Looking for a Builder in Adelaide?

Tell us your suburb, what you want built or extended, whether you have plans and a soil report (a test of how much the ground moves), the age of the house and any heritage mapping. We will pass that description to licensed builders across the metropolitan area, so every quote you receive is based on the same details.

Get Free Builder Quotes

Adelaide Building Price Guide

New home build, per m²$1,800 - $3,500+
Project home, about 200 m²$360,000 - $500,000
Ground floor addition, per m²$2,600 - $4,500
Second storey addition, per m²$3,200 - $5,500
Rear extension, about 30 m²$85,000 - $150,000
Garage conversion, per m²$1,800 - $3,200
One bedroom granny flat$90,000 - $150,000
Double garage$18,000 - $32,000
Engineering and soil report$2,500 - $8,000
Independent stage inspection, per visit$350 - $550

These are estimated Adelaide price ranges for 2027. Your price depends on the soil, the design, the finishes and the access to your block. Council fees, private certifier fees, the state building training levy and service connections usually sit outside the builder's price.

Hire a Builder Adelaide SA - Get Local Quotes

Building in Adelaide means working with some of the most reactive clay soils in the country, which swell when wet and shrink as they dry. It also means a planning system run through PlanSA, the state's online planning portal, and licensing laws that South Australia toughened in January 2026. A builder may be asked to extend a stone villa in a historic street, pour a new slab on heavy clay for a granny flat or add a second storey to a postwar brick home. Each job needs a contractor whose Consumer and Business Services (CBS) licence covers the work, with a registered building work supervisor, the person answerable to CBS for quality on site. Contracts above $20,000 must be in writing, come with a cooling-off period and cap the deposit at 5 per cent of the price. Building indemnity insurance, which protects you if the builder dies, disappears or becomes insolvent, applies when the work also needs formal approval to build. Our prices are 2027 estimates from our South Australian building guides, before council fees, engineering and the training levy on larger projects. Many inner suburbs also sit in mapped historic areas, where demolishing or heavily changing an older house needs approval before any builder can start. Final figures depend on the soil report, the design, the finishes chosen, access to the block and how much of the old house has to come down. Post your project on The Quote Yard and we will connect you with licensed builders across metropolitan Adelaide who can price the same plans and specification.

Adelaide Building Projects We Cover

Building work across metropolitan Adelaide ranges from a steel carport on a suburban block to a second storey on a brick bungalow or a new home on a cleared lot. We can connect you with licensed local builders who all price the same written description and plans for your job.

Get Free Quotes

At a Glance - Adelaide Building Prices, 2027 Estimates

Job Price Range How It Is Charged What Drives It In Adelaide Who Can Do It
New home build $1,800 - $3,500+ per m² Fixed price contract (one agreed total) Soil class, design and finishes Licensed building work contractor
Project home, about 200 m² $360,000 - $500,000 Fixed price contract Plan choice and site costs Licensed building work contractor
Ground floor addition $2,600 - $4,500 per m² Fixed price after plans Joining to the old house Licensed building work contractor
Second storey addition $3,200 - $5,500 per m² Fixed price after plans Engineering and roof removal Licensed building work contractor
Rear extension, about 30 m² $85,000 - $150,000 Fixed price after plans Footings on clay and access Licensed building work contractor
Major renovation $150,000 - $400,000+ Fixed price, or cost plus (actual costs plus a margin) Hidden defects in older homes Licensed building work contractor
Garage conversion $1,800 - $3,200 per m² Fixed price Slab condition and insulation Licensed building work contractor
One bedroom granny flat $90,000 - $150,000 Fixed price plus site costs Services, approval and site works Licensed building work contractor
Double garage $18,000 - $32,000 Fixed price Walls, door and slab Licensed builder or garage builder
Double steel carport $6,000 - $12,000 Supply and install Roof style and footings Licensed carport builder
Brick house demolition, 100 to 200 m² $18,000 - $30,000 Fixed price Asbestos and access Licensed demolition contractor
Engineering and soil report $2,500 - $8,000 Fixed fees Site class (soil rating) and design Engineer and soil testing firm
Design and documentation 5 - 12 per cent of build Fixed fee or percentage Level of detail Building designer or architect

What Pushes an Adelaide Building Price Up

What is involved
Highly reactive clay can call for deeper, stiffer footings. The soil report sets the design, and the extra concrete and steel show up in the price.
Joining new work to an older stone or brick house takes more labour than building on a clear block. Hidden defects often appear once walls and roofs are opened.
Heritage and historic area mapping can slow planning consent, the approval of your design against the planning rules. Matching original materials and detailing also adds cost.
Asbestos found in eaves, wet areas or sheds must be removed under licence before demolition. That removal is usually priced on top of the building work.
Ask every builder to list the soil report, engineering, approvals, connections and allowances on separate lines. Quotes set out that way can be compared line by line.

Matching the Builder to the Adelaide Job

The word builder covers very different businesses in Adelaide, from large companies selling standard project home designs from display villages to small firms that take on one renovation at a time. A custom home builder, an extension specialist and a carport erector may all hold building licences, yet their prices, contracts and timeframes are far apart. Knowing which type suits your job saves time, because a firm that mostly builds new homes may decline a small rear addition to a stone cottage. The main kinds of building work, with statewide price ranges, are set out in our overview of home construction across South Australia. Hiring a builder within metropolitan Adelaide brings its own issues, because the clay, the heritage rules and the council notification steps shape both the price and the paperwork.

Before calling anyone, decide whether you already have plans or need the builder to arrange the design as well. Design and construct builders handle drawings, engineering and approvals, while others will only price plans drawn by your own designer or architect. Either approach can work well, but a design and construct price and a price for finished drawings are hard to compare until the scope is settled. Making that decision first keeps every later conversation shorter and makes each quote far more useful when you sit down to compare them.

What Houses, Extensions and Granny Flats Cost in Adelaide

New homes in Adelaide cost roughly $1,800 to $3,500 or more per square metre by our estimate, so a project home of about 200 square metres comes to around $360,000 to $500,000. Extensions cost more per square metre than new homes, because the builder has to join new work to an existing structure while people often still live there. A ground floor addition runs at about $2,600 to $4,500 per square metre, and a second storey at about $3,200 to $5,500. A rear extension of around 30 square metres typically sits between $85,000 and $150,000, and our home extensions guide for SA breaks those figures down further. Garage conversions are cheaper at roughly $1,800 to $3,200 per square metre, since the slab, walls and roof already exist and mostly need insulation, linings and windows. All of these are 2027 estimates, so check each one against written quotes for your own block.

Smaller structures are priced differently, and a double steel carport costs around $6,000 to $12,000 compared with roughly $18,000 to $32,000 for an enclosed double garage. Roof style, footings and whether the structure is attached to the house all move those figures, and the options are compared on our carport builders page. A one bedroom granny flat comes to about $90,000 to $150,000, and site preparation, services and approval can add $15,000 to $40,000 or more, as our granny flat cost guide explains. Knocking down a brick house of 100 to 200 square metres costs around $18,000 to $30,000 before asbestos removal, and engineering, design and soil reports are usually priced on top.

Job Adelaide Range How It Is Charged What Moves It
New home, per square metre $1,800 - $3,500+ per m² Fixed price contract Soil class and finishes
Project home, about 200 m² $360,000 - $500,000 Fixed price contract Plan and site costs
Ground floor addition $2,600 - $4,500 per m² Fixed price after plans Joining to the old house
Second storey addition $3,200 - $5,500 per m² Fixed price after plans Engineering and roof work
Rear extension, about 30 m² $85,000 - $150,000 Fixed price after plans Footings and access
Garage conversion $1,800 - $3,200 per m² Fixed price Slab and insulation
One bedroom granny flat $90,000 - $150,000 Fixed price plus site costs Services and approval
Double garage $18,000 - $32,000 Fixed price Walls and door type
Double steel carport $6,000 - $12,000 Supply and install Roof style
Brick house demolition, 100 to 200 m² $18,000 - $30,000 Fixed price Asbestos and access

Fixed Price, Cost Plus and Rise and Fall Contracts

Most Adelaide homeowners sign a fixed price lump sum contract, where the builder agrees to complete the described work for a set amount. Changes you ask for after signing are called variations, and they should be agreed in writing and attached to the contract. A cost plus contract works differently, because you pay the actual cost of labour and materials plus a margin for the builder. The Law Handbook published by the Legal Services Commission says that margin is limited to 15 per cent on domestic building work. Cost plus can suit a heritage repair or a fire damaged house, where nobody knows the full scope until walls, floors and ceilings are opened. It still leaves the final price open, so insist on regular statements showing every invoice and cost incurred since the last one.

A rise and fall clause lets the price move with the cost of labour or materials during the job. The Law Handbook notes that such a clause is allowed only where the contract also states a completion date. Provisional sums and prime cost items are allowances for work or fittings not yet chosen, such as tiles, tapware or rock excavation. A contract built mostly on allowances can finish well above its quoted total, so ask how each allowance was worked out. Lysaght makes steel roofing, cladding and framing, and naming exact products like these in the contract removes one common source of variations. Fielders makes steel roofing, verandahs and carports, and a verandah added late to an extension is a typical example of a costly variation.

How Adelaide Building Contracts Are Priced

What is involved
Fixed price lump sum contracts suit work with finished drawings and a clear specification.
Cost plus contracts pass on actual costs, with the margin limited to 15 per cent on domestic work.
Rise and fall clauses need a completion date written into the contract.
Provisional sums and prime cost items should each carry a dollar figure and a description.
A contract made up mostly of allowances can finish well above its headline price, so ask for firm figures wherever the work is clearly defined.

Reading a Builder's CBS Licence Before You Sign

Any person or business in business as a building work contractor in South Australia needs a licence from Consumer and Business Services, and that includes subcontractors. All building work must also be supervised by a registered building work supervisor, who may be the licence holder or a person the company nominates. Each licence carries conditions stating the type of work the holder can contract for, and some also limit the height of buildings or the value of contracts the holder can take on. A contractor licensed only for specified building work, meaning one listed trade such as carpentry or bricklaying, should not be signing you up for a whole extension. To see what those narrower licences allow, read our guides to hiring a carpenter in Adelaide and hiring a bricklayer in Adelaide.

CBS answers licence questions on 131 882, and its public licensing register confirms whether a business is licensed, so check it against the exact name on your quote. Employees of a licensed business do not need a licence of their own, so the carpenters and labourers on site may not appear on the register. Plumbing, gas fitting and electrical work need separate licences under their own law, even when the builder books and pays those trades for you. Look for both the contractor licence number and the supervisor's name in the contract itself, not only on the letterhead of the quote.

What to Check on a Builder's Licence

What is involved
The licence number on the quote matches the business name that will sign the contract.
The licence conditions cover general building work rather than one specified trade.
A registered building work supervisor is named for the job.
Plumbers, gas fitters and electricians on the job hold their own separate licences.
Working without a licence or outside its conditions now carries a $5,000 expiation fee, an on the spot fine, so a builder with nothing to hide will share the number readily.

What a Builder Can Ask You to Pay, and When

Domestic building contracts above $20,000 must be in writing, legible, signed by both parties and handed over with Form 1, the official notice of your rights set by law. You then have five full business days after signing to cancel by giving written notice. On those larger jobs the deposit is capped at 5 per cent of the contract price, and on work up to $20,000 the cap is $1,000. After the deposit, a builder can only demand a genuine progress payment, which pays for a stage of work already done, or a prescribed payment, meaning one the regulations allow for set services. These cover professional services such as engineering, drawing and surveying, which often come early in a design and construct job. If a builder asks for money outside those categories, stop and call CBS before paying anything further.

Building indemnity insurance must be in place for domestic building work over $20,000 that also needs development approval. Since 10 November 2025 it pays up to $250,000 if the builder dies, disappears or becomes insolvent before finishing the job or fixing defects. Only a licensed builder can take out a policy for your project, and the certificate should name the builder, the licence number, the insurer and the work covered. You can confirm a policy directly with the insurer named on the certificate before the deposit leaves your account. The state government page on this insurance links to online certificate registers run by insurers, so checking a policy takes only a few minutes. Failing to take out required cover now attracts a $20,000 expiation fee, which is an on the spot fine, so honest builders treat it as routine.

Payment Allowed Over $20,000 Limit What to Ask For
Deposit Yes 5 per cent of the contract price Signed contract and Form 1 first
Progress payment Yes, for work done Value of the completed stage Written claim naming the stage
Engineering, drawing or surveying Yes, as a prescribed payment Cost of the service Invoice from the consultant
Payment for work not yet done No Not allowed Refuse and contact CBS

From Planning Consent to Development Approval on PlanSA

Most new homes, extensions and garages in Adelaide need development approval before any building work begins, including site works such as excavation for the footings. In South Australia that approval is built from planning consent and building consent, and both are lodged through the PlanSA portal. Planning consent checks the design against the Planning and Design Code, whose rules for each zone and mapped overlay cover height, distance from boundaries and how much of the block is covered. Building consent checks the structure against the Building Code, covering items such as footings, framing, fire safety and energy efficiency. Development approval, the final go-ahead, is granted only once every required consent is in place, and building work starts after that point.

Each consent has a timeframe set by law, counted in business days. Planning consent takes 5 business days for a deemed to satisfy application, meaning one that meets every standard set in the Code, and up to 95 for some unusual proposals classed as restricted. Building consent for a house or outbuilding has a 20 business day timeframe, after a five day check at lodgement that the fees are paid and documents are complete. The count of days restarts whenever the authority asks for more information, so complete plans can save weeks.

Building consent can be issued by the council or by an accredited professional, often called a private certifier. A private certifier typically charges about $1,500 to $3,500 for a granny flat or similar project by our estimate, while council fees follow a set schedule. Many design and construct builders lodge the whole application for you, but the owner still approves the plans that are submitted and remains named on the application. Ask each builder who prepares and lodges the application, who pays the fees and what happens to the price if consent is delayed. Approval steps for small backyard homes are covered in more detail in our granny flat approval guide.

Some minor building work is exempt from development approval, but the exemptions are narrow and carry conditions about size, height and boundaries. A builder who says no approval is needed should be able to name the specific exemption in writing and explain how your project meets each of its conditions. Starting without a required approval can lead to legal action by the authorities and leave a structure that buyers and their inspectors question later. Heritage mapping, protected trees and easements, which give others rights over part of your land for pipes or access, can also remove an exemption that would otherwise apply. If the answer matters to your plans, ask the council's duty planner, the planner who answers public questions, for a view before signing any building contract. Keep a copy of every consent and stamped plan, because a future buyer will want to see them.

Step Who Handles It Statutory Timeframe What It Covers
Verification at lodgement Relevant authority 5 business days Fees paid and documents complete
Planning consent, deemed to satisfy Relevant authority 5 business days Meets every Code standard
Planning consent, restricted with notification Relevant authority Up to 95 business days Neighbours notified and assessed
Building consent, house or outbuilding Council or private certifier 20 business days Structure, fire safety and energy
Referral to the State Commission Assessment Panel State panel Adds 10 business days Certain building classes
Decision on development approval Relevant authority 2 business days All consents brought together

Council Notifications at Footings, Frame and Completion

Once development approval is issued, Adelaide councils expect to hear when key stages of the build are reached. West Torrens, for example, asks for one business day's notice before work starts, before concrete covers the footing steel, the steel bars in the trenches, after wall and roof framing and at completion. The licensed contractor in charge of the work gives these notices, and the owner gives them only where no contractor is involved. Council officers may then inspect, and missing a stage where notice is mandatory is an offence carrying a maximum penalty of $10,000 under the West Torrens guidance.

The City of Adelaide asks that each notification include the development application number, the site address, contact details and the builder's licence number. Notices can be lodged through the PlanSA portal, which keeps a dated record of each stage with the rest of the application and the approved plans. Where the contract is over the $20,000 threshold, the indemnity insurance certificate must also reach the authority that approved the work before it starts. A private certifier may add extra inspection stages to the consent, and those stages need notice as well. Ask the builder to send you a copy of each notification as it is lodged. Keeping those copies also shows a later buyer that each stage of the build was reported to council at the time it happened.

Independent stage inspections are a separate step that many owners add for their own protection. An inspector you pay checks the slab, the frame, lock-up, when the roof, windows and outside doors are in place, and handover, and reports only to you. Each visit costs about $350 to $550 by our estimate, or roughly $1,400 to $2,750 for four or five visits, and our building inspection costs guide lists the other report types. Write your inspection rights into the contract, so the builder gives notice before each stage is covered up.

Stage Notice Required Who Gives It Why It Matters
Commencement of work One business day Licensed contractor Builder and insurance details on record
Footing steel before the pour One business day Licensed contractor Last look before concrete covers steel
Wall and roof framing before lining One or two business days Licensed contractor Frame checked before plasterboard
Stages named by a private certifier One business day Licensed contractor Extra checks set in the consent
Completion of the work One business day Licensed contractor Leads to final sign-off
No contractor in charge Same stages Building owner The duty passes to the owner

Adelaide's Reactive Clay and the Soil Report

South Australia is known for highly reactive soils, meaning clays that swell when wet and shrink as they dry. University of Adelaide researchers recorded cracks 5 to 40 millimetres wide and up to a metre deep at one Adelaide site, with the deepest in March and April. Their work also notes that Adelaide home design is recommended to allow for moisture related ground movement to a depth of about four metres. That movement is why footings here are often deeper and stiffer than the same house would need on sand, and why the concrete and steel in a slab can cost more. A soil investigation, written up as the soil report, gives the site a class based on how much the ground moves, and a structural engineer then designs the footing to suit. Soil testing alone, known as geotechnical testing, costs about $400 to $800 by our estimate, while engineering and a soil report together run to $2,500 to $8,000 on an extension.

Older Adelaide houses built on shallow footings often show diagonal cracks above doors and windows that open in late summer and close again after winter rain. Before an extension is joined to such a house, ask the engineer how the new footing will cope with movement between the old and new parts. Garden beds against the walls, leaking pipes and large trees close to the house all change soil moisture and can make that seasonal movement worse. Where cracking is already serious, our underpinning page explains what deeper support for an old footing involves. Pryda makes timber connectors, brackets and nailplates (toothed steel plates that join timbers) used throughout house frames. Simpson Strong-Tie makes structural connectors and anchors, including fixings used where new framing meets old.

Footing Questions to Ask on Adelaide Clay

What is involved
Who carries out the soil investigation, and is its cost inside or outside the contract price?
What footing depth and design has the engineer specified for the site class?
How will the new footing be separated from, or tied to, the old one?
Which drainage and paving work around the house is included to keep soil moisture even?
A quote that names a footing system before any soil report exists is a guess, and the price may change once the engineer sees the results.

South Australia's Own Rules for House Slabs

South Australia adds its own variations to the national footing and slab rules in the ABCB Housing Provisions, part of the National Construction Code (NCC), the national building rulebook. These stay in force until the state adopts NCC 2025 on 1 May 2027. One variation requires a continuous damp-proofing membrane, a 0.2 millimetre polyethylene plastic sheet that stops ground moisture rising, under the slab of every new house. Joints in that membrane must overlap by at least 200 millimetres, and the openings around pipes have to be sealed. Concrete must be at least N20 grade, a standard strength rating, and no water may be added on site to make it wetter than the specification allows. The slab surface and edges must then be kept moist for seven days while the concrete hardens, and builders cannot stack materials or park machinery on it for at least seven days.

One rule matters greatly in an Adelaide summer, because concrete must not be poured when the air temperature on site is above 32 degrees. The only exception is where a professional engineer has given written instructions for a hot weather pour. A builder who reschedules a slab pour because of a heat forecast is following the code rather than wasting your time, even if it pushes the schedule back a few days. Sika makes concrete admixtures (additives that change how concrete sets), sealants and waterproofing membranes used across many stages of a house build. Paths, driveways and outdoor slabs away from the house are covered in our guide to hiring a concreter in Adelaide.

Slab Day Checks on an Adelaide Build

What is involved
The council has had notice before concrete covers the footing steel.
The membrane is continuous, lapped at least 200 millimetres and sealed at pipes.
The forecast for the site stays at or below 32 degrees, or the engineer has given written instructions.
A plan exists to keep the slab moist for seven days with nothing stacked on it.
Ask for the concrete delivery docket showing the grade, and keep it with your contract papers.

Historic Areas, Heritage Places and Demolition Control

Many inner and middle ring Adelaide suburbs sit within a Historic Area Overlay, a mapped zone in the Planning and Design Code that protects the character of older streets. Inside those areas demolition is controlled, which means pulling down a house or a large part of it needs approval. Representative Buildings, which are houses mapped as typical of an area's character, also have demolition control within a Historic Area. South Australia has more than 2,300 State Heritage Places, valued for the whole state, and more than 7,000 Local Heritage Places, valued locally, and demolition control applies to both. A Character Area Overlay, which guides the look of new work in streets with a valued character, is different, because its Representative Buildings have no demolition control. Check how your property is mapped in the South Australian Property and Planning Atlas before asking any builder to price a knockdown and rebuild.

Heritage status rarely rules out an extension altogether, but it shapes where new work can sit on the block and how it looks from the street. Builders who often work in historic areas tend to place additions at the rear and keep the original roof form visible. Expect planning consent to take longer than in an unmapped street, and allow for heritage advice or a design statement where the council asks for one. Austral Bricks makes face bricks, which are left exposed, and render bricks, which are covered with render, in a wide range of colours. PGH Bricks makes bricks and pavers, and a sample of your old brick helps a builder compare possible matches. Prices and steps for pulling down an older house are set out in our house demolition guide.

Mapping Demolition Controlled Typical Effect Where to Check
State Heritage Place Yes Heritage Minister can direct the decision Property and Planning Atlas
Local Heritage Place Yes Changes assessed against heritage policy Planning and Design Code listings
Historic Area Overlay Yes Street-facing changes closely assessed Atlas and Historic Area Statement
Representative Building, Historic Area Yes Treated much like a heritage item for demolition Property and Planning Atlas
Representative Building, Character Area No Design of new work still assessed Atlas and Character Area Statement
Land next to a heritage place Not by itself Rules for land next to heritage places can apply Property and Planning Atlas

Owner Builders, Investors and Selling Within Five Years

Some Adelaide owners think about becoming an owner builder, someone who manages their own build, to save the builder's profit margin. Owner builders need no formal trade qualifications, but they take responsibility for the whole project, including the notices to council. They also cannot take out building indemnity insurance, so a later buyer has no policy to claim on if defects appear. A person who sells or rents out two or more buildings within five years is treated as a building work contractor unless they can show otherwise. That person then needs a builder's licence and must take out indemnity insurance. Without a builder's warranty behind the work, the owner also carries the cost of fixing anything an inspector or a later buyer finds wrong.

Investors planning several townhouses or granny flats to sell or rent should weigh that rule carefully before buying land or starting any work. Any trade contracted directly by an owner builder for work of $20,000 or more still needs a written contract. Each trade must also hold the right licence for its own part of the work. Running the project yourself saves a margin but adds risk, paperwork, insurance questions and many hours of coordination between trades who each work to their own timetable.

Many owners choose a middle path, hiring a builder for the structure up to lock-up and then managing the finishing trades themselves. That split should be stated clearly in the contract, so everyone knows which work the builder's warranties and insurance cover. Kitchens, bathrooms and floor coverings are common items to take out of a builder's scope, and our guides to kitchen renovations and bathroom renovations price both. When a buyer's inspector later asks who did each part of the work, clear records protect the sale. Keep a file of every contract, licence number and invoice from the first day.

Arrangement Licence Needed Indemnity Insurance Who Notifies Council
Licensed builder, full contract Builder Yes, over $20,000 with approval Builder
Builder to lock-up, owner finishes Builder and each finishing trade Covers the builder's contract only Agree it in writing
Owner builder hiring trades directly Each trade for its own work Not available to the owner Owner
Owner selling or renting two buildings in five years Builder's licence Required The licensed contractor
Design and construct builder Builder Yes, over $20,000 with approval Builder
Kit home put up by the owner Licensed trades for their parts Not available to the owner Owner

Costs That Sit Outside the Building Contract

A builder's contract price is rarely the whole cost of an Adelaide project. The Construction Industry Training Fund (CITF) levy, a state charge that pays for building industry training, applies to building work over $100,000 including GST, at 0.25 per cent of the estimated project value. On a $400,000 home that comes to $1,000, paid by the owner before building approval is issued. Council fees for planning and building consent follow a set schedule, while private certifiers set their own fees. A design and construct builder may include these costs or may list them as exclusions. Ask for the levy and fee amounts to be shown as separate lines, so you can see which costs go to government rather than to the builder.

Professional fees add up quickly before any digging starts. Design and documentation commonly run at about 5 to 12 per cent of the build cost by our estimate, depending on who draws the plans. Engineering and the soil report add roughly $2,500 to $8,000 on an extension, and a contingency of 10 to 15 per cent covers surprises in the ground or the old house. A dilapidation report, which records the condition of neighbouring buildings before work starts, costs about $600 to $1,500. That report can prevent a dispute if a neighbour later claims that your excavation, piling or heavy machinery cracked their walls or paving.

Service connections are another line that many first quotes for new homes and granny flats leave out. Water, sewer and power connections for a new home or granny flat are priced on quote, because they depend on the distance to existing mains. Ask every builder whether connections, the driveway crossover across the verge, landscaping and fencing are included or excluded. Totals only compare fairly once those exclusions are listed on the same basis.

Item Adelaide Range Who Usually Pays When It Falls Due
Training Fund levy, work over $100,000 0.25 per cent of value Owner Before building approval
Private certifier, building consent $1,500 - $3,500 Owner or builder At lodgement
Engineering and soil report $2,500 - $8,000 Owner or builder Design stage
Design and documentation 5 - 12 per cent of build Owner Before quotes
Dilapidation report $600 - $1,500 Owner Before excavation
Contingency 10 - 15 per cent Owner Held in reserve

Asbestos Checks Before an Older Home Is Opened Up

Older Adelaide homes can contain asbestos cement sheeting, often called fibro, in eaves, wet areas, sheds and fences. Under SafeWork SA guidance, asbestos likely to be disturbed must be identified by a competent person, meaning someone trained to identify asbestos, before a house is demolished or refurbished. If that person is unsure, the material has to be treated as asbestos until tests show otherwise. Friable asbestos, the crumbly kind, can only be removed by a removalist holding a Class A licence, the highest grade of asbestos removal licence. Bonded asbestos, with fibres set in cement, needs a Class B licence for removal of more than 10 square metres, although smaller amounts must still be handled safely. A clearance certificate, written confirmation that the removal area is safe to use again, must be issued before anyone moves back into it.

Asbestos removal adds roughly $3,000 to $15,000 to a house demolition by our estimate, depending on the amount and where it sits. An inspection and sampling before quoting lets every builder price the same removal rather than guessing at how much sheeting is hidden in the house. Sampling, laboratory fees and reports are covered in our asbestos inspection guide. Ask the builder who will remove the material, which licence class that removalist holds and where the waste will be taken.

Before Walls or Roofs Come Down

What is involved
A competent person has inspected the house for asbestos likely to be disturbed.
Friable material is going to a Class A removalist, and bonded sheeting over 10 square metres to a Class B removalist.
A clearance certificate is planned before the family or other trades go back in.
The demolition and removal costs appear as separate lines in the quote.
Stop the work and contact SafeWork SA if sheeting is being broken or cut without precautions.

Coordinating the Other Trades on an Adelaide Build

A house build or extension brings in a long line of trades, and the builder's job is to book them in the right order. Roof sheeting, gutters and flashings, the metal strips that seal joins, follow the frame, and the roofer's licence and height safety duties are covered in our guide to hiring a roofer in Adelaide. Linings, the plasterboard walls and ceilings, go up after the frame inspection, and fixing and finishing plasterboard is described in our Adelaide plasterer guide. Painting usually comes last, and our guide to hiring a painter in Adelaide explains how painters price that final stage. MiTek makes roof trusses, the factory-made frames that hold up a roof, and Posi-Strut floor joist systems used in many new homes. Hyne Timber makes structural pine framing and glulam beams, which are laminated timber members for long spans.

Some services sit outside the builder's usual list of subcontractors but can still affect the timing and cost of a project. A pest inspection of an older house before an extension starts can reveal termite damage, and the Adelaide pest controller guide covers checks and treatment. Families who move out for the noisiest weeks of a major renovation can find packing and storage costs in our Adelaide removalist guide. The electrician and plumber each need their own licence, and their certificates of compliance, which confirm the work meets the rules, should come to you at handover. CSR makes Gyprock plasterboard for internal walls and ceilings. James Hardie makes fibre cement cladding and interior linings used on many Adelaide extensions.

A Typical Order of Trades on an Adelaide Build

What is involved
Demolition, asbestos removal and site works come first, with approvals already in hand.
Footings and slab follow the soil report, then framing, roofing, windows and outside doors.
Pipes and cables are run inside the walls before the frame inspection and plasterboard.
Fit-out, tiling and painting follow, then the final clean and handover inspection.
Ask who books and supervises each trade, and confirm that the contract price covers them.

Defects, Warranties and Penalties Since January 2026

Statutory warranties, which are guarantees set by law, apply to domestic building work in South Australia whatever the contract value. They require the work to be done in a proper manner with good materials, and claims must be brought within five years of completion. Raise any defect with the builder in writing as soon as you find it, with photos, dates, the relevant contract clause and a reasonable time for the repair. CBS offers conciliation, where a neutral officer helps both sides reach agreement, and this can settle a building dispute without going to court. Claims that cannot be settled go to the Magistrates Court or the District Court, depending on the amount. Indemnity insurance only pays out where the builder has died, disappeared or become insolvent.

South Australia raised the penalties for builders who break the rules from 15 January 2026. Working without a licence or outside its conditions attracts a $5,000 expiation fee, and the same fee applies to improper payment demands and to contracts that breach the Building Work Contractors Act 1995. Repeat offences can bring fines of up to $150,000 for individuals and $550,000 for companies. CBS also announced a Building Industry Response Team in June 2026 to target unlicensed work, misleading advertising and improper payment demands.

What to Look Out For in an Adelaide Building Contract

Start with the basics on the first page of any contract over $20,000. It should show the builder's name and licence number, the price, the deposit, the payment stages and a start and finish date or estimated number of days. The Form 1 notice should come with your signed copy of the contract. Each payment should be linked to a stage you can see, such as the slab, frame, lock-up and completion. Allowances should be listed one by one, each with a dollar figure and a plain description of what it covers and excludes.

A deposit above 5 per cent, or a large payment due before the slab is poured, breaks the payment rules. A builder who wants to start before development approval or before the insurance certificate exists is asking you to share a legal risk. Watch for quotes that leave out the soil report, engineering, connections or council fees without saying so. A price far below the others often reflects cheaper materials and fittings, smaller allowances or missing items rather than a genuinely better deal. Weathertex makes timber weatherboards and wall panels in several profiles. Stegbar makes windows and doors, and naming exact products in the contract helps stop cheaper substitutions.

Items Every Adelaide Building Contract Should Show

What is involved
The builder's licence number and the registered supervisor named for the job.
A deposit no higher than 5 per cent on contracts over $20,000.
Progress payments tied to visible stages such as slab, frame and lock-up.
Allowances listed one by one with dollar figures and descriptions.
Who pays for the soil report, engineering, approvals and the training levy.
Indemnity insurance details where the job needs development approval.

Requests to start work before development approval is granted.

Payment demands for work that has not yet been done.

A quote far below the others may leave out footings, approvals, connections or fees, so ask what is missing before you sign.

Getting Quotes From Adelaide Builders Using One Set of Plans

Builders can only price the same job if they receive the same documents. Send each one the drawings, the engineer's footing design if you have it, the soil report and a written list of fittings and finishes. Mention the suburb, any heritage or historic area mapping, the width of side access and whether you will live in the house during the work. Where plans are not ready, ask for a preliminary estimate only and say clearly that it is not a contract price. Photos of the house from the street, the side access and any existing cracks help each builder judge the job before the site visit. An independent check of the existing house before design starts is worthwhile, and you can find a building inspector in Adelaide through our directory.

Three written quotes usually give a fair spread of prices for a new house, a second storey or a rear extension. Ask each builder how long the price holds, when they could start and how many weeks the build is expected to take. Compare the allowances line by line, because two quotes with the same total can hold very different sums for tiles, kitchens or rock. Stratco makes sheds, fencing and steel outdoor structures, so any quote using its products should name the exact system, size and colour being supplied.

Once you choose a builder, read the full contract before signing rather than relying on the quote. Confirm the licence, the supervisor and the insurance certificate, and keep the five business day cooling-off period in mind while you read the fine print. Stage inspections, a handover inspection and a written defects list at practical completion, when the builder says the work is finished, protect you at the end of the job. A handover inspection costs about $400 to $700 by our estimate, and the checks involved are described in our guide to new home inspections. Keep every approval, certificate, warranty and signed variation in one folder for the day you sell or refinance.

Builders Across Adelaide

Building prices on this page apply across Adelaide. Sites with tight access, steep slopes or heritage mapping often cost more to build on, whatever the suburb.

▶ Inner Adelaide & CBD 10 areas
Adelaide CBD North Adelaide Prospect Walkerville Medindie Kent Town Unley Parkside Hyde Park Thebarton
▶ Eastern Suburbs 10 areas
Norwood Kensington Burnside Glenside Magill Campbelltown Payneham St Peters Rostrevor Athelstone
▶ Southern Suburbs 10 areas
Mitcham Goodwood Blackwood Marion Happy Valley Morphett Vale Noarlunga Centre Hallett Cove Seaford Aldinga Beach
▶ Western Suburbs & Beaches 10 areas
Glenelg Brighton Plympton Henley Beach Grange Findon Woodville West Lakes Port Adelaide Semaphore
▶ Northern Suburbs 10 areas
Enfield Para Hills Modbury Tea Tree Gully Golden Grove Mawson Lakes Salisbury Paralowie Elizabeth Munno Para

Adelaide Builder FAQ

Is a builder allowed to bill me for engineering before construction starts?
Yes, on a contract over $20,000 the rules allow prescribed payments for professional services such as engineering, drawing and surveying. Those charges sit alongside a deposit of no more than 5 per cent of the contract price. Beyond that, the builder can only claim genuine progress payments for work already done on site. Ask for the consultant's invoice with any engineering claim, and call CBS on 131 882 if a demand looks wrong.
What does the CITF levy add to an Adelaide building project?
The Construction Industry Training Fund (CITF) levy, which funds building industry training, applies to building work over $100,000 including GST. It is charged at 0.25 per cent of the estimated project value. The owner pays it before building approval is issued, and councils ask for proof of payment. On a $400,000 home the levy comes to about $1,000.
Why would a builder refuse to pour my slab on a hot day?
South Australia's own variation to the national Housing Provisions bars pouring concrete when the air temperature on site is above 32 degrees. The only exception is a pour carried out under a professional engineer's written instructions. The same rules require the slab to be kept moist for seven days afterwards. A delayed pour on a hot day is therefore the builder following the code.
Does the council need to hear from my builder before the frame is lined?
Yes, councils such as West Torrens require notice when wall and roof framing is finished and before any lining goes on. The licensed contractor in charge of the work gives that notice, usually one or two business days ahead. Council officers may then inspect the frame before plasterboard hides it. Failing to notify at a mandatory stage is an offence with a maximum penalty of $10,000.
How long does PlanSA take to issue building consent for a house?
Building consent for a house or outbuilding has a statutory timeframe of 20 business days. That count follows a five business day check at lodgement that fees are paid and documents are complete. Planning consent comes first and takes from 5 business days for a deemed to satisfy design, one that meets every Code standard, to much longer for complex proposals. Requests for more information restart the count, so lodging complete plans saves time.
Can I knock down an old villa in a historic area of Adelaide?
Demolition is controlled inside a Historic Area Overlay, so pulling down the house needs approval first. Representative Buildings inside a Historic Area carry the same demolition control. State and Local Heritage Places are controlled as well, while Representative Buildings in a Character Area are not. Check the mapping in the South Australian Property and Planning Atlas before you pay for any design work.
What is the most a cost plus builder can add as a margin in South Australia?
The Law Handbook states that the margin on a domestic cost plus contract is limited to 15 per cent. You pay the actual cost of labour and materials, and the margin sits on top. Ask for regular statements that show each invoice so you can track the running total. Cost plus suits work where the scope is genuinely unknown, such as major repairs to an old house.
If I build as an owner builder, can I sell the house soon afterwards?
You can sell, but owner builders cannot take out building indemnity insurance, so the buyer has no policy behind the work. A person who sells or rents two or more buildings within five years is treated as a building work contractor unless they prove otherwise. That person then needs a builder's licence and indemnity insurance. Buyers and their inspectors will also ask for approvals and certificates for every stage.
Who pays if my Adelaide builder goes broke halfway through the job?
Building indemnity insurance covers that situation where the contract is over $20,000 and the work needs development approval. It pays up to $250,000 if the builder dies, disappears or becomes insolvent before finishing or fixing defects. The certificate should be in your hands before any work starts on site. Confirm the policy with the insurer named on it rather than relying on a copy alone.
What happens to a builder caught working without a licence in South Australia?
From 15 January 2026, working unlicensed or outside licence conditions attracts a $5,000 expiation fee. Repeat offences can lead to fines of up to $150,000 for individuals and $550,000 for companies. CBS has also set up a Building Industry Response Team to target unlicensed work and misleading advertising. You can report a suspected unlicensed builder to CBS on 131 882.

Adelaide Building Specialists

For Trades & Contractors - SA

A building project in Adelaide relies on licensed trades and consultants beyond the builder. Electricians and plumbers need their own licences, engineers design footings for reactive clay, and asbestos must be inspected before demolition. These services can be booked alongside a building job across the metropolitan area.

Compare Adelaide Builder Quotes

Tell us your suburb, what you want built or extended, whether you have plans and a soil report, and compare quotes from licensed Adelaide builders all pricing the same job.

Get Free Builder Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 20 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All SA tradies are required to hold appropriate licences. Verify at Consumer and Business Services SA.
Prices are 2027 estimates based on typical Adelaide building rates. Your final price will depend on the soil, the design, the finishes and the site, so compare written quotes that list the soil report, engineering, approvals and allowances separately.
Need work done? Get free quotes. Post a Job – It's Free