Looking for a Builder in Sydney?

Tell us your suburb, the type of project, the size in square metres, the year the house was built and whether you already have drawings or approval. We will pass that brief to local builders, so every quote you receive prices the same plans.

Get Free Builder Quotes

Sydney Building Price Guide

Single room ground floor extension$95,000 - $190,000
Ground floor extension, per sq m$2,500 - $4,500
Inner and eastern extension, per sq m$3,000 - $6,000
First floor addition, per sq m$3,500 - $5,500
Second storey addition$320,000 - $620,000
Project home, per sq m$1,800 - $2,500
Custom home, per sq m$2,500 - $4,500
Granny flat, complying development$145,000 - $280,000
Kitchen renovation$28,000 - $70,000
Demolition, inner Sydney house$30,000 - $45,000

These figures are 2027 estimates for building work in Sydney. Your price depends on the design, the lot, the approval pathway, heritage or bush fire controls and what is found once the existing house is opened up.

Hire a Licensed Builder in Sydney and Compare Quotes With Confidence

Hiring a builder in Sydney goes best when the design, the approval pathway and the paperwork are settled before anyone prices the job. For 2027, Sydney figures put a single room ground floor extension at about $95,000 to $190,000, and a second storey addition at $320,000 to $620,000. Ground floor extensions run at about $2,500 to $4,500 a square metre across the metro area, with inner and eastern suburbs reaching $6,000. Residential building work over $5,000 needs a contractor licence, which anyone can check on the free NSW Verify licence tool. Many extensions and new homes qualify as complying development, a fast combined approval from council or a certifier, while others need a development application. Heritage conservation areas, common across the inner suburbs, generally rule out that faster pathway. Sydney Water expects to see your plans through its Tap in service whenever a council or certifier must approve the building. You, not the builder, appoint the principal certifier who inspects the work and issues the occupation certificate. Inner city terraces may also need council approval for hoardings or a works zone before materials can be delivered. Apartment owners need owners corporation approval for most renovations beyond cosmetic work. Homes built before the late 1980s may hide asbestos, so testing belongs before demolition. Post your job on The Quote Yard and we will connect you with licensed builders across Sydney who can quote on your plans.

Sydney Building Work Covered

Building work across Sydney runs from a single room at the back of a terrace to a second storey, a granny flat or a full knockdown rebuild. We can connect you with local licensed builders who all price the same written brief for your project.

Get Free Quotes

At a Glance - Hiring a Builder in Sydney, 2027 Estimates

Job Price Range How It Is Charged What Drives It In Sydney Who Can Do It
Single room ground floor extension $95,000 - $190,000 Whole job Room size and the join to the old house Licensed extension builder
Extension, inner and eastern suburbs $3,000 - $6,000 per sq m Per square metre Narrow lots and heritage controls Licensed builder
Extension, Western Sydney $2,500 - $5,000 per sq m Per square metre Slab, roof form and finishes Licensed builder
Second storey addition $320,000 - $620,000 Whole job Frame strengthening and stairs Builder with an engineer
Custom new home $2,500 - $4,500 per sq m Per square metre Design detail and site slope New home builder
Granny flat, complying development $145,000 - $280,000 Whole job Size, services and yard access Secondary dwelling builder
Bathroom, same layout $22,000 - $42,000 Whole job Waterproofing and fittings Builder or bathroom renovator
Structural repair to a terrace $18,000 - $85,000 Whole job Walls, footings and party walls Builder with an engineer
Design and approval $5,000 - $20,000 Fees for the project Pathway and number of reports Designer and certifier
Structural engineering $2,000 - $8,000 Per design Spans, footings and soil Structural engineer
Heritage controls on an extension Adds $15,000 - $60,000 Added to the build Reports, matching and design limits Builder and heritage consultant
Rock excavation, North Shore Adds $8,000 - $45,000 Added to site works Rock depth and machine access Builder or excavation crew

What Pushes a Sydney Building Price Up

What is involved
Narrow terrace lots leave little room for skips, cranes and deliveries. Council approval for hoardings or a works zone adds time and fees.
Rock under the block slows excavation for footings and basements. Sydney price guides add about $8,000 to $45,000 for it on the North Shore.
Heritage conservation areas bring reports, longer assessment and matching materials. Those controls are estimated to add $15,000 to $60,000 to a comparable extension.
Older houses may hide asbestos in walls, eaves and floors. Testing before demolition adds a cost but avoids a much larger surprise later.
Ask each builder to show demolition, structure, services, finishes, fees and provisional sums on separate lines. Quotes laid out that way can be compared item by item without guesswork.

Before a Sydney Builder Prices Anything

A builder is the licensed contractor who takes charge of a construction job, from the slab or frame through to handover, and coordinates the other trades on site. In Sydney that usually means a rear extension on a terrace, a first floor addition on a brick bungalow, a knockdown rebuild or a granny flat in a deep back yard. Services, costs and contract basics for the whole state sit in the NSW guide to licensed builders, so this page stays with hiring under Sydney's own approvals and authorities. The advice here follows the order a Sydney project tends to run, from price checks and licences to certifiers, Sydney Water and the street outside. Each rule is described as it stood when we checked, so confirm the current position before you sign anything.

Start with one written brief that every builder will receive, so the prices that come back describe the same project. List the suburb, the lot size, the year the house was built and whether it is freestanding, semi-detached, a terrace or an apartment. Attach the architect's or building designer's drawings if you have them, or a sketch with room sizes if the design is still loose. Say which approval you expect, whether a development application or a complying development certificate, because that decides how detailed the drawings must be. Note anything you already know about the block, such as a sewer line in the back yard, a heritage listing or a steep driveway. For the earlier stage of finding and shortlisting names, the Sydney builder search guide covers where to look and what to ask on the first call.

Sydney Building Prices for 2027 and Where They Come From

The prices below are 2027 estimates drawn from current Quote Yard price guides for New South Wales, using Sydney figures wherever they are published. A single room ground floor extension is estimated at about $95,000 to $190,000, while a second storey addition is estimated at $320,000 to $620,000. Measured by area, ground floor extensions run at about $2,500 to $4,500 a square metre and first floor additions at about $3,500 to $5,500. A project home, meaning a design chosen from a volume builder's standard range, is estimated at $1,800 to $2,500 a square metre, and a custom home at $2,500 to $4,500. A granny flat approved as complying development is estimated at $145,000 to $280,000 across greater Sydney. Every figure moves with the design, the site and the finishes, so treat them as a test for quotes rather than a budget.

Location within Sydney changes the per square metre rate for extensions noticeably. Inner and eastern suburbs, along with the North Shore and Northern Beaches, are estimated at about $3,000 to $6,000 a square metre. Western Sydney is estimated at $2,500 to $5,000, while the Hills and North West and the south and Sutherland areas sit at $2,500 to $5,500. Narrow terrace lots, rock under the North Shore and heritage controls in older suburbs all add cost, with rock excavation alone adding an estimated $8,000 to $45,000. Regional figures, breakdowns by extension type and a comparison with building new are set out in the guide to home extension costs.

Demolition is priced separately on a knockdown rebuild, and Sydney estimates vary with access to the site. A standard demolition in the inner west, inner city or eastern suburbs is estimated at $30,000 to $45,000, rising to $50,000 to $70,000 or more on a tight site. Western and south west Sydney demolitions are estimated at $20,000 to $32,000 for a standard block, with harder sites at $35,000 to $50,000. Asbestos removal, service disconnections and tree work sit on top, and the knockdown rebuild guide breaks those items down by area.

Project 2027 Estimate How It Is Charged What Changes It
Single room ground floor extension $95,000 - $190,000 Whole job Room size and the roof join
Ground floor extension $2,500 - $4,500 per sq m Per square metre Suburb, slab and roof form
First floor addition $3,500 - $5,500 per sq m Per square metre Strengthening the frame below
Second storey addition $320,000 - $620,000 Whole job Stairs, roof and weather cover
Project home $1,800 - $2,500 per sq m Per square metre Range design and upgrades
Custom home $2,500 - $4,500 per sq m Per square metre Architect design and finishes
Granny flat, complying development $145,000 - $280,000 Whole job Size, services and access
Kitchen renovation $28,000 - $70,000 Whole job Layout changes and joinery
Bathroom, same layout $22,000 - $42,000 Whole job Waterproofing and fittings
Deck or pergola $12,000 - $38,000 Whole job Size, height and materials
Demolition, inner Sydney $30,000 - $45,000 Whole house Access and shared walls
Demolition, Western Sydney $20,000 - $32,000 Whole house Asbestos and tree work

Extension Builder, Renovator or New Home Builder

Builders in Sydney tend to specialise, and matching the business to the project saves a lot of wasted quoting. An extension builder is used to opening up the back of an occupied house, tying a new roof into an old one and keeping the weather out. A renovation builder works mostly inside the existing footprint, rebuilding kitchens, bathrooms and living areas while services are rerouted. Custom and volume home builders focus on new houses, either on a vacant lot or after a knockdown, and many will not take on an alteration at all. Ask each business what share of its recent work matches yours, and ask to see a finished example of that type.

Some projects call for a narrower specialist than a general builder. A granny flat, which NSW planning rules call a secondary dwelling, is often built by firms that do little else and know the complying development standards well. Duplexes, meaning two attached homes on one lot, raise extra approval and title questions, so a builder with duplex experience is the safer choice. A bathroom on its own rarely needs a general builder, and a Sydney bathroom renovator can usually run it from strip-out to final clean. Larger houses designed by an architect suit a builder used to detailed drawings and long lists of specified finishes. Whatever the type of project, the licence must cover the work, which the next section explains.

Which Builder Suits Which Sydney Project

Project and builder type
Rear or side extension: an extension builder used to working beside an occupied house and joining old and new roofs.
First floor addition: a builder with second storey experience, an engineer's design and a plan for temporary roof cover.
Knockdown rebuild: a new home builder who manages demolition, disconnections and the new house under one contract.
Granny flat in the back yard: a secondary dwelling builder who knows the complying development standards and Sydney Water checks.
Apartment renovation: a renovation builder who has worked under strata approval conditions and building manager rules.
Ask each builder for the address of a finished job of the same type. A business that mostly builds new houses may price an extension high simply because it does not want the work.

Checking the Licence Before the First Site Visit

In New South Wales, a contractor licence is needed to carry out, advertise or contract for residential building work worth more than $5,000, counting labour and materials including GST. When we checked, the licence types were an individual contractor licence, a company or partnership contractor licence and a qualified supervisor certificate. A qualified supervisor certificate allows a person to supervise building work, while the contractor licence is what allows a business to contract for it. The licence must belong to the party that signs the contract, because an individual's licence does not cover their company or partnership. Licensing guidance for builders and trades now comes from Building Commission NSW, the state's regulator for residential building quality.

The free Verify licence tool, linked from the NSW Government website, shows the holder's name, licence numbers, categories and expiry dates. It also lists any conditions on the licence, any cancellation or suspension and any formal cautions or penalty notices. Search by licence number rather than trading name, since several businesses can share similar names across Sydney. Check that the categories include general building work, or a category that matches the job, rather than only a single trade. Look again just before signing, because a licence can lapse or be suspended between the first visit and the contract. Keep a screenshot of the result in your project file, along with the date you checked.

Specialist work needs its own licence at any value, and that covers electrical wiring, plumbing, drainage, gasfitting and air conditioning work. Your builder will subcontract those trades, but you can still ask for each licence number, whether from a licensed Sydney electrician or a plumber handling the sewer connection. Waterproofing is licensed trade work in NSW once it is worth more than $5,000 in labour and materials. On a smaller wet area job, ask who applies the membrane anyway, and whether a specialist waterproofer or the tiler will do it.

Work Licence Needed Where to Check
Contracting for building work over $5,000 Contractor licence for general building work Verify licence tool
Supervising building work Qualified supervisor certificate or endorsed contractor licence Verify licence tool
Electrical wiring, any value Electrical licence Verify licence tool
Plumbing, drainage and gasfitting, any value Plumbing, drainage or gasfitting licence Verify licence tool
Waterproofing over $5,000 Contractor licence for waterproofing Verify licence tool
Non-friable asbestos over 10 sq m Non-friable asbestos removal licence SafeWork NSW
Friable asbestos, any amount Friable asbestos removal licence SafeWork NSW
Certifying the building work Registered certifier Public register of certifiers

Exempt Work, a CDC or a Development Application

Every Sydney building project falls into one of three planning pathways, and the right one shapes the drawings, the timeline and the price. Exempt development covers minor, low impact works that need no planning approval, as long as they meet the published standards. Complying development is a combined planning and construction approval for straightforward projects, issued by council or an accredited certifier. When we checked, the state planning department said a complying development certificate could be issued in as little as 20 days. Anything that does not meet those standards needs a development application, which council assesses on its merits. The NSW Planning Portal is where both kinds of application are lodged and tracked online.

The Housing Code, the set of complying development standards for houses, covers new one or two storey homes and alterations and additions to an existing home. When we checked, it required a lot of at least 200 square metres that was at least 6 metres wide at the building line. It generally could not be used in a heritage conservation area or on a heritage item, apart from limited exceptions. Bush fire prone and flood prone lots could still use it, subject to the extra requirements set out in the code. Secondary dwellings follow their own standards, explained in the guide to complying development for granny flats.

Ask each builder which pathway they expect and why, because a builder who assumes complying development on an unsuitable lot will price the wrong drawings. A section 10.7 planning certificate, a council document setting out the planning rules that apply to a lot, answers many of these questions early. Order one before the design is fixed, since it should also show whether the land is mapped as bush fire prone. The building contract must require the work to comply with the development consent or certificate conditions, so read those conditions before you sign.

Approval Checks Before the Design Is Final

Questions to settle
Is the house a heritage item, or inside a heritage conservation area on the council's heritage map?
Does the lot meet the Housing Code's minimum area and width for complying development?
Is the land mapped as bush fire prone or flood prone on the planning certificate?
Will the work need Sydney Water building plan approval because it sits near pipes or an easement?
Before building starts on a development application project, a construction certificate must be issued. Decline any offer to begin work while that paperwork is still pending.

Your Principal Certifier and the Inspection Stages

A principal certifier is the registered professional who checks that approved building work is carried out to the plans and the building code. If your project needs approval, you must appoint one, and it can be a registered building surveyor, your local council or a registered certifying company. The owner engages the principal certifier, and the builder is not allowed to appoint the certifier or influence the choice. Certifiers are public officials who must act in the public interest, which is why the rule keeps them independent from the builder. You can check a certifier's registration on the state's public register of certifiers before signing their agreement.

On a development application project, a construction certificate is needed before building starts, confirming the detailed plans meet the building code. If the principal certifier is not the council, they must tell council of their appointment at least 2 days before building work starts. The certifier then makes mandatory inspections at key stages of the build and may ask for extra documents to confirm compliance. After the final inspection, the certifier issues an occupation certificate if all the requirements have been met. Ask the builder to book each inspection in good time and to forward you the result once it is done. Many disputes start because a stage of work was covered up before the certifier had a chance to see it.

A certifier is not a project manager or site supervisor, so the quality of everyday work stays the builder's responsibility. If you want someone checking workmanship on your behalf, an independent inspector can visit at agreed stages and report to you alone. The guide to independent building inspections explains the reports available, and a structural engineer designs the beams and footings the plans rely on. Write into the contract that your own inspector may access the site at each agreed stage.

Step Who Does It What You Receive
Lodge a DA or CDC application Owner or designer, through the Planning Portal Consent or complying development certificate
Sydney Water plan check Owner, designer or coordinator, through Tap in Approval letter or written requirements
Appoint the principal certifier Owner, never the builder Signed certifier agreement
Construction certificate on a DA project Principal certifier or council Approved detailed plans
Tell council of the appointment Principal certifier, at least 2 days before work Record on the council file
Inspections at key stages Principal certifier Inspection records
Final inspection Principal certifier Occupation certificate if requirements are met

Heritage Conservation Areas in Inner Sydney

Large parts of inner Sydney sit in heritage conservation areas, mapped precincts where the streetscape as a whole is protected rather than one building. The City of Sydney asks owners to check its local environmental plan heritage map, and a separate planning map shows how each building contributes to the area's character. In the Inner West, council describes a property in a conservation area as one that contributes to the collective significance of that area. Works there that alter external or internal built elements generally need consent, and only certain works can be approved through a complying development certificate. Minor or maintenance works may qualify for a heritage exemption certificate, though that approval is still needed before work starts. Council may also ask for a heritage impact statement, which is a report by a heritage consultant on how the work affects the place.

Sydney price guides estimate that heritage controls add about $15,000 to $60,000 to a comparable extension in the inner suburbs. The extra cost comes from the consultant's report, a longer assessment, matching materials and design limits on what can be seen from the street. Inner West guidance expects alterations to be compatible with the existing building and sympathetic to the streetscape in scale, form and materials. Both councils offer duty planner advice, and the City of Sydney also runs pre-lodgement advice for proposed changes to heritage buildings. Booking that advice before paying for final drawings is one of the cheapest steps on the whole project.

Builders who work in conservation areas know that face brick, timber joinery and roof materials often need to match the original. A bricklayer who matches old Sydney brickwork is worth asking about when the builder lists subcontractors for the job. Original roofs facing the street also tend to draw council's attention, and a roofer used to slate and terracotta can price that part. Ask each builder for a heritage job they completed recently and the council that approved it.

Heritage Questions for a Sydney Builder

Ask before quoting
Have you built under a heritage consent in this council area, and can I see the finished street front?
Who prepares the heritage impact statement, and is it in your price or mine?
Which existing materials will be kept, repaired or matched, and how is the matching priced?
How will the new roof meet the old one where it can be seen from the street?
Complying development is generally unavailable for a house in a heritage conservation area. A builder who promises a fast approval there should be able to explain which exception applies.

Sydney Water Tap in and the Pipes Under Your Yard

Sydney Water checks building plans to protect the water, wastewater and stormwater pipes it owns, many of which run through private land. When we checked, Sydney Water said that if your project needs building approval from a council or certifier, it needs Sydney Water approval as well. That applies even to a home extension or a new swimming pool in the back yard. Plans are lodged online through Sydney Water Tap in, the authority's service for applications, approvals and tracking. Where the work has no impact on its pipes, approval can be given without further assessment and an approval letter is emailed. Keep that letter with your development documents, because councils and certifiers may ask to see it.

Plans are referred for closer review when they affect wastewater pipes larger than 300 millimetres, water or recycled water pipes, or a property with a Sydney Water easement. Basement excavation and dewatering, meaning pumping groundwater out of a dig, also trigger a referral. In those cases a water servicing coordinator, a provider listed by Sydney Water, helps you meet the requirements it sets. Complex cases go through an out of scope application, which carries review costs and takes longer to finish. Ask your designer to locate the pipes on the site plan before the extension footprint is fixed.

Approval is also needed to relocate, replace or remove Sydney Water pipes, including temporary pipework during construction. That matters on knockdown rebuilds and granny flats, where the new footprint can end up close to an old sewer line. Slabs and footings near pipes are priced on quote, and the builder's engineer or a Sydney concreter will need the pipe depth to plan them. Applications to connect to Sydney Water's pipes are made by plumbers, not by builders or owners. Put the Sydney Water steps on your project timeline so they do not hold up the first concrete pour.

Sydney Water Checks for Your Plans

Before lodging
Mark the sewer and water pipes, and any easement, on the site survey.
Lodge the plans through Tap in when council or certifier approval is being sought.
Engage a water servicing coordinator if the plans are referred for review.
Keep the approval letter or the written requirements with the contract documents.
Sydney Water says its approval protects your building if it later needs to work on its pipes. Settle that position before the slab design is final.

Site Hours, Hoardings and the Street Outside

Construction hours in Sydney are set by each council and through each approval, so check the conditions on your consent or certificate. When we checked, the City of Sydney asked for noisy work outside the city centre to run from 7.30am to 5.30pm on weekdays and 7.30am to 3.30pm on Saturdays. Inside the city centre the hours were 7am to 7pm on weekdays and 7am to 5pm on Saturdays. No work was allowed on Sundays or public holidays unless it had been specifically approved. Other Sydney councils publish their own hours, so look up the page for your area before agreeing a programme.

Terraces and narrow lots often leave no room on site for materials, skips or a crane. In its own area, the City of Sydney regulates hoardings and scaffolding on roads and footpaths, along with works zones and cranes. A works zone is a kerbside space reserved for construction vehicles, and its council approval and fees are priced on quote. Out of hours work such as crane set up or hoarding installation needs council approval before it happens. Contact details for the builder and the certifier must be displayed in a prominent position on the site. Council also offers builders a free site meeting to work through public space approvals and consent conditions.

Neighbours on a Sydney street share walls, driveways and parking, so warn them well before the first day. A dilapidation report, a dated photo record of neighbouring buildings before work starts, protects both sides if cracks appear later. Ask whether the builder includes one in the price or expects you to arrange it separately. If an established tree sits near the footprint, a Sydney arborist can assess it before any application is lodged.

Item City Centre Rest of the City of Sydney Area
Weekday hours for noisy work 7am to 7pm 7.30am to 5.30pm
Saturday hours for noisy work 7am to 5pm 7.30am to 3.30pm
Sundays and public holidays No work unless specifically approved No work unless specifically approved
Out of hours crane or hoarding work Council approval first Council approval first
Hoardings, scaffolding and works zones Council approval Council approval
Reporting work outside hours Council or the certifier Council or the certifier

Renovating an Apartment Under Strata Rules

Apartment renovations in Sydney need two kinds of permission, the planning approval for the work and the owners corporation's approval under strata law. The owners corporation is the legal body made up of every owner in the scheme, and it looks after common property such as the structure and shared walls. NSW strata rules sort renovations into cosmetic work, minor renovations and major renovations. Cosmetic work, such as painting inside, laying carpet or fitting built-in wardrobes, needs no approval at all. Minor renovations, including kitchen changes, hard flooring and changes to internal walls, need approval from the owners corporation or, where the by-laws allow, the strata committee. A refusal must come with written reasons within three months, and no refusal within that time counts as approval.

Major renovations, such as a bathroom renovation or moving a structural internal wall, can only be approved by the owners corporation by special resolution. A special resolution passes at a general meeting when no more than 25 per cent of the value of votes cast is against it. If the work changes the structure, the owner must give the owners corporation 14 days' written notice before work starts. Builders working in apartment buildings should expect conditions on working hours, lift protection and where materials can be stored. A Sydney tiler or waterproofer working inside the unit will be bound by the same conditions as the builder.

Apartment buildings where people live above or below each other are class 2 buildings, and the Design and Building Practitioners Act applies to work on new and existing ones. When we checked, that scheme needed a registered building practitioner to take on the work and registered design practitioners to declare that regulated designs comply. Building Commission NSW enforces the scheme and can issue stop work or rectification orders on class 2 buildings. Whether your particular renovation is caught depends on the work, so ask the builder and certifier early. Defects in common property usually sit with the owners corporation, and strata building maintenance is often contracted separately.

Strata Paperwork for an Apartment Builder

Have ready
The scheme's registered by-laws and any renovation by-law that applies to your lot.
Plans, dates and times of work, and each trade's details and qualifications.
The owners corporation's written approval, with any conditions attached.
Building manager rules on lifts, loading docks and parking for trades.
Do not let work start on a major renovation before the special resolution is passed. Structural work also needs 14 days of written notice to the owners corporation.

Asbestos, Bush Fire Prone Land and BASIX on Sydney Blocks

Older Sydney houses can hide asbestos in places that only show once walls, eaves or floors come apart. When we checked, SafeWork NSW warned that homes built before the late 1980s may contain asbestos. Friable asbestos, the crumbly form, needs a friable removal licence for any amount, and non-friable asbestos needs a licence above 10 square metres. Only a NATA accredited laboratory can confirm a sample, and SafeWork NSW strongly recommends a licensed professional takes it. NSW price guides put asbestos removal on a knockdown at about $5,000 to more than $30,000, depending on what is found.

Order an asbestos inspection before the builder prices demolition, so the quote rests on a report rather than a guess. Clearance certificates for friable removal must be issued by an independent asbestos assessor before anyone moves back in. Bush fire risk also reaches into suburbs beside bushland, and the NSW Rural Fire Service map tool shows whether a lot is mapped as bush fire prone. On mapped land, a new home or a renovation that needs consent must meet Planning for Bush Fire Protection, the state's rules for those areas. The construction standard is AS 3959, which sets requirements for six bush fire attack levels, from BAL-Low to Flame Zone. A higher level means tougher requirements for building elements, which the builder must include in the price.

BASIX, the Building Sustainability Index, sets water and energy commitments for new homes and many alterations in NSW. When we checked, alterations and additions valued at $50,000 or more needed a BASIX certificate, as did a pool or spa holding more than 40,000 litres. The certificate requires new taps, toilets and showerheads to carry at least a 3 star WELS water rating, among other commitments. Ask whether the builder's price covers every commitment on the certificate, and check each one appears in the quote.

Check Why It Matters Who Arranges It
Asbestos inspection Prices removal before demolition starts Licensed professional and NATA laboratory
Bush fire prone land map Sets the bush fire attack level Owner or designer
Section 10.7 planning certificate Shows the planning rules for the lot Council
BASIX certificate Sets water and energy commitments Designer or assessor
Sydney Water pipe check Finds sewers and easements near the footprint Designer, through Tap in
Tree assessment Tests whether trees near the footprint can stay Arborist
Service disconnections Makes gas, power and water safe Licensed trades
Dilapidation report Records existing cracks next door Builder or inspector

Materials and Makers to Name in the Specification

A specification lists the products a builder will use, and naming them stops a cheaper substitute appearing halfway through. James Hardie makes fibre cement cladding, including the Linea weatherboard and Axon panel ranges. Weathertex makes weatherboards and wall panels from Australian hardwood, an option for a timber look on a new addition. Austral Bricks makes face bricks, render bricks and thin brick systems, useful when new walls must sit beside old ones. PGH Bricks makes bricks, pavers and stone, and its range is worth checking when matching existing brickwork. Hebel makes autoclaved aerated concrete panels, a lightweight masonry used for walls and floors in many additions.

Hyne Timber makes structural pine framing and glue laminated beams, which can carry long spans over open living areas. Lysaght makes steel roofing, walling and framing products, which suit additions that need a lighter roof. BlueScope makes COLORBOND steel for roofing, walling, guttering and fascia in a wide set of colours. Gyprock makes plasterboard for walls and ceilings, including wet area and fire rated boards, and a Sydney plasterer will often name it. Bradford makes insulation and acoustic products, which matter for BASIX commitments and for noise between floors. Boral makes concrete, cement and quarry materials, which end up in slabs, footings and driveways.

Stegbar makes windows, doors and wardrobes in aluminium and timber ranges, so the window schedule can name a series and frame colour. VELUX makes skylights and roof windows for pitched and flat roofs, which bring light into the middle of a deep terrace. Laminex makes laminates, benchtops and cabinetry panels, often specified for kitchens and laundries in additions. Dulux makes interior and exterior paints, and naming the product line and number of coats avoids arguments at the painting stage. A carpenter fitting doors and skirting will work from the same schedule, so keep it current as choices change.

Items to Name in a Sydney Building Specification

Write it down
Cladding and brick: the product, range and colour, plus how new brick will meet old.
Frame and roof: timber or steel framing, and the roofing profile and colour.
Windows and doors: the frame material, the glazing and the series for each opening.
Linings and insulation: the plasterboard type in wet areas and the insulation in walls and ceilings.
Prime cost items, allowances for fittings you choose after signing, should carry a realistic figure. A low allowance makes a quote look cheaper than it will end up.

Contract Paperwork Under the Home Building Act

The Home Building Act 1989 sets the contract rules for residential work across the state, and Sydney jobs follow them like any other. Work over $5,000 needs a written contract, with a small jobs contract up to $20,000 and a fuller large jobs contract above that. The deposit is generally capped at 10 per cent, and on work over $20,000 the builder cannot ask for any payment before home building compensation cover is in place. That cover, known as HBC, is a last resort if the builder dies, disappears, becomes insolvent or has their licence suspended for ignoring a compensation order. Statutory warranties of six years for major defects and two years for other defects apply even when the contract leaves them out.

A large jobs contract must show the price prominently on the first page and include a cooling off period of five clear business days. Progress payments must match the work actually done, and variations must be written, signed by both parties and show how they change the price. Arbitration clauses are void in these contracts, so a builder cannot lock you into private arbitration instead of the state's dispute process. Check that the registered certifier information sheet is attached, since it sets out your freedom to choose the certifier.

Contract Value Contract Needed Deposit Insurance
$5,000 or less Written quote recommended Keep it small Not required
Over $5,000 up to $20,000 Small jobs contract Up to 10 per cent Not required
Over $20,000 Large jobs contract with checklist Up to 10 per cent, after the certificate HBC cover required
Cost plus contract Large or small contract Up to 10 per cent HBC if over $20,000

Getting the House and Household Ready

Most Sydney extensions mean living around a building site for months, or moving out for the noisiest stages. Agree with the builder which rooms stay usable, where a temporary kitchen goes and when water and power will be off. If the house will be empty, a removalist in Sydney can move furniture into storage before the strip-out begins. Second storey additions often mean the roof comes off, so ask how the house will be kept dry and secure overnight. Cover for the existing house during construction is worth raising with your own insurer before work starts.

Clear the side passage and back yard of anything that must survive, because trucks, bins and pallets need the space. Photograph the house, fences and paths before the site is handed over, and keep the dated files somewhere safe. Ask the builder where the workers' toilet, the skip and the materials will sit on a narrow lot. When the build ends, an after-builders clean removes the fine dust that settles inside every cupboard.

Task Who When
Move furniture and valuables Owner or removalist Before strip-out
Tell neighbours the start date Owner and builder Before day one
Photograph the house, fences and next door walls Owner or inspector Before the site is handed over
Confirm skip and materials locations Builder Before deliveries
Check hoarding or works zone approval Builder Before deliveries
Confirm the principal certifier is appointed Owner Before work starts
Raise cover for the existing home Owner Before work starts
Agree when services are cut Builder and trades Before strip-out

If Work Stalls or Defects Appear

Most problems are sorted by raising them early, in writing, with photos and a clear request for action. If that fails, Building Commission NSW runs a home building dispute resolution service that either the owner or the builder can ask for. An inspector reviews the evidence and may meet both parties on site to try to settle the issue. If the parties cannot agree and the inspector finds the builder responsible, the inspector may issue a rectification order with a due date. Failing to comply with that order is a breach of the Home Building Act. Complaints about certifiers are handled through a separate complaint form, which is also run by Building Commission NSW.

When a dispute is not resolved, the NSW Civil and Administrative Tribunal, known as NCAT, can decide claims about residential building work. It can deal with payment disputes, incomplete or defective work and damage to other structures caused by building work. NCAT says home building disputes must first go through the state's dispute process, with exceptions such as claims against unlicensed contractors. Keep the contract, variations, inspection records and photos in one file, because the tribunal will want to see them. Time limits apply, so do not let a defect sit until the warranty period is nearly over.

What to Look Out For When a Sydney Builder Quotes

A quote far below the others usually leaves something out, often demolition, site costs or realistic provisional allowances. Look for a licence number that matches the business named on the quote, not a different company or a personal name. Be wary of a builder who suggests skipping approval, or splitting the work to stay under the $20,000 insurance line. A request for more than 10 per cent up front, or any payment before the HBC certificate on a large job, breaks the rules. A builder who offers to appoint the certifier for you is ignoring a clear rule about certifier independence.

Watch for vague lines such as site works or preliminaries with a single figure and no detail behind it. Site works on a sloping or rocky Sydney block can be one of the largest costs, so they deserve their own breakdown. Ask what the builder has allowed for rock, since North Shore excavation alone can add an estimated $8,000 to $45,000. Check whether the price assumes complying development when the house sits in a conservation area. The guide to new home construction lists more items that new builds commonly leave off a first quote.

Quote Warning Signs

Ask about these
No licence number, or a licence in a different name from the contracting business.
A single total with no split between demolition, structure, services and finishes.
Provisional sums for rock, pipes or asbestos that look far too low for the site.
No mention of who pays for the certifier, Sydney Water, BASIX and heritage reports.
Never pay a deposit on a job over $20,000 before you hold the HBC certificate. You can check the certificate through the State Insurance Regulatory Authority's HBC Check tool.

Getting Sydney Builder Quotes That Price the Same Plans

Send every builder the same drawings, engineering, specification and site survey, along with the approval documents you have so far. Ask each one to visit, since access, slope and neighbouring walls rarely show on a plan. Request the same layout from each, with demolition, structure, roofing, services, finishes, fees and provisional sums on separate lines. Ask how long each stage will take and how many weeks, if any, the house will be unlivable. Line the quotes up item by item and ask about every gap, rather than comparing the totals. The dearest quote can be the better value once the cheaper ones add back what they left out.

Confirm in writing who pays for the certifier, the Sydney Water application, BASIX and any heritage or bush fire reports. Check that each quote names the approval pathway and the drawing revision it is based on. Ask for the builder's licence number, insurance details and a recent reference for a similar Sydney job. Keep every quote, email and photo together, since that file becomes the starting record for the contract. Choose the builder whose answers are clear and consistent, not only the one with the lowest number.

A building project often leads straight into work by other trades around the house. Repainting the older rooms can go to a Sydney painter once new walls have cured, and a landscaper in Sydney can rebuild a yard the trucks have flattened. Larger one-off designs are covered by the guide to custom home builders across the state. Post your job on The Quote Yard with that brief, and we will connect you with licensed builders across Sydney who can quote on it.

Builders Across Sydney

Building prices on this page apply across greater Sydney, with the area differences shown in the tables above. Approval steps, construction hours and heritage maps differ from council to council, so check the rules for your own suburb.

▶ Sydney 30 areas
Sydney CBD Parramatta Blacktown Penrith Liverpool Bankstown Hurstville Sutherland Cronulla Kogarah Rockdale Marrickville Randwick Bondi Manly Chatswood Hornsby Ryde Epping Castle Hill Baulkham Hills Rouse Hill Kellyville Macquarie Park Strathfield Burwood Auburn Fairfield Campbelltown Camden
▶ Central Coast 24 areas
Gosford Erina Terrigal Wamberal Avoca Beach Kincumber Woy Woy Umina Beach Ettalong Beach Wyong Tuggerah The Entrance Long Jetty Bateau Bay Toukley Budgewoi Lake Munmorah Warnervale Wadalba Kariong Somersby Narara Niagara Park Saratoga
▶ Blue Mountains 22 areas
Katoomba Leura Wentworth Falls Blackheath Mount Victoria Medlow Bath Bullaburra Lawson Hazelbrook Woodford Linden Faulconbridge Springwood Winmalee Valley Heights Warrimoo Blaxland Glenbrook Lapstone Mount Riverview Mount Wilson Megalong Valley
▶ Illawarra 30 areas
Wollongong Fairy Meadow Figtree Mount Keira Mount Ousley Corrimal Bellambi Woonona Bulli Thirroul Austinmer Coledale Helensburgh Port Kembla Warrawong Berkeley Dapto Kembla Grange Albion Park Shellharbour Oak Flats Flinders Kiama Gerringong Minnamurra Jamberoo Shell Cove Stanwell Park Coalcliff Unanderra
▶ Southern Highlands 24 areas
Bowral Mittagong Moss Vale Burradoo Berrima Bundanoon Exeter Sutton Forest Robertson Kangaloon Fitzroy Falls Welby Braemar Willow Vale New Berrima Colo Vale Yerrinbool Hill Top Balmoral Village Bargo Wingello Penrose Marulan Goulburn
▶ South Coast 28 areas
Nowra Bomaderry Berry Kangaroo Valley Shoalhaven Heads Culburra Beach Callala Bay Huskisson Vincentia Sanctuary Point St Georges Basin Sussex Inlet Ulladulla Milton Burrill Lake Batemans Bay Malua Bay Moruya Tuross Head Narooma Bodalla Bermagui Cobargo Bega Tathra Merimbula Pambula Eden

Sydney Builder FAQ

Can my builder choose the principal certifier for my extension?
No, the owner engages the principal certifier, and the builder is not allowed to appoint the certifier or influence the choice. The rule keeps certification independent, since certifiers are public officials who must act in the public interest. You can choose a registered building surveyor, a registered certifying company or your local council. Check the certifier on the state's public register before signing their agreement.
Can I use complying development for a rear extension in a heritage conservation area?
Generally not, because the Housing Code could not be used in a heritage conservation area or on a heritage item when we checked. A few exceptions exist, and Inner West Council says certain works meeting the state codes can still be approved that way. Most alterations that change the building's fabric need consent through a development application instead. Speak to the council's duty planner before paying for final drawings, since the answer shapes the whole design.
Do I need Sydney Water approval to build a granny flat or extension?
When we checked, Sydney Water said any project needing building approval from a council or certifier also needs its approval. That includes extensions, granny flats and swimming pools, lodged through the Tap in online service. Plans with no impact on its pipes can be approved without further assessment. Plans near larger wastewater pipes, water pipes or an easement are referred for review, often with a water servicing coordinator.
What hours can a builder work on a house in the City of Sydney?
When we checked, the City of Sydney asked for noisy work outside the city centre to run from 7.30am to 5.30pm on weekdays. Saturday hours outside the city centre were 7.30am to 3.30pm, and no work was allowed on Sundays or public holidays without specific approval. City centre sites had longer hours, from 7am to 7pm on weekdays and 7am to 5pm on Saturdays. Your own consent conditions take priority, and other Sydney councils publish their own hours.
Does my apartment bathroom renovation need owners corporation approval?
Yes, because NSW strata rules list bathroom renovations as major renovations. Major renovations can only be approved by the owners corporation through a special resolution at a general meeting. If the work changes the structure, you must also give 14 days of written notice before starting. Expect conditions on working hours, lift use and waterproofing, and get the approval in writing before booking a builder.
How do I find out whether my Sydney block is bush fire prone?
The NSW Rural Fire Service has an online Bush Fire Prone Land map tool where you can search for your address. A section 10.7 planning certificate from council should also say whether the land is mapped as bush fire prone. On mapped land, a new home or a renovation that needs consent must meet Planning for Bush Fire Protection. The bush fire attack level then decides which AS 3959 construction requirements the builder must follow.
Does my home addition need a BASIX certificate?
When we checked, alterations and additions valued at $50,000 or more needed a BASIX certificate in NSW. A pool or spa holding more than 40,000 litres also triggered the requirement. The certificate sets energy and water commitments, such as new taps, toilets and showerheads with at least a 3 star WELS rating. Ask your designer who will prepare it, and check that the builder has priced every commitment listed.
What happens if asbestos turns up after demolition starts?
Work on the affected area should stop, since SafeWork NSW advises treating suspected asbestos as asbestos until tests confirm otherwise. Only a NATA accredited laboratory can confirm a sample, and a licensed professional should take it. Friable asbestos needs a friable removal licence for any amount, and non-friable asbestos needs a licence above 10 square metres. The extra work is normally priced as a variation, which should be written and signed before removal goes ahead.
Who do I complain to if my builder will not fix defects?
Start by writing to the builder with photos, a list of defects and a reasonable date for repairs. If that fails, Building Commission NSW offers a home building dispute resolution service, which either party can request. An inspector may visit the site and can issue a rectification order if the builder is found responsible. If the matter is still not settled, you can apply to NCAT, which hears claims about defective and incomplete residential building work.
How long does a complying development certificate take in Sydney?
When we checked, the state planning department said fast-tracked complying development certificates could be issued in as little as 20 days. That depends on the application being complete and the lot meeting every standard in the relevant code. Neighbour notification also forms part of the complying development process. A development application usually takes longer, because council assesses it on its merits.

Sydney Building Specialists

For Trades & Contractors - NSW

Building jobs in Sydney often turn up work for other trades, such as new drainage, rewiring, framing or a fresh slab. Links to those follow-up jobs across NSW sit below, along with work for trades looking for new clients.

Ready to Book a Builder in Sydney?

Post your job with the drawings, the lot details and the approval you expect, and we will connect you with licensed builders across Sydney. Compare written quotes that price the same plans before you sign.

Get Free Builder Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 29 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All NSW tradies are required to hold appropriate licences. Verify at NSW Fair Trading.
Prices are 2027 estimates based on current NSW building, extension and knockdown rebuild price guides, using Sydney figures where they are given. Your final price will depend on the design, the lot, the approval pathway, any heritage, bush fire or Sydney Water requirements and what is found once the existing house is opened up, so compare written quotes that show demolition, structure, services, finishes, fees and provisional sums separately.
Need a builder in Sydney?Get free Sydney builder quotes Post a Job – It's Free