Looking for a Builder in Melbourne?

Tell us your suburb, what you want built, the floor area, whether you have drawings and when you hope to start. We will pass that brief to local builders, so every quote you receive prices the same project.

Get Free Builder Quotes

Melbourne Building Price Guide

Volume house, growth corridor, per sq m$1,700 - $2,600
Custom home, established suburb, per sq m$3,200 - $5,500
Ground floor period addition, per sq m$4,000 - $6,500
Double storey addition, per sq m$5,000 - $8,000
Single bedroom addition$80,000 - $150,000
Large living extension$150,000 - $350,000
Granny flat$120,000 - $200,000
Knockdown rebuild, whole project$600,000 - $1,200,000
Soil test and site classification$800 - $2,000
Stage inspections, set of five$1,800 - $3,500

These figures are 2027 estimates for building work in Melbourne. Your price depends on the design, the lot, site access and what the approvals require, such as heritage conditions, flood levels or protection work for a neighbour.

Melbourne Builders for Hire: Registration, Contracts and Fair Quotes

Hiring a builder in Melbourne starts with three checks: the builder's registration, the approvals your block needs and the contract you will sign. Local price guides put a ground floor addition to a period home at about $4,000 to $6,500 a square metre for 2027. A double storey addition on a narrow inner block is estimated at $5,000 to $8,000 a square metre, and a full knockdown rebuild at $600,000 to $1,200,000. Domestic building work worth more than $10,000 needs a builder registered with the Building and Plumbing Commission, the state regulator since 1 July 2025. Contracts signed from 1 July 2026 for work over $20,000 come under the new Home Warranty scheme, which can help with lost deposits and defective work. From 31 March 2027, the threshold for a major domestic building contract is set to rise from $10,000 to $20,000. Most jobs also need a building permit from a registered building surveyor, and many need a council planning permit first. Heritage overlays, flood-prone land and walls shared with a neighbour can each add a step before work starts. New homes are due to be all-electric from 1 January 2027, so gas cooking and heating drop out of new designs. Ask every builder for a registration number and photo ID card, and check the class against the work before paying a deposit. Until the March 2027 changes, deposits are capped at 5 per cent on contracts of $20,000 or more. Tell us your suburb, the drawings you have and your hoped-for start, and local builders across Melbourne can price the same scope.

Melbourne Building Work Covered

Building work across Melbourne runs from a single room addition on a weatherboard to a second storey, a backyard granny flat or a full knockdown rebuild. We can connect you with registered local builders who all price the same written brief for your project.

Get Free Quotes

At a Glance - Hiring a Builder in Melbourne, 2027 Estimates

Job Price Range How It Is Charged What Drives It In Melbourne Who Can Do It
Volume house, growth corridor $1,700 - $2,600 per sq m Floor area Standard plans on flat land Domestic builder (unlimited)
Custom home, established suburb $3,200 - $5,500 per sq m Floor area One-off design and tight access Domestic builder (unlimited)
Ground floor period addition $4,000 - $6,500 per sq m Floor area Tying new work into old framing Domestic builder (unlimited)
Double storey addition $5,000 - $8,000 per sq m Floor area Scaffold and narrow blocks Domestic builder (unlimited)
Single bedroom addition $80,000 - $150,000 Whole job Size and finishes Registered builder
Large living extension $150,000 - $350,000 Whole job Kitchen, glazing and steel Registered builder
Granny flat $120,000 - $200,000 Whole job Service runs and access Registered builder
Knockdown rebuild $600,000 - $1,200,000 Whole project Design and demolition Registered builder
House demolition, inner north $30,000 - $45,000 Whole house Asbestos and access Demolition contractor
Hazardous materials survey $500 - $1,500 Per survey House age Asbestos assessor
Soil test and site classification $800 - $2,000 Per site Reactive ground Geotechnical engineer
Independent stage inspections $1,800 - $3,500 Set of five Size of the job Independent inspector

What Pushes a Melbourne Building Price Up

What is involved
Narrow blocks and shared walls slow every stage. Scaffold, crane hire and protection work for the neighbour all add cost.
Period homes hide surprises once walls open up. Old stumps, undersized framing and patched wiring often need fixing before new work joins on.
Approvals can add design changes. Heritage conditions, flood levels and Clause 54 standards may reshape the plans before building starts.
Older houses may contain asbestos in eaves, cladding or floors. A survey before demolition adds a cost but avoids a much bigger one later.
Ask each builder to show demolition, structure, services, finishes, permits and insurance on separate lines. Quotes laid out that way can be compared item by item.

Hiring a Builder for a Melbourne Home

A builder is the registered practitioner who takes responsibility for the whole job, from the footings to the final coat of paint, and who manages the other trades along the way. In Melbourne that usually means a rear extension on a weatherboard or brick house, a second storey, a granny flat in the backyard or a new home after a knockdown. Prices, design styles and the steps of a typical project are covered in the Victorian guide to builder services, so this page sticks to hiring decisions under Victorian rules. Those decisions include who is registered for your job, which approvals apply to your block and what the contract has to say before you sign it. Getting them right early protects your deposit and keeps every quote pricing the same scope of work.

Start by writing down what you want built, roughly how many square metres it covers and whether you already have drawings. Note the year the house was built, whether it shares a wall with a neighbour and any overlays your council has mapped on the land. If you are still deciding which builder to approach, the Melbourne builder search guide explains how to shortlist and check names. Once you have a shortlist, the sections below set out what each builder should be able to show you, and when.

Melbourne Building Prices for 2027, by Type of Project

Building prices in Melbourne depend far more on the design, the block and the age of the house than on the suburb alone. For 2027, local guides estimate a volume house in a growth corridor, the new estates on the city's edge, at about $1,700 to $2,600 a square metre. A custom home in an established suburb is estimated at $3,200 to $5,500 a square metre, because the design is one-off and access is tighter. Ground floor additions to period homes run at about $4,000 to $6,500 a square metre, as the new work has to join old framing and footings. Double storey additions on narrow inner blocks are the dearest at $5,000 to $8,000 a square metre, largely because of scaffolding, structure and limited site access. These are whole-of-job figures that include the builder's margin, but they leave out land, design fees and the council and surveyor costs.

Smaller additions are easier to budget as a lump sum, and Melbourne metro guides put a single bedroom addition at $80,000 to $150,000. A large living extension, such as a new open kitchen and family room across the back of the house, is estimated at $150,000 to $350,000. A knockdown rebuild, where the old house is demolished and a new one built in its place, is estimated at $600,000 to $1,200,000 for the whole project. Demolition alone in the inner north is estimated at $30,000 to $45,000 for a clean house, rising to $45,000 to $75,000 or more where asbestos is present. The knockdown rebuild guide for Victoria breaks those demolition figures down region by region across Melbourne.

Project 2027 Estimate How It Is Charged What Changes It
Volume house, growth corridor $1,700 - $2,600 per sq m Floor area Standard plans and flat land
Custom home, established suburb $3,200 - $5,500 per sq m Floor area One-off design and access
Ground floor period addition $4,000 - $6,500 per sq m Floor area Joining old and new structure
Double storey addition, narrow block $5,000 - $8,000 per sq m Floor area Scaffold, steel and site access
Single bedroom addition $80,000 - $150,000 Whole job Size, finishes and services
Large living extension $150,000 - $350,000 Whole job Kitchen, glazing and structure
Granny flat $120,000 - $200,000 Whole job Size and service connections
Knockdown rebuild $600,000 - $1,200,000 Whole project Design, demolition and site works
Demolition, inner north, no asbestos $30,000 - $45,000 Whole house Access and house size
Demolition, northern and western suburbs $20,000 - $33,000 Whole house Access and house size
Hazardous materials survey $500 - $1,500 Per survey House age and size
Service disconnections $2,000 - $8,000 Per site Gas, power, water and sewer

Granny flats are estimated at $120,000 to $200,000 in Melbourne metro guides, depending on size and how far the services have to run. Site costs need their own line too, and a soil test with a site classification, the engineer's rating of how much the ground moves, is estimated at $800 to $2,000. Engineering for a removed load-bearing wall is estimated at $600 to $1,800, and footing and slab design at $1,500 to $4,000. Older weatherboards often need restumping or reblocking before an addition, and state guides put the permit and surveyor fees for that work at $700 to $2,500. Protection work for a neighbour, flood level referrals, heritage advice and council bonds vary too much to estimate, so they are priced on quote.

Builder, Single Trade or Owner Builder: Who Should Run the Job

Not every Melbourne building job needs a registered builder, and booking the wrong kind of business can cost you protection you assumed you had. When we checked, the BPC said a registered builder is needed for domestic building work worth more than $10,000, counting labour, materials and GST. Consumer Affairs Victoria also listed exceptions for work that involves only one trade, such as painting, tiling or plastering on its own. A Melbourne carpenter replacing a deck frame, or a bricklayer in Melbourne rebuilding a front fence, may therefore fall outside the builder rules. A bathroom refit on its own often goes to a Melbourne bathroom renovator rather than a general builder, provided the registration rules are met. Once the work spans structure, roofing, plumbing and finishes, one registered builder should hold the contract and coordinate everyone else.

Some owners consider running the job themselves as an owner builder, the person who takes on the builder's legal duties for work on their own land. When we checked, the BPC required a certificate of consent before an owner builder could carry out domestic building work worth more than $20,000. It also limited owners to one certificate every five years where more than one home is involved, unless an exemption is granted for hardship or a major change in circumstances. An owner builder still needs a building permit, and the plumbing and electrical work must still go to licensed trades. Home Warranty does not protect owners who use an unregistered builder for work that must be done by a registered one, which is a separate risk to weigh. For most families, paying a registered builder to carry that risk is simpler than taking it on personally.

Matching the Job to the Right Kind of Business

Job and who should hold the contract
Extension, second storey or new home: a domestic builder registered with the BPC, holding the contract for the whole job.
Single-trade work below the registration threshold: the tradesperson for that trade, with a written quote and invoice.
Restumping, underpinning or structural repairs: a registered builder, with an engineer's design where the surveyor asks for one.
Owner-managed project over $20,000: a certificate of consent from the BPC before any work starts on site.
Ask every builder for their registration number and photo ID card, then check the class shown against the work you are asking them to do.

Reading a BPC Registration Before You Sign

The Building and Plumbing Commission, or BPC, was set up on 1 July 2025 and is now the state's building and plumbing regulator. It took over the work of the Victorian Building Authority, the dispute service known as DBDRV and the domestic building insurance arm of the state insurer. You may still see the old VBA name on older permits, certificates and insurance papers, which does not by itself mean anything is wrong. Registered individuals carry a BPC photo ID card showing their category, and the BPC website has a search for checking a name and number. Compare the name on the card with the name on the quote, because a contract signed with a different company can leave you dealing with someone unregistered.

Domestic builders are registered in classes, and the broadest is Domestic Builder (Unlimited), which covers carrying out, managing and arranging all parts of domestic building work. That class takes in Class 1, 2, 4 and 10 buildings under the National Construction Code, meaning houses, apartments, a home inside another building, and sheds, garages or carports. Some registrations carry conditions that narrow the scope, for example to Class 1 and Class 10 buildings only, so read the conditions as well as the class. A Domestic Builder (Limited) registration covers one type of work, such as carpentry or glazing, and the holder can only take on that type of work.

What to Check Where to Find It Why It Matters
Registration number Quote, contract and ID card Must match the BPC register
Class of registration BPC register and ID card Unlimited for whole projects
Conditions on the registration BPC register May limit the building classes
Company or individual name Front page of the contract The party you can claim against
Home Warranty position Contract and BPC guidance Cover for eligible contracts over $20,000
Public liability cover Insurer's certificate of currency Proof that the policy is active

What Changes for Melbourne Contracts on 31 March 2027

Until 31 March 2027, a written major domestic building contract is needed with a registered builder for work of $10,000 or more. When we checked, the Domestic Building Contracts Amendment Regulations 2026 were due to raise that threshold to $20,000 from that date. The same changes lift the maximum deposit across every type of contract, with the limit set by the share of modern methods of construction used. Modern methods of construction, or MMC, means parts of the home built off site, such as prefabricated wall panels or whole modules delivered to the block. New progress payment rules also apply, including for contracts where less than 30 per cent of the work uses those methods. Contracts must also include information about the Home Warranty scheme, so expect new contract forms from builders during 2027.

Until then, deposits are capped at 10 per cent for contracts under $20,000 and 5 per cent for contracts of $20,000 or more. Cost plus contracts, where you pay the builder's actual costs plus a percentage, are only allowed for projects worth $1 million or more. From 31 March 2027, a cost escalation clause, the term that lets the price rise with materials, must rest on evidence such as a quote, estimate or supplier offer. It also cannot be triggered by a dispute between the builder and a subcontractor, so check any escalation clause signed after that date against those rules.

Contract Rules Before and After 31 March 2027

Rule and what changes
Major domestic building contract threshold: $10,000 now, rising to $20,000 from 31 March 2027.
Deposits: 10 per cent under $20,000 and 5 per cent at $20,000 or more now, with higher limits linked to the MMC share from 31 March 2027.
Progress payments: new arrangements from 31 March 2027, with homes priced at $1 million or more per dwelling exempt from the set schedules.
Small second dwellings: exempt from the set payment schedules from 31 March 2027, but payments must still match progress on site.
If a contract is signed close to 31 March 2027, ask the builder which set of rules it is written under and get that answer in writing.

Home Warranty for Contracts Signed From 1 July 2026

Home Warranty is the BPC's own cover for eligible domestic building work under contracts signed on or after 1 July 2026. It applies to work valued at more than $20,000 on buildings of up to three storeys, and it replaces the older domestic building insurance for new contracts. Help may be available where work is left incomplete, is defective or does not comply, including lost deposits when the job never started. It can also cover temporary accommodation, removal and storage costs, and the cost of securing an unfinished site. When we checked, the BPC listed up to $400,000 in total assistance per home, subject to eligibility, limits and exclusions.

Major defects may be covered for up to six years after the work is completed, and other defects or non-compliant work for up to two years. In most cases you are expected to raise the problem with your builder first, before making a claim. Contracts signed before 1 July 2026 stay under the old domestic building insurance scheme, and that cover does not move across to Home Warranty. If your extension began under an older contract, keep the certificate of insurance the builder gave you, because it is still the document you would rely on. For work under a newer contract, ask the builder to explain in writing how the job is covered before you pay anything.

Situation Cover That Applies What to Keep
Signed before 1 July 2026, over $16,000 Domestic building insurance Certificate from the builder
Signed on or after 1 July 2026, over $20,000 Home Warranty through the BPC Contract and BPC details
Building of more than three storeys Not eligible for Home Warranty Contract warranties and records
Unregistered builder on registrable work No Home Warranty protection Avoid this situation entirely
Job of $20,000 or less No Home Warranty Written quote and invoices

Building Surveyors, Permits and the Levy in Melbourne

In Victoria, all building work needs a building permit unless the Building Regulations exempt it. The permit is a written approval from a building surveyor, the registered professional who checks the plans against the building rules and inspects the work in stages. You can choose a private building surveyor or the municipal surveyor at your council, and you must appoint one before applying. Many builders offer to arrange the surveyor, which is common, but the BPC warns owners never to sign blank forms that let others act for them. The building permit levy is based on the cost of the work, and for applications from 1 July 2019 the owner pays it directly. The permit number is not issued until the levy is paid, so ask who is paying it before you compare quotes.

Possible exemptions include some minor alterations, pergolas attached to a house, some garden sheds under 10 square metres and maintenance repairs. The exemptions are narrow, so a quick question to your building surveyor costs far less than fixing unpermitted work later. At the end of the job, the permit requires either an occupancy permit or a certificate of final inspection, depending on the work. Keep that document with the plans, because a buyer's conveyancer or a pre-sale building inspection may ask for it years later.

Permit Paperwork to Ask For

Document and when it appears
Appointment of building surveyor: signed by you before the permit application goes in.
Building permit: issued once any planning permit is in place and the levy is paid.
Inspection records: made by the surveyor as the footings, frame and other stages are checked.
Occupancy permit or certificate of final inspection: issued at the end, and needed before you treat the job as finished.
Do not let work start before the permit number is issued, even if the builder says the paperwork is only a formality.

Planning Permits, Clause 54 and Small Melbourne Lots

A planning permit is a separate approval from your council about land use and design, and it must be in place before a building permit can be issued. Whether you need one depends on your zone, any overlays and the size of your lot, so check them through the state planning website or your council early. For applications lodged from 8 September 2025, Clause 54 of the planning schemes uses deemed-to-comply standards for single homes, their extensions and small second dwellings. If a design meets a standard, the matching objective is treated as met, and the council does not weigh the related decision guidelines. A design that misses a standard is still assessed, but against the decision guidelines rather than automatically.

Lots under 300 square metres, such as many narrow inner-suburban blocks, still need a planning permit for a new home or an extension. When we checked, that applied in the Residential Growth, General Residential, Neighbourhood Residential, Housing Choice and Transport, Mixed Use and Township zones. Lots over 300 square metres in those zones are generally assessed through the building permit process instead, unless an overlay adds a planning trigger. Two homes on one lot is a different planning question, and duplex builders usually work with a planner from the start. Extension builders in Victoria often work with a designer who handles the planning stage, so ask who lodges the application and who answers council requests.

What Is on the Land Approval Likely Needed Who Decides
Lot under 300 sq m, residential zone Planning permit for a new home or extension Council
Lot over 300 sq m, no overlays Usually a building permit only Building surveyor
Heritage Overlay Permit to demolish, build or alter the outside Council
Victorian Heritage Register listing Heritage permit or consent Heritage Victoria
Land liable to flooding Report and consent, plus a flood level approval Council and Melbourne Water
Work that could affect a neighbour's footings Protection work notice Building surveyor
Works near footpaths and kerbs Asset protection permit Council

Heritage Overlays on Melbourne Period Homes

Period homes in many Melbourne suburbs sit under a Heritage Overlay, a planning control that protects the look of a building or a whole street. Under clause 43.01, a permit is needed to demolish or remove a building, to build or carry out works, and to alter the outside by structural work, rendering or sandblasting. Internal changes need a permit only where the overlay schedule lists internal alteration controls for that particular place. Trees are treated the same way, needing a permit only where the schedule applies tree controls to the property. Solar panels attached to the house need a permit if they can be seen from a street, other than a lane, or from a public park. Each of these triggers is set out in the schedule for your council, so ask your designer to read it before the drawings are fixed.

A separate state list, the Victorian Heritage Register, covers places of state significance, and the Heritage Council of Victoria decides what goes on it. Places on that Register do not need a permit under the local overlay, because they are handled under the Heritage Act 2017 instead. The state heritage property search shows whether an address is on the Register, the Victorian Heritage Inventory or a Heritage Overlay. Builders who work on period homes should be comfortable with the extra paperwork and the slower approval path that comes with it. If the job is mostly about restoring an old exterior, a Melbourne painter with heritage experience may be needed alongside the builder.

Heritage Questions for the Builder

Question and why it matters
Have you built under a Heritage Overlay before? Experience with permit conditions can save weeks.
Will the new work be visible from the street? Visible additions draw closer attention from council.
Do the windows, cladding and roofing in the drawings match the permit? Swapping them later may need fresh approval.
Who handles any heritage advice the council asks for? Agree the cost of it before it comes up.
Never let demolition of any part of a building under a Heritage Overlay start until the planning permit is issued and its conditions are understood.

Protection Work for Terraces and Close Boundaries

Many Melbourne homes sit close to the boundary or share a wall with the house next door, which brings in the protection work rules. Protection work is work that keeps the neighbouring property safe from damage, such as underpinning its footings, shoring it up or overhead protection. Underpinning means extending a footing deeper so it is not undermined by digging alongside, and shoring means temporary propping. The building surveyor decides whether protection work is needed when the building permit application is made. If it is, the owner must serve a notice on the adjoining owner with details of the proposed work, and no permit is issued until that process is complete. Builders who regularly work on terraces will know this step, but ask who prepares the notice and who pays the neighbour's reasonable costs.

The neighbour has 14 days to reply, and if they do not respond in time they are treated as having agreed. If they reject the proposal or ask questions, the surveyor must review it and issue a written determination, which either party can appeal within 14 days. Appeals go to the Building Appeals Board, which also hears disagreements about the insurance or the condition survey done before work starts. That survey records the state of the neighbour's house beforehand, so any cracks found later can be judged fairly.

Step Who Acts Timing
Decide whether protection work is needed Building surveyor At the permit application
Serve notice on the adjoining owner Owner, often through the builder Before the permit issues
Reply to the notice Adjoining owner Within 14 days of service
Written determination if there is an objection Building surveyor After review
Appeal against the determination Either owner Within 14 days
Give the neighbour a copy of the insurance Owner Before work starts

The owner must hold insurance that protects the adjoining property, its occupiers and the public during the work and for 12 months after it ends. The BPC notes that a standard construction or public liability policy usually does not meet that minimum, so a separate policy is often needed. A copy has to go to the neighbour before work starts, and the owner also covers the neighbour's reasonable expenses, such as specialist fees. Ask each builder whether protection work insurance and those expenses are in their price or left to you. Where deeper footings are needed under your own house, underpinning specialists may be brought in by the builder, so confirm who designs and certifies them.

Flood-Prone Land and Melbourne Water Flood Levels

Parts of Melbourne near creeks, rivers and overland flow paths are mapped as land liable to flooding, and building there needs extra approval. Councils handle this through report and consent, a council approval the building surveyor needs before the permit can be finalised. Boroondara's guidance, for example, cites Building Regulation 153 and says applicants need Melbourne Water approval of their plans. Under that guidance, the finished floor must sit above the identified flood level plus 300 millimetres of extra height, known as freeboard. Plans must show levels to the Australian Height Datum, the national reference level used on survey plans.

Melbourne Water also provides property flood level statements through the retail water companies, and certificates that say whether a property is affected by flooding. Darebin notes that if a planning permit already deals with the flood mapping, a separate report and consent is not needed. Rules differ a little between councils, so ask your building surveyor early whether your lot is mapped and which documents are required. A raised floor level can change step numbers, ramp lengths and the height of the extension, so it belongs in the design before builders quote.

Flood Checks Before the Drawings Are Final

Document and purpose
Land survey plan to the Australian Height Datum: shows the existing ground levels across the lot.
Melbourne Water flood level referral or approval: confirms the level the new floor must sit above.
Floor plans and elevations with levels: show the new finished floor height for the council.
Report and consent application: lodged with council before the building permit is finalised.
A builder who quotes before the floor level is fixed may have to reprice the footings, steps and drainage once consent comes back.

Footpaths, Skips and Building Hours Around the Site

Many Melbourne councils, Boroondara among them, protect footpaths, nature strips, kerbs, drains and laneways during building work through asset protection permits. Under Boroondara's rules, works that may affect council assets cannot start until the permit is issued, and a bond is taken after an inspection. Council inspects again before refunding the bond, and any damage has to be repaired before the money comes back. Ask whether the builder applies for the permit and pays the bond, because the refund goes to whoever paid it. Skips or materials stored on the road or footpath may also need a separate council permit, so check your council's rules.

EPA Victoria guidance says residential construction should happen in normal working hours, from 7am to 6pm on weekdays and 9am to 1pm on Saturdays. Noise within those hours can still be unreasonable, and councils may set their own construction conditions under planning permits or local laws. The EPA does not investigate residential building site complaints, which go to your local council instead. Repairs and maintenance on an existing house are treated as residential noise rather than construction noise. Telling neighbours the start date, the noisy stages and a contact number goes a long way on a tight street. Trees near the work zone may need a permit under an overlay or local law, and a Melbourne arborist can advise on protecting roots during excavation.

Item Who Usually Arranges It Notes
Asset protection permit and bond Builder or owner Inspections before and after
Skip or materials on the road Builder A separate council permit may apply
Site fencing and signage Builder Keeps the public out of the work area
Working hours notice to neighbours Builder Weekdays 7am to 6pm, Saturdays 9am to 1pm
Buried services search Builder or excavator Done before any digging starts
Tree permits Owner Check overlays and local laws

All-Electric New Homes From 1 January 2027

If you are planning a new home or a knockdown rebuild, the gas question has changed in Victoria. When we checked, the state energy website said all new residential buildings must be built as all-electric from 1 January 2027. A building surveyor will not be able to issue a building permit where a new gas connection is proposed for those homes. Gas cooktops, gas heating and gas hot water cannot be installed during construction, and new gas pipework past the meter is also ruled out. Projects that already hold a building permit before the regulations start are exempt, and the guidance noted the regulations were still being finalised. Ask any of the new home builders in Victoria you approach how the design handles heating, hot water and cooking without gas.

For renovations, existing gas appliances in a home do not have to be replaced under the guidance. A gas appliance that is disconnected for a renovation and reconnected in the same building is exempt as well. Separate electrification rules for existing homes under the Plumbing Regulations were listed from 1 March 2027, so check the latest position before replacing a gas hot water unit. A Melbourne electrician should check the switchboard and supply early, because an all-electric home may need more capacity than the old one.

Electric Design Questions for a New Home

Item and what to confirm
Hot water: the system type, the tank size and where it sits on the block.
Heating and cooling: the system type and the rooms it serves.
Cooking: the cooktop type and the circuit it needs.
Switchboard and supply: whether the existing supply is enough or needs an upgrade.
If an older design shows gas, ask whether the building permit was issued before 1 January 2027, because that decides whether the exemption applies.

Granny Flats Under the Small Second Dwelling Rules

A small second dwelling, often called a granny flat, is a self-contained home of no more than 80 square metres on the same lot as an existing house. The 80 square metre limit came in under Amendment VC306, replacing the earlier limit of 60 square metres. In most residential and rural zones no planning permit is needed, but lots under 300 square metres in residential zones are an exception. Under a Heritage, Design and Development or Neighbourhood Character Overlay, no permit is needed if the building is 5 metres or less in height and finished in muted tones. A separate lot cannot be created for land with a small second dwelling, so it cannot later be sold off on its own title.

A building permit is normally still needed, even where no planning permit is required for the granny flat. Service connections, access along the side of the house and the distance to the sewer often decide the final price. Granny flat builders in Victoria offer both prefabricated and site-built options, and the share of off-site work affects the deposit rules from 31 March 2027. A Melbourne plumber will need to confirm how the new kitchen and bathroom connect to the existing sewer and water supply.

Asbestos in Older Melbourne Houses Before Anything Comes Down

Extensions and knockdowns almost always disturb old walls, eaves or floors, which is where asbestos turns up in older homes. Better Health Channel guidance says houses built before the mid-1980s are highly likely to contain asbestos products, and those built up to 1990 may. Fibre cement cladding, often called AC sheet or fibro, is one of the firmly bound products found in older homes. Householders may legally remove asbestos themselves, but the guidance recommends that only a licensed professional removes the loosely bound kind. Waste has to be wetted, double wrapped in heavy plastic, labelled and taken to an EPA-approved disposal facility.

A hazardous materials survey before demolition is estimated at $500 to $1,500 and tells the builder what has to come out first. The results should then appear in every quote, either as a fixed removal price or as a clearly marked allowance. Booking asbestos testing and inspection before the builders visit means every quote prices the same material. WorkSafe Victoria licenses asbestos removalists and lists them in a service providers directory, so the removal contractor named in a quote can be checked there before work starts. Where the whole house is coming down, demolition contractors should work from the same survey, and the Melbourne asbestos removal cost guide shows local removal figures.

Bricks, Cladding, Linings and Glazing to Name in the Specification

A specification is the written list of products and finishes that goes with the drawings, and it stops one quote quietly using cheaper materials. Austral Bricks makes clay bricks, pavers and lightweight brick systems, and it says it manufactures its bricks in Australia. PGH Bricks makes bricks and pavers, and its site says the company has been Australian made since 1958. James Hardie makes fibre cement cladding such as Linea weatherboards and Axon panels, along with interior linings and fire and acoustic wall systems. Weathertex makes weatherboards and wall panels from Australian hardwood, which can help when an extension has to match old timber cladding.

Hebel makes autoclaved aerated concrete panels, a lightweight concrete product, for walls, floors and fences. Gyprock makes plasterboard and cornices, including Aquachek boards for wet areas such as bathrooms and laundries. Linings are usually fixed by a Melbourne plasterer working under the builder, so the board type belongs in the specification. Bradford makes insulation and acoustic control products for the walls, ceilings and floors of homes. Lysaght makes steel roofing, walling, guttering, fascia and framing used on many additions. Metal roofing on an addition is fixed by a licensed roof plumber, so a Melbourne roofer may be part of the builder's team.

BlueScope makes COLORBOND steel, which is used for roofing, gutters, fascia and wall cladding. VELUX makes roof windows, skylights and sun tunnels, which can bring light into the middle of a long, narrow house. Viridian makes glass in energy, acoustic and security ranges, and the glass type matters for both comfort and the energy rating of new rooms. Hume Doors makes internal and entrance doors in timber, aluminium and fibreglass, produced in Australia. Laminex makes laminates, cabinetry panels and benchtops, and it has manufactured in Australia for over 90 years. Dulux makes interior and exterior paints, including the Weathershield range for outside walls and trims.

Ask the builder to list the brand and range for bricks, cladding, windows, roofing, insulation and linings, rather than writing 'or similar'. Where a product is genuinely interchangeable, the specification can say so, but it should still name the standard a substitute must meet. Substitutions after signing should go through a written variation, with any change in price shown before the work is done. Keep the product data sheets with the contract, because they show what was promised if a defect appears later. For glazing and insulation, a swap can also affect the energy rating that the building surveyor approved with the plans.

Defects, Delays and the Path From Builder to VCAT

If something goes wrong, the first step is a written complaint to the builder that sets out the problem, the photos and what you want fixed. The BPC runs a free and impartial dispute resolution service, but only after you have taken reasonable steps to sort it out directly. Its officers may run a conciliation, a guided discussion aimed at an agreed outcome between you and the builder. If that fails, the BPC may issue a binding dispute resolution order or a certificate that lets the matter go to VCAT, the state tribunal. Cases involving health, safety or financial hardship may be dealt with ahead of others.

Keep the contract, variations, invoices, inspection records and photos together in one place from the first day. An independent stage inspection, estimated at $1,800 to $3,500 for a set of five, gives you a neutral record if a dispute arises. A structural inspection is worth considering if cracks or movement appear after the job, as it helps separate new defects from old ones. Home Warranty claims follow a similar order, with the builder given the first chance to fix the problem.

What to Look Out For Before You Sign With a Melbourne Builder

A deposit request above the legal limit is the clearest warning sign, so work out 5 or 10 per cent of the price before you meet. Be wary of a builder who wants to start before the building permit number is issued, or who asks you to sign blank forms. A quote with no registration number, a different company name on the contract or an ID card that does not match is another reason to pause. Watch for large allowances, the guessed amounts for items not yet chosen, because they can turn into extra costs once real prices come in. The same checks apply whether you are building new or planning whole-house renovations, where hidden problems are more likely to appear.

Warning Signs in a Melbourne Building Quote

Sign and what to do
Deposit over 5 per cent on a job of $20,000 or more, before 31 March 2027: refuse it and ask for a compliant schedule.
No mention of Home Warranty on a contract over $20,000 signed after 1 July 2026: ask how the job is covered.
Protection work, flood consent or heritage conditions left out: ask who handles them and who pays.
Gas appliances on a new home design for 2027: check the permit date and whether the exemption applies.
If any answer is vague, ask for it in writing before you sign, and walk away if the written answer never arrives.

Getting Builder Quotes in Melbourne That Price the Same Scope

Builders can only give comparable prices if they all quote from the same drawings, specification and site information. Send each one the plans, the soil report if you have it, the zone and overlay details and any flood or heritage advice. Ask for the price split into preliminaries, meaning site setup such as fencing, toilets and scaffold, then demolition, structure, roofing, services and finishes. Ask each builder to show the deposit, the stage payments and the expected building period in weeks. Check that each quote states who pays the levy, the asset protection bond and any protection work costs. Then compare the quotes line by line rather than total against total.

Allow time for questions, because a builder who answers clearly at quote stage is more likely to communicate well on site. If quotes are far apart, ask the cheapest builder what they have left out before assuming it is the better deal. Trades that often follow a build, such as a Melbourne landscaper for the garden or a concreter in Melbourne for the driveway, can be briefed from the same plans. New rooms often need flooring and wet area tiling, and a tiler in Melbourne can quote from the same specification. Post your project on The Quote Yard with the drawings and your suburb, and Melbourne builders can come back with quotes built on the same scope.

Builders Across Melbourne

The 2027 estimates on this page are for building work across metropolitan Melbourne. Site access, lot size and the approvals on your land change a building price far more than the suburb name does.

▶ Melbourne 32 areas
Melbourne CBD Carlton Fitzroy Richmond South Yarra Prahran St Kilda Brighton Bentleigh Caulfield Malvern Camberwell Hawthorn Box Hill Doncaster Ringwood Glen Waverley Clayton Dandenong Springvale Frankston Werribee Point Cook Footscray Sunshine Essendon Moonee Ponds Coburg Preston Reservoir Epping Craigieburn
▶ Geelong & Surf Coast 24 areas
Geelong Newtown Belmont Highton Waurn Ponds Grovedale Corio Lara Leopold Drysdale Clifton Springs Portarlington Queenscliff Point Lonsdale Ocean Grove Barwon Heads Torquay Jan Juc Anglesea Aireys Inlet Lorne Winchelsea Bannockburn Armstrong Creek
▶ Mornington Peninsula 26 areas
Mornington Mount Eliza Mount Martha Safety Beach Dromana McCrae Rosebud Rye Blairgowrie Sorrento Portsea Tootgarook Capel Sound Red Hill Main Ridge Arthurs Seat Balnarring Merricks Somers Flinders Shoreham Hastings Bittern Crib Point Somerville Tyabb
▶ Yarra Valley & Dandenongs 26 areas
Lilydale Mooroolbark Chirnside Park Coldstream Yarra Glen Healesville Badger Creek Launching Place Yarra Junction Warburton Wandin North Seville Silvan Monbulk Olinda Sassafras Kallista Belgrave Tecoma Upwey Ferntree Gully Upper Ferntree Gully Emerald Cockatoo Gembrook Macclesfield
▶ Ballarat, Bendigo & Goldfields 26 areas
Ballarat Wendouree Alfredton Delacombe Sebastopol Buninyong Creswick Clunes Daylesford Hepburn Springs Trentham Kyneton Castlemaine Maldon Harcourt Bendigo Kangaroo Flat Strathdale Eaglehawk Epsom Heathcote Maryborough Avoca Beaufort Talbot Dunolly

Melbourne Builder FAQ

What changes for Melbourne building contracts on 31 March 2027?
When we checked, new contract regulations were due to start on 31 March 2027. The threshold for a major domestic building contract rises from $10,000 to $20,000 on that date. Deposit limits also rise, with the cap linked to how much of the home is built off site. New progress payment rules apply, and contracts must include information about Home Warranty. Ask your builder which rules a contract signed near that date follows.
Does Home Warranty help if my builder takes a deposit and never starts?
For eligible contracts signed on or after 1 July 2026, Home Warranty can help with lost deposits where work has not started. The contract must be for work worth more than $20,000 on a building of up to three storeys. In most cases you should first try to resolve the problem with the builder. Cover is not available if you used an unregistered builder for work that needed a registered one.
Can I choose my own building surveyor in Melbourne?
Yes, you can appoint either a private building surveyor or the municipal surveyor at your council. You must appoint a registered building surveyor before the building permit application is made. Many builders offer to organise the surveyor, and that can work well if you see every form. The BPC warns owners not to sign blank forms that let someone else act for them.
My neighbour's builder sent me a protection work notice. What happens now?
You have 14 days from when the notice is served to reply to it. If you do not respond in that time, you are treated as having agreed to the proposed work. You can accept it, reject it or ask for more information, and the building surveyor then reviews it. The owner doing the work must hold insurance covering your property and give you a copy before starting. They also have to cover your reasonable expenses, such as specialist fees.
How does flood-prone land change my extension's floor height?
If your lot is mapped as liable to flooding, the council usually needs to give report and consent before the permit is finalised. Boroondara's guidance, for example, requires the finished floor to sit 300 millimetres above the identified flood level. Plans must show the levels to the Australian Height Datum, the national reference level. Melbourne Water approval of the plans or a flood level referral is part of the paperwork.
Do I need a planning permit for a granny flat in Melbourne?
Often you do not, as long as the granny flat meets the small second dwelling rules. That means a self-contained home of no more than 80 square metres on the same lot as an existing house. Lots under 300 square metres in residential zones are an exception and may still need a permit. A building permit is normally required whether or not a planning permit is needed.
Can a new home in Melbourne still have a gas cooktop?
When we checked, all new residential buildings were due to be all-electric from 1 January 2027. A building surveyor will not issue a building permit where a new gas connection is proposed. Homes that already have a building permit before the regulations start are exempt. Existing gas appliances in older homes do not have to be replaced under the guidance.
Who protects the footpath and nature strip while my house is being built?
Many Melbourne councils require an asset protection permit before building work that may affect council assets. Under Boroondara's rules, the permit covers footpaths, nature strips, roads, laneways, kerbs and drains. The council inspects the site, takes a bond and inspects again before refunding it. Agree with your builder who applies and who pays the bond, since the refund goes back to that person.
What hours can a builder work on a house next door in Melbourne?
EPA Victoria guidance says residential construction should take place from 7am to 6pm on weekdays and 9am to 1pm on Saturdays. Noise within those hours can still be unreasonable, and councils may set extra conditions. The EPA does not investigate residential building site complaints, which go to your local council. A friendly word with the builder about noisy stages is usually the quickest first step.
Can I manage my own Melbourne renovation as an owner builder?
You can, but a certificate of consent from the BPC is needed when the work is worth more than $20,000. When we checked, owners could get a certificate once every five years where more than one home is involved. You still need a building permit, and plumbing and electrical work must go to licensed trades. Home Warranty does not protect owners who use an unregistered builder for work that needs a registered one.

Melbourne Building Specialists

For Trades & Contractors - VIC

Building jobs in Melbourne bring work for many other trades, from framing and brickwork to roof plumbing, wiring and the driveway at the end. Links to those jobs across Victoria sit below, for trades looking for new clients.

Ready to Book a Builder in Melbourne?

Post your project with the drawings, the floor area and your suburb, and we will connect you with registered builders across Melbourne. Compare written quotes that price the same scope before you sign.

Get Free Builder Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 29 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All Victorian tradies are required to hold appropriate licences. Verify at the Building and Plumbing Commission.
Prices are 2027 estimates based on current Victorian building price guides, using Melbourne figures where they are given. Your final price will depend on the design, the lot, site access, any heritage, flood or protection work requirements and what is found inside the existing house, so compare written quotes that show demolition, structure, services, finishes, permits and insurance separately.
Need a builder in Melbourne?Get free Melbourne builder quotes Post a Job – It's Free