Planning a Bathroom Retile in Queensland?

Tell us your town or suburb, the room size, the walls you want tiled, the shower type and the tiles you have in mind. We will pass the same description to licensed tilers across Queensland, so every quote you receive prices the same bathroom.

Get Free Tiling Quotes

Queensland Bathroom Tiling Price Guide

Standard wall and floor tiling, labour$55 - $110 per m²
Large format porcelain, labour$75 - $140 per m²
Mosaic or feature wall, labour$110 - $220 per m²
Small bathroom tiled, labour only$2,200 - $4,800
Ensuite tiled, supply and install$4,500 - $9,500
Licensed waterproofing, whole bathroom$700 - $1,800
Screed with fall to the waste$55 - $120 per m²
Strip-out and disposal$900 - $2,600
Epoxy grout upgrade$30 - $55 per m²
Linear drain supplied and fitted$450 - $1,200

These are estimated Queensland price ranges for 2026. Your price depends on the tile size and layout, the condition of the floor and walls, the shower and drain type, and whether waterproofing and strip-out are included.

Bathroom Tiling QLD - Get Quotes

A bathroom can be the hardest room in a Queensland home to tile well, because the tiles sit on top of a screed, a waterproofing membrane and plumbing that all have to be right first. Labour for standard wall and floor tiles is estimated at about $55 to $110 per square metre in 2026, while large format porcelain panels cost more because they are heavier and need flatter floors. Tiling a small bathroom from bare walls costs roughly $2,200 to $4,800 in labour, before tiles, waterproofing, strip-out and the plumber are added. Waterproofing by a licensed applicator adds an estimated $700 to $1,800 for a whole bathroom, and the screed that slopes the floor to the drain is priced on top. Building work valued over $3,300 must be done by a contractor licensed by the Queensland Building and Construction Commission, and plumbing needs a licensed plumber at any value. Choices such as a hobless shower, a linear drain, rectified tiles or epoxy grout each change the labour and the order the trades follow. Older homes may have asbestos sheeting behind the old tiles, which needs testing before anyone starts the strip-out. Unit owners may need body corporate approval, and regional jobs can carry travel and freight costs on top of the tiling rate. Comparing quotes is easiest when every tiler prices the same written scope, with labour, materials and waterproofing on separate lines. Post your job on The Quote Yard and we will connect you with licensed tilers across Queensland who can quote on it.

Bathroom Tilers Across Queensland

Bathroom tiling work in Queensland ranges from a single ensuite floor to a full room rebuilt from the frame with a new shower, drain and wall tiles. We can connect you with licensed tilers who all price the same written description of your bathroom.

Get Free Quotes

At a Glance - Queensland Bathroom Tiling Estimates 2026

Job Price Band How It Is Charged What Changes It Who Does It
Standard tiling labour $55 - $110 per m² Per square metre Tile size, cuts and pattern Licensed tiler
Large format porcelain labour $75 - $140 per m² Per square metre Panel size and floor flatness Licensed tiler, often two
Mosaic or feature wall $110 - $220 per m² Per square metre Piece size and grout lines Licensed tiler
Small bathroom tiled, labour $2,200 - $4,800 Fixed room price Wall height, niches and trims Licensed tiler
Ensuite tiled, supply and install $4,500 - $9,500 Fixed room price Tile range and layout Licensed tiler
Waterproofing, whole bathroom $700 - $1,800 Fixed price per room Shower size and wall heights Licensed waterproofer or tiler
Screed with fall $55 - $120 per m² Per square metre Depth, drain type and set-down Tiler or screeder
Strip-out and disposal $900 - $2,600 Fixed price Layers removed and skip access Demolition crew or renovator
Asbestos sample test $300 - $1,000 Per visit Number of samples and travel Licensed assessor
Epoxy grout upgrade $30 - $55 per m² Added per square metre Joint width and colour Licensed tiler
Linear drain fitted $450 - $1,200 Per drain Length and grate style Plumber and tiler together
Day rate for repairs $550 - $900 per day Per tiler, per day Travel and job size Licensed tiler

What Adds to a Bathroom Tiling Bill

What is involved
Large porcelain panels need flat floors and two people to place them. Grinding, levelling compound and a second tiler can all appear on the quote.
Hobless and step-down showers need a lowered floor or a thicker screed. That work happens before the membrane and is priced separately from the tiles.
Older homes may hide asbestos sheeting behind the tiles. Testing and licensed removal add cost and time before the strip-out can go ahead.
Unit and regional jobs carry their own extras. Lift bookings, rubbish removal, travel and freight can all be added on top of the tiling rate.
Get every tiler to list labour, tiles, adhesive and grout, waterproofing, screed and strip-out on separate lines, and to name the membrane and grout products they are pricing.

Tiling a Queensland Bathroom in the Right Order

Tiling a bathroom in Queensland is the visible end of a job that starts with demolition and relies on plumbing, a screed and a waterproofing membrane hidden underneath. On The Quote Yard's 2026 estimates, standard wall and floor tiling costs about $55 to $110 per square metre in labour, or roughly $2,200 to $4,800 for a small bathroom. Those figures are within the statewide ranges on the Queensland tiling services hub, which deals with floors, outdoor areas, pools and repairs as well as bathrooms. Each stage of the job, taken in the order the trades arrive, raises its own licence, product and price questions.

Bathroom tiling also differs from other rooms because a mistake under the tiles can stay hidden until water reaches a ceiling, a wall frame or the room next door. The Queensland Building and Construction Commission (QBCC) licenses builders and trades in the state. It reports that residential bathroom claims finalised under the Queensland Home Warranty Scheme in 2024 to 2025 averaged almost $25,000 in rectification costs. That figure covers repairs to defective work, so the cheapest tiling price does not always give the cheapest bathroom over ten years. Knowing the sequence, the paperwork and the handful of product choices that matter lets you read a quote with confidence. All prices on this page are estimates for 2026 and should be checked against written quotes for your own room.

Queensland Bathroom Tiling Price Bands for 2026

The bands below are 2026 estimates for bathroom work across Queensland, and they overlap the ranges on the state tiling hub and the Brisbane tiling cost guide. Standard ceramic or porcelain tiles up to about 600 mm long cost roughly $55 to $110 per square metre to lay, measured across walls and floor together. Large format porcelain, meaning panels of 600 by 1200 mm and bigger, raises labour to about $75 to $140 per square metre because each piece is heavier and harder to keep flat. Mosaic sheets and feature walls made of small pieces cost more again, at roughly $110 to $220 per square metre. Tile supply is billed separately, from around $30 per square metre for basic ceramic to $150 or more for good porcelain. Tiling a full ensuite with supply and installation comes to roughly $4,500 to $9,500 once the screed, trims and grout are counted.

Several costs on a bathroom job belong to other trades, and a tiling quote that looks cheap may simply leave them out. Waterproofing by a licensed applicator adds about $700 to $1,800 for a whole bathroom, and the screed with its slope toward the floor waste adds about $55 to $120 per square metre. Stripping out old tiles, sheeting and fittings, then carting them away, costs about $900 to $2,600 depending on how much comes out and whether a skip fits on the property. The plumber's pipework, the electrical work and the shower screen are priced by their own trades and appear on separate invoices. To see the tiling figures inside a whole renovation budget, compare them with the Queensland small bathroom renovation costs.

Job 2026 Estimate How It Is Charged What Moves the Price
Standard wall and floor tiling, labour $55 - $110 per m² Per square metre laid Tile size, cuts and pattern
Large format porcelain, labour $75 - $140 per m² Per square metre laid Panel weight and floor flatness
Mosaic or feature wall, labour $110 - $220 per m² Per square metre laid Piece size and grout lines
Small bathroom tiled, labour only $2,200 - $4,800 Fixed room price Wall height and niches
Ensuite tiled, supply and install $4,500 - $9,500 Fixed room price Tile choice and layout
Ceramic tiles, supply $30 - $80 per m² Per square metre ordered Range and size
Porcelain tiles, supply $50 - $150 per m² Per square metre ordered Finish, size and rectified edges
Licensed waterproofing, whole bathroom $700 - $1,800 Fixed price per room Shower size and wall heights
Screed laid with fall to the waste $55 - $120 per m² Per square metre Depth and drain type
Strip-out and disposal $900 - $2,600 Fixed price Layers removed and skip access
Epoxy grout upgrade $30 - $55 per m² Added per square metre Joint width and colour
Linear drain supplied and fitted $450 - $1,200 Per drain Length and grate style

Square Metre Rates, Room Prices and Day Rates

Tilers price bathroom work in three main ways, and each one moves the risk of hidden problems between you and the tradesperson. With a square metre rate, the tiler multiplies the measured wall and floor area by an agreed figure and adds cuts, niches and trims as extras. Fixed room prices bundle everything inside a written scope into one number, which suits a standard ensuite where the walls have already been stripped and checked. Day rates, estimated at about $550 to $900 per tiler in 2026, suit small repairs. They also suit jobs where nobody can see the substrate, meaning the sheet, slab or screed the tiles stick to, until the old tiles come off.

Two square metre quotes for the same room can differ because of how the area is measured. Some tilers measure the full wall height to the ceiling and others measure only the tiled area, so the area on each quote should be written down and checked against your own tape measure. Wastage is the extra tile bought to cover cuts and breakages, and it is billed in the supply price, not the labour price. Small rooms carry a higher rate per square metre because setting up, mixing adhesive and cleaning take the same time whether the floor is three or eight square metres. Pattern work such as herringbone or diagonal lays adds cutting time and can be priced as a separate surcharge. Asking each tiler to state the area, the wastage allowance and any surcharges lets you compare the labour figure fairly.

Three Ways a Tiling Quote Is Built

$550 to $900, estimated day rate per tiler in 2026, before tiles, adhesive and grout
Pricing method
When it suits
Square metre rate
Measured areas with a clear tile choice and layout
Fixed room price
Stripped rooms where the walls and floor are visible
Day rate
Repairs and rooms where the condition behind old tiles is unknown
Extras and surcharges
Niches, angle-cut (mitred) corners, herringbone and large panels

Each method is fair when the written scope is clear and the area is stated.

Mixed methods on one quote suit renovations where part of the work is still unknown.

Check that a day rate quote names the number of tilers and an estimated number of days, so the total can be judged before work starts.

The Sequence of Trades From Strip-Out to Final Sealant

Bathroom renovations in Queensland follow a fixed order, and each trade relies on the one before it finishing properly. The room is first checked for asbestos if the home is old enough, then stripped back to the frame and slab by a demolition crew or the renovator. Next, a licensed plumber runs the new water and waste pipes, which is called the rough-in, while an electrician moves power points, lights and the exhaust fan circuit. Frame repairs and the timber blocks that will hold vanities, grab rails and shower screens are fitted by a carpenter. Wet area wall sheeting goes on next, and only then does the floor and wall preparation for tiling begin.

Preparation starts with the screed, a layer of sand and cement mortar laid over the slab or floor sheet to set the finished height and slope. That slope is the fall, a gentle grade toward the floor waste so water drains away instead of pooling. The Housing Provisions of the National Construction Code (NCC) call for a continuous fall of at least 1:80 in the shower area. The membrane comes next, which is a rubber-like liquid or sheet coating that stops water passing into the structure, applied by a licensed applicator. Bond breakers go in first at the corners and joints, meaning strips or beads that stop the membrane sticking there so it can stretch when the building moves. Tiling can start only after the membrane has cured for the time on the maker's data sheet, followed by grout, sealant at the junctions and the plumber's fit-off of taps and fixtures.

The weak points in this sequence are the hand-overs, when one trade covers up the work of another. QBCC guidance asks licensees to inspect work before it is covered and to keep clear records, photos and test certificates showing it met the required standards. You can ask for photos of the pipes before sheeting, of the membrane before tiling and of the drain set in its puddle flange, the collar that seals the membrane to the waste pipe. Those photos cost the trades almost nothing to take and are hard to recreate after the tiles are laid.

Stage Who Does It Licence or Record What You Should See
Asbestos check Licensed assessor or removalist Test result before demolition A written result for any old sheeting
Strip-out Demolition crew or renovator Waste disposal records Bare frame and slab, no loose debris
Plumbing rough-in Licensed plumber Plumbing licence at any job value Pipes fixed and pressure tested
Electrical rough-in Licensed electrician Electrical certificate on completion Cables and fan ducting in place
Wet area sheeting Carpenter or renovator Sheet rated for wet areas Joints sealed, no damaged edges
Screed with fall Tiler or screeder Fall to the waste checked Water runs to the drain in a test
Membrane Licensed applicator Photos and certificate Full coverage, bond breakers at joints
Tiling, grout and sealant Licensed tiler Product names on the invoice Flat tiles, sealant at every junction

Matching Each Step to the Right QBCC Licence

The QBCC licence needed for each step depends on the work and its value, and building work valued over $3,300 must be done by a licensed contractor. Plumbing and drainage are different, because the QBCC lists them among the work that needs a licence at any value. The wall and floor tiling licence class covers cutting and fixing tiles to floors, walls, spas and pools, and its published scope also includes applying waterproofing for wall and floor tiling. The QBCC also issues a separate waterproofing licence, whose scope is applying, installing and repairing waterproofing, including the surface preparation. When one business manages the whole renovation and engages the other trades, look for a builder licence. Any of these licensees may also do incidental work outside their class, but only where that extra work is valued at $3,300 or less in total.

Owners working on their own property need an owner-builder permit from the QBCC only when the building work is valued at more than $11,000. That permit never covers plumbing, and electrical work must still be done by a licensed electrician. Before signing, run the name and licence number on the quote through the online register on the QBCC website, which shows the licence classes and whether the licence is current. The class shown should match the work on the quote, so a tiler pricing the membrane needs a class that includes waterproofing. If a renovator is engaging subcontractors, ask for the licence numbers of the tiler and the waterproofer as well as the main contractor.

Which Licence Covers Which Step

$3,300, the value above which bathroom building work must be done by a QBCC licensee
Work
Licence to look for
Tiles on walls and floors
Wall and floor tiling
Membrane under the tiles
Waterproofing, or a tiling class that includes it
Pipes, waste and drains
Plumbing and drainage, at any value
Whole renovation managed by one business
Builder licence

The $3,300 figure applies to the value of the work, and work at or below it is not licensed building work.

Plumbing licences apply no matter how small the job is.

Check the class and expiry date on the QBCC register, since a licence number on a quote proves little by itself.

Hobless, Step-Down and Hobbed Shower Recesses

The shower floor is the single biggest design choice for the tiler, because it sets how water is held inside the shower area. A hobbed shower has a raised kerb, the hob, around the floor that stops water flowing into the room. Hobless showers have no kerb, so the floor runs level with the rest of the bathroom and the slope alone keeps water in place. Step-down showers use a set-down, which is a recess formed in the slab or the floor framing so the shower floor sits lower than the room. Under the NCC Housing Provisions, the highest finished floor level of a step-down shower area must be at least 25 mm lower than the floor outside it. For enclosed hobless showers, the same provisions call for a waterstop, an angle strip bonded into the membrane at the edge of the shower area.

Set-downs are easiest to plan before a slab is poured, so for an existing house the choices are narrower. On a ground slab, a concreter can cut and break out the shower area to drop it, which adds cost and noise and may run into pipes under the slab. The alternative is to raise the rest of the bathroom floor with a thicker screed, which can leave a lip at the doorway unless the door is trimmed. In timber homes, a carpenter can sometimes lower the joists under the shower before the tiler starts, and older raised houses bring extra floor questions for anyone looking to hire a tiler in Brisbane. Whatever the method, the membrane must still run up the walls to the heights the NCC sets.

Level-entry, or hobless, showers suit people who want to stay in their home as they age or who use a mobility aid. They also suit large format tiles, because a single slope toward a long drain needs fewer cuts than a floor that falls from four sides. Grab rails need timber blocking in the wall before sheeting, so plan them with the grab rail installation trade before the tiler arrives. In a hobless shower, a fixed glass panel placed near the drain line keeps spray inside the shower area.

Shower Type How Water Is Held Build Work Needed Estimated Extra Cost, 2026
Hobbed shower Raised kerb around the floor Hob built and sealed before the membrane $300 - $700 for the hob
Hobless, built-up floor Fall and screen placement Thicker screed across the room $400 - $1,100 in screed
Step-down into a slab Floor at least 25 mm lower Concrete cut and plumbing checked $1,200 - $3,500
Step-down in timber framing Lowered joists and floor sheet Carpenter alters the joists $900 - $2,800
Pre-formed shower base Moulded tray with a fixed slope Base set level before wall tiling $350 - $1,500 plus fitting

Centre Wastes, Linear Drains and Tile Insert Grates

The drain style affects how the tiler shapes the floor and which tiles can be used without awkward cuts. A centre waste, also called a point drain, sits in the middle of the shower and needs the floor to fall from four directions. That means the tiles are cut along diagonal lines toward the drain, called envelope cuts, which works well with small tiles and mosaics. Linear drains are long narrow channels set along one wall or at the shower entry, so the whole floor falls in one direction. One-direction falls let large tiles run without diagonal cuts, which makes linear drains a good match for large format porcelain.

Linear drains come in two broad styles that change the look and the cost. Grate drains show a strip of stainless steel with slots or a pattern, and Stormtech makes linear drainage grates in several lengths and finishes. Tile insert drains have a shallow tray that the tiler fills with a strip of the floor tile, so only a thin gap shows at each side. Wedi makes Fundo shower floor elements, pre-sloped foam bases with a drain built in that can replace a sand and cement screed in some rooms. The plumber connects the waste pipe, while the tiler sets the drain body at the right height for the finished tile. If those two trades do not agree on heights before the screed, the drain can end up higher than the tiles or too low for water to reach it.

Centre Waste or Linear Drain

Detail
What it means for the tiles
Centre waste
Four-way fall and envelope cuts toward the drain
Linear drain with grate
One-way fall, visible metal strip
Tile insert drain
One-way fall, tile strip set in the tray
Pre-sloped foam base
Fall built into the board, drain included

Linear drains need the plumber and tiler to agree on the drain height before the screed is laid.

Tile insert trays need a strip cut from the same tile batch as the floor.

Write the drain brand, length and finish into the quote, as drain prices vary widely between plain grates and tile insert models.

Wall Tiles, Floor Tiles and the Numbers on the Carton

Bathroom tiles look alike in a showroom, but the walls and the floor need different properties. Wall tiles can be a lighter ceramic body that absorbs more water and is not made to take foot traffic, so they should stay on the walls. Porcelain is a dense tile body defined in the international tile standard by water absorption of 0.5 per cent or less, which suits floors and showers. Glazed tiles also carry a PEI rating, an abrasion class up to 5 based on a test developed by the Porcelain Enamel Institute, where the lowest classes suit walls only. Bathroom floors need a higher class than a feature wall, and the class is printed on the carton or the supplier's data sheet. Checking both numbers before ordering avoids the problem of a soft wall tile ending up on a shower floor.

Slip resistance is the other number that matters, and in Australia it is classified under AS 4586, the standard for the slip resistance of new pedestrian surfaces. The P-rating comes from a wet pendulum test, where a rubber slider swings across a wet tile, and runs from P0 for the most slippery to P5 for the most grip. There is also an R-rating from a ramp test, where a person walks on an oiled tile as the ramp tilts, and it runs from R9 to R13. Standards Australia publishes the standard and a handbook on matching ratings to locations. Shower floors and the area in front of a bath get wet every day, so a tile with a higher wet rating gives better footing there.

Tile retailers in Queensland can show test details such as slip ratings on their product listings, so check the listing before you buy. Ask for the test certificate behind any rating that will decide your choice, since the same design can come in a polished and a matt finish with very different results. Small mosaics on a shower floor give extra grip through the grout lines and bend more easily around a centre waste. On the main floor, a matt or textured finish is easier to clean than a heavily structured outdoor tile, which can trap soap.

Rating What It Measures Where It Matters What to Look For
Water absorption How much water the tile body takes up Shower floors and walls Porcelain at 0.5 per cent or less
PEI class Wear resistance of the glaze Main bathroom floor A class above 1 for any floor
P-rating Grip in a wet pendulum test Shower floor and wet zones A higher P class where feet get wet
R-rating Grip in an oil-wet ramp test Some imported tiles show only this Ask for the P-rating as well
Rectified edge Edges ground square after firing Large tiles with narrow joints Rectified marked on the carton
Batch and shade code Colour run from one firing Every carton in the order All cartons from one batch

Rectified Edges, Lippage and Big Porcelain Panels

Quotes for large format porcelain use two terms, rectified and lippage, that a homeowner may not have met before. A rectified tile has had its edges ground square after firing, so every piece is close to the same size and the grout joints can be as thin as about 2 mm. Lippage is the height difference between the edges of neighbouring tiles, and it shows up badly on long tiles lit from the side by a window or downlight. Long tiles also bow slightly in the kiln, so tile makers limit how far one tile may be offset from the next, and those limits are printed on the carton or data sheet. Raimondi makes tile levelling systems, clips and wedges that pull adjoining edges flush while the adhesive sets.

Flatness of the floor and walls matters more as tiles get larger, because a big tile cannot bend over a hump the way a small one can. Grinding high spots or pouring a self-levelling compound is a separate step, and floor levelling and screeding specialists price it by the square metre. Cutting heavy panels cleanly needs long rail cutters and wet saws, and Rubi, Montolit and Sigma each make manual tile cutters sized for long tiles. Two people may be needed to carry and place each panel, so a large format quote may list a second tiler for part of the job. Units without lift access add carrying time, and a 1200 mm tile may not fit up a tight stair at all. Before choosing panels for a small room, check that the tiler has handled that size and can show finished work.

What Large Panels Change

Item
Effect on the job
Rectified edges
Thin joints, so flatness errors show more
Levelling clips
Hold edges flush while adhesive sets
Floor preparation
Grinding or levelling compound before tiling
Second tiler
Needed to lift and place heavy panels

Surcharges for large panels cover handling, cutting and the extra preparation they need.

Flat floors cost less to tile well than floors that need correction under each panel.

Ask whether the quote includes levelling clips and floor correction, or whether those will be added after the old tiles come off.

Adhesive Coverage, Back-Buttering and the Boards Behind the Tiles

Tiles last only as long as the adhesive bond behind them, which is why the quote should say how full coverage will be achieved. Tile adhesive is a cement-based or polymer-modified mortar spread with a notched trowel, and Ardex, Mapei and Dunlop each make tile adhesives rated for wet areas. Back-buttering means spreading a thin coat of adhesive on the back of each tile as well as on the wall or floor, so no hollow pockets are left under it. AS 3958, the Australian standard for installing ceramic tiles, covers how much of each tile's back should be in contact with the adhesive. Tiles laid on dabs of adhesive can sound hollow when tapped, which tilers call drummy, and those tiles can crack or lift later. Fixing a floor that has already gone drummy is a separate job, priced with other tile repairs in Queensland.

Walls in a shower need a sheet made for wet areas, fixed and sealed to the maker's instructions. Fibre cement wet area sheet is one choice, while Wedi makes foam building boards that are light, cut with a knife and can form niches and benches. Old render, the cement coating on brick walls, may be kept if it is sound and flat, though a tiler should tap it all over and remove any loose sections first. Each choice affects how the membrane bonds, so the waterproofer should approve the substrate before applying anything. Sheet joints and screw heads need treatment before the membrane, and that step should be listed on the quote.

Timber floors move more than concrete, so they need extra layers before tiles go down. One method fixes fibre cement sheet over the floorboards or sheet flooring to add stiffness and a stable face for adhesive. Another adds an uncoupling membrane, a thin plastic mat that lets the floor and the tiles move slightly without cracking each other, and Schluter-Systems makes Ditra uncoupling membranes for this purpose. If joists are undersized or the floor bounces, a carpenter or the subfloor repairs trade should stiffen the frame first. Tiling straight onto a springy timber floor can crack the grout and tiles as the boards flex underfoot.

Substrate Where You Find It Preparation Before Tiling Estimated Extra Cost, 2026
Concrete slab Ground floor homes and units Clean, grind high spots, screed for fall $15 - $45 per m² for grinding
Fibre cement wet area sheet Shower and bathroom walls Joints taped and sealed Included in sheeting price
Foam building board Niches, benches and walls Joints sealed with maker's tape $60 - $120 per m² supplied
Old render on brick Older brick homes Tap test and patch loose areas $200 - $900 per room
Timber floor with sheet underlay Raised timber houses Fibre cement sheet fixed to the floor $40 - $90 per m²
Timber floor with uncoupling mat Raised timber houses Mat bonded before tiling $45 - $85 per m²

Grout and Sealant Choices for a Damp Queensland Bathroom

Grout and sealant do different jobs, and a bathroom needs both in the right places. Grout is the hard, cement or resin filler pressed into the joints between tiles across flat surfaces. Sealant is a flexible bead, such as silicone, placed where two surfaces meet or where the building moves, such as internal corners, the floor-to-wall junction and around a bath. Those flexible joints act as movement joints, gaps filled with a soft material so tiles can expand and shrink without cracking or pushing off the wall. Kerakoll makes Fugabella Color, a resin-cement grout, and Bostik makes silicone sealants for wet areas. Your quote should name both products and say where each one goes.

Epoxy grout is a two-part resin that resists stains and water better than cement grout, but it is slower to apply and has to be cleaned off quickly. Mapei makes Kerapoxy epoxy grout and Laticrete makes SpectraLOCK epoxy grout, and both are used in showers and on benches. The 2026 estimate for upgrading from cement to epoxy grout is about $30 to $55 per square metre of tiling. Cement grout can be sealed with a penetrating sealer once it has cured, and Selleys makes White For Life grout sealer for this job. Sealer reduces staining, but it does not replace a working exhaust fan or regular cleaning.

Damp Queensland summers keep bathroom surfaces wet for longer, and mould grows on grout and sealant that never dry out. Fitted by the exhaust fan installation trade, a ducted fan that vents outside the house removes moist air far faster than an open window. Mould-resistant neutral cure silicone, a type that gives off no acid as it sets, is better suited to wet areas than general purpose sealant from a hardware shelf. For a shower that already has stained grout or leaking corners, shower regrouting and leak repairs may fix the problem before a full retile is needed.

Choosing Joint Materials

Joint
Material to expect
Between tiles on walls
Cement grout with additive, or resin grout
Shower floor joints
Epoxy or resin grout for stain resistance
Internal corners and floor edges
Neutral cure silicone sealant
Around the bath and vanity
Flexible sealant, never hard grout

Hard grout in a corner cracks when the frame and slab move with the seasons.

Sealant is a maintenance item and needs renewing over the life of the bathroom.

Check that the quote names the grout and sealant brands and colours, and that corners and floor edges get sealant, not grout.

Setout, Niches and Ordering Tiles From One Batch

Setout is the planning of where full tiles and cut tiles will fall before any tile is stuck down. Good setout starts from the most visible line, such as the wall opposite the door or the centre of the vanity, and avoids thin slivers of tile at corners. Wall and floor joints can be lined up so the grout lines run straight from the floor into the walls. Niches, which are recessed shelves built between wall studs, look best when their edges fall on grout lines instead of cutting across tiles. The carpenter frames the niche, and the waterproofer must line it fully before the tiler finishes the edges with tile or metal trims.

Ordering enough tiles from one batch is cheaper than trying to match a shortfall later. As a working estimate, straight lays need about 10 per cent extra, while diagonal or herringbone layouts need closer to 15 per cent because of the extra cuts. Each carton carries a batch or shade code from the factory firing, and tiles from different batches can differ in colour and size. Keep at least a few spare tiles from the same batch, labelled and stored dry, because a discontinued tile can otherwise mean replacing a whole floor to fix one crack. Your tiler should check the codes on every carton before opening them, since returned cartons need to be unopened.

Layout Extra Tile to Order Effect on Labour Notes
Straight lay, small tiles About 10 per cent No surcharge Simplest setout for small rooms
Straight lay, large format About 10 to 12 per cent Large format surcharge Breakage costs more per piece
Brick or offset bond About 10 to 12 per cent Small surcharge Follow the maker's offset limit
Diagonal lay About 15 per cent Cutting surcharge More cuts at every wall
Herringbone or chevron About 15 per cent Pattern surcharge Slow setout and many small cuts
Mosaic sheets About 10 per cent Mosaic rate applies Sheets cut cleanly around drains

Old Wall Sheeting, Asbestos Tests and Silica Dust

Homes built before 1990 may contain asbestos, and the QBCC notes it has been found in splashbacks in wet areas and in vinyl and carpet underlay. Queensland's asbestos guide to a typical 1970s house shows asbestos-containing wall sheets plastered and then tiled over, and asbestos sheeting behind baths and shower recesses. That makes the strip-out stage the riskiest point of an older bathroom job, because breaking those sheets releases fibres. Testing a sample through the asbestos testing and inspection trade costs an estimated $300 to $1,000 in 2026 and gives an answer before demolition. No licence is needed to remove less than 10 square metres of bonded, non-friable asbestos, but safety precautions and proper disposal still apply. Removing 10 square metres or more needs a B class licence, while friable asbestos, which crumbles by hand, needs an A class licence, and both are held by firms offering asbestos removal.

Cutting tiles creates a different dust hazard, because ceramic and porcelain contain crystalline silica. Workplace Health and Safety Queensland's code of practice on silica dust in construction commenced on 1 May 2023 and gives tile saws as an example task. For tile saws, it lists wet cutting with an integrated water delivery system as a control, and on-tool dust collectors must be rated M or H class, the medium and high hazard dust classes. Norton Clipper makes wet tile saws with water feed built in, and those suit cutting porcelain in a garage or yard. Queensland also banned engineered stone from 1 July 2024, and WorkSafe Queensland lists porcelain, and sintered stone (a heat-fused slab) made without resin, among the exemptions.

Asbestos and Silica in a Bathroom Job

Hazard
What applies
Asbestos sheeting in pre-1990 homes
Test before demolition, licensed removal at 10 m² or more
Bonded asbestos under 10 m²
No licence, but safety precautions and proper disposal
Silica from tile cutting
Wet cutting or M or H class extraction
Engineered stone vanity tops
Banned from 1 July 2024 in Queensland

Asbestos test results should be in writing before the demolition price is fixed.

Cutting outdoors does not remove the need for silica controls.

If a quote for an older bathroom has no line for asbestos testing, ask why before any wall sheet is broken.

Deposits, Contract Levels and Home Warranty on a Tiling Job

Queensland contracts for domestic building work of $3,300 or more are regulated contracts, and bathroom tiling and renovation jobs can fall inside them. Level 1 contracts cover a price between $3,300 and $20,000, while level 2 contracts cover work priced at $20,000 or more, and both must be written, dated and signed. For level 2 work, the contractor must give you the QBCC Consumer Building Guide before you sign. The contractor must also give you a copy of the signed contract, with any plans and specifications, within five business days of entering the contract. Deposits are capped at 20 per cent for work up to $3,300, 10 per cent for work from $3,301 to $19,999, and 5 per cent for work of $20,000 or more. On a tiling-only job priced at $12,000, the deposit can therefore be no more than $1,200.

Contracts for work valued over $3,300 must also tell you about the five business day cooling-off period. If you withdraw in that time, you give written notice and pay the contractor $100 plus any out-of-pocket expenses reasonably incurred. Residential work valued over $3,300, counting labour, materials and goods and services tax (GST), also needs a home warranty premium paid to the QBCC. The licensed principal contractor collects the premium from the owner and pays it before work starts or within 10 business days of signing, whichever comes first. Progress payments after the deposit should match work actually completed, such as strip-out, membrane and tiling stages.

Time limits for home warranty claims are much shorter for non-structural defects than for structural ones. Those defects must be noticed within six months of completion and the claim lodged with the QBCC within seven months. Structural defects are covered for six years and six months, and claims must be lodged within three months of noticing the problem. Domestic building disputes that cannot be settled can go to the Queensland Civil and Administrative Tribunal, known as QCAT. Raising a defect in writing with the contractor first, with dated photos, gives you a record to use in any later QBCC claim or QCAT application.

Unit Bathrooms and Jobs Outside the South East

Bathrooms in units add a layer of approval before the tiler can start. The Body Corporate and Community Management Act 1997 governs community titles schemes in Queensland, and each scheme's by-laws are the rules it makes for its common property. Work that touches common property, or changes floor coverings where by-laws control them, may need written body corporate approval before it starts. Building managers also set working hours, lift bookings and rules for carrying rubbish through shared areas. Water shut-offs that affect other lots are planned with the building manager as part of strata and body corporate plumbing work.

High-rise unit bathrooms on the coast raise extra questions about lift access, rubbish chutes and noise rules for anyone planning to hire a tiler on the Gold Coast. Holiday homes renovated while the owners live elsewhere need photo sign-offs and staged payments when you hire a tiler on the Sunshine Coast. Homes in new estates may still be inside the builder's defect period, so check that before you hire a tiler in Moreton Bay to change the bathroom. In towers, carrying tiles, adhesive and rubbish through shared areas can add several labour hours to an otherwise standard bathroom.

Outside the south east, distance can change a bathroom quote more than the tiling rate does. Tilers who travel to a regional or remote town may add travel time, fuel and accommodation for a job that runs over several days. Tiles, adhesive and membrane may need freight from a larger centre, so choosing products already held by a local supplier can shorten lead times. Booking the plumber, waterproofer and tiler to follow each other closely avoids extra trips when one trade finishes early or late. In the north, line up the plumbing side early through Townsville plumber hiring or Cairns plumber hiring, so the plumber and tiler can follow each other on site.

Closer to Brisbane, landlords who hire a tiler in Logan and the Redlands can ask for the work to be programmed between tenancies, so tenants are not left without a shower. Older cottages and newer estates to the west each bring their own floor and slab questions when you hire a tiler in Ipswich. Membrane cure times on the maker's data sheet lengthen when the air is humid or cool, which can add a day to a tight schedule. Writing a realistic program into the quote removes pressure to tile over a membrane before it is ready.

Situation Extra to Expect Estimated Cost, 2026 How to Keep It Down
Body corporate approval Application and by-law check Time, sometimes a small fee Apply before booking trades
Unit with lift booking Restricted hours and carrying time $150 - $500 in labour Book the lift for delivery and removal
Rubbish from a tower Bagged removal through shared areas $300 - $900 Confirm the route with the manager
Regional travel Travel time and fuel $1 - $2 per km beyond a set radius Group trades into one visit
Remote job over several days Accommodation and meals $150 - $300 per night per tiler Agree the daily allowance in writing
Freight of tiles and products Delivery from a larger centre $150 - $600 per order Choose products held locally

Red Flags in a Queensland Bathroom Tiling Quote

Some quote wording should prompt a second look before you sign anything. Quotes that say waterproofing is included but give no licence number, product name or certificate leave you with nothing to check later. Phrases such as tile as required or make good, without areas or a list of rooms, let the scope shrink after the deposit is paid. A price per square metre with no stated area makes it impossible to compare one quote with another. Missing allowances for asbestos testing in an older home, or for floor correction under large panels, can turn into variations, meaning extra charges added to the contract, once the old tiles are off.

Payment terms deserve the same attention as the tiling scope. Any deposit above the legal cap for the contract value is a warning sign, as is a request for most of the price before the membrane is on. Cash-only terms with no written contract give you little to rely on if the shower leaks. Timelines that allow no cure time between membrane and tiles are a quality risk, whatever the price.

Wording That Needs Questions

Wording or term
Question to raise
Waterproofing included
Who applies it, with which licence and product?
Tile as required
How many square metres are included, and on which walls?
Make good
What exactly is repaired, and to what finish?
Deposit above the cap
Why is the deposit higher than the legal limit?

Clear written answers to these questions give you a firmer quote to sign.

Tilers who set out the scope in writing are easier to hold to it later.

Keep every written answer with the contract, since emails and messages can show what was agreed.

Lining Up Bathroom Tiling Quotes on One Written Scope

Comparable quotes start with one written scope that every tiler prices. List the room size, wall heights to be tiled, the shower type and drain, the tile sizes and whether you or the tiler supplies tiles. Add the age of the home, any known asbestos result, the floor type and access details such as stairs or a lift. Photos of the room, the ceiling below in a unit and the outside access help each tiler estimate preparation without guessing. State whether the waterproofing, screed and strip-out should be inside the tiling price or priced separately. When every quote answers the same list, the differences in price show up as real differences in work.

When the quotes arrive, line them up item by item instead of by the total. Labour, tile supply, adhesive and grout, waterproofing, screed, trims and sealant should each appear as a separate figure. Check that the membrane product and the licence of whoever applies it are named, and that the program allows its full cure time. The membrane's own scope belongs in a separate bathroom waterproofing quote, so the tiling quote only needs to show who applies it and when. If one quote is far lower, look for the missing lines before assuming it is better value.

Bathroom tiling can be one part of a bigger renovation, and that changes who you should be comparing. A tiler engaged directly suits a room where you manage the plumber, electrician and waterproofer yourself and can keep them in order. For a full rebuild, a renovator or builder is the better match, and that scope is priced as a Queensland bathroom renovation. A tiling-only quote and a full renovation quote cover different work, so group quotes by scope before judging price.

Bathroom Tilers Across Queensland

Tiling prices on this page apply across Queensland. Jobs close to the main centres rarely carry a travel charge, while outer suburbs and fringe areas sometimes do.

▶ Brisbane Inner City 20 areas

CBD & North

Brisbane CBD Fortitude Valley Spring Hill Kelvin Grove Red Hill Paddington

Inner East

New Farm Teneriffe Newstead Bulimba Hawthorne

Inner South

South Brisbane West End Highgate Hill Woolloongabba Kangaroo Point

Inner West

Toowong Milton Auchenflower St Lucia
▶ Greater Brisbane 37 areas

Brisbane Suburbs

Indooroopilly Carindale Sunnybank Chermside Aspley Nundah Clayfield Mount Gravatt Eight Mile Plains Kenmore The Gap Forest Lake

Ipswich

Ipswich Springfield Lakes Redbank Plains

Logan

Loganholme Logan Central Beenleigh Woodridge Browns Plains Springwood Shailer Park Daisy Hill

Moreton Bay

North Lakes Redcliffe Caboolture Strathpine Petrie Deception Bay Bribie Island Morayfield

Redlands

Cleveland Wynnum Manly Victoria Point Capalaba Redland Bay
▶ Gold Coast & Surrounds 23 areas

Central Gold Coast

Southport Surfers Paradise Broadbeach Benowa Carrara Nerang Labrador Runaway Bay

Southern Gold Coast

Burleigh Heads Palm Beach Currumbin Miami Mermaid Beach Coolangatta Varsity Lakes Mudgeeraba Robina

Northern Gold Coast

Coomera Upper Coomera Helensvale Hope Island Pimpama Ormeau
▶ Sunshine Coast 15 areas

Coastal

Maroochydore Mooloolaba Caloundra Coolum Beach Alexandra Headland Kawana Waters Birtinya

Noosa

Noosa Peregian Beach Sunshine Beach

Hinterland

Buderim Nambour Sippy Downs Montville Maleny
▶ Far North Queensland 17 areas

Cairns & Northern Beaches

Cairns Palm Cove Trinity Beach Gordonvale

Port Douglas & Daintree

Port Douglas Mossman Kuranda Cooktown

Atherton Tablelands

Atherton Mareeba Ravenshoe Yungaburra

Cassowary Coast

Innisfail Mission Beach Babinda Tully Cardwell
▶ Whitsundays & Central Coast 16 areas

Townsville Region

Townsville Magnetic Island Charters Towers Ayr Ingham Home Hill

Whitsundays

Airlie Beach Cannonvale Proserpine Bowen Collinsville Hamilton Island

Mackay Region

Mackay Sarina Moranbah Clermont
▶ Fraser Coast & Wide Bay 17 areas

Fraser Coast

Hervey Bay Maryborough Rainbow Beach

Bundaberg Region

Bundaberg Bargara Childers Gin Gin Agnes Water

South Burnett

Gympie Kingaroy Nanango Murgon

Central Queensland

Gladstone Rockhampton Yeppoon Biloela Emerald
▶ Darling Downs & Outback 17 areas

Darling Downs

Toowoomba Warwick Stanthorpe Gatton Dalby Goondiwindi

Western Downs

Roma Chinchilla Miles St George

Outback Queensland

Longreach Mount Isa Charleville Barcaldine Winton Cloncurry Cunnamulla

Queensland Bathroom Tiling FAQ

Does a QBCC tiling licence cover the membrane under the tiles?
The QBCC's published scope for the wall and floor tiling licence includes applying waterproofing for wall and floor tiling. A separate waterproofing licence also exists for applicators who do membranes as their main trade. Check the licence classes on the QBCC register for whoever will apply the membrane on your job.
How long should the membrane cure before tiling starts?
Cure time depends on the membrane product, the number of coats, and the temperature and humidity in the room. The maker's data sheet sets the minimum, and humid or cool weather can lengthen it. Your quote's program should allow that full time before any tile goes down.
Can a step-down shower be built on an existing concrete slab?
It can, but the shower area has to be cut out and lowered, or the rest of the floor raised with a thicker screed. The NCC Housing Provisions require the step-down shower floor to sit at least 25 mm below the floor outside it. Before any cutting starts, a plumber should check for pipes under the slab.
What is the largest deposit a tiler can take on a $12,000 bathroom?
Work valued from $3,301 to $19,999 has a maximum deposit of 10 per cent in Queensland, so the cap on a $12,000 job is $1,200. Jobs of $20,000 or more have a 5 per cent cap. Later progress payments should match the work completed on site.
Why do some tilers avoid large tiles on a centre waste?
Centre wastes need the floor to fall from four directions, which means diagonal cuts toward the drain. Large flat panels do not follow those slopes well, so a linear drain with a one-direction fall is the better match. Small tiles or mosaics suit a centre waste better.
Which details on a tile carton matter for a bathroom floor?
Look for the slip rating under AS 4586, the PEI wear class for glazed tiles, and the water absorption figure. The batch or shade code should match on every carton you buy. Ask the supplier for test certificates if a rating decides your choice.
Should old wall sheeting be tested before the bathroom is stripped?
Yes, if the home was built before 1990, because asbestos has been found in wet area sheets and splashbacks in Queensland homes. Testing a sample before demolition tells you whether licensed removal is needed. Removing 10 square metres or more of bonded asbestos requires a licensed removalist.
Who seals the joint where the bath meets the wall tiles?
The tiler normally finishes that joint with a flexible sealant after grouting, since hard grout there will crack. Bostik makes silicone sealants for wet areas, and a mould-resistant neutral cure type suits bathrooms. The quote should state the sealant product and colour.
Do unit owners need approval to retile a bathroom?
It depends on the scheme's by-laws and whether the work touches common property. Read the by-laws and ask the body corporate in writing before booking trades. Building managers also set working hours, lift bookings and rubbish removal rules.
Why might a regional Queensland quote include accommodation or freight?
Tilers travelling to distant towns may charge travel time, fuel and accommodation when a bathroom takes several days. Tiles and membranes may also need freight from a larger centre. Grouping trades into one visit and choosing locally held products can reduce those costs.

Bathroom Tiling Specialists

For Trades & Contractors - QLD

A bathroom tiling job in Queensland relies on several trades working in a set order. A licensed plumber handles the rough-in and fit-off, an electrician moves circuits and fits the fan, and a carpenter or demolition crew prepares the frame. These are the services booked alongside bathroom tiling around the state.

Compare Queensland Bathroom Tiling Quotes

Tell us your town or suburb, the room size, the shower type and the tiles you want, and compare quotes from licensed tilers who are all pricing the same bathroom.

Get Free Tiling Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 3 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All Queensland tradies are required to hold appropriate QBCC licences. Verify at the Queensland Building and Construction Commission.
Prices are estimates based on typical Queensland tiling rates in 2026. Your final price will depend on the tile, the floor or wall preparation and access, so compare written quotes that list labour, materials and waterproofing separately.
Need work done? Get free quotes. Post a Job – It's Free