Looking for a Tiler in Moreton Bay?
Tell us your suburb, the rooms or outdoor areas to be tiled, rough measurements, the tile size you want and the year the home was built. We will pass that description to licensed tilers across the region, so every quote you receive is priced on the same details.
Moreton Bay Tiling Price Guide
These are estimated Moreton Bay price ranges for 2026. Your price depends on the tile chosen, the old floor or wall covering to remove, the state of the slab or sheeting underneath, and whether a plumber, waterproofer or electrician is part of the job.
Hire a Tiler Moreton Bay QLD - Get Local Quotes
Moreton Bay runs from the older brick homes and unit blocks of the Redcliffe peninsula to the new estates around North Lakes, Narangba and Caboolture, and on to the beach houses of Bribie Island. Each part of the region brings a different kind of tiling job. Owners in new estates add tiles to alfresco areas, garages and bedrooms soon after handover, and they also need the builder's tiles checked before the defect periods run out. Homes and units built before 1990 can hide asbestos in the vinyl or wall sheeting under old tiles, so testing comes before demolition. Bayside and island homes need outdoor tiles that stay safe underfoot when wet and sandy. In Queensland, tiling and waterproofing work valued over $3,300 needs a contractor licensed by the Queensland Building and Construction Commission, and contracts above that value carry deposit limits and a cooling-off period. The prices on this page are 2026 estimates for labour across the region, before tiles, demolition or waterproofing are added. Tile choice, the state of the floor or wall underneath and access to the room all change the final figure. Waterproofing, screed (a sand and cement layer that levels or slopes a floor) and any plumbing changes are separate stages, so a detailed quote shows each of them on its own line. Travel to the island and the northern estates can add time to jobs that need several visits. Post your job on The Quote Yard and we will connect you with licensed tilers across Moreton Bay and Redcliffe who can quote on it.
At a Glance - Moreton Bay Tiling Estimates 2026
| Job | Price Band | How It Is Charged | What Drives It In Moreton Bay | Who Can Do It |
|---|---|---|---|---|
| Floor tiling labour | $55 - $100 per m² | Per square metre | Tile size, layout and floor condition | Licensed tiler over $3,300 |
| Wall tiling labour | $60 - $110 per m² | Per square metre | Cuts, niches and wall height | Licensed tiler over $3,300 |
| Large format porcelain | $80 - $150 per m² | Per square metre | Floor flatness and two-person handling | Licensed tiler |
| Alfresco or patio tiling | $65 - $120 per m² | Per square metre | Falls, steps and edge trims | Licensed tiler |
| Kitchen splashback | $350 - $1,000 | Fixed price | Tile size and power point cuts | Tiler |
| Small bathroom tiling | $2,200 - $5,000 | Fixed price, labour only | Wall height and shower layout | Licensed tiler |
| Day rate for small jobs | $550 - $900 | Per tiler, per day | Number of cuts and visits | Tiler |
| Old tiles removed | $35 - $70 per m² | Per square metre | Adhesive bed and tip fees | Tiler or demolition crew |
| Screed to level or slope | $40 - $100 per m² | Per square metre | Depth and drying time | Tiler or screeder |
| Uncoupling membrane | $45 - $85 per m² | Per square metre | Slab age and cracking | Tiler |
| Shower recess waterproofing | $500 - $1,000 | Fixed price | Recess size and system used | Licensed waterproofer or tiler |
| Asbestos sample testing | $300 - $1,500 | Per job | Number of samples and report | Asbestos assessor or laboratory |
| Minimum repair visit | $250 - $450 | Per visit | Travel and tiles replaced | Tiler |
What Pushes a Moreton Bay Tiling Bill Up
Finding the Right Tiler From Redcliffe to Bribie Island
Floor and wall tiling labour across Moreton Bay is estimated at $55 to $100 per square metre in 2026, with large porcelain, mosaic and natural stone priced above that band. Those figures overlap the ranges on the Queensland tiling services hub, which describes the different kinds of tiling work offered across the state. Labour is only one part of the bill, since tile removal, floor preparation, waterproofing, trims and rubbish removal each appear as separate lines on a detailed quote. Hiring a tiler in this region also means planning for the local situations that change the scope of a job. Owners near the city boundary at Bald Hills and Bracken Ridge can find more detail in our guide to hiring a tiler in Brisbane. The same state licensing rules apply on both sides of that line.
Writing a short brief before anyone visits saves time for you and for each tiler. List each area to be tiled with rough measurements, the tile size you have in mind and whether the existing tiles, carpet or vinyl are coming up first. Note the year the home was built, whether it is a house or a unit, and whether the job touches a shower, bath or laundry floor. Photos of the floor edges, doorways and any cracked or hollow tiles let a tiler spot preparation work before the site visit. With the same brief in hand, each tiler prices the same scope, and the differences between quotes become much easier to explain.
Moreton Bay Tiling Estimates for 2026, Job by Job
Standard ceramic or porcelain floor tiles between 300 and 600 millimetres are estimated at $55 to $100 per square metre for labour in 2026. Wall tiling takes longer because of cuts around windows, taps and niches, so it costs a little more at roughly $60 to $110 per square metre. Large format tiles, meaning pieces of 600 by 1200 millimetres and bigger, are estimated at $80 to $150 per square metre because they need a flatter base and two people to lift. Outdoor tiling on an alfresco slab runs at about $65 to $120 per square metre for labour, depending on falls (the slope that sends water off the surface), edges and steps. Kitchen splashbacks are estimated at $350 to $1,000 as a fixed job, and tiling a small bathroom from a prepared base is estimated at $2,200 to $5,000 in labour. For line by line figures on these jobs, see the Brisbane tiling cost guide, whose bands suit the southern half of Moreton Bay closely.
Several costs are not part of the labour rate and need their own line on the quote. Tile supply is a separate purchase, with standard ceramic tiles estimated at $30 to $80 per square metre and porcelain from about $50 upward. Lifting old tiles and carting them away is estimated at $35 to $70 per square metre. Building up an uneven floor with screed, a sand and cement layer spread to level or slope a floor, adds about $40 to $100 per square metre. Waterproofing a shower recess is estimated at $500 to $1,000 when it is done by a licensed waterproofer as part of a bathroom job. Small repair visits carry a minimum charge, estimated at $250 to $450, whatever the number of tiles replaced.
| Job | Moreton Bay Estimate | How It Is Charged | What Moves It |
|---|---|---|---|
| Floor tiling labour, 300 to 600 mm tiles | $55 - $100 per m² | Per square metre | Layout, cuts and floor condition |
| Wall tiling labour | $60 - $110 per m² | Per square metre | Niches, windows and tap cut-outs |
| Large format porcelain, 600 x 1200 mm and up | $80 - $150 per m² | Per square metre | Floor flatness and handling |
| Alfresco or patio tiling labour | $65 - $120 per m² | Per square metre | Falls, steps and edge trims |
| Kitchen splashback | $350 - $1,000 | Fixed price | Tile size and power point cuts |
| Small bathroom tiling, labour only | $2,200 - $5,000 | Fixed price | Wall height and shower layout |
| Old tiles lifted and removed | $35 - $70 per m² | Per square metre | Adhesive bed and tip fees |
| Screed to level or slope a floor | $40 - $100 per m² | Per square metre | Depth needed and drying time |
| Minimum charge for a small repair | $250 - $450 | Per visit | Travel and number of tiles |
Square Metre Rates, Day Rates and Minimum Charges
Tilers in the region price work in three main ways, and a single quote can mix them. Larger floors and walls are priced per square metre, while splashbacks, showers and small bathrooms are priced as a fixed job after a site visit. Fiddly work such as replacing a few cracked tiles or tiling a set of front steps may be charged as a day rate, estimated at $550 to $900 per tiler in 2026. Each method can produce a fair price, as long as the quote says which one applies to each part of the work. Mixing methods without saying so makes it hard to tell whether two tilers have priced the same job.
The square metre figure only means something once you know how the area was measured. Some tilers measure the finished surface, while others add an allowance for cuts, skirting tiles and the returns around a window. Tile supply also needs a wastage margin, and a tiler may allow around 10 percent extra for a straight lay and more for diagonal or herringbone patterns. Checking the measured area on each quote against your own tape measure is the quickest way to find a pricing gap.
Travel across the region is part of the price even when it is not shown as a separate line. From a base near Strathpine, North Lakes, Redcliffe and Narangba are a short drive away, while a job at Woorim or Bongaree on Bribie Island adds time over the bridge each day. Jobs that need several visits, such as a bathroom waiting on screed and waterproofing to cure, multiply that travel. Grouping small jobs, such as a splashback and a laundry floor, into one booking can reduce the number of trips. The number of separate site visits each quote assumes can explain why one figure is higher than another.
How Tilers Price the Work
The measured area should appear on the quote, so it can be checked against the room.
Any wastage allowance for tiles belongs on the supply side of the quote, not the labour side.
Checking the Builder's Tiles Before and After Handover
New estates at North Lakes, Mango Hill, Narangba, Burpengary East and the Caboolture West growth area hand over homes with tiles already laid by the builder's subcontractor. The final inspection before handover, called practical completion, is the best time to check those tiles while the builder's team is still on site. Tap each floor tile lightly with a coin or the end of a screwdriver and listen for a hollow sound, which tilers call drummy and which points to adhesive that has not bonded fully. Look across the floor at a low angle for lippage, the step in height between the edges of neighbouring tiles. Check for chipped edges, cracked tiles, missing grout and gaps where the sealant should meet the bath or shower base. Write every item on the builder's defects list with a photo, so there is a dated record of what you found.
The Queensland Building and Construction Commission (QBCC) sets the time limits that apply once you have the keys. Its guidance asks owners to raise each defect with the builder in writing first and to allow a reasonable time to fix it, with 14 days given as an example. Complaints about a non-structural defect, such as a cracked or drummy tile, must reach the QBCC no later than 12 months after the work is completed. Separate and shorter limits apply to a claim under the Queensland Home Warranty Scheme, which requires a non-structural defect to be noticed within 6 months of completion and claimed within 7 months. Writing those dates in your calendar on the day of handover helps you avoid losing a claim because it was lodged late.
Independent checks before handover can pick up tiling faults that are hard for an owner to judge alone. During a building inspection at practical completion, the inspector looks at tiles, falls toward floor wastes and sealant joints along with the rest of the house. Ask the builder for any spare boxes of tiles left on site, since a matching batch makes a later repair far simpler. Those spares are what a tile repair specialist will need if a tile cracks after the builder's responsibility ends.
| Situation | Time Limit | Where It Comes From | What to Keep |
|---|---|---|---|
| Non-structural defect complaint | No later than 12 months from completion | QBCC defective work guidance | Defects list and photos |
| Structural defect complaint | Within 12 months of noticing it | QBCC defective work guidance | Dated photos and reports |
| Home warranty, non-structural | Noticed within 6 months, claimed within 7 | Queensland Home Warranty Scheme | Handover date record |
| Home warranty, structural | Claim within 3 months of noticing | Queensland Home Warranty Scheme | Inspector's report |
| Written notice to the builder | Reasonable time, for example 14 days | QBCC guidance | Copy of the letter or email |
Adding Tiles to a New Home After You Get the Keys
Owners of new homes in the region may ask a tiler to finish spaces the builder left plain, such as an alfresco slab, a garage floor or bedrooms that came with carpet. That work is a separate contract between you and your own tiler, so any later problem with it is that tiler's responsibility and not the builder's. Keeping the two jobs apart on paper matters while the builder's defects period is still running. Take dated photos of the builder's tiles, sealant joints and slab edges before your own tiler starts, so nobody can confuse old faults with new ones. Where the new work joins the builder's tiles, such as at a doorway, tell the builder in writing before it starts.
Matching the builder's tiles can be difficult, even when you know the product name. Each production run has a shade code and a batch number printed on the box, and two batches of the same tile can vary slightly in colour and size. If the range has been discontinued, a deliberate change of tile at a doorway or a step can look better than a near match. Tiling into former carpeted rooms raises the floor, so door bottoms, robe tracks and the junction strip all need checking. Garage floors carry car tyres and dropped tools, so the tile needs a high wear rating, shown as a PEI (Porcelain Enamel Institute) rating, which measures how well a glazed surface resists scratching.
Work in a new home can also expose problems that belong to the builder. Your tiler should stop and photograph any cracked slab, uneven slab edge or hollow builder's tile found next to the new area. You can then add the item to the builder's defects list before your own work covers it. Paying your tiler for a short pause is cheaper than losing a valid claim against the builder.
Before Your Own Tiler Starts
Dated photos of the builder's work protect both you and your tiler.
Separate written contracts keep the two jobs clearly apart.
Giving a New Slab Time Before the Tiles Go Down
New alfresco slabs, granny flats and extensions need time before tiles go down. Ardex Australia's technical data sheet for its X 17 tile adhesive says new concrete should be left to cure for at least four weeks before tiling. Waiting times can differ between products, so the data sheet for the adhesive actually being used is the one to follow. Your tiler should read those instructions and check the slab itself before starting. Tiling too early can lead to tiles lifting or cracking as the slab dries.
Slabs shrink as they dry, and fine cracks are common in new concrete even when it was poured well. An uncoupling membrane is a thin plastic layer bedded between slab and tile, and it lets the slab move a little without cracking the tiles above it. Schluter-Systems makes the Ditra range of uncoupling membranes, and The Quote Yard's Queensland tile repair figures put the installed cost at about $45 to $85 per square metre. Any saw cut or control joint (a planned crack line) in the slab should carry up through the tiles as a movement joint, a flexible gap filled with sealant. Where a slab is out of level, floor levelling and screeding corrects it before tiling, and it should be priced as a separate line. Booking the concreter and tiler together through concreting services helps the slab finish at the right height for the tiles.
Outdoor slabs need a gentle slope that carries rain off the tiles and away from the house. Tiles and adhesive add height, so the finished surface has to stay below the door sill and clear of weep holes, the small drainage gaps near the bottom of a brick wall. Those heights should be checked on the first visit, before the tiles are ordered. Correcting them after the tiles are laid means lifting and relaying the whole area.
New Slab Checklist
Uncoupling membranes add cost but help on young or cracked slabs.
Screed or levelling work belongs on its own line of the quote.
The QBCC Licence Classes Behind a Tiling Job
Under Queensland law, a person or company needs a QBCC licence to carry out building work valued at more than $3,300, and that value includes labour, materials and goods and services tax (GST). The QBCC wall and floor tiling licence covers cutting and fixing ceramic, glass, marble, slate, stone and terracotta tiles to floors, walls, hearths, spas and swimming pools. Its scope also lets the holder apply waterproofing as part of wall and floor tiling, and build terrazzo (polished stone chips set in cement) floors and steps. A separate waterproofing licence class covers applying, installing and repairing waterproofing systems, including surface preparation. Licence holders can also do incidental work from another class, as long as that extra part is valued at less than $3,300. One bathroom job may therefore involve one licence or two, depending on who applies the membrane.
Checking the licence takes a few minutes on the Queensland Building and Construction Commission licensee register. The name and number on the register should match the business named on the quote and the contract. Some trades need a licence for work of any value, and plumbing and drainage are on that list, so moving a floor waste or shower outlet is a job for a licensed plumber. Owners carrying out work on their own property do not need a licence for work valued at no more than $11,000. That exemption covers your own labour, and anyone you pay for the work still needs to hold the right licence.
Heated floors and bathroom power add another trade to the job. Any wiring for an underfloor heating mat or new power points must be done by a licensed electrician, and the tiler lays the tiles over the mat once it has been tested. Booking through hiring an electrician in Moreton Bay lets you schedule that test before tiling begins. Drain and tap changes go through hiring a plumber in Moreton Bay for the same reason.
| Work | Licence Needed | Value Trigger | Note |
|---|---|---|---|
| Wall and floor tiling | QBCC wall and floor tiling | Over $3,300 | Includes waterproofing for tiling |
| Waterproofing only | QBCC waterproofing | Over $3,300 | Covers surface preparation |
| Moving a floor waste or outlet | Plumbing and drainage | Any value | Licensed plumber only |
| Heated floor wiring | Electrical licence | Any value | Electrician tests before tiling |
| Owner's own labour | None | Up to $11,000 | Your own property only |
| Out-of-class incidental work | Existing licence | Under $3,300 | Must be minor to the main job |
Level 1 and Level 2 Contracts, Deposits and the Five-Day Cooling-Off
Queensland contract rules change with the value of the tiling job. No written contract is required for work valued at $3,300 or less, but a written quote and a record of what was agreed still protect both sides. Between $3,301 and $19,999 the job needs a Level 1 contract. That contract names the contractor and licence number, describes the work, states the price and home warranty premium, and includes a notice of your cooling-off rights. From $20,000 the job needs a Level 2 contract, which also lists a start date and the warranties set by law, known as statutory warranties, and comes with the QBCC Consumer Building Guide. The contractor must give you a fully signed copy within five business days of entering the contract.
Deposits are capped by the same value bands. The maximum deposit is 20 percent for work of $3,300 or less, 10 percent for a Level 1 contract and 5 percent for a Level 2 contract. A higher deposit of up to 20 percent applies only where more than half the price is custom work made off site, which is rare in tiling. On a $12,000 ensuite retile, the most a tiler can lawfully ask before starting is $1,200. Progress claims (payments asked for during the job) are limited too, since a contractor cannot claim more than half the price, including the deposit, until at least half the onsite work is done.
The cooling-off period gives you five business days to withdraw from a contract over $3,300. It starts the day after you receive a signed copy of the whole contract, and for Level 2 contracts the Consumer Building Guide as well. Withdrawal must be in a signed written notice, and you may have to pay $100 plus reasonable out-of-pocket costs the contractor has already spent. The right does not apply if you had legal advice before signing or had an earlier contract with the same tiler for the same work.
| Contract Value | Contract Type | Maximum Deposit | Cooling-Off |
|---|---|---|---|
| $3,300 or less | No written contract required | 20 percent | Not required |
| $3,301 to $19,999 | Level 1 contract | 10 percent | Five business days |
| $20,000 or more | Level 2 contract | 5 percent | Five business days, after the guide is received |
| Over half custom made off site | Level 1 or Level 2 | Up to 20 percent | Five business days |
Retiling an Older Unit on the Redcliffe Peninsula
Older two and three storey brick unit blocks line streets in Redcliffe, Scarborough, Woody Point and Margate, and some owners want to swap worn carpet for tiles. Before booking a tiler, read the by-laws of your community titles scheme, which is the legal name for a body corporate in Queensland. Some schemes set specific limits on hard floors such as tiles, and others have by-laws about noise. Your body corporate manager can confirm whether the committee needs to approve the change in writing. Getting that approval before the tiles are ordered avoids a dispute after the money is spent.
Footsteps and dropped objects on a hard floor can be heard in the unit below, and that noise can lead to a dispute. Under section 167 of the Body Corporate and Community Management Act 1997, an occupier must not use a lot in a way that causes a nuisance or unreasonably interferes with others. If neighbours complain, the Office of the Commissioner for Body Corporate and Community Management first offers conciliation, a guided talk to reach agreement, and an adjudicator can decide the dispute if that fails. An adjudicator who finds the noise unreasonable can order changes to the floor, such as putting carpet back or adding sound insulation. Laying an acoustic underlay under the tiles reduces that risk, and the underlay product and its tested rating belong on the quote. Tilers with unit block experience should raise this on the first visit.
Access shapes the price of a unit job as much as the floor area. Walk-up blocks mean every box of tiles, bag of adhesive and load of rubbish goes up and down the stairs by hand. Parking for the tiler's vehicle, working hours set by the by-laws and the place to run a wet saw all need sorting before the start date. Shared drainage stacks also mean a leaking shower can damage the unit below, so shower regrouting and leak repairs is the place to start if water is already escaping. If your unit is in a tower with lifts and loading docks, see our guide to hiring a tiler on the Gold Coast for those issues.
Before Tiling a Unit
Neighbours below are the people most affected by hard floor noise.
Keep a copy of the approval with your unit records.
Old Vinyl, Wall Sheeting and Asbestos in Pre-1990 Homes
Homes and units built before 1990 can contain asbestos in places a tiling job disturbs. Queensland Government asbestos guidance for a typical 1970s house lists recessed edge wall sheeting that was plastered over and tiled, and sheeting fitted over the bath and shower recess. The same list includes asbestos-backed sheet vinyl and vinyl floor tiles. The same guidance says buildings constructed after 1990 are unlikely to contain asbestos materials. These products are not dangerous while they are in good condition and left alone, but lifting old tiles, grinding off adhesive or cutting into wall sheeting can release fibres, so testing comes before demolition. Older homes in Clontarf, Kippa-Ring and Strathpine are examples of where that check matters.
Laboratory testing of a sample tells you whether a material contains asbestos before anyone breaks it. Asbestos testing and inspection is estimated at $300 to $1,500 depending on the number of samples and whether a written report is needed. If a product contains asbestos, its removal must follow Queensland workplace safety rules, and larger jobs need a licensed removalist through asbestos removal. Guidance for workers and homeowners is published by Workplace Health and Safety Queensland and the national Asbestos and Silica Safety and Eradication Agency. Every tiling quote for an older home should state who arranges testing and what happens to the price if asbestos is found.
Tiling over an old floor is sometimes possible and can leave a hidden material undisturbed. Your tiler can only consider it where the existing tiles are firmly bonded, the floor height allows it and any wet area membrane is sound. The test result should come first, since it decides whether removal or covering is the safer path. Either way, the decision belongs in writing with the reason for it.
| Material | Where It Is Found | Risk When Tiling | Who Handles It |
|---|---|---|---|
| Recessed edge wall sheeting | Bathroom walls plastered then tiled | Cutting or removing releases fibres | Tester first, then licensed removalist if needed |
| Sheeting over bath and shower | Wet area walls in older homes | Disturbed during a strip out | Tester first, then removalist |
| Asbestos-backed sheet vinyl | Kitchens, laundries and bathrooms | Lifting or sanding the backing | Tester first, then removalist |
| Vinyl floor tiles | Older kitchens and living areas | Grinding or breaking the tiles | Tester first, then removalist |
| Products in homes built after 1990 | Throughout | Unlikely to contain asbestos | Tiler, with normal dust controls |
Bribie Island and Bayside Patios: Sand, Salt and Slip Ratings
Bribie Island, Sandstone Point and the bayside streets around Deception Bay and Scarborough bring sand, salt and outdoor living into every tiling decision. Bribie Island is reached by a road bridge, so a tiler drives across each day of the job, and that travel time adds to the price. Fine beach sand carried onto patios and paths scratches soft glazes and wears away open grout lines. Through-body porcelain, where the colour runs right through the tile, shows wear less than a thin surface glaze. Darker grout and a sealed finish also hide the sand that collects in joints between cleans.
Slip resistance matters more than looks on a wet outdoor surface. AS 4586, published by Standards Australia, sets the way new floor surfaces are tested and classified. Its wet pendulum test gives each tile a P rating from P0 at the lowest to P5 at the highest. Guidance tables based on HB 198, the Standards Australia handbook that goes with it, list P4 for external walkways, courtyards and pool surrounds, and P5 for outdoor ramps steeper than 1 in 14. Around a pool, the edge and coping details, meaning the pieces that cap the top of the pool wall, overlap with pool tile and surface repairs, which covers waterline tiles and expansion joints. Existing slippery tiles can sometimes be treated without replacement through non-slip coatings and strips.
Trims and edges face the same exposure as the tiles. Schluter-Systems makes edge and step profiles in aluminium and stainless steel, and the metal chosen should suit a home near salt water. Dry Treat makes penetrating sealers for natural stone and porous tiles, and outdoor stone needs resealing on the maker's schedule. Drainage at the outer edge of a patio stops water ponding against the house during summer storms.
Choosing Outdoor Tiles on the Coast
The test certificate for the slip rating should come from the supplier.
Natural stone needs a sealer and a resealing schedule.
Tile Cutting Dust and the Engineered Stone Ban
The national ban on engineered stone took effect on 1 July 2024, and tilers still get questions about whether it covers their work. The Asbestos and Silica Safety and Eradication Agency lists ceramic wall and floor tiles as outside the ban. Porcelain products and sintered stone, a manufactured stone-look surface, are also excluded, as long as they contain no resin. Grout, mortar, render and concrete products are not covered by the ban either. That means a tiler can still cut and install ordinary ceramic and porcelain tiles, but the dust rules for cutting them still apply.
Queensland's code of practice on managing respirable crystalline silica dust in construction, which deals with silica dust fine enough to breathe in, commenced on 1 May 2023. It covers cutting tiles, pavers, bricks and concrete with handheld and stationary saws. The controls it describes include water suppression, on-tool dust extraction and properly fitted respirators. Rubi makes manual tile cutters and wet saws, Montolit makes manual cutters and diamond blades, and Norton Clipper makes wet tile saws. Each of those tools can be set up to cut wet or with dust collection.
For a homeowner, the rules lead to a few practical questions on the day of the job. Find out where the tiler plans to cut, since a garage, driveway or balcony keeps dust out of the living areas. In a unit block, cutting in shared areas may need body corporate agreement. Wet cutting leaves slurry that should be collected and not washed into the street gutter.
Silica Controls You Can See on Site
Ceramic tiles are outside the engineered stone ban.
Porcelain is outside the ban only when it contains no resin.
Which Trade Does Each Stage of a Bathroom Retile
A bathroom retile involves several trades working in a fixed order. The room is stripped first, then a licensed plumber sets or moves the pipes and floor waste. The floor is built up with screed so it has a fall to the waste, which is a gentle slope that sends water to the drain. Some homes have a set-down, a section of slab built lower in the wet area so the screed and tiles finish level with the hallway. A licensed waterproofer then applies the membrane, the waterproof layer under the tiles, with a bond breaker, which is a tape or bead of sealant at each corner that lets the membrane stretch without tearing. The work must meet AS 3740, the Australian Standard for waterproofing domestic wet areas, before the tiler starts.
Once the membrane has cured, the tiler lays the floor and walls and finishes with grout and sealant. Grout fills the joints between tiles, while flexible sealant goes at corners, at the bath edge and where the floor meets the wall, because those joints move. Wedi makes waterproof building boards and prefabricated shower floors, and Stormtech makes linear shower drains and grates. For the full order of work in a bathroom, see our guide to bathroom tiling in Queensland, and for the membrane stage, see bathroom waterproofing. When several trades are booked separately, a leak can become a dispute between them, so one contractor taking responsibility for the whole wet area is simpler.
Laundries and powder rooms follow the same order on a smaller scale. Laundry floors still need a waste and a membrane in the right places, which is why laundry renovation jobs go through the same steps. Larger projects that include vanities, toilets and screens are better planned through bathroom renovation. Owners with a tight budget can compare their scope against small bathroom renovation costs before asking for quotes.
| Stage | Who Does It | Licence | What You Receive |
|---|---|---|---|
| Strip out and asbestos check | Demolition crew or tiler | Removalist if asbestos is found | Test result for older homes |
| Pipes and floor waste | Plumber | Plumbing and drainage | Compliance paperwork for the plumbing |
| Screed with fall to the waste | Tiler or screeder | Tiling licence over $3,300 | Even slope toward the drain |
| Membrane to AS 3740 | Waterproofer or licensed tiler | Waterproofing or tiling licence | Written statement of the system used |
| Tiles, grout and sealant | Tiler | Wall and floor tiling licence | Tile, grout and sealant product names |
Rectified Tiles, Adhesives and Grout on Your Quote
Product choices on a tiling quote affect how the floor looks and how long it lasts. A rectified tile has been machine cut after firing so its edges are square and its size is exact, which allows very fine grout joints. Large or rectified tiles show lippage more clearly, so tilers use levelling clips and wedges to hold the edges flush while the adhesive sets. Raimondi makes tile levelling systems and other tiling tools. Back-buttering means spreading adhesive on the tile's underside as well as the floor, so large tiles bond fully without hollow spots. When a quote names these steps, it shows the tiler has priced the extra time they take.
Adhesive and grout are chosen to suit the tile, the base and the exposure. Ardex, Mapei and Davco make cement-based tile adhesives, and Dunlop makes tile adhesives and grouts for home use. Kerakoll makes adhesives and grouts, and Laticrete makes epoxy grout, which is a resin-based grout that resists stains and water better than standard cement grout. Bostik makes sealants for the flexible joints at corners and edges. Having the product names in writing lets you check the maker's instructions and keep them for later repairs.
Tile retailers and makers are separate businesses, and both matter when a tile needs replacing later. Tile retailers stock ranges from many different makers, so ask which company made the tile you choose. Buy enough for the job plus spares from the same batch, and keep the box label with the shade code. Those spares give a tiler a matching piece to use when a single tile cracks years later.
Product Terms on a Tiling Quote
Product names belong on the quote, not just the word adhesive or grout.
Spare tiles from the same batch should stay with the house.
Raising a Problem With Finished Tiling Work
Problems with tiling work are easier to resolve when you follow the steps in order. Raise each issue with the tiler in writing, list the defects clearly and give a reasonable time to fix them, such as 14 days. Check the tiler's licence status on the QBCC register before going further, because it decides which options are open to you. Where the issue is not fixed, a defective work complaint can be lodged with the QBCC, within 12 months of completion for non-structural defects. You must give the tiler reasonable access to inspect or repair the work, with at least 48 hours' notice during normal working hours.
When a complaint does not settle the matter, building disputes over money or contract terms can be heard by the Queensland Civil and Administrative Tribunal after the QBCC process where it applies. Consumer guarantees under the Australian Consumer Law also require services to be supplied with due care and skill, and the Australian Competition and Consumer Commission publishes guidance on them. Photos, the contract, invoices and the product names used are the most useful records in any of these steps. Independent reports on the defect, such as a tap test survey of drummy tiles, can settle a disagreement about cause.
Things to Look Out For Before Signing a Moreton Bay Tiling Quote
Several warning signs on a tiling quote are easy to spot once you know them. Quotes with no licence number, or a deposit above the legal caps, tell you the contractor is not following Queensland rules. Watch for a bathroom quote that never mentions waterproofing, screed or falls, since those are the stages where leaks and failures begin. Words like make good (repair the surrounding area) or prepare floor without a price or description leave room for a large variation, meaning an extra charge added later. For an older home, a quote with no mention of asbestos testing leaves another gap to close before signing. Outdoor quotes should name the slip rating, and every floor over a certain size should show where movement joints will go.
Choosing a lower quote only saves money if it includes the same work as the others. Compare the measured areas, the removal and preparation lines and the products named on each quote. When two tilers are several thousand dollars apart on the same bathroom, ask both of them what they have left out. The cost of fixing failed tiles later can be more than any saving from a quote that left work out.
| Quote Item | What a Clear Quote Says | Warning Sign | Why It Matters |
|---|---|---|---|
| Licence | QBCC number and licence class | No number shown | Work over $3,300 needs a licence |
| Deposit | Within 20, 10 or 5 percent caps | Half the price up front | Breaches the contract rules |
| Waterproofing | Who applies it and the system used | Not mentioned at all | Membrane failures are costly to fix |
| Preparation | Removal, screed and levelling priced | Make good, no price | Leaves room for big variations |
| Asbestos | Testing for homes built before 1990 | Silent on older materials | Testing must come before demolition |
| Outdoor tiles | Slip rating and test certificate | Tile name only | Wet patios and pool edges need grip |
Lining Up Three Moreton Bay Tiling Quotes on One Brief
Three quotes on the same written brief give you a fair basis for choosing a tiler. Send each tiler the same measurements, photos and tile choice, and tell them whether you will buy the tiles or want them supplied. Request that every quote show labour, tile supply, removal, preparation, waterproofing and rubbish removal on separate lines. With those lines in place, any difference between the totals can be traced to a specific part of the job. Tilers who will not itemise a quote of several thousand dollars are harder to hold to the scope later.
Timing also differs between tilers in the region. Find out when each one can start, how many days the work will take and how long the screed, membrane and adhesive need between stages. Losing the only shower for a week or more needs planning in a home with one bathroom. For units, confirm that the start date fits the body corporate's approval and the by-law working hours. Tilers coming from across the region may also prefer to book a whole job in a single block of days. Writing the agreed dates into the contract avoids confusion when one stage runs late.
Nearby regions have their own tiling pages that may suit owners who live near a boundary. Owners towards the Glass House Mountains can read our guide to hiring a tiler on the Sunshine Coast, while owners with investment properties further south can compare hiring a tiler in Logan and the Redlands. For homes west of Brisbane, hiring a tiler in Ipswich and the Lockyer Valley covers older cottages and new estates in that corridor. Each of those pages works under the same state licensing and contract rules described above, so only the local details change.
Tilers Across Moreton Bay and Redcliffe
Tiling prices on this page apply across Moreton Bay and Redcliffe. Jobs close to the main centres rarely carry a travel charge, while outer suburbs and fringe areas sometimes do.
▶ Brisbane Inner City 20 areas
CBD & North
Inner East
Inner South
Inner West
▶ Greater Brisbane 37 areas
Brisbane Suburbs
Ipswich
Logan
Moreton Bay
Redlands
▶ Gold Coast & Surrounds 23 areas
Central Gold Coast
Southern Gold Coast
Northern Gold Coast
▶ Sunshine Coast 15 areas
Coastal
Noosa
Hinterland
▶ Far North Queensland 17 areas
Cairns & Northern Beaches
Port Douglas & Daintree
Atherton Tablelands
Cassowary Coast
▶ Whitsundays & Central Coast 16 areas
Townsville Region
Whitsundays
Mackay Region
▶ Fraser Coast & Wide Bay 17 areas
Fraser Coast
Bundaberg Region
South Burnett
Central Queensland
▶ Darling Downs & Outback 17 areas
Darling Downs
Western Downs
Outback Queensland
Moreton Bay Tiler FAQ
What should I check on the builder's tiles before handover in North Lakes or another new estate?
How long should a new alfresco slab cure before it is tiled?
Does my tiler need a QBCC licence for a small splashback?
How much deposit can a tiler ask for in Queensland?
Do I need body corporate approval to tile my Redcliffe unit?
Could there be asbestos under the old tiles in my house?
What slip rating suits an outdoor patio on Bribie Island?
Can my tiler also do the waterproofing?
Are porcelain tiles affected by the engineered stone ban?
Will a tiler charge extra to travel to Bribie Island or Caboolture?
Moreton Bay Tiling Specialists
Related Services
For Trades & Contractors - QLD
Tiling jobs in Moreton Bay can need other trades before or after the tiler. Floor wastes and pipe changes need a licensed plumber, heated floors and new power points need an electrician, and older homes may need an asbestos removalist before demolition. Owners across the region can book these services alongside a tiling job.
Compare Moreton Bay Tiling Quotes
Tell us your suburb, the areas to be tiled and the tile you have chosen, and compare quotes from licensed Moreton Bay tilers who are all pricing the same job.
Get Free Tiling QuotesAbout This Guide
This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Looking for more services across Queensland? View all available trade services.
Reviewed by The Quote Yard Editorial Team
How The Quote Yard Works
We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.