Need a Tiler in Hobart?
Send us the suburb, the room, its floor and wall area, the tile you like and the age of the house. Local tilers then price one written brief, so the quotes line up side by side.
Hobart Tiling Price Guide
These are 2027 estimates drawn from Tasmanian tiling price guides, which give statewide rather than Hobart-only figures. Tile supply is usually extra, and the final price turns on the surface underneath, the tile size and any plumbing, electrical or asbestos work.
Cracked Tiles or a Bathroom Retile in Hobart? Get Free Tiler Quotes
Most Hobart tiling jobs are bathrooms, showers, laundries, kitchen splashbacks and living area floors, and the price depends on what sits under the old tiles. Statewide Quote Yard figures, used here as 2027 estimates, put floor tiling labour at about $55 to $85 a square metre for ceramic and $65 to $110 for porcelain. A small bathroom tiled and waterproofed is estimated at $3,500 to $6,500, and a larger one at roughly $6,500 to $12,000. Tasmania had no separate tiling licence when we checked, so insurance, a written scope and the Building Act work categories do the protecting. Replacing floor and wall finishes like for like is low risk work, the lightest category, needing no permit or council notice. Minor bathroom, kitchen and laundry renovations may be done by a licensed builder or a competent person, meaning someone trained enough to meet the building code. Relocating a shower, toilet or basin counts as plumbing, which a licensed plumber must carry out and report to the council. The shower membrane, the waterproof coat beneath the tiles, must meet the national building code and AS 3740. Fibro sheeting behind old wall tiles can contain asbestos, so test it first in any home built or renovated before 1990. New engineered stone splashbacks have been banned since 1 July 2024, while ceramic tiles are not covered. Post your job on The Quote Yard and we will put it in front of local Hobart tilers, who can then visit and quote on the same room.
At a Glance - Hiring a Tiler in Hobart, 2027 Estimates
| Job | Price Range | How It Is Charged | What Drives It In Hobart | Who Can Do It |
|---|---|---|---|---|
| Ceramic floor tiling | $55 - $85 per sq m | Labour per square metre | Flatness of the old floor | Tiler, no Tasmanian licence class |
| Porcelain floor tiling | $65 - $110 per sq m | Labour per square metre | Tile size and cutting | Tiler |
| Large format floor tiles | $80 - $140 per sq m | Labour per square metre | Levelling and two-person lifts | Tiler |
| Natural stone tiles | $90 - $160 per sq m | Labour per square metre | Sealing and careful handling | Tiler |
| Bathroom wall tiling | $70 - $130 per sq m | Labour per square metre | Niches, corners and fittings | Tiler |
| Waterproofing, small bathroom | $800 - $1,500 | Per room | Shower size and junctions | Tiler or waterproofer |
| Small bathroom, tiled complete | $3,500 - $6,500 | Whole room | Strip-out and hidden damage | Tiler, builder or competent person |
| Shower niche | $180 - $350 each | Per niche | Framing and waterproof corners | Tiler |
| Small kitchen splashback | $350 - $650 | Whole job | Power points and edges | Tiler, electrician for new power |
| Small laundry, tiled complete | $1,200 - $2,500 | Whole room | Floor waste and wall height | Tiler, plumber for wastes |
| Floor tile removal | $30 - $55 per sq m | Per square metre | Mortar bed thickness | Tiler or strip-out crew |
| Asbestos testing of old sheeting | Priced on quote | Per sample or visit | Number of samples | Asbestos assessor |
What Lifts a Hobart Tiling Price
Before You Ring a Hobart Tiler
A tiler fixes ceramic, porcelain or stone tiles to floors and walls with adhesive, then fills the gaps with grout, a cement or epoxy joint filler. Around Hobart the work is usually a tired bathroom, a leaking shower, a laundry floor, a kitchen splashback or a covered outdoor area. Tile choices, adhesives and the steps of a typical floor job are set out in the Tasmanian guide to floor tiling, so this page sticks to booking well. Booking well matters here because the Building Act categories, plumbing notices, heritage controls and older wall linings all touch a tiled room. A short written brief also means every tiler prices the same work, which is the only way quotes can be compared fairly.
Start the brief with the room, its floor and wall area in square metres and the tile size you have in mind. Add photos of the floor, the shower, the corners and any drummy tiles, which sound hollow when tapped because the adhesive underneath has failed. Note the year the house was built, whether it is a detached house or a unit, and whether it is on a heritage list. Say whether the toilet, basin or shower will move, since that brings in a plumber and changes the paperwork. For a full refit with new cabinets and fittings, bathroom renovation specialists often run the job and bring the tiler in at the right stage. For new tiles on sound floors and walls, booking a tiler directly usually costs less and takes fewer weeks.
Hobart Tiling Prices for 2027, Room by Room
The Quote Yard's Tasmanian price guides give statewide figures rather than Hobart-only ones, and they are used here as 2027 estimates. Ceramic floor tiling is about $55 to $85 a square metre for labour, porcelain about $65 to $110, and large format tiles, generally 600 millimetres a side or bigger, about $80 to $140. Bathroom walls cost more than floors because every tile is cut around fittings and corners, at roughly $70 to $130 a square metre. Marble, slate and travertine are estimated at $90 to $160 a square metre, since stone needs sealing and gentle handling. These rates normally exclude the tiles themselves, so treat tile supply as a separate line on every quote.
Whole rooms are simpler to budget, and a small bathroom tiled and waterproofed is estimated at $3,500 to $6,500, with larger rooms at $6,500 to $12,000. A complete shower recess is about $1,200 to $2,500, and a walk-in shower with no hob or step is about $3,000 to $5,500. Smaller jobs include a kitchen splashback from about $350, while a laundry starts at roughly $1,200, and splashback tiling rates cover patterns in detail. Strip-out of a small bathroom is estimated at $400 to $800 on its own, so check whether it is inside or outside the tiling price. Asbestos testing, door trimming and repairs to damaged framing are priced on quote, because nobody can tell what they involve until the old tiles are off. Ask each tiler to visit before pricing, as photos rarely show a sloping floor or a loose wall sheet.
| Tiling Job | Estimate for 2027 | Charged By | What Changes the Price |
|---|---|---|---|
| Ceramic floor tiles | $55 - $85 per sq m | Rate per square metre | How flat the old floor is |
| Porcelain floor tiles | $65 - $110 per sq m | Rate per square metre | Tile size and pattern |
| Large format floor tiles | $80 - $140 per sq m | Rate per square metre | Levelling the base |
| Natural stone tiles | $90 - $160 per sq m | Rate per square metre | Sealer coats and care |
| Bathroom wall tiles | $70 - $130 per sq m | Rate per square metre | Corners, niches and taps |
| Floor levelling | $25 - $50 per sq m | Per square metre | Depth of the dip |
| Waterproofing, small bathroom | $800 - $1,500 | Per room | Shower size and junctions |
| Waterproofing, large bathroom | $1,500 - $2,800 | Per room | Floor area and hob type |
| Shower recess, complete | $1,200 - $2,500 | Whole shower | Niches and wall height |
| Walk-in shower, complete | $3,000 - $5,500 | Whole shower | Floor falls and screen detail |
| Small bathroom, complete | $3,500 - $6,500 | Whole room | Strip-out and repairs |
| Large bathroom, complete | $6,500 - $12,000 | Whole room | Tile format and wall height |
| Small laundry, complete | $1,200 - $2,500 | Whole room | Floor waste and splashback |
| Electric undertile heating mat | $120 - $180 per sq m | Installed price | Floor area and controls |
| Bathroom strip-out, small room | $400 - $800 | Whole room | Mortar bed and access |
Regrout, Repair, Retile or Renovate: Picking the Booking
Not every tired bathroom needs new tiles, and the cheapest fix is often the one booked first. Dark, crumbling or missing grout lines can be raked out and refilled, and tile regrouting for a whole shower is estimated at $350 to $650. One or two cracked tiles can often be cut out and matched, and tile repair work starts at about $120 for a single tile. A shower that leaks through the floor needs a different answer, because the membrane underneath has usually failed and the tiles must come off.
A straight retile over sound surfaces, such as a laundry floor or kitchen splashback, can go straight to a tiler. Showers and bathroom floors get a membrane first, and some tilers apply it while others bring in a waterproofing contractor. Moving walls, turning a spare room into a bathroom or changing the structure is work for a licensed builder, not a tiler. For that kind of project, a Hobart builder can manage the surveyor, the plumber and the tiler in the right order. Placing your job in one of these groups early keeps the brief tight and stops anyone pricing work outside their trade.
Matching the Problem to the First Call
No Tiling Licence in Tasmania, and the Checks That Replace One
When we checked, Consumer, Building and Occupational Services (CBOS) had split into Consumer Affairs Tasmania and Building Standards Tasmania from 1 October 2026, and older CBOS pages now refer to those agencies. When we checked, the builder licence classes listed on the CBOS website covered general construction, fire protection work and demolition, with no separate class for tiling or waterproofing. The CBOS website also says some building work, such as concreting, painting and paving, does not need a licence in Tasmania. A tiler can therefore lay tiles in your home without holding a state licence, provided the job stays within the categories that allow it. That makes the other checks more important, because a licence register search will not tell you anything about a tiler's record.
Ask every tiler for their ABN, the Australian Business Number, and look it up on the public register to see that it is active. Ask too for a certificate of currency, a single page from the insurer confirming that public liability cover is in force today. Public liability cover pays for damage the tiler causes to people or property, such as a cracked basin or a flooded downstairs ceiling. If a tiler says they also hold a builder licence, check the name and licence number with Building Standards Tasmania before relying on it.
The membrane is the part of the job that most often fails out of sight, so ask who applies it and which product they use. Ask whether they photograph each coat before tiles cover it, and whether they will hand those photos over at the end. Ask for photos of finished showers from earlier jobs, because a feature wall says little about how well a floor drains. Falls are the gentle slope formed in a shower or bathroom floor so water runs to the drain instead of sitting in corners. A written promise covering the falls, the membrane and the grout is worth more than a certificate pinned to a van door.
| Task | Tasmanian Rule | Who Does It | What to Check |
|---|---|---|---|
| Like-for-like floor and wall tiles | Low risk work, no permit | Owner, competent person or builder | ABN, insurance, written scope |
| Minor bathroom, kitchen or laundry renovation | Low risk work, no council notice | Licensed builder or competent person | No structural or load-bearing work |
| Shower membrane | NCC and AS 3740 apply | Tiler or waterproofer | Product name and photos of coats |
| Moving a shower, toilet or basin | Plumbing work, council notified | Licensed plumber | Licence card and the council notice |
| New power point or heated floor | Electrical work | Licensed electrician | Record of work or compliance certificate |
| Removing over 10 sq m of fibro | Class B asbestos licence | Licensed asbestos removalist | Licence and clearance paperwork |
| Structural change or new bathroom | Notifiable or permit work | Licensed builder and surveyor | Certificate of Likely Compliance |
Kitchen, Bathroom and Laundry Retiles Under the Low Risk Categories
Tasmania sorts building work into four categories under the Building Act 2016, set out in a Director's Determination issued by the Director of Building Control. Low risk work needs no permit, notifiable work needs a Certificate of Likely Compliance, a building surveyor's sign-off that the plans meet the rules, and permit work needs a full building permit. When we checked, version 1.4 of the Determination listed non-structural repairs and like-for-like replacement of components as low risk work that an owner can also do. Its notes name floor and wall finishes among those components, so replacing old tiles with new ones in the same room normally sits there. A separate low risk item covers minor interior renovations of existing kitchens, bathrooms and laundries, which a licensed builder or a competent person may carry out.
That bathroom item has limits, and work on load-bearing walls, structural alterations and turning another room into a bathroom are all outside it. The Determination says bathroom alterations beyond those limits become notifiable work, which a licensed builder does under a building surveyor's oversight. Its notes also flag that extra smoke alarms may be needed when a bathroom, kitchen or laundry is renovated, so ask who checks that. Where building work and its plumbing total $20,000 or more, a training levy and a Building Administration Fee are payable on the value.
Questions That Place the Job in a Category
Shower Membranes, AS 3740 and the 1800 Millimetre Line
Wet areas, meaning bathrooms, showers, laundries and toilets, must stop water getting into the walls and floor framing behind the tiles. The National Construction Code, published by the Australian Building Codes Board, applies in Tasmania and sets that requirement for houses. When we checked, a house could meet it by following Australian Standard AS 3740 or Part 10.2 of the ABCB Housing Provisions. Under the Housing Provisions, the shower membrane runs over the floor and up the walls to at least 1800 millimetres above the finished tile level. Where a floor waste drains a bathroom or laundry floor, the floor, the joint between floor and wall, and every pipe opening must also be waterproof. This is national building law, so it applies to a low risk retile just as much as a full renovation.
Showers without a hob, the small raised lip at the entrance, need extra care because nothing holds water back except the floor slope. The Housing Provisions allow a stepdown shower, set at least 25 millimetres below the floor outside, or a level entry with a waterstop under the screen. A waterstop is a metal or plastic angle fixed at the shower edge, and its upright leg must finish at least 5 millimetres above the finished floor. These details decide whether a walk-in shower stays dry, and shower tiling quotes should say which method will be used. Ask the tiler to leave the membrane to cure for the time on the product data sheet before any adhesive goes on. Ask for a flood test, filling the shower floor with water for a set time, if the tiler offers one before tiling.
Plumbing Notices, Electrical Certificates and the Order of Trades
Tasmanian plumbing work has its own Director's Determination, and the owner may only do the simplest category, such as swapping tapware or a shower rose like for like. Anything more, including moving an existing fixture in a bathroom or kitchen, belongs with a Hobart plumber who holds a current Tasmanian plumbing licence. When we checked, version 1.4 said bathroom alterations and fixture relocations that add no extra load still needed the council notified on Form 80. That notice comes with as-constructed drawings, which show where the pipes actually ended up inside the walls and floor. Work that adds load to the drains, such as a second shower, becomes notifiable plumbing and needs a Certificate of Likely Compliance before it starts.
Electrical work also comes before the tiles, since a power point or switch cannot be shifted neatly once a splashback is grouted. A Hobart electrician must fit new power points, move light switches and connect any heated floor. Guidance on the CBOS website says the contractor must give you a record of the work, and anything beyond basic repairs also needs a Certificate of Electrical Compliance sent to the government funded inspection service. If a split system indoor unit is planned above a tiled wall, an air conditioning installer should cut the pipe hole before the tiles go up. Keep every certificate with the tiling quote, because a future buyer's inspector may ask for them.
Warmup makes undertile heating that sits directly beneath stone or porcelain, controlled by programmable or WiFi thermostats. Electric mats for underfloor heating are estimated at $120 to $180 a square metre installed, with controls on top. Stormtech makes linear drains, floor wastes and tile insert grates, which hold a strip of the floor tile so the drain almost disappears. Allproof makes tile floor wastes, puddle flanges and linear channel drains, the outlets that the membrane is dressed into.
| Step | Trade | Record to Keep | Ready for the Next Step When |
|---|---|---|---|
| Asbestos check of old linings | Asbestos assessor | Written test result | Clear result or licensed removal |
| Strip-out to frame or slab | Tiler or renovator | Photos of what was found | Room bare and swept |
| Frame and floor repairs | Carpenter or builder | Photos of new timber | Walls straight and solid |
| Pipes set in place (rough-in) | Licensed plumber | Form 80 notice where required | Pipes tested before closing |
| Cables set in place (rough-in) | Licensed electrician | Record of electrical work | Boxes and cables placed |
| Wet area wall sheets | Tiler or carpenter | Board type named on quote | Sheets fixed and joints set |
| Membrane coats | Tiler or waterproofer | Photos of every coat | Cured to the data sheet |
| Tiles, grout and sealant | Tiler | Batch numbers kept | Grout cured, corners sealed |
| Fittings and final checks | Plumber and electrician | Compliance certificates | Everything tested and working |
Retiling Inside a Heritage Listed Hobart House
Plenty of Hobart homes are entered on the Tasmanian Heritage Register or sit inside heritage precincts, groups of streets protected as a whole by the planning scheme, especially in the older inner suburbs. The City of Hobart says a locally listed place or a property in a heritage precinct usually needs planning approval for use or development. Places on the state register are protected under the Historic Cultural Heritage Act 1995, and the council refers proposals for them to the Tasmanian Heritage Council. The Council's Works Guidelines, revised in 2025 and published by Heritage Tasmania, explain which interior jobs can go through minor works approval, a quicker sign-off for low impact work. For a large job on a listed house, heritage renovation specialists are used to these approvals and the paperwork.
When we checked, the guidelines allowed minor works approval for replacing worn bathroom or kitchen fixtures that are not historic fabric, provided walls, floors, skirtings and hearths escape damage. Removing fittings that are themselves historic fabric, or work likely to damage significant elements, needs a discretionary permit instead, which is decided on its merits after a fuller assessment. The guidelines also say replacing a framed timber floor with concrete is acceptable only as a last resort, which matters when a bathroom floor is rotten. Original encaustic tiles in a hallway or tiles around a fireplace are worth repairing rather than replacing, so ask Heritage Tasmania before anyone lifts them.
Fibro Behind Wall Tiles and Vinyl Under the Floor
The national Asbestos and Silica Safety and Eradication Agency says a home built or renovated before 1990 might contain asbestos. Its list of likely spots includes wall and ceiling sheeting in bathrooms, laundries and kitchens, and the backing behind wall tiles and splashbacks. It also lists vinyl floor tiles and the felt backing under vinyl or linoleum, which often hides under a tiled floor in an older laundry. The agency says suspect materials should never be cut, ground, sanded or drilled with high-speed power tools. That rules out breaking tiles off untested fibro with a demolition hammer, so a sample should be tested before strip-out day.
When we checked, WorkSafe Tasmania required a Class B licence to remove more than 10 square metres of non-friable asbestos, the bonded kind found in fibro. Friable asbestos, which crumbles easily by hand, needs a Class A licence whatever the amount. Removing less than 10 square metres of bonded material needs no licence, but the work must still follow the code of practice on safe removal. In a bathroom, the sheeting behind the tiles usually exceeds that area once walls and ceiling are counted, so licensed removal is the common outcome.
Body Corporate By-Laws for Tiling in a Hobart Unit
Units and many townhouses in Hobart sit inside a strata scheme, where each owner holds a lot and a body corporate, made up of all owners, runs the shared parts. Under the Strata Titles Act 1998, a lot boundary is the centre of the wall, floor or ceiling that separates it from another lot, unless the strata plan says otherwise. The model by-laws, the default scheme rules in Schedule 1 of the Act, say an owner must not make structural improvements to a lot without the body corporate's written permission. The same by-laws say an owner or occupier must not use a lot in a way that causes a nuisance, and a week of tile breaking can test that. A scheme can register its own by-laws in place of the model ones, so ask the strata manager for the current set before booking.
Hard floors carry footsteps into the unit below, so check whether your scheme's by-laws mention tiles, hard floors or underlay. Cutting into the slab for a new floor waste reaches into the shared structure, which nearly always needs permission in writing. Book the lift, agree the hours tradespeople may work, and find out where a trailer can park while rubble is carried out. If an owner ignores a by-law compliance notice, Land Tasmania says the body corporate can apply to TASCAT, the state tribunal, for orders. When furniture must come out while the floor is laid, book a Hobart removalist for the same lift slot.
Questions for the Body Corporate
Splashbacks After the Engineered Stone Ban, and Silica From Every Cut
Engineered stone is a manufactured slab of crushed stone held together with resin, once a common choice for benchtops and tall splashbacks. Safe Work Australia says a ban on manufacturing, supplying, processing and installing engineered stone benchtops, panels and slabs took effect on 1 July 2024 in every jurisdiction. Porcelain and sintered stone, a dense slab fused under heat and pressure, are outside the ban provided they contain no resin. Ceramic wall and floor tiles are also excluded, so a tiled splashback remains an easy choice for a Hobart kitchen. Glass is another option, and glass splashbacks avoid grout lines altogether behind a cooktop.
Stone installed before the ban, known as legacy stone, may still be taken out, repaired, modified in minor ways or disposed of. WorkSafe Tasmania says a business must notify it before processing legacy engineered stone, again every 12 months, and within 30 days of any change. If a kitchen update means cutting back an old engineered stone splashback, ask whether that notice has been lodged. For a porcelain slab, ask for the product data sheet, which is the simplest written proof that no resin is involved.
Cutting any tile releases crystalline silica dust, tiny particles that scar the lungs and can lead to silicosis years later. WorkSafe Tasmania's SilicaSafe pages put ceramic tiles at 5 to 45 per cent crystalline silica, granite at 25 to 60 and slate at 20 to 40. Dry sweeping stirs the dust up again, so ask how the tiler will cut, clean and ventilate inside a lived-in house. Festool makes M class mobile dust extractors, a rating for medium hazard dust, which hook up to grinders and saws. Hilti makes power tools alongside a dust and water management range for cutting and drilling on site. Cutting outdoors with water on the blade, or with an extractor attached, keeps most of the dust out of bedrooms.
Splashback Materials Under the Ban
Demolition Hammers, Tile Saws and Tasmanian Hours of Use
Breaking out an old mortar bed with a demolition hammer and cutting porcelain with a grinder are about as loud as household renovation gets. When we checked, EPA Tasmania let portable power tools run at homes between 7am and 6pm from Monday to Friday. Saturday use could begin at 9am, and Sunday or public holiday use at 10am, with a 6pm finish on both. The Noise Regulations also set hours for equipment on construction sites, where the Saturday start was 8am, so ask which hours the tiler is planning around. Putting strip-out and the heaviest cutting on weekday mornings causes the least friction with the street.
Tell the neighbours before strip-out starts, with the dates and the hours of heavy work. In a semi-detached house or terrace, the shared wall carries hammering straight through, so ask for the loudest work early in the day. Setting up the tile saw in a carport or on a back path keeps both noise and dust away from bedroom windows. If a neighbour complains, talking to the tiler first usually settles it faster than a formal report to the council. Grouting, wiping down and sealing are quiet, so they suit the hours when power tools must stay off. Keep children and pets out of the room each day until the dust has been cleaned up.
| Situation | Rule When We Checked | Agree With the Tiler | Contact |
|---|---|---|---|
| Power tools at home, weekdays | 7am to 6pm | Hammering kept to planned days | The tiler first |
| Power tools at home, Saturday | 9am to 6pm | Start time agreed in writing | The tiler first |
| Sunday or public holiday | 10am to 6pm | Quiet tasks only, or a day off | The tiler first |
| Construction site equipment, Saturday | Not before 8am | Which hours the tiler follows | EPA Tasmania guidance |
| Unit or townhouse | By-laws may set shorter hours | Hours from the body corporate | Strata manager |
| Neighbour upset by noise | Talk first, then report | Dates shared in advance | City of Hobart |
Rubble, Grout Wash and Wrapped Asbestos at McRobies Gully
A bathroom strip-out produces heavy rubble, and an old mortar bed under the floor adds weight to every load. Tiling rubble from Hobart homes usually ends up at The Tip, the council's McRobies Gully Waste Management Centre off McRobies Road, South Hobart. When we checked, trucks and large trailer loads had to arrive before the 3.30pm cut-off, and payment was by card only. The council's A to Z waste guide sent concrete to The Tip, and bricks and pavers to the South Hobart Tip Shop or The Tip. Check opening hours on the council website before loading a trailer, because any closure notices are posted there first. Ask whether the quote includes waste, since Tasmanian guides estimate disposal at about $150 to $300 a trailer load.
Asbestos has its own rules at McRobies Gully, and the A to Z guide limited it to 25 kilograms per customer when we checked. The guide said it must be wrapped in two layers of thick black builders' plastic or placed in approved asbestos bags. A bathroom's worth of fibro sheeting is usually well over that weight, which is another reason licensed removalists handle most of it. Never put untested sheeting in a skip or trailer with the tile rubble, because the whole load becomes contaminated.
A wet tile saw keeps its blade cool with a stream of water, and the grey slurry from every cut needs somewhere to settle. EPA Tasmania guidance on building sites aims to stop sediment from reaching waterways and stormwater systems, which in Hobart drain to the rivulets and the Derwent. Letting wash water settle in a drum lets the solids sink, so they can dry and go out with the rubble. Grout buckets and trowels should be washed on the block, well away from any kerb inlet or yard grate. Once the job is finished, a Hobart gardener can tidy any lawn or bed that sat beside the cutting area.
Clean-Up Steps to Agree Before Strip-Out
| Material | Destination | Check First | Arranged By |
|---|---|---|---|
| Broken tiles and mortar | McRobies Gully or a recycler | Opening hours and cut-off time | Tiler or you |
| Unused boxes of new tiles | Keep, sell or give away | Batch number on the box | You |
| Old bricks from a hob or step | Tip Shop or The Tip | Clean and stacked | You or the tiler |
| Concrete from a cut slab | The Tip | Sorted from mixed waste | Tiler or plumber |
| Wet saw slurry | Settled and dried, then rubble | Nothing down a drain | Tiler |
| Fibro sheeting that may contain asbestos | Licensed removal, or 25 kg wrapped | Test result first | Licensed removalist |
| Old engineered stone splashback | Disposal by a notified business | WorkSafe Tasmania notice | Business removing it |
Membranes, Adhesives, Boards and Drains to Name on the Quote
A clear quote names the products under the tiles, because the membrane, adhesive and wall board decide how long the room lasts. Ardex makes tile adhesives, grouts, waterproofing membranes and floor levelling products for preparing a subfloor. Laticrete makes Hydro Ban, a waterproofing and crack isolation membrane, along with SpectraLOCK Pro epoxy grout and PermaColor grout. Mapei makes Kerapoxy Easy Design, an epoxy grout promoted as easier to work without leaving a haze on the tiles. Sika makes tile and stone installation systems, from adhesives and grouts to primers and liquid applied membranes. Crommelin makes Wetite, a waterproofing product for shower areas that goes on before the tiles.
Gripset makes liquid and sheet waterproofing membranes, with tile systems for bathrooms and showers. James Hardie makes Villaboard, a fibre cement wet area lining sheet that it describes as ideal for use under tiles. Gyprock makes Aquachek, a 10 millimetre residential plasterboard, so check its wet area guidance before it is used behind a shower. Selleys makes Wet Area Silicone, a mould resistant sealant for the joints between walls, floors and fittings. Ask for each product to be written on the quote by name, so you can read the curing times and temperature limits yourself. Wall sheet repairs outside the wet area, such as patching cracked plasterboard in the hall, are usually work for a Hobart plasterer.
Layers a Clear Tiling Quote Names
Tile Orders, Shade Codes and Slip Ratings for Outdoor Areas
Decide early who buys the tiles, because supply by you or by the tiler changes the price, the warranty and who handles breakages. If you buy them, ask the tiler for the area plus an allowance for cuts, and buy a little extra for patterns such as herringbone. Every box is printed with a batch or shade code, and two batches of the same tile can differ slightly in colour or size. Buy the full quantity from a single batch, then open a box or two on delivery to compare colours before tiling starts. Hold back one sealed box marked with the room and grout colour, because a matching tile makes later repairs simple.
Outdoor and wet floors need tiles with enough grip, and the slip rating on the data sheet shows how a tile performs when wet. Covered decks, patios and entries are priced in the guide to outdoor tiling, at about $75 to $130 a square metre for a patio. An outdoor slab must be sound and sloped to drain before tiles go down, and a new slab is a job for a concreter first. A cracked or uneven base can go to a Hobart concreter, and a tiled area around a pool still needs a compliant barrier from a Hobart fencer. Rectified tiles, with edges ground square after firing, allow narrow grout joints but show every dip in the floor. Levelling is estimated at $25 to $50 a square metre, and it often turns up later as an extra if nobody checked the floor.
| Order Detail | Note Down | Reason | Checked By |
|---|---|---|---|
| Area in square metres | Floor and walls listed apart | Sets the order size | Tiler |
| Cutting allowance | Extra for patterns and cuts | Covers breakages | Tiler |
| Batch or shade code | One code on every box | Keeps colour even | You on delivery |
| Edge type | Ground square or pressed edge | Decides how thin the joints are | Tiler |
| Slip rating | Rating on the data sheet | Grip when wet | You and the tiler |
| Spare tiles | One sealed box kept | Future repairs | You |
| Delivery spot | Dry, level and on your block | Protects the boxes | You |
Living at Home While the Bathroom Is Out of Action
A bathroom retile can leave a household without a shower for many days while membranes and grout cure, so plan where everyone will wash. Clear the room completely the day before, from towels and mats to cleaning products kept beneath the basin. Clear out neighbouring cupboards and cover hallway floors, because dust drifts and rubble passes through all day. Tell the tiler about parking, steep driveways, gates and pets, and agree where the saw and mixing area will sit. Many Hobart houses sit on sloping blocks with steps to the door, so mention any long carry for tiles and rubble when asking for quotes.
New floor tiles sit higher than vinyl or carpet, so doors may need trimming and a trim strip may be needed at the join. Small jobs like that, along with rehanging towel rails and shelves, suit a Hobart handyman if the tiler does not do them. Rotten floor framing found under old tiles is work for a Hobart carpenter, and since the NCC does not treat termites as a Tasmanian risk, rot under a shower usually means a long leak. Once the sealant cures, a Hobart painter can freshen the ceiling and door frames, and a cleaner can remove the last of the dust.
| Job Before Day One | Timing | Reason | Done By |
|---|---|---|---|
| Room emptied | Day before | Every surface reachable | You |
| Somewhere else to shower lined up | Ahead of demolition | Main bathroom unusable | You |
| Asbestos result in hand | Ahead of demolition | Safe removal method chosen | You and the assessor |
| Isolation valve or mains shut | Start of day one | Taps and toilet can come off | Plumber or tiler |
| Saw and mixing spot agreed | Before day one | Slurry kept from drains | You and the tiler |
| Next-door households warned | Several days earlier | Noise and dust coming | You |
| Doors trimmed | After the floor is laid | New floor sits higher | Carpenter or handyman |
Contracts, Deposits, Free Mediation and TASCAT
Most single-room tiling jobs cost less than $20,000, but a full bathroom with other trades can pass it. At $20,000 or more, the Residential Building Work Contracts and Dispute Resolution Act 2016 requires a written contract and gives you five business days to cool off. When we checked, a deposit could be no more than a tenth of the price below $50,000, falling to 5 per cent from $50,000 up. Free mediation, now run through Building Standards Tasmania, is offered for disputes over residential building contracts of $20,000 or more signed from 1 January 2017. It says statutory warranties, the legal promises that the work is sound and suitable, last six years from practical completion, the day the job is done except for small defects.
For smaller jobs, keep any deposit modest and tied to a list of materials, and link later payments to finished stages. The Australian Consumer Law, enforced by the ACCC, requires services to be supplied with acceptable care and skill and to be fit for any stated purpose. A shower floor that holds water against the screen fails that test, so raise it in writing with photos as soon as you notice. Depending on the problem, the ACCC lists repair, replacement, refund, cancellation or compensation as possible remedies. If talking does not settle it, the Tasmanian Civil and Administrative Tribunal can hear building disputes under the 2016 Act.
What to Look Out For When a Hobart Tiler Quotes
A cheap quote that leaves out the membrane, strip-out or levelling stops being cheap once those items return as variations. A variation means any change to the agreed scope or price, so get each one signed off before extra work begins. Look for square metres listed for floors and walls, with the tile size and laying pattern beside them. Check that the quote names the membrane, says how many coats go on and identifies who applies them. Be wary of any quote for a pre-1990 house that never mentions asbestos testing of the old linings. Where a toilet or shower moves, ask for the plumbing to be priced separately, or compare it with a bathroom plumber quote.
Find out how many days the bathroom will be unusable, and question any timeline with no curing time for the membrane. A good quote sets a written rate for hidden damage, for example a fixed figure for each rotten wall sheet replaced. Payments should be tied to finished stages, and no large sum should change hands before work begins. For a heritage or strata property, check that the quote allows for approvals, and look at small bathroom renovation costs if the scope keeps growing.
What a Thorough Tiling Quote Shows
Getting Hobart Tiler Quotes That Price the Same Wet Area
Give each tiler an identical brief covering the room size, photos, tiles, the age of the house and any plumbing changes. Ask each one to visit, because a drummy floor or a loose wall sheet rarely shows up in a photo. Request the same layout from all of them, with labour, tiles, membrane, strip-out and waste on separate lines. Compare the quotes item by item, since a higher total that includes levelling may cost less in the end. For bathrooms, the statewide bathroom tiling figures are a useful cross-check on each line.
Check the start date, how many working days each stage takes, and whether the tiler works the job daily or fits it around other sites. Put in writing who arranges the plumber, electrician and asbestos removal, and who keeps them in order. If you rent, get the owner's written consent before any tiling, and if you own a unit, attach the body corporate's approval to the brief. Store the signed quote, product names, certificates and stage photos together in one folder. That folder helps if a fault appears later, and it shows a future buyer how the wall tiling and floors were built.
Tiling is often one piece of a bigger refresh, and the same notes can brief the other trades involved. A laundry can share the same tiler, and laundry tiling rates start at about $1,200 for a small room. A new screen often finishes a shower, and shower screens are fitted once the grout and sealant have cured. Once the brief is ready, post it on The Quote Yard and we will pass it to local Hobart tilers to quote.
Tilers Across Hobart
The figures on this page are statewide 2027 estimates that apply across greater Hobart. Ask each tiler whether travel, parking or a long carry up steps to the door is included in the price.
▶ Hobart 30 areas
▶ Launceston 26 areas
▶ Devonport & Burnie 26 areas
▶ Huon Valley 22 areas
▶ East Coast 22 areas
Hobart Tiler FAQ
Is retiling a Hobart bathroom low risk work, or do I need a building surveyor?
Who is allowed to move my shower drain in Tasmania?
How high should the waterproofing go inside my shower?
Can I retile a bathroom in a heritage listed Hobart house?
Does my body corporate need to approve tiles in my unit?
What should happen if fibro sheeting is found behind old wall tiles?
What hours can a tiler use a demolition hammer at a Hobart home?
Can old tiles and mortar go to McRobies Gully?
Is a porcelain slab splashback allowed under the engineered stone ban?
How much deposit can a tiler ask for on a bathroom contract?
Hobart Tiling Specialists
Related Services
For Trades & Contractors - TAS
A Hobart tiling job often leads to work for other trades, from a moved floor waste to new power points or replaced floor framing. Links to that follow-on work across Tasmania sit below, along with jobs for trades looking for new clients.
Ready to Book a Tiler in Hobart?
Post your job with the room size, photos and tile choice, and we will connect you with local tilers across Hobart. Compare written quotes for the same room before you decide.
Get Free Tiling QuotesAbout This Guide
This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Looking for more services across Tasmania? View all available trade services.
Reviewed by The Quote Yard Editorial Team
How The Quote Yard Works
We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.