Looking for a Builder in Hobart?
Tell us your suburb, what you want built, rough sizes in metres, the age of the home and whether you already have drawings. We will pass that brief to local builders, so every quote you receive prices the same project.
Hobart Building Price Guide
These figures are 2027 estimates for building work in Hobart. Your price depends on the design, the slope of the block, any heritage or bushfire requirements and what is found once the existing house is opened up.
Licensed Builders for Hire in Hobart: Extensions, Knockdowns and Renovations
Hiring a builder in Hobart goes more smoothly when the scope, the approvals and the contract terms are settled before anyone prices the job. For 2027, Tasmanian price guides put extensions at about $2,500 to $4,500 a square metre, and a single room addition at $80,000 to $150,000. Second storey work is estimated at $3,000 to $5,000 a square metre, because the frame below often needs strengthening. New homes and knockdown rebuilds are priced on quote, since every design and every block is different. Each builder must hold a current Tasmanian licence of the right class, and the Domestic class covers houses, units and outbuildings. From 1 October 2026, the old CBOS office moved into Consumer Affairs Tasmania and Building Standards Tasmania. Extensions and new homes are usually notifiable or permit work, the categories that need formal sign-off, so a licensed building surveyor checks the plans first. Hobart now sits under the Tasmanian Planning Scheme, and landslip, bushfire and heritage map layers can add extra steps. Heritage listed homes may need Tasmanian Heritage Council approval, and work near TasWater pipes may need a 56W consent. Asbestos is likely in homes built or renovated before 1990, so a survey should come before any demolition. Jobs of $20,000 or more need a written contract, a cooling-off period of 5 business days and a capped deposit. Post your job on The Quote Yard, and local builders across Hobart who can take it on will send you written quotes to compare side by side.
At a Glance - Hiring a Builder in Hobart, 2027 Estimates
| Job | Price Range | How It Is Charged | What Drives It In Hobart | Who Can Do It |
|---|---|---|---|---|
| Home extension | $2,500 - $4,500 per sq m | Per square metre of new floor | Slope, footings and roof tie-in | Licensed builder |
| Single room addition | $80,000 - $150,000 | Whole project | Access and site works | Licensed builder |
| Bedroom with ensuite | $120,000 - $200,000 | Whole project | Plumbing and wet area fit-out | Builder with a licensed plumber |
| Living area extension | $120,000 - $250,000 | Whole project | Glazing and floor size | Licensed builder |
| Kitchen and living extension | $180,000 - $350,000 | Whole project | Cabinetry and services | Licensed builder |
| Partial second storey | $200,000 - $400,000 | Whole project | Engineering and stair position | Licensed builder |
| Full second storey | $350,000 - $700,000+ | Whole project | Frame strengthening and roof | Licensed builder |
| One bedroom granny flat | $150,000 - $220,000 | Whole project | Services and approvals | Builder or owner builder |
| Heritage work | $3,500 - $6,000+ per sq m | Per square metre | Heritage Council approval | Builder with heritage experience |
| Standard kitchen, central Hobart | $34,000 - $55,000 | Whole job | Older homes and access | Builder or kitchen renovator |
| Removing a wall to open up living areas | $6,800 - $19,000 | Per wall | Beams for load-bearing walls | Licensed builder |
| New home or knockdown rebuild | Priced on quote | Whole project | Design, demolition and site | Builder and licensed demolisher |
What Pushes a Hobart Building Price Up
Booking a Builder for a Hobart Home
A builder is the licensed tradesperson who manages or carries out building work, from a rear extension or a second storey to a new home on a cleared block. In Hobart that often means opening up a weatherboard cottage in New Town, adding a level to a brick home in Sandy Bay or replacing a tired house in Glenorchy. The wider range of renovation work, from kitchens to outdoor rooms, is set out in the Tasmanian guide to building renovations, while this page sticks to hiring the builder. The rules that matter here cover the licence class, the category of the work, the building surveyor, the contract and what happens if something goes wrong. Sorting them out before anyone quotes saves time, because every builder can then price the same job on the same terms.
Start with a short written brief that names your suburb, the year the home was built and what you want to change. Add photos of the outside, the roof and any cracks, along with a rough floor plan showing sizes in metres. Say whether you already have drawings from a building designer, the licensed person who prepares building plans, or need the builder to arrange them. Note whether the block slopes, whether it backs onto bush and whether the house appears on a heritage list, since each one adds steps. Mention your budget range and the month you hope to start, because well regarded Hobart builders are often booked months ahead. That single page lets every builder see the same project, so the prices that come back can be compared fairly.
Hobart Building Prices for Extensions, Additions and New Work, 2027
Extensions are usually priced per square metre of new floor, and Tasmanian price guides put that at about $2,500 to $4,500 for 2027. A single room added to the side or rear of a home is estimated at $80,000 to $150,000, and a bedroom with its own ensuite at $120,000 to $200,000. A larger living area extension is estimated at $120,000 to $250,000, while a combined kitchen and living extension runs from $180,000 to $350,000. Going up costs more per square metre than going out, with second storey work estimated at $3,000 to $5,000 a square metre. Partial second storeys are estimated at $200,000 to $400,000, and the options are explained further in the guide to second storey additions.
Kitchens are the one job where live Tasmanian guides give Hobart figures by area, so they are worth checking before you set a budget. A standard kitchen renovation in central heritage suburbs such as Battery Point, West Hobart and Sandy Bay is estimated at $34,000 to $55,000. The same kitchen in New Town, Moonah or North Hobart is estimated at $31,000 to $50,000, and on the eastern shore at $28,000 to $46,000. Glenorchy, Claremont and Bridgewater sit lower, at about $26,000 to $43,000, according to the Tasmanian kitchen renovation cost guide. A small bathroom kept to the same layout is estimated at $18,000 to $28,000 in inner Hobart and $14,500 to $22,500 in the northern suburbs. New homes and knockdown rebuilds, where the old house is demolished and a new one built, are priced on quote because no live Tasmanian guide sets a range.
| Job | 2027 Estimate | How It Is Charged | What Changes the Price |
|---|---|---|---|
| Home extension | $2,500 - $4,500 per sq m | Per square metre of new floor | Footings, roof tie-in and finishes |
| Single room addition | $80,000 - $150,000 | Whole project | Slope of the block and access |
| Bedroom with ensuite | $120,000 - $200,000 | Whole project | Plumbing runs and wet area fit-out |
| Sunroom addition | $50,000 - $120,000 | Whole project | Glass area and floor type |
| Living area extension | $120,000 - $250,000 | Whole project | Glazing, ceiling height and floor size |
| Kitchen and living extension | $180,000 - $350,000 | Whole project | Cabinetry and appliance level |
| Second storey | $3,000 - $5,000 per sq m | Per square metre | Strengthening the frame below |
| Full second storey | $350,000 - $700,000+ | Whole project | Engineering and temporary roofing |
| One bedroom granny flat, 50 sq m | $150,000 - $220,000 | Whole project | Services and site works |
| Whole house renovation | $150,000 - $400,000 | Whole project | Hidden damage and asbestos |
| Hardwood deck | $450 - $850 per sq m | Per square metre | Height, stairs and balustrade |
| New home or knockdown rebuild | Priced on quote | Whole project | Design, demolition and site |
Smaller line items are worth knowing because they turn up on almost every Hobart quote for an older home. A laboratory test for asbestos is estimated at $270 to $560, and licensed removal at $1,400 to $4,800, depending on how much is found. A four to six cubic metre bin for building waste is estimated at $400 to $820, and surveyor and category assessment fees for a small job at $450 to $1,400. All of these figures are 2027 estimates, and the final price depends on the design, the block and what is uncovered once walls are opened.
A contingency is money set aside for surprises, and older Hobart homes tend to need a generous one. Tasmanian heritage renovation guides suggest allowing 15 to 25 per cent on heritage work, where hidden problems are most common. A newer home on flat ground may need a smaller allowance, but it is rarely wise to plan with none at all. Keep the contingency outside the contract price, so it is only spent if a real problem turns up. Ask each builder which risks they see on your block, such as rock, old drains or rotten stumps, and have those priced first.
Builder Licence Classes and the October 2026 Changeover
Every builder doing residential building work in Tasmania must hold a current licence, and the class on that licence decides how big a job they may take on. When we checked, the Builder (General Construction) licence had four subclasses called Domestic, Low Rise, Medium Rise and Open. The Domestic class covers homes, units and outbuildings, which the National Construction Code (NCC), the national building rulebook, calls Class 1, Class 2 and Class 10 buildings. Low Rise, Medium Rise and Open licences cover larger and commercial work, with Open covering every building class without a size limit. Some Domestic licences are restricted to houses and outbuildings, so check that the scope printed on the licence matches your job.
Demolition has its own licence, and a licensed demolisher may pull a building down but cannot carry out new building work. For a knockdown rebuild, ask whether the builder holds both licences or will bring in a licensed demolisher as a subcontractor. Licensed builders must also hold public liability cover plus contract works insurance, a policy protecting the half-built job from damage such as fire or storm. Before signing, request a certificate of currency for each policy, which is the insurer's short statement that the cover is in force. From 1 October 2026, CBOS, the former Consumer, Building and Occupational Services office, moved into two agencies called Consumer Affairs Tasmania and Building Standards Tasmania. When we checked, the CBOS website said older references to CBOS should be read as the matching function within those new agencies.
| Work | Who Does It | Licence or Approval |
|---|---|---|
| New home or extension | Builder | Builder licence, Domestic class or higher |
| Pulling down an old house | Demolisher, or a builder using one | Demolisher licence |
| Plans and drawings | Building designer or architect | Licensed building designer or registered architect |
| Checking plans and inspecting stages | Building surveyor | Licensed building surveyor |
| Drains, pipes and fixtures | Plumber | Licensed plumber |
| Wiring, switchboards and lights | Electrician | Licensed electrician |
| Asbestos survey before work starts | Asbestos assessor | Licensed asbestos assessor |
| Bushfire advice for the site | Bushfire hazard practitioner | Accredited under the Tasmania Fire Service scheme |
| Running the job yourself | Owner | Owner builder permit |
Not every task on a building job needs the builder's own licence, and much of it is done by subcontractors the builder manages. Framing, stairs and decks are often handled by a Hobart carpenter working under the builder, while drains go to a licensed plumber. The builder remains responsible for the whole job under the contract, even when a subcontractor does part of the work. Ask for a list of the main subcontractors and their licence numbers, so you know who will be on site and when.
Low Risk, Notifiable or Permit Work: Finding Your Category
Tasmania sorts building work into categories by risk, set out in a Director's Determination, an official ruling made under the Building Act 2016. Low risk work needs no permit or approval, and some of it can be done by owners, although larger low risk projects still need a licensed builder. Notifiable work is medium risk, so a Notice of Work goes to a building surveyor, and the council is told about the work but does not approve it. Permit work is high risk, which means an application to the council for a building permit and a full assessment before anything starts. Most extensions, second storeys and new homes in Hobart fall into the notifiable or permit categories, so expect paperwork before the first footing, the concrete base under the walls, goes in.
Small structures sit at the low end, and when we checked an owner could build a shed, garage or carport of up to 18 square metres without a permit. That limit rose to 36 square metres for a prefabricated kit, and fences and low decks were also listed among things an owner can build. A shared boundary job is often simpler with a Hobart fencer, while a raised outdoor platform suits a specialist deck builder. For some low risk work you must still tell the council once it is finished, using Form 80, the Notice of Low Risk Work.
Category Questions to Settle Before Quotes
The Building Surveyor and the Certificate of Likely Compliance
A building surveyor is a licensed professional who checks that a design meets the building rules and then inspects the work at set stages. Owners often engage the surveyor directly, and Tasmanian consumer guidance asks you to confirm that the surveyor holds a current licence. For notifiable and permit work, the surveyor issues a Certificate of Likely Compliance, a document saying the plans are likely to meet the NCC and other rules. Permit work then goes to the council for a building permit, while notifiable work goes ahead once the paperwork is lodged and the council is told. Work may begin once your builder receives a start work authorisation, the surveyor's written go-ahead, so ask to see it before the excavator arrives.
During the build, the surveyor needs to be notified at stages listed in the approval, so work can be checked before it is covered up. Ask the builder for a timeline that shows those notification points, since a missed inspection can mean opening up finished work. You can move into a new home or extension once all permit conditions are met and a Certificate of Occupancy, the document allowing people to live there, has been issued. Keep that certificate with the contract and the plans, because it shows the work was approved and finished properly. Surveyor and category assessment fees for a small job are estimated at $450 to $1,400, and larger projects cost more. Check whether those fees sit inside the builder's price or are billed to you separately by the surveyor.
Knockdown Rebuilds and New Homes on Hobart Blocks
A knockdown rebuild means demolishing an existing house and building a new one on the same block, so you keep the street, the views and the services. It involves two kinds of licensed work, because the demolition and the new build are separate stages with their own approvals. The Director's Determination covers demolition work as well as building work, so the surveyor confirms which category the demolition falls into. A house on the Tasmanian Heritage Register or inside a local heritage area may need approval before it can be pulled down, so check that before buying a block to rebuild. Because each design and site is different, new homes and knockdown rebuilds are priced on quote rather than from a published range.
Before demolition, the asbestos survey matters most, since a whole house of old sheeting may need licensed removal before machinery arrives. Water and sewer connections must be capped properly, and any changed connection for the new house may need TasWater certification. Power to the old house has to be safely disconnected first, and an electrician can advise on the supply for the replacement home. The new house is designed to the 6 Star requirement and to the NCC edition in force when it is approved. Ask builders for a staged quote that separates demolition, site preparation, the slab or footings and the new home itself. That layout lets you fairly compare a builder who demolishes in house with one who uses a separate demolisher.
| Stage | Who Usually Does It | Paperwork to Expect |
|---|---|---|
| Design and energy rating | Building designer or architect | Drawings and a 6 Star assessment |
| Planning check | Designer or owner | Planning permit if an overlay or zone rule applies |
| Asbestos survey | Licensed asbestos assessor | Survey report with removal advice |
| Demolition | Licensed demolisher | Category confirmed by the surveyor |
| Services capped and reconnected | Plumber and electrician | TasWater certificates where needed |
| New home build | Licensed builder | Certificate of Likely Compliance and permit |
| Handover | Builder and surveyor | Certificate of Occupancy |
Hobart Under the Tasmanian Planning Scheme
Building approval is separate from planning approval, which deals with how a building fits its street, its neighbours and the land itself. When we checked, the City of Hobart said the city had moved to the Tasmanian Planning Scheme, replacing the Hobart Interim Planning Scheme 2015 and the Sullivans Cove Planning Scheme 1997. Local detail sits in the Hobart Local Provisions Schedule, the part of the scheme that maps zones and overlays for each property in the city. Overlays, the map layers that add extra rules to some properties, include the Landslip Hazard Code, the Bushfire-Prone Areas Code and local heritage provisions, and any of them can trigger a planning permit. The City of Hobart offers an address search showing the zones and provisions on a property, plus a duty planner for questions.
Planning rules often decide the size and shape of an extension long before a builder can price it. Setbacks, the minimum gaps to a boundary, along with building height and site coverage, the share of the lot under roof, can limit what you add, especially on narrow inner city lots. If a planning permit is needed, get it before the drawings are finalised, since permit conditions can change the design. For a rear home extension that stays inside the standard rules, approval is usually quicker, so ask the designer to check the zone first.
Sloping Blocks, Landslip Hazard Areas and Bushfire-Prone Streets
Much of Hobart is built on hillsides running down from kunanyi or Mount Wellington to the Derwent, and that shapes how builders price a job. Steep blocks need deeper footings, retaining walls and careful drainage, and access for trucks and concrete pumps can be tight. Some land is mapped as a landslip hazard area, meaning ground where soil movement is more likely, and building there follows its own Director's Determination. When we checked, that Determination grouped land into low, medium, medium-active and high hazard levels, along with landslip areas A and B. A landslip hazard report may be required, and its findings can add cost to the footings and the stormwater design. Ask the builder whether the quote allows for that report, or whether the price assumes stable ground.
Bushfire-prone areas take in many Hobart streets that back onto bushland on the hilly edges of the city. Building there follows the bushfire hazard Determination, which covers a bushfire hazard management plan and a matching certificate. Advice on those plans comes from bushfire hazard practitioners accredited under a Tasmania Fire Service scheme. The assessment sets a bushfire attack level, or BAL, which rates how much ember and heat exposure the building must be designed to resist. A higher BAL can mean ember screens, toughened glass and non-combustible cladding, so it changes the price of windows and walls.
| Condition | What It Means | What to Ask the Builder |
|---|---|---|
| Steep slope | Deeper footings and more retaining | Is digging a fixed price or an allowance? |
| Landslip hazard area | Separate Determination and a report | Who arranges the landslip hazard report? |
| Bushfire-prone area | Hazard management plan and a BAL | Which BAL is the quote based on? |
| Heritage listed place | Heritage Council approval | Has a minor works approval or permit been sought? |
| TasWater pipe nearby | A 56W consent may be needed | Where does the sewer main run? |
| Narrow street access | Crane, skip or scaffold on the road | Who applies for the street permit? |
| Home built before 1990 | Asbestos is likely | Has a licensed assessor surveyed it? |
| Close neighbours | Noise and dust controls | Which hours will the crew work? |
Heritage Listed Cottages and Heritage Council Approval
Hobart has many nineteenth century cottages and terraces, and a good number in suburbs such as Battery Point are protected by heritage listing. Places on the Tasmanian Heritage Register need approval from the Tasmanian Heritage Council for works, either a minor works approval or a permit. Work that leaves the heritage values of a place untouched can get the simpler minor works approval, known until the start of 2025 as a Certificate of Exemption. Bigger changes need a development application, the formal planning application, lodged with the council and referred on to the Heritage Council. When we checked, Heritage Tasmania said City of Hobart works could be lodged online through PlanBuild Tasmania.
Local heritage listings in the planning scheme are a separate layer, so a home can be affected even when it is not on the state register. Builders who know traditional work, such as lime mortar, sandstone and hardwood joinery, may price heritage jobs higher but tend to avoid costly mistakes. Tasmanian guides put heritage work at about $3,500 to $6,000 or more a square metre, and a sympathetic rear addition at $200,000 to $500,000. The heritage renovation guide covers restoration methods, and the approvals above are best started before any builder finalises a price.
Building Near TasWater Pipes and the 56W Consent
Many older Hobart lots have a sewer or water main running through the backyard, often right where an extension would go. TasWater, the state's water and sewerage business, requires a 56W consent before building over or close to its pipes. When we checked, that consent applied to a structure, fill or excavation inside a TasWater easement, a strip of land kept for the pipes, or within 2 metres sideways of them. Work that changes water demand or needs a new connection may also need a Certificate for Certifiable Work, with a compliance certificate once it is finished. For Hobart properties these applications go through PlanBuild Tasmania, the state's online planning and building portal.
Ask the builder or designer to locate the pipes early, since moving a sewer line is costly and slow. Before any digging, plans of underground cables and pipes can be requested free through Before You Dig Australia. New drains, toilets and kitchen connections are plumbing work, so a Hobart plumber with a current licence must do them. Check that the quote shows who lodges the TasWater applications and who pays the fees.
Six Star Energy Rules and NCC 2022 Back in Force
Energy rules decide how much insulation, glazing and sealing a new home or extension needs, and they are checked at the design stage. When we checked, Tasmanian building guidance said new homes and residential extensions in Tasmania must meet the 6 Star requirement. Stars run from 1 to 10 and are worked out with NatHERS software, the national house energy rating tools, or through the NCC's Deemed-to-Satisfy route of set measures. Hobart sits in zone 7, which covers most of the state, while alpine areas above 900 metres fall in zone 8. The building surveyor checks the energy design as part of the Certificate of Likely Compliance, so it must be settled before materials are ordered. Ask which star rating the design achieves and which insulation and window products were assumed in the assessment.
The edition of the NCC that applies also matters, and in Tasmania it changed twice during 2026. NCC 2025 briefly started in Tasmania on 1 May 2026, but the Building Amendment Act 2026 reversed that change. When we checked, NCC 2022 again applied in Tasmania from 5 June 2026 until 1 May 2027, after which NCC 2025 is to be adopted. A design approved now may be built after the next edition arrives, so ask your surveyor which edition your approval uses. Upgrades such as double glazing and a heat pump from a Hobart air conditioning installer are easiest to add while walls are open.
Owner Builder Permits, Courses and Limits
An owner builder is a property owner who runs building work on their own home instead of hiring a licensed builder for the whole job. When we checked, Service Tasmania said you needed to own the land, engage a building surveyor and hold insurance before a permit would be approved. You also needed a white card, the general construction induction, and an approved Tasmanian owner builder course from the last 12 months if building or extending a residence. Permits were only issued for residential buildings, and only two owner builder Class 1a projects, meaning houses, were allowed in ten years. Each new project needs its own permit, and an owner builder still needs a building permit for notifiable or permit work. The permit ends when the project is complete, and the surveyor must be notified at each mandatory notification stage along the way.
Owner building can save the builder's margin, but it moves the risk of delays, defects and coordination onto you. Many owners take a middle path and hire a builder for the structure, then finish painting and landscaping themselves. Small finishing jobs such as hanging doors or fitting shelves suit a Hobart handyman once the main work is signed off. A backyard studio or granny flat, meaning a small second home on the same block, is a common owner builder project, although its approvals follow the same categories as any other home.
Contracts, Deposits and Statutory Warranties from $20,000
When we checked, the Residential Building Work Contracts and Dispute Resolution Act 2016 applied to residential building work with a contract price of $20,000 or more. For those jobs the contract must be in writing, and the builder must give you the Residential Building Consumer Guide before you sign. You then have a cooling-off period of 5 business days to withdraw, or 7 days from finding out if the guide was never given. The most a builder could ask as a deposit was 10 per cent on a contract below $50,000, falling to 5 per cent once the price reached $50,000. A higher cap of 20 per cent applied where more than half the work is done off site, such as a factory-built home. Ask the builder to show the deposit amount and each payment stage on the contract itself.
The Act also builds statutory warranties into every covered contract, which are promises that apply whatever the contract says. They include suitable materials, compliance with the law, work done with proper care and skill, and work that follows the plans and specifications. For a new home there is also a warranty that it will be suitable to live in, and work must be carried out with reasonable diligence. When we checked, a claim for breach of warranty had to start within 6 years of practical completion, the point when the work is finished apart from minor items. Home warranty insurance changes passed in 2023 were not part of the Act in force when we checked, so ask the builder what protects you if their business closes.
| Term | What It Means | Where to Look |
|---|---|---|
| Contract price | The agreed amount for the agreed work | First page of the contract |
| Provisional sum | An allowance for work not yet fully priced, such as rock in the footings | Schedule of allowances |
| Prime cost item | An allowance for an item you choose later, such as an oven | Schedule of allowances |
| Deposit | Capped at 10 or 5 per cent depending on the price | Payment schedule |
| Progress payments | Paid as each stage is finished | Payment schedule |
| Variations | Written changes to the scope and the price | Variation clause |
| Practical completion | Finished apart from minor items | Completion clause |
| Statutory warranties | Six years to start a claim | Consumer guide and the Act |
The Building Administration Fee and the Training Levy
Two government charges apply to larger building jobs in Tasmania, and some quotes leave them out. When we checked, the Building Administration Fee was 0.1 per cent of the total cost of work costing $20,000 or more, collected by councils for the state. A separate training levy, which funds building industry training, was 0.2 per cent of the estimated value of work worth more than $20,000. The project owner must pay that levy before a building or plumbing permit is issued, or before work starts where no permit is needed. On a $200,000 extension the two charges together come to about $600, so they are small but still worth confirming on the quote.
The levy is paid before the permit is issued, so it often falls due before the builder's first invoice. Some builders pay both charges and pass them on, while others list them as owner costs outside the contract. Either approach is fine as long as the quote says clearly which one applies to your job. Keep the receipts with the approval paperwork, so the full cost of the project stays on record.
Noise Hours, Street Permits and Asbestos on a Hobart Site
Building work brings noise, trucks and dust, and Hobart has clear rules about when the loudest equipment can run. The City of Hobart construction noise guide says listed equipment must not be heard inside nearby homes before 7am or after 6pm on weekdays. On Saturdays the quiet times were before 8am and after 6pm, and on Sundays and public holidays before 10am and after 6pm. Noise can still be judged unreasonable at other times, so a careful builder warns neighbours and saves the loudest work for the middle of the day. A crane, skip bin, scaffold or hoarding, a temporary site wall, on a public street or footpath needs a council permit, and road excavation needed 14 days notice when we checked.
Any house built or altered before 1990 probably has some asbestos in it, says WorkSafe Tasmania. It can hide in wall sheeting, eaves and old vinyl floors, so it must be identified before walls are cut or floors lifted. A residential asbestos survey is an inspection by a licensed asbestos assessor, who reports where the material is and how to manage or remove it. Removal rules depend on the type and amount found, so the builder should price removal separately once the survey is done. Before the old switchboard is touched, a Hobart electrician can isolate the power and quote any upgrade the extension needs.
Site Rules a Hobart Builder Should Plan For
Cladding, Framing and Linings to Name in the Contract
Naming the main products in the contract stops a cheaper substitute from appearing halfway through the job. James Hardie makes fibre cement cladding, a tough sheet of cement reinforced with fibres, including weatherboard profiles that suit both new extensions and older Hobart homes. Weathertex makes weatherboards and wall panels from Australian hardwood, a common choice where a timber look is wanted. Cemintel makes lightweight fibre cement facade, cladding and internal lining systems for new walls. BlueScope makes COLORBOND steel for roofing, walling and gutters, and the colour name should be written on the quote. Lysaght makes steel roofing and walling profiles as well as steel framing, and a Hobart roofer may fix the sheets.
Structure matters just as much as the finishes, even though you will rarely see it once the job is closed in. Tilling makes engineered timber such as SmartLVL, a laminated veneer lumber beam that can span further than solid timber of the same size. Pryda makes timber connectors, nail plates and bracing that hold frames and roof trusses together. Dincel makes PVC forms that stay in place to shape poured concrete walls, a method often used with a Hobart concreter on steep blocks. Hebel makes autoclaved aerated concrete (AAC) panels, a lightweight concrete product used for walls and floors in many new homes. Austral Bricks makes bricks and pavers, and a Hobart bricklayer usually lays them under the builder's direction.
Inside the walls, the linings and insulation decide how warm and quiet the finished rooms will feel. Bradford makes insulation for walls, ceilings and floors, and the R-value, a measure of resistance to heat flow, should match the energy assessment. CSR makes Gyprock plasterboard, the sheet lining used on most new walls and ceilings. Stegbar makes windows and doors, so check that the glazing in the quote matches the windows assumed in the star rating. VELUX makes roof windows and skylights, a simple way to bring daylight into a deep extension. ARDEX makes waterproofing membranes and screeds, the smooth levelling layer laid over a floor, for wet areas, which are then finished by a Hobart tiler.
Dulux makes exterior paints including its Weathershield range, and the paint system belongs on the finishing schedule. Plasterboard set and sanded by a Hobart plasterer is often a separate line, so check that it is included. If the builder wants to swap a named product, the contract should require a written variation, a signed change to the agreed work, and your approval first. Keep product data sheets and warranty cards together, since some manufacturer warranties ask for proof of correct installation.
Products to List on a Hobart Building Quote
Mediation, TASCAT and Raising a Building Problem
If something goes wrong, raise it with the builder in writing first, with photos and a clear list of what you want fixed. Under the 2016 Act you can lodge a Notice of Dispute with the Director of Building Control, the state official overseeing building standards, to ask for mediation, a guided meeting aimed at agreement. When we checked, there was no application fee for mediation, and the mediator's costs were usually shared equally between the parties. Any agreement is written up as Terms of Mediated Settlement and signed by both sides. If a settlement is not honoured, the tribunal may, in certain circumstances, declare it binding and enforceable.
The Tasmanian Civil and Administrative Tribunal, known as TASCAT, hears residential building disputes in its Civil and Consumer Stream. It can decide whether work was completed satisfactorily, whether it complies with the law and what the terms of a contract mean. It can also review some decisions of the Director of Building Control, such as a refusal to accept a notice of dispute. Keep the contract, variations, invoices, emails and dated photos together from the start, because they become your evidence. Jobs below the Act's $20,000 threshold still carry consumer guarantees under the Australian Consumer Law, the national law on faulty goods and services.
What to Look Out For in a Hobart Building Contract
A low price can hide large provisional sums, which are estimates for work the builder has not fully priced, such as digging into rock. Check how many provisional sums the quote contains and how each one will be adjusted if the real cost turns out different. Look for the licence number and class on the quote, and confirm both with the licence search before you pay anything. Be wary of a builder who asks for more than the legal deposit or wants cash payments without an invoice. Check that the contract names the building surveyor, the start date, the expected finish date and how wet weather delays are handled. Ask who is responsible for TasWater, heritage and planning applications, since those can stall a job for weeks.
Watch for exclusions in the fine print, such as asbestos removal, rock excavation, site clean-up and connection fees. A quote that leaves out the levies, the surveyor and the waste bin may look cheaper than one that includes them. If you will need to move out during the build, ask for the dates early so a Hobart removalist can be booked. Finally, check that the contract attaches the drawings, the specification and the product schedule, so everyone builds to the same plan.
Signs of a Complete Building Quote
Comparing Hobart Builder Quotes Line by Line
Send every builder the same brief, with the drawings, the energy report, the site photos and any planning or heritage approvals. Ask each one to visit the site, because slope, access and the condition of the existing house rarely show in photos. Request the same layout from each builder, with preliminaries, demolition, footings, framing, roofing, linings, services and finishes on separate lines. Preliminaries are the setup costs of a job, such as site fencing, a toilet, insurance and supervision, and they vary widely between builders. Compare item by item rather than the totals, and ask about any line that sits far above or below the others.
Ask how long the job will take from start to practical completion and how many crews will be on site. Check whether the builder can start when your approvals arrive, or whether you will wait behind other jobs already booked. Ask for the names of recent clients you can contact, and if possible look at a finished job in a similar Hobart suburb. Get it in writing which party arranges the plumber, the electrician and any asbestos removal, and which party pays them. Keep the accepted quote, the contract and every variation together, since that file is your record for the whole warranty period.
Building work in Hobart often leads to other jobs once the main contract finishes. New rooms may need fresh colour from a Hobart painter, and the garden around them may need restoring by a Hobart gardener. Larger outdoor work such as paths and planting suits a Hobart landscaper, ideally booked once the scaffolding has gone. Post your job on The Quote Yard with that brief, and we will connect you with licensed builders across Hobart who can quote on it.
Builders Across Hobart
Building prices on this page apply across greater Hobart, from the city and inner suburbs to the eastern shore, Glenorchy and Kingborough. Steep or narrow sites can take longer to build on, and builders will price access once they have seen the block.
▶ Hobart 30 areas
▶ Launceston 26 areas
▶ Devonport & Burnie 26 areas
▶ Huon Valley 22 areas
▶ East Coast 22 areas
Hobart Builder FAQ
Which licence class should a builder hold for a house extension?
Who took over from CBOS for building licences and complaints?
Do I need to do a course before becoming an owner builder?
How much are the Building Administration Fee and the training levy?
Can I extend a home that sits in a mapped landslip hazard area?
What is a TasWater 56W consent and when is it needed?
Do I need Heritage Council approval to extend a listed cottage?
Which edition of the building code applies to my Hobart project?
What hours can builders run noisy equipment near homes in Hobart?
What can I do if my builder and I cannot agree?
Hobart Building Specialists
Related Services
For Trades & Contractors - TAS
Building jobs in Hobart often create work for other trades, such as new drains, a switchboard upgrade, framing or a fresh slab. Links to those follow-up jobs across Tasmania sit below, along with work for trades looking for new clients.
Ready to Book a Builder in Hobart?
Post your job with your suburb, drawings and photos, and we will connect you with licensed builders across Hobart. Compare written quotes that price the same project before you sign a contract.
Get Free Builder QuotesAbout This Guide
This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Looking for more services across Tasmania? View all available trade services.