Looking for a Builder in Hobart?

Tell us your suburb, what you want built, rough sizes in metres, the age of the home and whether you already have drawings. We will pass that brief to local builders, so every quote you receive prices the same project.

Get Free Builder Quotes

Hobart Building Price Guide

Home extension, per sq m$2,500 - $4,500
Single room addition$80,000 - $150,000
Bedroom with ensuite$120,000 - $200,000
Living area extension$120,000 - $250,000
Second storey, per sq m$3,000 - $5,000
Partial second storey$200,000 - $400,000
One bedroom granny flat$150,000 - $220,000
Standard kitchen, inner Hobart$31,000 - $50,000
Small bathroom, inner Hobart$18,000 - $28,000
New home or knockdown rebuildPriced on quote

These figures are 2027 estimates for building work in Hobart. Your price depends on the design, the slope of the block, any heritage or bushfire requirements and what is found once the existing house is opened up.

Licensed Builders for Hire in Hobart: Extensions, Knockdowns and Renovations

Hiring a builder in Hobart goes more smoothly when the scope, the approvals and the contract terms are settled before anyone prices the job. For 2027, Tasmanian price guides put extensions at about $2,500 to $4,500 a square metre, and a single room addition at $80,000 to $150,000. Second storey work is estimated at $3,000 to $5,000 a square metre, because the frame below often needs strengthening. New homes and knockdown rebuilds are priced on quote, since every design and every block is different. Each builder must hold a current Tasmanian licence of the right class, and the Domestic class covers houses, units and outbuildings. From 1 October 2026, the old CBOS office moved into Consumer Affairs Tasmania and Building Standards Tasmania. Extensions and new homes are usually notifiable or permit work, the categories that need formal sign-off, so a licensed building surveyor checks the plans first. Hobart now sits under the Tasmanian Planning Scheme, and landslip, bushfire and heritage map layers can add extra steps. Heritage listed homes may need Tasmanian Heritage Council approval, and work near TasWater pipes may need a 56W consent. Asbestos is likely in homes built or renovated before 1990, so a survey should come before any demolition. Jobs of $20,000 or more need a written contract, a cooling-off period of 5 business days and a capped deposit. Post your job on The Quote Yard, and local builders across Hobart who can take it on will send you written quotes to compare side by side.

Hobart Building Work Covered

Building work across Hobart runs from a single room addition in Moonah to a second storey in Sandy Bay or a new home on a sloping eastern shore block. We can connect you with licensed local builders who all price the same written brief for your project.

Get Free Quotes

At a Glance - Hiring a Builder in Hobart, 2027 Estimates

Job Price Range How It Is Charged What Drives It In Hobart Who Can Do It
Home extension $2,500 - $4,500 per sq m Per square metre of new floor Slope, footings and roof tie-in Licensed builder
Single room addition $80,000 - $150,000 Whole project Access and site works Licensed builder
Bedroom with ensuite $120,000 - $200,000 Whole project Plumbing and wet area fit-out Builder with a licensed plumber
Living area extension $120,000 - $250,000 Whole project Glazing and floor size Licensed builder
Kitchen and living extension $180,000 - $350,000 Whole project Cabinetry and services Licensed builder
Partial second storey $200,000 - $400,000 Whole project Engineering and stair position Licensed builder
Full second storey $350,000 - $700,000+ Whole project Frame strengthening and roof Licensed builder
One bedroom granny flat $150,000 - $220,000 Whole project Services and approvals Builder or owner builder
Heritage work $3,500 - $6,000+ per sq m Per square metre Heritage Council approval Builder with heritage experience
Standard kitchen, central Hobart $34,000 - $55,000 Whole job Older homes and access Builder or kitchen renovator
Removing a wall to open up living areas $6,800 - $19,000 Per wall Beams for load-bearing walls Licensed builder
New home or knockdown rebuild Priced on quote Whole project Design, demolition and site Builder and licensed demolisher

What Pushes a Hobart Building Price Up

What is involved
Steep blocks need deeper footings, retaining walls and careful stormwater design. Access for trucks, pumps and cranes can also be tight on narrow hillside streets.
Older homes often hide problems once walls are opened. Rotten stumps, tired wiring and asbestos sheeting all need fixing before new work can join the old.
Mapped landslip, bushfire and heritage areas add reports and approvals. Each one takes time and can change the drawings before a final price is set.
Second storeys usually mean strengthening the existing frame and footings. A temporary roof may also be needed while the old roof comes off.
Ask each builder to show preliminaries, demolition, structure, services and finishes on separate lines. Quotes laid out that way can be compared item by item, and any gaps are easy to spot.

Booking a Builder for a Hobart Home

A builder is the licensed tradesperson who manages or carries out building work, from a rear extension or a second storey to a new home on a cleared block. In Hobart that often means opening up a weatherboard cottage in New Town, adding a level to a brick home in Sandy Bay or replacing a tired house in Glenorchy. The wider range of renovation work, from kitchens to outdoor rooms, is set out in the Tasmanian guide to building renovations, while this page sticks to hiring the builder. The rules that matter here cover the licence class, the category of the work, the building surveyor, the contract and what happens if something goes wrong. Sorting them out before anyone quotes saves time, because every builder can then price the same job on the same terms.

Start with a short written brief that names your suburb, the year the home was built and what you want to change. Add photos of the outside, the roof and any cracks, along with a rough floor plan showing sizes in metres. Say whether you already have drawings from a building designer, the licensed person who prepares building plans, or need the builder to arrange them. Note whether the block slopes, whether it backs onto bush and whether the house appears on a heritage list, since each one adds steps. Mention your budget range and the month you hope to start, because well regarded Hobart builders are often booked months ahead. That single page lets every builder see the same project, so the prices that come back can be compared fairly.

Hobart Building Prices for Extensions, Additions and New Work, 2027

Extensions are usually priced per square metre of new floor, and Tasmanian price guides put that at about $2,500 to $4,500 for 2027. A single room added to the side or rear of a home is estimated at $80,000 to $150,000, and a bedroom with its own ensuite at $120,000 to $200,000. A larger living area extension is estimated at $120,000 to $250,000, while a combined kitchen and living extension runs from $180,000 to $350,000. Going up costs more per square metre than going out, with second storey work estimated at $3,000 to $5,000 a square metre. Partial second storeys are estimated at $200,000 to $400,000, and the options are explained further in the guide to second storey additions.

Kitchens are the one job where live Tasmanian guides give Hobart figures by area, so they are worth checking before you set a budget. A standard kitchen renovation in central heritage suburbs such as Battery Point, West Hobart and Sandy Bay is estimated at $34,000 to $55,000. The same kitchen in New Town, Moonah or North Hobart is estimated at $31,000 to $50,000, and on the eastern shore at $28,000 to $46,000. Glenorchy, Claremont and Bridgewater sit lower, at about $26,000 to $43,000, according to the Tasmanian kitchen renovation cost guide. A small bathroom kept to the same layout is estimated at $18,000 to $28,000 in inner Hobart and $14,500 to $22,500 in the northern suburbs. New homes and knockdown rebuilds, where the old house is demolished and a new one built, are priced on quote because no live Tasmanian guide sets a range.

Job 2027 Estimate How It Is Charged What Changes the Price
Home extension $2,500 - $4,500 per sq m Per square metre of new floor Footings, roof tie-in and finishes
Single room addition $80,000 - $150,000 Whole project Slope of the block and access
Bedroom with ensuite $120,000 - $200,000 Whole project Plumbing runs and wet area fit-out
Sunroom addition $50,000 - $120,000 Whole project Glass area and floor type
Living area extension $120,000 - $250,000 Whole project Glazing, ceiling height and floor size
Kitchen and living extension $180,000 - $350,000 Whole project Cabinetry and appliance level
Second storey $3,000 - $5,000 per sq m Per square metre Strengthening the frame below
Full second storey $350,000 - $700,000+ Whole project Engineering and temporary roofing
One bedroom granny flat, 50 sq m $150,000 - $220,000 Whole project Services and site works
Whole house renovation $150,000 - $400,000 Whole project Hidden damage and asbestos
Hardwood deck $450 - $850 per sq m Per square metre Height, stairs and balustrade
New home or knockdown rebuild Priced on quote Whole project Design, demolition and site

Smaller line items are worth knowing because they turn up on almost every Hobart quote for an older home. A laboratory test for asbestos is estimated at $270 to $560, and licensed removal at $1,400 to $4,800, depending on how much is found. A four to six cubic metre bin for building waste is estimated at $400 to $820, and surveyor and category assessment fees for a small job at $450 to $1,400. All of these figures are 2027 estimates, and the final price depends on the design, the block and what is uncovered once walls are opened.

A contingency is money set aside for surprises, and older Hobart homes tend to need a generous one. Tasmanian heritage renovation guides suggest allowing 15 to 25 per cent on heritage work, where hidden problems are most common. A newer home on flat ground may need a smaller allowance, but it is rarely wise to plan with none at all. Keep the contingency outside the contract price, so it is only spent if a real problem turns up. Ask each builder which risks they see on your block, such as rock, old drains or rotten stumps, and have those priced first.

Builder Licence Classes and the October 2026 Changeover

Every builder doing residential building work in Tasmania must hold a current licence, and the class on that licence decides how big a job they may take on. When we checked, the Builder (General Construction) licence had four subclasses called Domestic, Low Rise, Medium Rise and Open. The Domestic class covers homes, units and outbuildings, which the National Construction Code (NCC), the national building rulebook, calls Class 1, Class 2 and Class 10 buildings. Low Rise, Medium Rise and Open licences cover larger and commercial work, with Open covering every building class without a size limit. Some Domestic licences are restricted to houses and outbuildings, so check that the scope printed on the licence matches your job.

Demolition has its own licence, and a licensed demolisher may pull a building down but cannot carry out new building work. For a knockdown rebuild, ask whether the builder holds both licences or will bring in a licensed demolisher as a subcontractor. Licensed builders must also hold public liability cover plus contract works insurance, a policy protecting the half-built job from damage such as fire or storm. Before signing, request a certificate of currency for each policy, which is the insurer's short statement that the cover is in force. From 1 October 2026, CBOS, the former Consumer, Building and Occupational Services office, moved into two agencies called Consumer Affairs Tasmania and Building Standards Tasmania. When we checked, the CBOS website said older references to CBOS should be read as the matching function within those new agencies.

Work Who Does It Licence or Approval
New home or extension Builder Builder licence, Domestic class or higher
Pulling down an old house Demolisher, or a builder using one Demolisher licence
Plans and drawings Building designer or architect Licensed building designer or registered architect
Checking plans and inspecting stages Building surveyor Licensed building surveyor
Drains, pipes and fixtures Plumber Licensed plumber
Wiring, switchboards and lights Electrician Licensed electrician
Asbestos survey before work starts Asbestos assessor Licensed asbestos assessor
Bushfire advice for the site Bushfire hazard practitioner Accredited under the Tasmania Fire Service scheme
Running the job yourself Owner Owner builder permit

Not every task on a building job needs the builder's own licence, and much of it is done by subcontractors the builder manages. Framing, stairs and decks are often handled by a Hobart carpenter working under the builder, while drains go to a licensed plumber. The builder remains responsible for the whole job under the contract, even when a subcontractor does part of the work. Ask for a list of the main subcontractors and their licence numbers, so you know who will be on site and when.

Low Risk, Notifiable or Permit Work: Finding Your Category

Tasmania sorts building work into categories by risk, set out in a Director's Determination, an official ruling made under the Building Act 2016. Low risk work needs no permit or approval, and some of it can be done by owners, although larger low risk projects still need a licensed builder. Notifiable work is medium risk, so a Notice of Work goes to a building surveyor, and the council is told about the work but does not approve it. Permit work is high risk, which means an application to the council for a building permit and a full assessment before anything starts. Most extensions, second storeys and new homes in Hobart fall into the notifiable or permit categories, so expect paperwork before the first footing, the concrete base under the walls, goes in.

Small structures sit at the low end, and when we checked an owner could build a shed, garage or carport of up to 18 square metres without a permit. That limit rose to 36 square metres for a prefabricated kit, and fences and low decks were also listed among things an owner can build. A shared boundary job is often simpler with a Hobart fencer, while a raised outdoor platform suits a specialist deck builder. For some low risk work you must still tell the council once it is finished, using Form 80, the Notice of Low Risk Work.

Category Questions to Settle Before Quotes

Questions to settle first
Is the work low risk, notifiable or permit work, and who has confirmed that in writing?
Is the block in a mapped hazard area, such as a landslip or bushfire-prone area, which changes how the job is treated?
Will an owner builder do any of the work, since notifiable work by an owner builder is handled differently?
Does the job need a planning permit from the City of Hobart as well as building approval?
Which building surveyor will be used, and is the surveyor's fee inside or outside the quoted price?
A builder who says an extension needs no paperwork should be asked to put that in writing. A building surveyor can confirm the category in a short consultation before you sign anything.

The Building Surveyor and the Certificate of Likely Compliance

A building surveyor is a licensed professional who checks that a design meets the building rules and then inspects the work at set stages. Owners often engage the surveyor directly, and Tasmanian consumer guidance asks you to confirm that the surveyor holds a current licence. For notifiable and permit work, the surveyor issues a Certificate of Likely Compliance, a document saying the plans are likely to meet the NCC and other rules. Permit work then goes to the council for a building permit, while notifiable work goes ahead once the paperwork is lodged and the council is told. Work may begin once your builder receives a start work authorisation, the surveyor's written go-ahead, so ask to see it before the excavator arrives.

During the build, the surveyor needs to be notified at stages listed in the approval, so work can be checked before it is covered up. Ask the builder for a timeline that shows those notification points, since a missed inspection can mean opening up finished work. You can move into a new home or extension once all permit conditions are met and a Certificate of Occupancy, the document allowing people to live there, has been issued. Keep that certificate with the contract and the plans, because it shows the work was approved and finished properly. Surveyor and category assessment fees for a small job are estimated at $450 to $1,400, and larger projects cost more. Check whether those fees sit inside the builder's price or are billed to you separately by the surveyor.

Knockdown Rebuilds and New Homes on Hobart Blocks

A knockdown rebuild means demolishing an existing house and building a new one on the same block, so you keep the street, the views and the services. It involves two kinds of licensed work, because the demolition and the new build are separate stages with their own approvals. The Director's Determination covers demolition work as well as building work, so the surveyor confirms which category the demolition falls into. A house on the Tasmanian Heritage Register or inside a local heritage area may need approval before it can be pulled down, so check that before buying a block to rebuild. Because each design and site is different, new homes and knockdown rebuilds are priced on quote rather than from a published range.

Before demolition, the asbestos survey matters most, since a whole house of old sheeting may need licensed removal before machinery arrives. Water and sewer connections must be capped properly, and any changed connection for the new house may need TasWater certification. Power to the old house has to be safely disconnected first, and an electrician can advise on the supply for the replacement home. The new house is designed to the 6 Star requirement and to the NCC edition in force when it is approved. Ask builders for a staged quote that separates demolition, site preparation, the slab or footings and the new home itself. That layout lets you fairly compare a builder who demolishes in house with one who uses a separate demolisher.

Stage Who Usually Does It Paperwork to Expect
Design and energy rating Building designer or architect Drawings and a 6 Star assessment
Planning check Designer or owner Planning permit if an overlay or zone rule applies
Asbestos survey Licensed asbestos assessor Survey report with removal advice
Demolition Licensed demolisher Category confirmed by the surveyor
Services capped and reconnected Plumber and electrician TasWater certificates where needed
New home build Licensed builder Certificate of Likely Compliance and permit
Handover Builder and surveyor Certificate of Occupancy

Hobart Under the Tasmanian Planning Scheme

Building approval is separate from planning approval, which deals with how a building fits its street, its neighbours and the land itself. When we checked, the City of Hobart said the city had moved to the Tasmanian Planning Scheme, replacing the Hobart Interim Planning Scheme 2015 and the Sullivans Cove Planning Scheme 1997. Local detail sits in the Hobart Local Provisions Schedule, the part of the scheme that maps zones and overlays for each property in the city. Overlays, the map layers that add extra rules to some properties, include the Landslip Hazard Code, the Bushfire-Prone Areas Code and local heritage provisions, and any of them can trigger a planning permit. The City of Hobart offers an address search showing the zones and provisions on a property, plus a duty planner for questions.

Planning rules often decide the size and shape of an extension long before a builder can price it. Setbacks, the minimum gaps to a boundary, along with building height and site coverage, the share of the lot under roof, can limit what you add, especially on narrow inner city lots. If a planning permit is needed, get it before the drawings are finalised, since permit conditions can change the design. For a rear home extension that stays inside the standard rules, approval is usually quicker, so ask the designer to check the zone first.

Sloping Blocks, Landslip Hazard Areas and Bushfire-Prone Streets

Much of Hobart is built on hillsides running down from kunanyi or Mount Wellington to the Derwent, and that shapes how builders price a job. Steep blocks need deeper footings, retaining walls and careful drainage, and access for trucks and concrete pumps can be tight. Some land is mapped as a landslip hazard area, meaning ground where soil movement is more likely, and building there follows its own Director's Determination. When we checked, that Determination grouped land into low, medium, medium-active and high hazard levels, along with landslip areas A and B. A landslip hazard report may be required, and its findings can add cost to the footings and the stormwater design. Ask the builder whether the quote allows for that report, or whether the price assumes stable ground.

Bushfire-prone areas take in many Hobart streets that back onto bushland on the hilly edges of the city. Building there follows the bushfire hazard Determination, which covers a bushfire hazard management plan and a matching certificate. Advice on those plans comes from bushfire hazard practitioners accredited under a Tasmania Fire Service scheme. The assessment sets a bushfire attack level, or BAL, which rates how much ember and heat exposure the building must be designed to resist. A higher BAL can mean ember screens, toughened glass and non-combustible cladding, so it changes the price of windows and walls.

Condition What It Means What to Ask the Builder
Steep slope Deeper footings and more retaining Is digging a fixed price or an allowance?
Landslip hazard area Separate Determination and a report Who arranges the landslip hazard report?
Bushfire-prone area Hazard management plan and a BAL Which BAL is the quote based on?
Heritage listed place Heritage Council approval Has a minor works approval or permit been sought?
TasWater pipe nearby A 56W consent may be needed Where does the sewer main run?
Narrow street access Crane, skip or scaffold on the road Who applies for the street permit?
Home built before 1990 Asbestos is likely Has a licensed assessor surveyed it?
Close neighbours Noise and dust controls Which hours will the crew work?

Heritage Listed Cottages and Heritage Council Approval

Hobart has many nineteenth century cottages and terraces, and a good number in suburbs such as Battery Point are protected by heritage listing. Places on the Tasmanian Heritage Register need approval from the Tasmanian Heritage Council for works, either a minor works approval or a permit. Work that leaves the heritage values of a place untouched can get the simpler minor works approval, known until the start of 2025 as a Certificate of Exemption. Bigger changes need a development application, the formal planning application, lodged with the council and referred on to the Heritage Council. When we checked, Heritage Tasmania said City of Hobart works could be lodged online through PlanBuild Tasmania.

Local heritage listings in the planning scheme are a separate layer, so a home can be affected even when it is not on the state register. Builders who know traditional work, such as lime mortar, sandstone and hardwood joinery, may price heritage jobs higher but tend to avoid costly mistakes. Tasmanian guides put heritage work at about $3,500 to $6,000 or more a square metre, and a sympathetic rear addition at $200,000 to $500,000. The heritage renovation guide covers restoration methods, and the approvals above are best started before any builder finalises a price.

Building Near TasWater Pipes and the 56W Consent

Many older Hobart lots have a sewer or water main running through the backyard, often right where an extension would go. TasWater, the state's water and sewerage business, requires a 56W consent before building over or close to its pipes. When we checked, that consent applied to a structure, fill or excavation inside a TasWater easement, a strip of land kept for the pipes, or within 2 metres sideways of them. Work that changes water demand or needs a new connection may also need a Certificate for Certifiable Work, with a compliance certificate once it is finished. For Hobart properties these applications go through PlanBuild Tasmania, the state's online planning and building portal.

Ask the builder or designer to locate the pipes early, since moving a sewer line is costly and slow. Before any digging, plans of underground cables and pipes can be requested free through Before You Dig Australia. New drains, toilets and kitchen connections are plumbing work, so a Hobart plumber with a current licence must do them. Check that the quote shows who lodges the TasWater applications and who pays the fees.

Six Star Energy Rules and NCC 2022 Back in Force

Energy rules decide how much insulation, glazing and sealing a new home or extension needs, and they are checked at the design stage. When we checked, Tasmanian building guidance said new homes and residential extensions in Tasmania must meet the 6 Star requirement. Stars run from 1 to 10 and are worked out with NatHERS software, the national house energy rating tools, or through the NCC's Deemed-to-Satisfy route of set measures. Hobart sits in zone 7, which covers most of the state, while alpine areas above 900 metres fall in zone 8. The building surveyor checks the energy design as part of the Certificate of Likely Compliance, so it must be settled before materials are ordered. Ask which star rating the design achieves and which insulation and window products were assumed in the assessment.

The edition of the NCC that applies also matters, and in Tasmania it changed twice during 2026. NCC 2025 briefly started in Tasmania on 1 May 2026, but the Building Amendment Act 2026 reversed that change. When we checked, NCC 2022 again applied in Tasmania from 5 June 2026 until 1 May 2027, after which NCC 2025 is to be adopted. A design approved now may be built after the next edition arrives, so ask your surveyor which edition your approval uses. Upgrades such as double glazing and a heat pump from a Hobart air conditioning installer are easiest to add while walls are open.

Owner Builder Permits, Courses and Limits

An owner builder is a property owner who runs building work on their own home instead of hiring a licensed builder for the whole job. When we checked, Service Tasmania said you needed to own the land, engage a building surveyor and hold insurance before a permit would be approved. You also needed a white card, the general construction induction, and an approved Tasmanian owner builder course from the last 12 months if building or extending a residence. Permits were only issued for residential buildings, and only two owner builder Class 1a projects, meaning houses, were allowed in ten years. Each new project needs its own permit, and an owner builder still needs a building permit for notifiable or permit work. The permit ends when the project is complete, and the surveyor must be notified at each mandatory notification stage along the way.

Owner building can save the builder's margin, but it moves the risk of delays, defects and coordination onto you. Many owners take a middle path and hire a builder for the structure, then finish painting and landscaping themselves. Small finishing jobs such as hanging doors or fitting shelves suit a Hobart handyman once the main work is signed off. A backyard studio or granny flat, meaning a small second home on the same block, is a common owner builder project, although its approvals follow the same categories as any other home.

Contracts, Deposits and Statutory Warranties from $20,000

When we checked, the Residential Building Work Contracts and Dispute Resolution Act 2016 applied to residential building work with a contract price of $20,000 or more. For those jobs the contract must be in writing, and the builder must give you the Residential Building Consumer Guide before you sign. You then have a cooling-off period of 5 business days to withdraw, or 7 days from finding out if the guide was never given. The most a builder could ask as a deposit was 10 per cent on a contract below $50,000, falling to 5 per cent once the price reached $50,000. A higher cap of 20 per cent applied where more than half the work is done off site, such as a factory-built home. Ask the builder to show the deposit amount and each payment stage on the contract itself.

The Act also builds statutory warranties into every covered contract, which are promises that apply whatever the contract says. They include suitable materials, compliance with the law, work done with proper care and skill, and work that follows the plans and specifications. For a new home there is also a warranty that it will be suitable to live in, and work must be carried out with reasonable diligence. When we checked, a claim for breach of warranty had to start within 6 years of practical completion, the point when the work is finished apart from minor items. Home warranty insurance changes passed in 2023 were not part of the Act in force when we checked, so ask the builder what protects you if their business closes.

Term What It Means Where to Look
Contract price The agreed amount for the agreed work First page of the contract
Provisional sum An allowance for work not yet fully priced, such as rock in the footings Schedule of allowances
Prime cost item An allowance for an item you choose later, such as an oven Schedule of allowances
Deposit Capped at 10 or 5 per cent depending on the price Payment schedule
Progress payments Paid as each stage is finished Payment schedule
Variations Written changes to the scope and the price Variation clause
Practical completion Finished apart from minor items Completion clause
Statutory warranties Six years to start a claim Consumer guide and the Act

The Building Administration Fee and the Training Levy

Two government charges apply to larger building jobs in Tasmania, and some quotes leave them out. When we checked, the Building Administration Fee was 0.1 per cent of the total cost of work costing $20,000 or more, collected by councils for the state. A separate training levy, which funds building industry training, was 0.2 per cent of the estimated value of work worth more than $20,000. The project owner must pay that levy before a building or plumbing permit is issued, or before work starts where no permit is needed. On a $200,000 extension the two charges together come to about $600, so they are small but still worth confirming on the quote.

The levy is paid before the permit is issued, so it often falls due before the builder's first invoice. Some builders pay both charges and pass them on, while others list them as owner costs outside the contract. Either approach is fine as long as the quote says clearly which one applies to your job. Keep the receipts with the approval paperwork, so the full cost of the project stays on record.

Noise Hours, Street Permits and Asbestos on a Hobart Site

Building work brings noise, trucks and dust, and Hobart has clear rules about when the loudest equipment can run. The City of Hobart construction noise guide says listed equipment must not be heard inside nearby homes before 7am or after 6pm on weekdays. On Saturdays the quiet times were before 8am and after 6pm, and on Sundays and public holidays before 10am and after 6pm. Noise can still be judged unreasonable at other times, so a careful builder warns neighbours and saves the loudest work for the middle of the day. A crane, skip bin, scaffold or hoarding, a temporary site wall, on a public street or footpath needs a council permit, and road excavation needed 14 days notice when we checked.

Any house built or altered before 1990 probably has some asbestos in it, says WorkSafe Tasmania. It can hide in wall sheeting, eaves and old vinyl floors, so it must be identified before walls are cut or floors lifted. A residential asbestos survey is an inspection by a licensed asbestos assessor, who reports where the material is and how to manage or remove it. Removal rules depend on the type and amount found, so the builder should price removal separately once the survey is done. Before the old switchboard is touched, a Hobart electrician can isolate the power and quote any upgrade the extension needs.

Site Rules a Hobart Builder Should Plan For

Before the first day on site
Working hours that respect the noise rules for weekdays, Saturdays, Sundays and public holidays.
A council permit for any skip, scaffold, crane or hoarding placed on the street or footpath.
A residential asbestos survey for any home built or renovated before 1990.
Free plans of underground services requested before any excavation begins.
Site fencing, a toilet and a waste plan that keeps mud and debris out of the street.
Ask the builder to put the site rules in the contract or the start-up letter. Neighbours who know the dates and hours in advance are far less likely to complain.

Cladding, Framing and Linings to Name in the Contract

Naming the main products in the contract stops a cheaper substitute from appearing halfway through the job. James Hardie makes fibre cement cladding, a tough sheet of cement reinforced with fibres, including weatherboard profiles that suit both new extensions and older Hobart homes. Weathertex makes weatherboards and wall panels from Australian hardwood, a common choice where a timber look is wanted. Cemintel makes lightweight fibre cement facade, cladding and internal lining systems for new walls. BlueScope makes COLORBOND steel for roofing, walling and gutters, and the colour name should be written on the quote. Lysaght makes steel roofing and walling profiles as well as steel framing, and a Hobart roofer may fix the sheets.

Structure matters just as much as the finishes, even though you will rarely see it once the job is closed in. Tilling makes engineered timber such as SmartLVL, a laminated veneer lumber beam that can span further than solid timber of the same size. Pryda makes timber connectors, nail plates and bracing that hold frames and roof trusses together. Dincel makes PVC forms that stay in place to shape poured concrete walls, a method often used with a Hobart concreter on steep blocks. Hebel makes autoclaved aerated concrete (AAC) panels, a lightweight concrete product used for walls and floors in many new homes. Austral Bricks makes bricks and pavers, and a Hobart bricklayer usually lays them under the builder's direction.

Inside the walls, the linings and insulation decide how warm and quiet the finished rooms will feel. Bradford makes insulation for walls, ceilings and floors, and the R-value, a measure of resistance to heat flow, should match the energy assessment. CSR makes Gyprock plasterboard, the sheet lining used on most new walls and ceilings. Stegbar makes windows and doors, so check that the glazing in the quote matches the windows assumed in the star rating. VELUX makes roof windows and skylights, a simple way to bring daylight into a deep extension. ARDEX makes waterproofing membranes and screeds, the smooth levelling layer laid over a floor, for wet areas, which are then finished by a Hobart tiler.

Dulux makes exterior paints including its Weathershield range, and the paint system belongs on the finishing schedule. Plasterboard set and sanded by a Hobart plasterer is often a separate line, so check that it is included. If the builder wants to swap a named product, the contract should require a written variation, a signed change to the agreed work, and your approval first. Keep product data sheets and warranty cards together, since some manufacturer warranties ask for proof of correct installation.

Products to List on a Hobart Building Quote

Write these into the schedule
Cladding maker, profile and paint or factory finish for every external wall.
Roofing material, profile and colour, with the gutter and downpipe sizes.
Frame type, beam sizes and the engineer who signed off the structure.
Insulation R-values for walls, ceilings and floors, matching the energy report.
Window and door maker, frame material and glass type for each opening.
Wet area membrane product and the trade responsible for applying it.
A quote that says "or equivalent" beside every product gives the builder room to downgrade. Ask for the exact names, or a written rule that any change needs your sign-off.

Mediation, TASCAT and Raising a Building Problem

If something goes wrong, raise it with the builder in writing first, with photos and a clear list of what you want fixed. Under the 2016 Act you can lodge a Notice of Dispute with the Director of Building Control, the state official overseeing building standards, to ask for mediation, a guided meeting aimed at agreement. When we checked, there was no application fee for mediation, and the mediator's costs were usually shared equally between the parties. Any agreement is written up as Terms of Mediated Settlement and signed by both sides. If a settlement is not honoured, the tribunal may, in certain circumstances, declare it binding and enforceable.

The Tasmanian Civil and Administrative Tribunal, known as TASCAT, hears residential building disputes in its Civil and Consumer Stream. It can decide whether work was completed satisfactorily, whether it complies with the law and what the terms of a contract mean. It can also review some decisions of the Director of Building Control, such as a refusal to accept a notice of dispute. Keep the contract, variations, invoices, emails and dated photos together from the start, because they become your evidence. Jobs below the Act's $20,000 threshold still carry consumer guarantees under the Australian Consumer Law, the national law on faulty goods and services.

What to Look Out For in a Hobart Building Contract

A low price can hide large provisional sums, which are estimates for work the builder has not fully priced, such as digging into rock. Check how many provisional sums the quote contains and how each one will be adjusted if the real cost turns out different. Look for the licence number and class on the quote, and confirm both with the licence search before you pay anything. Be wary of a builder who asks for more than the legal deposit or wants cash payments without an invoice. Check that the contract names the building surveyor, the start date, the expected finish date and how wet weather delays are handled. Ask who is responsible for TasWater, heritage and planning applications, since those can stall a job for weeks.

Watch for exclusions in the fine print, such as asbestos removal, rock excavation, site clean-up and connection fees. A quote that leaves out the levies, the surveyor and the waste bin may look cheaper than one that includes them. If you will need to move out during the build, ask for the dates early so a Hobart removalist can be booked. Finally, check that the contract attaches the drawings, the specification and the product schedule, so everyone builds to the same plan.

Signs of a Complete Building Quote

Signs of a complete quote
A licence number and class, an active ABN and certificates of currency for both insurance policies.
Preliminaries (the site setup costs), demolition, structure, services and finishes shown as separate lines.
Every provisional sum and prime cost item listed with its amount and what it covers.
Surveyor fees, levies, TasWater fees and waste removal shown as included or excluded.
A payment schedule tied to finished stages, with a deposit inside the legal cap.
If the quote is a single line with one total, ask for a breakdown before you agree to anything. A one-line price leaves no way to tell which builder allowed for the footings.

Comparing Hobart Builder Quotes Line by Line

Send every builder the same brief, with the drawings, the energy report, the site photos and any planning or heritage approvals. Ask each one to visit the site, because slope, access and the condition of the existing house rarely show in photos. Request the same layout from each builder, with preliminaries, demolition, footings, framing, roofing, linings, services and finishes on separate lines. Preliminaries are the setup costs of a job, such as site fencing, a toilet, insurance and supervision, and they vary widely between builders. Compare item by item rather than the totals, and ask about any line that sits far above or below the others.

Ask how long the job will take from start to practical completion and how many crews will be on site. Check whether the builder can start when your approvals arrive, or whether you will wait behind other jobs already booked. Ask for the names of recent clients you can contact, and if possible look at a finished job in a similar Hobart suburb. Get it in writing which party arranges the plumber, the electrician and any asbestos removal, and which party pays them. Keep the accepted quote, the contract and every variation together, since that file is your record for the whole warranty period.

Building work in Hobart often leads to other jobs once the main contract finishes. New rooms may need fresh colour from a Hobart painter, and the garden around them may need restoring by a Hobart gardener. Larger outdoor work such as paths and planting suits a Hobart landscaper, ideally booked once the scaffolding has gone. Post your job on The Quote Yard with that brief, and we will connect you with licensed builders across Hobart who can quote on it.

Builders Across Hobart

Building prices on this page apply across greater Hobart, from the city and inner suburbs to the eastern shore, Glenorchy and Kingborough. Steep or narrow sites can take longer to build on, and builders will price access once they have seen the block.

▶ Hobart 30 areas
Hobart CBD Battery Point Sandy Bay South Hobart West Hobart North Hobart New Town Lenah Valley Mount Stuart Moonah Glenorchy Claremont Berriedale Rosetta Montrose Bellerive Howrah Lindisfarne Rosny Park Lauderdale Sandford Kingston Blackmans Bay Taroona Margate Brighton Bridgewater Sorell Richmond New Norfolk
▶ Launceston 26 areas
Launceston CBD East Launceston West Launceston South Launceston Newstead Norwood Kings Meadows Youngtown Prospect Riverside Trevallyn Summerhill Legana Grindelwald Exeter Beaconsfield Beauty Point Rosevears Hadspen Carrick Longford Perth Evandale Scottsdale Lilydale George Town
▶ Devonport & Burnie 26 areas
Devonport East Devonport Spreyton Miandetta Latrobe Port Sorell Shearwater Hawley Beach Ulverstone Turners Beach Penguin Burnie Somerset Wynyard Boat Harbour Sisters Beach Stanley Smithton Wivenhoe Cooee Park Grove Montello Sheffield Railton Westbury Deloraine
▶ Huon Valley 22 areas
Huonville Ranelagh Franklin Port Huon Geeveston Dover Southport Cygnet Lymington Gardners Bay Woodbridge Middleton Snug Kettering Bruny Island Alonnah Grove Glen Huon Judbury Lower Longley Leslie Vale Pelverata
▶ East Coast 22 areas
St Helens Scamander Beaumaris Binalong Bay Stieglitz Pyengana Fingal Mathinna Bicheno Coles Bay Swansea Orford Triabunna Maria Island Buckland Dolphin Sands Cranbrook Apslawn Seymour Falmouth Four Mile Creek Gray

Hobart Builder FAQ

Which licence class should a builder hold for a house extension?
A builder working on a house extension needs a current Builder (General Construction) licence in the Domestic class or higher. When we checked, the Domestic class covered NCC Class 1, Class 2 and Class 10 buildings, which means houses, units and outbuildings. Some Domestic licences are restricted to Class 1 and Class 10 work, so read the scope printed on the licence. Low Rise, Medium Rise and Open licences cover bigger and commercial projects as well as homes.
Who took over from CBOS for building licences and complaints?
From 1 October 2026, CBOS transitioned into two agencies called Consumer Affairs Tasmania and Building Standards Tasmania. When we checked, the CBOS site said older references to CBOS should be read as the matching function in the new agencies. Information was still being moved across to the new websites at that time. Older licence pages and dispute forms remain useful, but confirm the current agency name before you lodge anything.
Do I need to do a course before becoming an owner builder?
Yes, when we checked you needed an approved Tasmanian owner builder course completed within the last 12 months if building or extending a residence. You also needed a white card, which is the general construction induction for anyone working on a building site. The applicant must own the land, engage a building surveyor and hold insurance before the permit is approved. Only two owner builder house projects were allowed in any ten year period, and each project needed its own permit.
How much are the Building Administration Fee and the training levy?
When we checked, the Building Administration Fee was 0.1 per cent of the total cost of work costing $20,000 or more. The training levy was 0.2 per cent of the estimated value of work worth more than $20,000. Councils collect the administration fee for the state, and the levy is paid by the project owner before a permit is issued. Ask whether your builder has included both charges in the quote or expects you to pay them separately.
Can I extend a home that sits in a mapped landslip hazard area?
Often you can, but building in a landslip hazard area follows a separate Director's Determination with extra requirements. When we checked, it grouped land into low, medium, medium-active and high hazard levels, with landslip areas A and B. A landslip hazard report may be needed, and its findings can change the footings and stormwater design. Check your address on the City of Hobart planning map before a builder prices the job. Then ask the builder whether the quote assumes stable ground or allows for that extra engineering.
What is a TasWater 56W consent and when is it needed?
A 56W consent is permission from TasWater to build over or close to its water or sewer pipes. When we checked, it applied to a structure, fill or excavation inside a TasWater easement or within 2 metres sideways of its pipes. In Hobart the application is lodged through PlanBuild Tasmania, the state's online planning and building portal. Finding the pipes before the design is final can save the cost of moving a sewer line later.
Do I need Heritage Council approval to extend a listed cottage?
If the place is on the Tasmanian Heritage Register, works need approval from the Tasmanian Heritage Council. Minor works that do not affect heritage values can receive a minor works approval, which was called a Certificate of Exemption before 2025. Larger changes such as an extension need a development application to the council, which refers it to the Heritage Council. Local heritage listings in the planning scheme can apply even when a home is not on the state register.
Which edition of the building code applies to my Hobart project?
When we checked, NCC 2022 again applied in Tasmania from 5 June 2026 until 1 May 2027. NCC 2025 had briefly started on 1 May 2026, but the Building Amendment Act 2026 reversed that change. Transitional arrangements can still apply to some approvals issued around those dates. Ask your building surveyor which edition your Certificate of Likely Compliance was assessed under.
What hours can builders run noisy equipment near homes in Hobart?
The City of Hobart construction noise guide says listed equipment must not be heard inside nearby homes before 7am or after 6pm on weekdays. On Saturdays the quiet periods were before 8am and after 6pm when we checked. On Sundays and public holidays the quiet periods were before 10am and after 6pm. Noise can still be found unreasonable at other times, so builders are asked to warn neighbours and keep loud work to the daytime.
What can I do if my builder and I cannot agree?
Start by setting out the problem in writing to the builder, with photos and the outcome you want. For contracts covered by the 2016 Act, you can lodge a Notice of Dispute with the Director of Building Control and ask for mediation. When we checked there was no application fee, and the mediator's costs were usually shared between the two sides. If mediation does not settle it, TASCAT can decide whether the work was completed satisfactorily or complies with the law.

Hobart Building Specialists

For Trades & Contractors - TAS

Building jobs in Hobart often create work for other trades, such as new drains, a switchboard upgrade, framing or a fresh slab. Links to those follow-up jobs across Tasmania sit below, along with work for trades looking for new clients.

Ready to Book a Builder in Hobart?

Post your job with your suburb, drawings and photos, and we will connect you with licensed builders across Hobart. Compare written quotes that price the same project before you sign a contract.

Get Free Builder Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 27 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

We service all regions including Hobart, Launceston, and regional areas. Verify licences at CBOS Tasmania.
Prices are 2027 estimates based on current Tasmanian building and renovation price guides, using Hobart figures where they are given. Your final price will depend on the design, the slope and access of the block, any heritage, landslip or bushfire requirements and what is found once the existing house is opened up, so compare written quotes that show preliminaries, structure, services, finishes, fees and levies separately.
Need a builder in Hobart?Get free Hobart builder quotes Post a Job – It's Free