as separate items. Laid out like that, two quotes can be checked against each other stage by stage.

Before You Call a Perth Builder

Have your suburb, the certificate of title, the year the house was built, any drawings and photos of the area to be changed. Note any sewers, easements, slopes, large trees or shared walls, and whether the block shows on the bushfire prone map.

Get Free Quotes
Free · No obligation · WA-wide

Hiring a Builder for a Perth Home

A builder is the registered contractor in charge of structural work, whether a roofed patio, a new opening in a brick wall, a rear addition, a second storey or a complete new house. On a Perth job the builder normally books and supervises the other trades as well, including the bricklayer, carpenter, roof plumber, electrician and plumber. The state guide to registered builders in Western Australia explains the building work and the laws behind it, and the sections below deal with choosing and contracting one. A handful of local checks decide who can legally take the job, which approvals come first and what protects your money if things go wrong. Settling those points first spares you weeks of redrawn plans and revised prices.

Begin with a written brief that lists your suburb, the block, the year the house was built and what you want built. Add any drawings, the certificate of title, photos of the area involved and notes on slope, trees, sewers and truck access. If you are still drawing up a shortlist, the guide to finding a builder in Perth covers register searches, sand pads and stage payments in detail. With one brief in every builder's hands, the quotes that come back describe the same project and can be compared fairly.

Perth Building Budgets for 2027, From Rear Additions to Rebuilds

Quote Yard price guides for Western Australia estimate a small rear extension of 15 to 30 square metres at $50,000 to $100,000 for 2027. A mid-sized single storey addition of 30 to 60 square metres is estimated at $100,000 to $250,000, and larger additions at $200,000 to $450,000. Going up rather than out costs more, with a second storey addition estimated at $250,000 to $600,000, or about $3,500 to $5,500 a square metre. That premium pays for the stairs and for new structure carried over rooms that people may still be living in. For a one-bedroom granny flat, a self-contained second dwelling behind or beside the main house, guides suggest $130,000 to $180,000. A full home renovation is estimated at $200,000 to $500,000, and a cosmetic refresh that leaves the structure alone at $20,000 to $60,000.

New homes are usually priced by floor area, and Perth guides treat volume builds and custom work separately. A volume build on a new estate is estimated at $1,500 to $2,300 a square metre, while a custom build in an established suburb is estimated at $2,800 to $4,800. A knockdown rebuild, covering the clearing of the old house and the building of the new one, is estimated at $450,000 to $950,000 for the whole project. Demolishing a standard double brick home is estimated at $16,000 to $32,000 on its own, and a timber-framed home at $12,000 to $22,000. Size, design and finishes move these figures most, and the home extension and granny flat guides break them down further.

Perth Job Estimate for 2027 Priced As Main Cost Driver
Small rear extension, 15 to 30 sq m $50,000 - $100,000 Whole job Footings and roof join
Single storey addition, 30 to 60 sq m $100,000 - $250,000 Whole job Wet areas and finishes
Single storey rear addition by area $2,500 - $3,800 per sq m Per square metre Slope and finishes
Second storey addition $250,000 - $600,000 Whole job Stairs and structure
Second storey addition by area $3,500 - $5,500 per sq m Per square metre Existing walls and footings
Studio granny flat, 35 to 45 sq m $90,000 - $140,000 Whole job Service connections
One-bedroom granny flat $130,000 - $180,000 Whole job Layout and access
Two-bedroom granny flat $170,000 - $220,000 Whole job Size and finishes
Volume build on a new estate $1,500 - $2,300 per sq m Per square metre Standard plans
Custom build, established suburb $2,800 - $4,800 per sq m Per square metre Design and access
Building surveyor fees $400 - $1,800 Per project Project size

The Three Tests That Decide Whether You Need a Registered Builder

Building and Energy applies three tests to decide whether a job counts as builder work that only a registered building contractor may carry out. The work must need a building permit, it must be valued at $20,000 or more and it must sit in the prescribed area of the state. When we checked, the prescribed area took in 122 local governments, with some low-population areas included only for their main town sites. If any one of the three answers is no, registration is not required, although the work must still meet the building standards. A $15,000 internal alteration can therefore go to an unregistered tradesperson, but home indemnity insurance is not required at that value either. Your local government, the council that issues building permits, can confirm whether a particular job needs a permit at all.

Some structures are exempt from registration even when they need a permit and cost more than $20,000. The official fact sheet lists fences, free-standing and retaining walls, swimming pools, timber decking, cabinet making and second-fix joinery, meaning the doors, skirting and trims fitted after the linings. From 1 July 2026, a newer rule also lets a Class 10a building valued under $50,000 be built without a registered builder. Class 10a means a non-habitable building such as a private garage, carport, shed or roofed patio, so a patio or verandah under that value can go to a smaller business. The permit, the building code and any planning approval still apply, so the change affects who builds rather than what must be approved.

Work that suits a specialist is often better booked directly rather than through a builder. A new slab or driveway on its own suits a Perth concreter, and a re-roof that leaves the frame untouched suits a Perth roofer. Brick repairs, new piers or a garden wall can go to a local bricklayer without anyone in between. Electrical, plumbing and gas work always need their own licensed trades, whoever manages the job. Where three or more of these trades must work in sequence, a builder can tie them together under one contract and one program.

Matching the Job to the Right First Call

Job and first booking
A permit job worth $20,000 or more, such as an extension, second storey or new home, goes to a registered building contractor.
A garage, carport, shed or roofed patio under $50,000 can go to a registered builder or a smaller business, with a permit still needed.
A fence, retaining wall, pool or timber deck can go to the specialist trade, with a permit where the council requires one.
Wiring, pipes or gas lines need a licensed electrician, plumber or gas fitter, whoever runs the rest of the job.
If you are unsure whether a job passes all three tests, ask your local government permit authority before you sign anything. The answer decides whether registration and home indemnity insurance apply.

Checking the Register and Matching Names Across Every Document

Building and Energy is the state regulator for builders, plumbers, electricians and gas fitters, and it now sits inside the Department of Local Government, Industry Regulation and Safety. That department, often shortened to LGIRS, was previously the Department of Energy, Mines, Industry Regulation and Safety, so older paperwork may carry the earlier name. The public register on the WA Government website shows whether a building contractor is registered, and Building and Energy answers register queries on 1300 489 099. Search by the name on the quote and by the registration number, and check that the entry is current. A builder whose registration has lapsed or been cancelled cannot lawfully take on builder work, however good the price looks.

The regulator's own advice is that a builder's details should be identical on every document you receive. The name on the register, the quote, the contract, the building permit and the insurance certificate should all match, along with a physical address and an ABN, the Australian Business Number. A company name on the contract and a personal name on the register is a good reason to ask questions before signing. You can also search company and bankruptcy records, and ask for a list of recent jobs so you can speak with former clients.

Preparation of Plans Agreements Signed Before the Contract

Many Perth builders offer a preparation of plans agreement, often called a PPA, before they will draw up a full building contract. Under a PPA you pay the builder to prepare drawings and site information that lead to a detailed price for the job. Building and Energy warns that money paid under a PPA may not be refundable if you decide not to go ahead. A PPA is also separate from the building contract, so home indemnity insurance does not cover it. Read it as carefully as the main contract, because it is a binding agreement with its own terms.

Before you sign, ask who will own the plans if you walk away, and whether you can take them to another builder. Ask too which reports the fee covers, such as a soil test, a feature survey of levels and boundaries, or early engineering advice. Perth guides estimate a soil test and site classification at $600 to $1,500 for 2027, so check whether that sits inside the PPA fee or on top. If the drawings stay with the first builder, a second builder may need the design redrawn from scratch before quoting. Getting those answers in writing keeps your options open while the design is still on paper.

Deemed-to-Comply Designs, Clause 61 and Planning Approval

Planning approval, also called development approval, checks whether a design suits the zoning and local planning rules before any building permit is issued. For houses, the main rulebook is Volume 1 of the Residential Design Codes, known as the R-Codes, which control matters such as boundary setbacks, building height and open space. Under clause 61 of the deemed provisions, the state planning rules read into each council's scheme, a single house that meets the deemed-to-comply criteria is exempt from development approval. Deemed-to-comply means the design meets every measurable standard exactly as written, with no variations to argue for. Extensions and renovations to an existing single house that meet those criteria are exempt in the same way. A local planning policy or scheme can amend or replace some criteria, so the detail can differ between councils across Perth.

Some councils offer a clause 61A check, a formal written answer on whether a design needs development approval or can go straight to a building permit. Councils set their own fee and lodgement process for that check, so ask yours before the drawings are final. A design that varies a setback, a height limit or a privacy rule needs a planning application instead. Heritage places are another trigger, because works to a place on the State Register must be referred under the Heritage Act 2018 through the local government. Alterations, additions, demolition and re-roofing are referred, while minor maintenance and some like-for-like repairs generally are not.

The R-Codes are under review, and when we checked, public consultation was open until 5pm on 26 February 2027. The Department of Planning, Lands and Heritage expects any changes to begin taking effect later in 2027, and current applications are still assessed under today's rules. Proposals released for comment include lifting the maximum granny flat floor area from 70 to 90 square metres and removing minimum car parking for granny flats. Treat these as proposals until the final codes are approved, and design to the rules in force on the day you lodge.

Questions That Sort Out the Planning Path

Ask before the design is final
Does the design meet every deemed-to-comply criterion in R-Codes Volume 1, with no variations?
Has the council adopted a local planning policy that changes any of those criteria?
Is the property on the State Register, on the council's heritage list or inside a heritage area?
Would a clause 61A check give you written certainty before the building permit is lodged?
Planning approval must be in place before a building permit can be issued. Ask the council planning team early if you are unsure which path applies to your design.

Certified or Uncertified: Lodging the Building Permit With Council

In Western Australia the local government is the permit authority, and there are two ways to apply for a building permit. In a certified application, a registered building surveyor, an independent professional who checks plans against the building code, issues a certificate of design compliance first. That certificate, the BA1 form and the plans then go to the council, which must decide within 10 business days. In an uncertified application, the BA2 form and plans go straight to the council, whose own surveyor issues the certificate and permit together within 25 business days. Your builder may handle the lodgement, but you should know which path they plan to use and how it affects the start date.

A building permit is only issued once planning and health requirements are met, so any development approval must come first. The permit names the builder, and it is the person named who is allowed to start the work it covers. Fees are prescribed in the Building Regulations 2012, and the Construction Training Fund levy and the Building Services Levy apply to certain applications. Perth guides estimate building surveyor fees for an extension at about $400 to $1,800 for 2027, separate from council fees and levies. Ask each builder whether those costs sit inside the quote or will be passed on to you.

During construction, the surveyor's certificate lists the inspections and certificates the builder must obtain, such as engineering sign-offs. When the work is finished, the builder must lodge a notice of completion, form BA7, within seven days of completion. That notice closes the permit for compliance and record keeping, but it does not decide practical completion under your contract. Keep a copy with your plans, because buyers, lenders and insurers may ask to see it later.

Step Certified Application Uncertified Application
Who checks the design Private registered building surveyor Council's building surveyor
Certificate of design compliance Issued before lodging Issued with the permit
Form lodged with council BA1 BA2
Council decision time 10 business days 25 business days
Planning approval Needed first where it applies Needed first where it applies
Notice of completion BA7 within seven days BA7 within seven days

Water Corporation Approval for Work Near Sewers and Mains

In Perth, the Water Corporation must approve building plans before construction starts in any area served by its water or sewer mains. The approval protects its pipes from building loads, keeps them reachable for maintenance and checks for backflow risk, meaning dirty water flowing back into the drinking supply. Separate application types cover single houses, renovations and extensions, and minor works such as pools, retaining walls, parapet walls and sheds. Application fees are set by the corporation and must be paid before work begins. Ask your builder who lodges the application and how long it is taking, because a missing approval can hold up the start.

Before the design is fixed, find out where any Water Corporation assets sit on the block. The most common are sewer reticulation pipes of 300 millimetres across or smaller, while larger mains, pressure mains and drains turn up less often. Minimum clearances between a sewer and a building depend on the sewer's depth and the materials involved, and they shrink where footings go below the pipe's zone of influence. The zone of influence is the soil that would pass building loads onto the pipe, so deeper footings keep that load away from it. Where redesign and relocation are ruled out, a structural engineer must design piles reaching at least 300 millimetres below that zone. Easements registered on the title do not always stop you building, provided the technical guidelines are met.

New wet areas need a licensed plumber, so bring a Perth plumber into the design as soon as a bathroom, laundry or kitchen moves. The plumber can check how the new drains will reach the existing sewer connection and whether the falls will work. A new en suite on the far side of the house can cost more in drainage than owners expect. Getting that advice early keeps the plumbing allowance in each builder's quote realistic.

Pipe Questions for the Design Stage

Check early
Does a sewer or water main cross the block, and how deep does it run?
Is an easement for Water Corporation assets registered on the certificate of title?
Will any new footings sit inside the required clearance from the pipe?
Has an engineer signed and dated a pile detail and site plan where piling is needed?
A sewer under the planned footprint can change the design or add engineered piles. Find it before the drawings are final rather than when the excavator arrives.

BA20 Notices and Consent for Work Touching a Neighbour's Land

Many Perth additions sit close to a side boundary, and the Building Act 2011 sets a formal process for work that affects the land next door. When building work will permanently encroach on, or adversely affect, a neighbour's land, a BA20 form goes in with the building permit application. Encroach means part of the building, such as a footing or an eave, would cross onto the other property. A separate BA20A notice and request for consent covers matters such as removing a dividing fence, putting up protection structures, going onto the land or working on a party wall. A party wall is one wall shared by two buildings that sit on the common boundary.

The neighbour has 28 days to give written consent once they receive a BA20A notice. If they refuse, the work that needs their land cannot go ahead without a court order from the Magistrates Court. The requirement does not apply where the neighbouring land, and any building on it, is vacant. Talk to the neighbour well before the notice arrives, and show them the plans, the timing and how their fence and garden will be protected. A friendly early conversation is far cheaper than a court application and a stalled site.

Protection structures include hoardings, scaffolding and screens that stop debris falling onto the next block. A Perth scaffolder can advise what will be needed along a tight boundary, and that detail belongs in the BA20A notice. If the dividing fence must come down, agree in writing who rebuilds it and when, and ask a Perth fencer to price it once the heavy work is done. Photos of the fence and the neighbour's walls taken before work starts make any later disagreement simpler to settle.

Situation Form When It Is Used
Footings or eaves permanently crossing the boundary BA20 With the building permit application
Work that will adversely affect the next block BA20 With the permit, or after it where needed
Taking down a dividing fence BA20A Before the fence is touched
Scaffolding or screens over the boundary BA20A Before the structure goes up
Entering the neighbour's land BA20A Before access is needed
Work affecting a party wall BA20A Before the wall is touched
Neighbour refuses consent Court order Magistrates Court application

Designated Bushfire Prone Land and the BAL Rating for Your Block

Some Perth blocks sit on designated bushfire prone land, and new homes there must meet extra construction rules in the building code. The Fire and Emergency Services Commissioner designates these areas, and DFES publishes the Map of Bush Fire Prone Areas, where designated land is shown in pink. A building wholly outside the pink areas does not have to meet the additional requirements. The rules cover detached houses and the garages, sheds and decks associated with them. Roof-mounted evaporative coolers installed in these areas are also treated as building work.

A bushfire attack level, or BAL, rates how exposed a particular site is to embers, radiant heat and direct flame. The rating weighs up slope, vegetation type and distance to that vegetation, and it runs from BAL-LOW through 12.5, 19, 29 and 40 to BAL-FZ, the flame zone. Australian Standard AS 3959 then sets construction methods for each level, covering walls, roofs, windows, doors and decks. A qualified assessor usually carries out the BAL assessment, and Fire Protection Association Australia lists accredited Level 1 assessors. The building surveyor relies on that assessment to set the construction requirements for the permit. BAL assessments are priced on quote, so ask whether each builder has included one.

Additions to an older house get some relief, because work on an existing building that never had to meet the bushfire rules can be exempt. The exemption applies when the work is valued under $20,000, or when it does not increase the building's risk of catching fire from a bushfire. New or relocated garages, sheds and decks linked to such a house are exempt as well. Ask the surveyor early whether your extension falls inside that exemption, since higher BAL levels change window, cladding and decking choices.

Seven Star Ratings and the 2025 Building Code as Adopted in WA

The national construction code sets minimum energy performance for new homes, and Western Australia adopts each edition with its own changes. Council guidance we checked said residential permit applications lodged on or after 1 May 2025 had to meet a new minimum 7 star energy rating. The star rating scores how little heating and cooling a design should need to stay comfortable through the year. Applications lodged before that date stayed under the earlier rules, which matters if your plans were approved some time ago. NCC 2025 was then adopted in WA, with state amendments in force from 1 May 2026.

The WA version of the 2025 code switches off two national provisions for houses. The livable housing design rules, covering access features for residents who use a wheelchair or walking frame, are voluntary for houses rather than compulsory. Separate heating and cooling load limits in the national rating scheme are also disapplied, although a home must still reach a compliant combined rating. Features such as a step-free entry and wider doorways can still be requested, and they cost less at design stage than as a retrofit. Write any features you want into the drawings so each builder prices them.

An extension is a chance to lift the comfort of the whole house as well as the new rooms. Upgrades such as ceiling and wall insulation and double glazed windows cost least to fit while the frame is still exposed. An electrician in Perth can size the switchboard for heat pump hot water, induction cooking or solar at the same time. Ask the energy assessor to model the options before the plans are final, since small changes to glazing and shading can lift the rating.

Decision What to Ask Who Helps
Code edition Which NCC edition applies to the permit? Building surveyor
Energy rating Does the design reach 7 stars? Energy assessor
Insulation R-values for roof, walls and floor Builder and assessor
Glazing and shading Frame type, glass and eaves Builder and designer
Livable features Step-free entry and wider doors Designer
Hot water and heating Heat pump or another system Plumber and electrician
Switchboard Capacity for new loads and solar Electrician

Testing Old Eaves, Wall Sheeting and Roofs for Asbestos

Asbestos is a natural fibre that manufacturers blended into fibre cement sheets, roofing and many other materials, and inhaled dust from it is linked to lung disease decades on. WorkSafe WA guidance says it was commonly used in homes built before 1990, and it is still present in many older houses. Roofing, wall sheeting, flooring, insulation and decorative finishes can all contain it, so any renovation that cuts or removes old materials should start with testing. Leave intact material alone, and never cut, sand, drill or pressure wash it. Perth price guides estimate an asbestos inspection of a typical suburban home at $400 to $1,200 for 2027.

Unlicensed removal is permitted for areas under 10 square metres, but WorkSafe says that is not recommended because of the serious health risks. Licensed asbestos removalists are trained in safe removal and disposal, and the material must never go into general waste or a skip bin. Your local council handles complaints and enforcement about asbestos found in residential properties. For anything beyond a small patch, use a licensed asbestos removal contractor and keep the clearance paperwork. An asbestos testing and inspection report before quoting lets every builder price the same scope.

Put testing, removal and clearance on the timeline and in the written contract from day one. Find out whether each price relies on an existing survey, and who carries the cost if sheeting is found behind a wall or under old floor coverings. For a knockdown rebuild, the demolition contractor should explain how asbestos will be removed before the main demolition starts. A clear provisional sum, an allowance for work whose extent is not yet known, keeps that cost visible.

Construction Hours, Underground Services and Life on a Perth Street

Construction noise in WA is governed by regulation 13 of the Environmental Protection (Noise) Regulations 1997. When we checked, noisy work on a construction site was allowed from 7am to 7pm, Monday to Saturday, excluding public holidays. The City of Perth adds that work must follow AS 2436, the standard on noise and vibration control on building sites. Work outside those hours needs council approval, usually through a noise management plan lodged in advance. One inner Perth council says a plan must be lodged at least seven days ahead, and that running behind schedule is not a reason for approval on its own.

No excavation should begin until the builder has asked for underground asset plans from Before You Dig Australia, a free national service. A damaged gas pipe, buried cable or main can hurt people on site and leave neighbours without power or water. Deliveries, skips and site fencing need planning too, especially on narrow streets where trucks block driveways. A skip bin kept within the block avoids clutter on the verge, the council strip between the boundary and the road. Ask the builder where materials will be stored and how loose sand will be stopped from washing into street drains.

Driveway crossovers, the section of driveway between the boundary and the road, sit on council land, so check your council's rules before a builder includes one. Perth guides estimate a crossover at $2,500 to $6,000 for 2027. Street trees on the verge are usually council assets, and an arborist in Perth can advise on protecting their roots near a new driveway. Raise both points at the first site meeting so they are not forgotten until handover.

Site Matter Agreed Arrangement Reason
Noisy work 7am to 7pm, Monday to Saturday Regulation 13 window
Public holidays Quiet tasks only Ordinary noise limits return
Out-of-hours concrete pours Council approval in advance Needed for work outside the hours
Buried services Asset plans in hand first Protects workers and supply
Skip and deliveries Kept within the block where possible Keeps the verge and road clear
Loose sand and spoil Contained every day Keeps street drains clear
Crossover and verge Council rules checked The verge is council land

Bricks, Cladding, Frames and Glazing to Name in a Perth Quote

Brand names on a quote let you look up installation guides and warranty terms yourself, so ask for the maker and range of each major item. Austral Bricks makes bricks meant to be left exposed or rendered over, plus lighter brick systems such as Panel Bricks and Thin Brick. Hebel makes aerated concrete panels and blocks, sold as PowerPanel for walls, PowerFloor for floors and PowerBlock for masonry-style walls. Dincel makes a polymer wall system that stays in place as permanent formwork, the mould that holds poured concrete while it sets. James Hardie makes fibre cement cladding such as Linea weatherboards, Axon and Stria for lightweight external walls.

BlueScope makes COLORBOND steel, a pre-painted steel used for roofing, gutters, walling, fencing and patios. Lysaght makes steel roofing and walling profiles such as CUSTOM ORB, KLIP-LOK and SPANDEK. Pryda makes the nail plates, connectors and tie-downs that hold timber frames and roof trusses together, plus the MuscleBrace bracing system. Gyprock makes plasterboard for walls and ceilings, including Aquachek for wet areas, Soundchek for noise and Supaceil for ceilings. Bradford makes insulation and acoustic products for homes, along with roof vents for sheds and workshops.

Stegbar makes windows, doors, wardrobes and shower screens, so one maker can cover several lines of a renovation quote. VELUX makes skylights, roof windows and sun tunnels, useful for a hallway or en suite that has no external wall. Dulux makes exterior paints such as Weathershield, as well as the Acratex render and texture coatings. Ask for any substitute product to be agreed in writing before it goes in, with the same or better rating.

Named Items Worth Seeing on a Perth Quote

Part of the build
Detail to look for
Slab and footings
Engineer drawing reference and concrete grade
Outer walls
Brick range, panel system or cladding name
Framing
Pine, hardwood or steel, plus tie-down hardware
Roof sheeting or tiles
Brand, profile and chosen colour
Insulation
Brand and R-value in ceiling, walls and floor
Glazing
Window maker, frame material and glass type
Plasterboard
Wet area and fire-rated boards where needed
An R-value tells you how strongly a material slows heat passing through it, so bigger numbers mean more resistance. The figures on the quote should agree with those used in the energy assessment.

The Notice for the Homeowner, the 6.5 Per Cent Cap and Variations

The Home Building Contracts Act 1991 covers home building work contracts with a fixed price between $7,500 and $500,000, whether or not the builder is registered. Those contracts must be in writing and signed by both parties, and the builder must give you the Notice for the homeowner before you sign. Outside that price range the Act does not apply, so its deposit limits do not apply either. Building and Energy points out that WA home building contracts do not have to include a cooling-off period, so signing usually locks you in. Read the termination clauses carefully, and check the current Act on the WA legislation website or with a lawyer. Perth guides estimate a lawyer's review of the contract at about $700 to $1,800 for 2027.

Under the Act, the deposit taken before work starts can be no more than 6.5 per cent of the contract price. Where off-site cabinetry makes up more than half of the contract value, the cap rises to 20 per cent. Progress payments after that may only cover work already carried out or materials already delivered to the site. Upfront payments for variations, meaning changes to the agreed work or price, are not permitted under the Act. The Act also restricts rise and fall clauses, which would otherwise let a builder pass on later increases in labour or material costs.

The Act sets no deadline for finishing the work, so the timeframe comes from the contract itself. A builder may seek an extension of time for causes outside their control, such as bad weather or materials that cannot be supplied. Ask for the reason and the clause relied on whenever an extension is claimed, and keep the reply on file. Defects you notify in writing within four months of practical completion must be fixed at no extra cost, so walk the house with a checklist during that period. An independent building inspection at key stages gives you a written record to point to.

Home Indemnity Insurance Before Any Payment

Confirm in writing
The builder has taken out home indemnity insurance in your name for permit work over $20,000.
The certificate arrived before the deposit was paid and before any work began.
The policy appears on the insurer's certificate register when searched by policy number or street address.
Cover is up to $40,000 for a lost deposit and up to $200,000 for incomplete or defective work.
Home indemnity insurance responds only if the builder dies, disappears or becomes insolvent, not to ordinary disputes. Payments made outside the rules of the Act may not be covered.

Running the Job Yourself: Owner-Builder Approval and Resale Cover

Some owners choose to manage their own build and hire each trade directly, which in WA needs owner-builder approval for most larger jobs. Approval is required when a building permit is needed and the work is valued over $20,000, or over $50,000 for a garage, carport or shed. Applicants generally must not have been granted an owner-builder permit in the previous six years, although a waiver can be sought in some cases. Every registered proprietor on the certificate of title must sign the application, which is made through LGIRS.

The biggest catch arrives when you sell the home. If an owner-builder sells within seven years of the building permit being issued, they must hold a home indemnity policy covering the buyer and later owners. That policy has to cover the rest of the seven-year period, and selling without it is an offence. Trades you hire directly, such as a Perth carpenter or a plasterer in Perth, then work to your program rather than a builder's. Weigh the policy cost and the hours of managing trades against the margin a registered builder would charge.

Notices of Proposed Complaint, the Building Commissioner and SAT

Your first step with any defect or delay is a dated written message to the builder, with time allowed for a response. Building and Energy suggests that an agreement between the two parties is often the best way to limit loss and disruption. If that fails, you must give the builder a notice of proposed complaint at least 14 days before lodging a formal complaint with the Building Commissioner. Email is enough to serve the notice, so keep a copy of the sent message as proof. Get independent advice before ending a contract, because terminating it wrongly can leave you paying the builder's losses and lost profit.

Two kinds of complaint are available, and their time limits differ. A home building work contract complaint covers matters such as variations, breach of contract and termination payments on contracts between $7,500 and $500,000. It generally has to be lodged within three years of the contract date or of when the cause of the dispute arose. A building service complaint about the work itself can generally be lodged up to six years after completion, and an affected neighbour can complain too. Keep the contract, variations, inspection reports and photos together so the evidence is ready.

The State Administrative Tribunal, known as SAT, reviews building remedy orders and other decisions of the Building Commissioner. When we checked, an application for review had to be made within 28 days of the decision, although SAT can allow more time. SAT also hears unresolved home building contract complaints and claims of unconscionable conduct, meaning dealings so unfair the law will not accept them. Its process can include directions hearings, mediation and a Scott Schedule, which sets out every alleged defect beside each side's position on it.

What to Look Out For Before Signing With a Perth Builder

The cheapest figure on the table is often cheap because of what it omits, so read the exclusions first. Be wary of a builder who asks for more than 6.5 per cent before work starts, or who wants payment for variations upfront. A builder who cannot produce the home indemnity insurance certificate before taking money on a job over $20,000 should not start. Watch for a preparation of plans fee that is large, non-refundable and leaves the drawings with the builder. Check that the register, the permit and the insurance certificate all name the same business. A quote with no allowance for Water Corporation approval, a BAL assessment or asbestos testing may simply have left them for later.

Look closely at how each builder deals with the ground itself. Ask whether the price allows for a soil test, an engineer's footing design and, on sandy or sloping blocks, any extra fill or retaining. Where a limestone or block wall is needed, the retaining wall approval and engineering steps should appear in the program. A design that relies on a variation to the R-Codes should be flagged as needing planning approval, with that time built into the start date. If the job is mostly new finishes with no structural change, renovation services specialists may be a closer fit.

What a Thorough Perth Quote Includes

Look for these items
The registration number shown on the Building and Energy register, with the ABN and business name.
Individual prices for strip-out, earthworks, footings, framing, roofing, walls and fit-out.
A note of who lodges the planning application, the building permit and the Water Corporation approval.
Allowances for a BAL assessment, asbestos testing and engineering where they apply.
A deposit of no more than 6.5 per cent and payments tied to completed stages.
Where one total sits far below the rest, line up the allowances and the exclusions list before anything else. Missing items tend to come back later as variations.

Getting Like-for-Like Quotes From Perth Builders

Building and Energy suggests comparing several builders, noting that the cheapest option may not be the best one. Send every builder the same drawings, specifications, site photos and certificate of title, plus any soil, survey or asbestos reports. Ask each one to visit before quoting, since slope, access, sewer locations and neighbouring walls rarely show on paper. Ask for the price to be split by construction stage, matching the payment schedule, so you only ever pay for finished stages. Each quote should also state a likely start, a build duration and how delays are handled under the contract.

When a kitchen or bathroom forms part of the job, compare the allowances against prices for kitchen renovation and bathroom renovation work in WA. A waterproofing allowance can be checked with a Perth waterproofer, since failed wet areas are costly to repair later. Tiling, painting and floor coverings are worth testing the same way, because low allowances there are easy to overlook. Ask each builder how they will handle any gap between an allowance and the real cost.

Put your drawings, site details and preferred timing into one job post on The Quote Yard, and registered Perth builders can respond to that single brief. Because every response prices identical information, the differences between them are real rather than accidental. Narrow the field to builders whose register entry, insurance history and recent projects stand up to checking. Then sign a written contract that mirrors the accepted quote, and file it beside the permit and the indemnity certificate. If you need to move out while the work is done, a Perth removalist can be booked around the start date.

Builders Across Perth

The building prices on this page are for Perth as a whole. Soil, slope, sewers, bushfire ratings and council rules shift a price far more than the suburb name does, so give every builder the same brief wherever your block is.

▶ Perth 28 areas
Perth CBD Joondalup Wanneroo Butler Alkimos Stirling Scarborough Hillarys Karrinyup Morley Bayswater Bassendean Belmont Victoria Park South Perth Melville Applecross Canning Vale Willetton Cannington Fremantle Cockburn Rockingham Baldivis Gosnells Armadale Byford Ellenbrook
▶ Mandurah & Peel 20 areas
Mandurah Halls Head Dawesville Falcon Erskine Silver Sands Madora Bay San Remo Greenfields Meadow Springs Lakelands Coodanup Pinjarra Ravenswood Waroona Dwellingup North Dandalup Serpentine Jarrahdale Boddington
▶ Bunbury & South West 24 areas
Bunbury Australind Eaton Dalyellup Gelorup Capel Busselton Vasse Dunsborough Yallingup Margaret River Cowaramup Augusta Harvey Brunswick Junction Collie Donnybrook Balingup Nannup Bridgetown Boyup Brook Manjimup Pemberton Northcliffe
▶ Swan Valley & Perth Hills 24 areas
Guildford Midland Herne Hill Middle Swan West Swan Upper Swan Caversham Baskerville Henley Brook Swan View Helena Valley Kalamunda Gooseberry Hill Lesmurdie Walliston Carmel Pickering Brook Mundaring Glen Forrest Darlington Parkerville Chidlow Roleystone Bedfordale
▶ Avon Valley & Wheatbelt 22 areas
Northam York Toodyay Beverley Bakers Hill Clackline Wundowie Goomalling Dowerin Wongan Hills Cunderdin Tammin Kellerberrin Merredin Wyalkatchem Trayning Nungarin Quairading Brookton Corrigin Bruce Rock Narrogin

Perth Builder FAQ

Does a carport or patio under $50,000 still need a registered builder?
No, not since 1 July 2026, when a new threshold for Class 10a buildings took effect. Garages, carports, sheds and roofed patios valued under $50,000 can now be built by smaller businesses or by the homeowner. A building permit is still needed, and the work must meet the building code and any planning approval. Registered builders can still take on Class 10a work of any value if you prefer one.
Can I get back money paid under a preparation of plans agreement?
Possibly not, because Building and Energy warns that PPA costs may not be refundable if you decide not to proceed. The PPA is separate from the building contract, and home indemnity insurance does not cover it. Read the refund and ownership clauses before signing, and ask who keeps the drawings. Keeping the PPA payment small limits what is at risk while the design is settled.
How long does my council have to decide a building permit?
A certified application, lodged with a certificate of design compliance from a private building surveyor, must be decided within 10 business days. An uncertified application, where the council's own surveyor checks the plans, must be decided within 25 business days. The count starts on the day after the application is lodged. Any planning approval must already be in place, so allow time for that step first.
Do I need Water Corporation approval for an extension?
In areas served by Water Corporation water or sewer mains, building plans need its approval before construction starts. Extensions and renovations have their own application type, and a minor plan type covers pools, retaining walls and sheds. The application fees must be paid before work begins. Find out early whether a sewer runs under the planned footprint, because clearances or engineered piles may be needed.
What happens if my neighbour will not sign the BA20A consent?
The neighbour has 28 days to respond in writing once they receive the BA20A notice. If they refuse consent, the work that needs their land cannot proceed without an order from the Magistrates Court. That covers things like removing a dividing fence, placing scaffolding over the boundary or working on a party wall. Talking through the plans and timing before the notice is served often avoids a refusal. Independent legal advice is worth getting before you apply to the court.
How do I find out whether my block is bushfire prone?
Check the Map of Bush Fire Prone Areas published by DFES, where designated land is shown in pink. If any part of your new home sits in a pink area, a bushfire attack level assessment will usually be needed. A qualified assessor rates the site from BAL-LOW up to BAL-FZ, and the surveyor sets construction requirements from that rating. Buildings wholly outside the pink areas do not need to meet the additional bushfire requirements.
Are livable housing features compulsory in a new Perth home?
No, the WA adoption of the 2025 building code makes the livable housing design provisions voluntary for houses. Those provisions cover features that make a home easier to use for people with limited mobility. You can still ask your builder to include them, and they cost less at design stage than as a retrofit. Write the features you want into the plans so every builder prices them.
What hours can a Perth builder run noisy machinery on site?
When we checked, construction noise was permitted from 7am to 7pm, Monday to Saturday, excluding public holidays. Work must also follow AS 2436, the standard on noise and vibration control on construction sites. Noisy work outside those hours needs approval from the council in advance. Ask your builder to tell the neighbours the working hours before the job starts.
Can I sell a home I built as an owner-builder within seven years?
Yes, but you must first hold a home indemnity policy that covers the buyer and later owners. The rule applies if you sell within seven years of the building permit being issued. The policy must cover the rest of that seven-year period, and selling without it is an offence. Factor the cost of that policy into your plans before deciding to owner-build.
How long do I have to ask SAT to review a Building Commissioner order?
Applications for review must generally be made within 28 days of the decision you want reviewed. SAT can allow an extension of time in some cases, but it is unwise to rely on that. Reviews can cover building remedy orders, home building work contract remedy orders and some refusals to accept a complaint. Get advice early, because 28 days passes quickly once a decision arrives.

Perth Building Specialists

For Trades & Contractors - WA

Building jobs in Perth keep concreters, carpenters, plumbers, electricians, roofers and painters busy, usually booked in stages by the builder. Links to trade jobs across Western Australia sit below for businesses looking for new clients.

Ready to Book a Builder in Perth?

Post your job with your plans, block details and timeframe, and we will connect you with registered builders across Perth. Compare written quotes that price the same project before you sign.

Get Free Builder Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 29 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

Service availability may vary in regional WA. Verify licences at WA Building and Energy.
Prices are 2027 estimates based on current WA building price guides. Your final price will depend on the design, the block, the finishes and any sewer, bushfire, asbestos or approval steps, so compare written quotes that show site works, structure, finishes and allowances separately.
Need a builder in Perth?Get free Perth builder quotes Post a Job – It's Free