Looking for a Tiler in Sydney?

Tell us your suburb, whether it is a house or a unit, the rooms and rough areas in square metres, the tiles you have chosen, and whether old tiles must come up first. We will pass the same description to local tilers across Sydney, so every quote you receive prices the same job.

Get Free Tiling Quotes

Sydney Tiling Price Guide

Tiler labour, per hour$60 - $100
Day rate, one tiler$500 - $850
Standard tiles 200 to 450 mm, labour$65 - $100 per m²
Large format 600 mm and over, labour$100 - $180 per m²
Herringbone or patterned laying$95 - $160 per m²
Natural stone, labour$110 - $190 per m²
Mosaic and small format, labour$120 - $200 per m²
Small bathroom, floor to ceiling, with tiles$4,000 - $8,000
Shower stripped and retiled$2,500 - $6,500
Old tile removal$25 - $60 per m²

These are estimated Sydney price ranges for 2027. Your price depends on the tile size and pattern, the state of the floor or wall underneath, whether old tiles and membrane must come out, and how easily materials and rubble can be moved.

Hire a Tiler Sydney NSW - Get Local Quotes

Tiling work in Sydney ranges from a single cracked tile in an older unit to a floor to ceiling bathroom in a Federation house or new porcelain through an open plan apartment in a tower block. Tilers here usually charge $60 to $100 an hour for small jobs and $500 to $850 a day on larger work, while whole bathrooms are mostly quoted as one fixed price. In New South Wales, wall and floor tiling is a licensed trade once a job is worth more than $5,000 in labour and materials, including GST. That licence also covers waterproofing a bathroom or other wet area before tiling, so confirm which business will lay the membrane, the waterproof layer under the tiles, before you sign. Apartment owners face extra steps, because swapping carpet for tiles is classed as a minor renovation, which needs strata approval and a sound test report (acoustic certificate). Older houses bring other questions, such as asbestos sheeting hidden behind old wall tiles and original patterned verandah tiles in heritage streets. Getting pallets of tiles in and bags of rubble out can also take planning on narrow terrace streets and in buildings with one shared lift. Many Sydney bathrooms also sit above another home, so a failed membrane or a noisy new floor quickly becomes a neighbour's problem as well as yours. The prices on this page are 2027 estimates for normal working hours, drawn from our NSW tiling price guides and tile repair figures for Sydney. Post your job on The Quote Yard and we will connect you with local tilers across Sydney who can quote on it.

Sydney Tiling Work Covered

Tiling across Greater Sydney runs from splashbacks and single tile repairs to full bathrooms, apartment floors and verandah repairs on older terraces. We can connect you with local tilers who all price the same written description of your job.

Get Free Quotes

At a Glance - Sydney Tiler Prices 2027

Job Price Range How It Is Charged What Drives It In Sydney Who Can Do It
Tiler labour $60 - $100 per hour Per hour, often with a minimum Small repairs and call-outs Licensed tiler
One tiler for a day $500 - $850 per day Day rate Larger floors and walls Licensed tiler
Standard bathroom tiles $65 - $100 per m² Per square metre, labour Tiles 200 to 450 mm Licensed tiler
Large format tiles $100 - $180 per m² Per square metre, labour Flat floors and careful handling Licensed tiler
Herringbone or patterns $95 - $160 per m² Per square metre, labour Extra cuts and time marking out the layout Licensed tiler
Natural stone $110 - $190 per m² Per square metre, labour Stone type and sealing Licensed tiler
Small bathroom, floor to ceiling $4,000 - $8,000 Fixed price with tiles Tile choice and wall condition Tiler or bathroom renovator
Standard bathroom, floor to ceiling $6,000 - $15,000 Fixed price with tiles Room size and tile choice Tiler or bathroom renovator
Kitchen splashback $500 - $2,000 Fixed price Tile type and power point cuts Licensed tiler
Shower strip and retile $2,500 - $6,500 Fixed price after inspection Damage found behind the tiles Tiler with membrane licence
Old tile removal $25 - $60 per m² Per square metre Mortar bed or glue underneath, and rubbish Tiler or demolition crew
Membrane during a renovation $650 - $1,500 per room Per room Room size and shower layout Tiler or waterproofer
Asbestos testing $50 - $150 per sample Per sample Number of materials tested Licensed assessor

What Pushes a Sydney Tiling Bill Up

What is involved
Old tiles laid on thick mortar beds take longer to break out than tiles on sheeting. Extra demolition time and heavier rubbish loads then appear on the bill.
Large format tiles and patterns need flatter floors and more cutting. Levelling compound, a pour-on mix that flattens floors, and time spent marking out the layout add to the labour cost on many jobs.
Units and terraces can make access slow and costly for the crew. Lift bookings, stairs and street parking all add time before a single tile is laid.
Hidden problems behind old tiles can force a change of method partway through. Rotten wall sheeting, a failed membrane or suspect asbestos can each add days and another trade.
Ask every tiler to show labour, tiles, adhesive and grout, membrane, demolition and rubbish removal on separate lines, and to name each product. Quotes set out that way are much easier to compare.

Hiring a Tiler in Sydney: Where to Start

Most Sydney tilers price small repairs by the hour and larger rooms by the square metre, or as one fixed sum after a site visit. A quoted figure can mean labour only, or labour with tiles, adhesive, grout, wall sheeting (the board fixed behind wall tiles) and rubbish removal, so first find out which one you are reading. The main kinds of tiling work, and how each is usually charged around the state, are set out in our NSW tiling services guide. Bathroom figures are broken down further in bathroom tiling costs across NSW, including the extra charged for patterns and large tiles. Two quotes for the same room can differ by thousands of dollars simply because one includes the tiles and the other does not. Knowing exactly what each price covers is the quickest way to compare them fairly.

Before anyone visits, measure each floor and wall you want tiled and note whether the old tiles must come up first. Take photos of the room, the path from the street to the room, any stairs or lift on the way, and any cracked or loose tiles, or ones that sound hollow when tapped. Say whether the home is a house, a townhouse or a unit, because strata rules can change what is allowed and when work can happen. If you have already bought tiles, write down the product name, size and batch number, the production run code printed on the box. If the tiling is part of a bigger bathroom refit, say so, because the tiler may need to work around a plumber and an electrician. A short brief like this lets every tiler price the same job without guessing.

Sydney Tiler Rates for 2027 by Job and by Area

Tilers in Sydney charge about $60 to $100 an hour for small jobs, and $500 to $850 a day for one tiler on larger work. For bathroom walls and floors using standard tiles between 200 and 450 millimetres, labour runs about $65 to $100 per square metre. Large format tiles of 600 millimetres or more cost $100 to $180 per square metre to lay, while herringbone, a zigzag pattern of oblong tiles, and other patterns cost $95 to $160. Natural stone costs $110 to $190, and mosaics or other small formats at $120 to $200, because every small piece takes longer to place, level and grout.

Whole rooms are easier to compare as finished prices that include the tiles. A small bathroom tiled floor to ceiling, with labour and tiles, costs about $4,000 to $8,000, and a standard bathroom $6,000 to $15,000. One example in our NSW figures prices a Kellyville townhouse ensuite at $4,000 to $6,500. Taking up old tiles adds about $25 to $60 per square metre, and a membrane, the waterproof layer beneath the tiles, adds $650 to $1,500 per room during a renovation. Repairs follow a different pattern, with one cracked tile costing $150 to $450 and stripping and retiling a shower $2,500 to $6,500. Shower work is priced differently across Sydney, as the table shows, using figures from our NSW tile repair guide.

Sydney Area Shower Reseal and Regrout Strip and Retile a Shower Main Price Factors
Eastern Suburbs and Lower North Shore $500 - $900 $3,500 - $6,500 How much has failed, and access
Inner West and Inner City $470 - $870 $3,300 - $6,200 Access and tile matching
Northern Beaches and Upper North Shore $480 - $880 $3,400 - $6,300 Tile type and size
Western Sydney and the Hills $380 - $700 $2,700 - $5,200 How much has failed
Single tile replacement, any area $150 - $450 Not applicable Finding a matching tile
Loose, hollow sounding tiles, any area $400 - $1,500 Not applicable Size of the hollow area
Regrouting, per square metre $35 - $90 Not applicable Gap width between tiles and grout type

Who Buys the Tiles, Allowances and Progress Payments

Many Sydney owners choose and buy their own tiles, then hire a tiler for labour only. That keeps control of the look, but it also makes you responsible for ordering enough, checking the boxes and getting them to site on time. When the tiler supplies the tiles, the quote may include a prime cost allowance, often shortened to PC, which sets a dollar figure per square metre for a tile not yet chosen. If you later pick a dearer tile, the difference is added to the price, so check that the allowance matches the range you are looking at. Ask which adhesive, grout and wall sheeting are included too, because a line that just says materials can hide a cheaper product. Tiles ordered online or from overseas can take weeks to arrive, so confirm the delivery date before you agree a start date with the tiler.

Order spare tiles with the main order, since a later batch can differ slightly in shade even when the product name is the same. Patterned layouts waste more tiles than straight ones, so the extra you order should rise for herringbone, as explained in hiring a tiler on the Central Coast. Check the shade or batch code on every box before the first tile is laid, because mixed batches show up once a wall is finished. Delivery to a Sydney unit also needs a plan, since a pallet of porcelain may have to wait for a booked lift or loading dock time. Keep a few full boxes after the job, so later repairs can use tiles from the same batch. Write down who pays for any shortfall if the tiler cuts more tiles than expected, and who collects the extra boxes from the supplier.

On a contract over $20,000, progress payments, paid in stages as each part is finished, follow a schedule written into the contract, and the NSW Government says each payment must match the work carried out. A sensible schedule for a bathroom might link payments to demolition, sheeting and membrane, wall tiles, then floor tiles, grout and silicone. Variations, meaning changes to the agreed work, have to be written down, signed by you and the tiler, and then attached to the contract. If a variation is needed because of the tiler's own mistake, you do not have to pay for the extra work to fix it.

Reading a Sydney Bathroom Payment Schedule

Five payments, each released only once that part of the bathroom is complete
Payment stage
Done before paying
Demolition and rubbish removal
Old tiles and fixtures out, room cleared
Sheeting and membrane
Walls lined, membrane finished and photographed
Wall and floor tiles
Tiles laid flat with even grout joints
Grout, silicone and clean
Joints filled, sealant applied, room cleaned
Final handover
Spare tiles left and certificates handed over

Each prime cost (PC) figure should state its allowance per square metre and the tile it was based on.

No claim should be paid for work that has not yet been done in the room.

Request photos of the membrane before tiles cover it, because nobody can see it once the room is finished.

Checking a Sydney Tiler on the NSW Licence Register

NSW defines wall and floor tiling as fixing tiles to internal or external building surfaces, whether the purpose is practical or decorative. A contractor licence is needed once the value of the job, counting labour, materials and GST, passes $5,000. Building Commission NSW issues licences to individuals, companies and partnerships, plus certificates for qualified supervisors who oversee work, and the usual qualification is a Certificate III in Wall and Floor Tiling. The tiling licence also includes waterproofing a wet area to prepare it for tiles, so a tiler may lay the membrane as well. A separate waterproofing licence covers other waterproofing work, and that trade is set out in hiring a waterproofer in Sydney. Under the Home Building Act 1989, unlicensed work can cost an individual a $22,000 fine and a company $110,000.

The online licence check shows far more than a number. It lists the holder's name, each licence category with its expiry date, and whether the licence is current. It also shows any conditions on the licence, any cancellation or suspension, public warnings, formal cautions and penalty notices, which are on-the-spot fines. Court cases under the Home Building Act that ended with the holder found guilty appear too, along with any failure to follow a tribunal order. Check that the name on the record matches the business on your quote, and that wall and floor tiling appears among its categories. A licence that has expired, carries conditions you do not understand or shows recent warnings is worth a call to Building Commission NSW before you sign.

Task Trade Responsible Licence or Record Confirm First
Wall and floor tiles Licensed tiler Tiling licence over $5,000 Category and expiry on the register
Membrane before tiling Tiler or waterproofer Tiling or waterproofing licence Who lays and photographs it
Moving a shower waste or taps Licensed plumber Notice of Work and Certificate of Compliance Plumber booked before sheeting
Heated floor or new power Licensed electrician Electrical certificate (CCEW) within 7 days Thermostat and circuit agreed
Old sheeting that may hold asbestos Licensed assessor and removalist Test result before demolition Results in writing
Grout and silicone Licensed tiler Covered by the tiling contract Product names on the quote
Floor levelling compound Licensed tiler Part of the tiling contract Area and depth shown on the quote

Contracts When the Tiler Works for You or for a Renovator

A residential tiling job priced above $5,000 needs a written contract, and a small job contract suits work from $5,000 up to $20,000. Above $20,000 a fuller contract is needed, along with a certificate of home building compensation cover, insurance that protects you if the contractor cannot finish or fix the work. The deposit can be no more than 10 per cent, and it is illegal to ask for any deposit before that cover is in place where it is required. Large job contracts also give you a cooling-off period of five clear business days, when you can cancel, once you hold your copy. Read the inclusions slowly during that time, since rubbish removal, sealing and silicone are easy to leave out.

Many Sydney bathroom jobs are run by a renovator who hires the tiler, plumber and electrician as subcontractors. In that case your contract is with the renovator, and the tiler answers to that business rather than to you. That arrangement is covered in hiring a bathroom renovator in Sydney, where one business holds the contract for the whole room. If you hire each trade yourself, you take on the job of booking them in the right order and sorting out any work that falls between their jobs. Owners who choose that path should get a separate written quote from each trade, with clear start dates and handover points. Either way, payment terms and variations still need to be written down before work begins.

Tiling often forms part of wider work on the same property, so it helps to see how the different trades and their contracts link together before anyone starts. A tiled alfresco usually sits on a concrete slab, and the slab itself is a job covered in hiring a concreter in Sydney. If the household moves out while a whole floor is retiled, hiring a removalist in Sydney covers moving and storing furniture in the meantime. Each of those trades should be named in the work timetable with realistic dates, so the tiler is not left waiting on site for a new slab to harden or a room to empty.

NSW Contract Rules for a Tiling Job

10 per cent the highest deposit a tiler can ask for under NSW home building law
Price of the job
Rule that applies
$5,000 or under
Get the quote in writing anyway
$5,000 to $20,000
Small job contract describing the work and price
Over $20,000
Fuller contract and a compensation certificate
After signing a large job contract
Cooling-off of five clear business days
Before paying any deposit
See the insurance certificate where it is required
Hold the compensation certificate before paying anything on a tiling job over $20,000.

Hard Floors in Sydney Apartments and the Noise Below

In a strata unit, swapping carpet for tiles is a minor renovation, which needs the owners corporation's approval and an acoustic certificate, a report showing the floor blocks enough sound. Retiling a bathroom, or any work that needs waterproofing, is a major renovation that needs a special resolution instead, meaning no more than 25 per cent of votes are against it. Ask the strata manager for the scheme's registered by-laws, the building's own rules, since a building can add its own flooring rules to the standard ones. Approval does not end the matter, because the standard noise by-law stops owners making noise likely to interfere with a neighbour's peaceful enjoyment of their home. A tiled floor that carries footsteps into the unit below can lead to a complaint under that rule even after the vote has passed. Allow time for the approval too, since a strata committee that refuses must give its written reasons within three months.

Schemes registered before 1996 may still use the old standard by-laws, where by-law 14 says floor space must be covered or treated to stop disturbing noise. That rule does not apply to kitchens, laundries, toilets or bathrooms, so living areas and bedrooms are where it matters most. For new apartment buildings, the National Construction Code sets a footstep noise rating of Ln,w 62 or lower for floors between units, and a lower number means a quieter floor. Ardex makes the DS 40 acoustic mat, which is laid before tiles, slabs or natural stone to reduce impact sound. Sika makes the Davco Sound Zero mat, a 4.5 millimetre layer made to reduce sound travelling through tiled floors. Regupol makes acoustic underlays, sound-absorbing sheets laid under a floor, and impact sound insulation for homes, and fitting this kind of product is covered in soundproofing installation.

Floor or Room Strata Approval Noise Point Ask For
Living room or bedroom, carpet to tiles Minor renovation, over 50% of votes Pre-1996 by-law 14 can apply Acoustic certificate
Kitchen floor in hard tiles Minor renovation By-law 14 excludes kitchens Plans with work dates and times
Hallway or entry, carpet to tiles Minor renovation, over 50% of votes Pre-1996 by-law 14 can apply Acoustic certificate
Bathroom retile with a new membrane Major renovation, special resolution Noise by-law still applies Notice if the structure changes
Laundry floor Minor, or major if waterproofing is needed By-law 14 excludes laundries Tradesperson qualifications
Floors in a new apartment building Built under the National Construction Code Ln,w 62 or lower between units Building by-laws on flooring

Verandah Tiles, Front Paths and Heritage Terraces

Many terraces and Federation houses in the inner suburbs still have patterned tiles on the verandah, the front path or the hall floor. If the house is a heritage item or sits in a heritage conservation area, those details can be part of what the council expects to keep. City of Sydney guidelines for terraces say repeated original features such as verandahs, cast iron lace and timber joinery must be kept when visible from a street or lane. Randwick City Council says maintenance and repair of heritage items is encouraged, and generally needs no consent if the council considers it minor. Items on the State Heritage Register can need consent under the Heritage Act 1977, so check with Heritage NSW before work starts. Once original tiles are broken up they cannot be put back, so decide what stays before any demolition begins.

For a heritage verandah, ask whether the tiler will lift the original tiles and lay them again rather than replace them all. Waverley Council's fact sheets on homes built between the two world wars add that paving should sit below the damp-proof course, the moisture barrier near the base of a brick wall. The same sheets say a bathroom or kitchen renovation that keeps the room layout and windows may need only a heritage exemption certificate, a council letter confirming full approval is not needed. Rules and forms differ between councils, so ask your own council which one applies before the old bathroom comes out. A tiler with heritage experience can also say whether matching reproduction tiles exist before any originals are lifted.

Tiling in a Heritage Street

Situation
What to check
Original verandah on a listed terrace
Kept when visible from a street or lane
Minor repair to a heritage item
Often no consent if council agrees it is minor
Bathroom kept to the same layout
An exemption certificate may be enough
State Heritage Register item
Consent under the Heritage Act 1977
Paving beside a brick wall
Kept below the damp-proof course
Photograph the old tiles and their pattern before anything is lifted, so the relaid floor can match the original.

Breaking Out Old Tiles Without Upsetting the Neighbours

Stripping a bathroom is loud work, with small jackhammers on the floor and saws cutting tiles for hours at a time. The NSW Environment Protection Authority sets times when power tools, including electric or air-powered tools, circular saws and compressors, should not be used at homes. On weekends and public holidays that means not before 8am or after 8pm, and on other days not before 7am or after 8pm. Complaints about noise outside those hours go to the local council or the police. The EPA also suggests letting neighbours know before noisy building work begins.

In a strata building, the approval for a renovation includes the dates and times of the work, so the tiler must keep to the agreed hours. Talk to the neighbours on each side, and above and below in a unit, before demolition day, and give them the expected dates for the noisiest work. Ask the tiler to plan the noisiest tasks, such as breaking out old floor tiles, for the middle of the day. Some tilers set up a cutting bench in a garage or courtyard, which keeps saw noise and dust away from shared walls. Ask the strata manager whether a notice must go up in the lift or foyer before demolition starts. These small steps cost little and can prevent a complaint that halts the job halfway through.

Day Not Before Not After Who to Contact
Monday to Friday 7am 8pm Local council or police
Saturday 8am 8pm Local council or police
Sunday 8am 8pm Local council or police
Public holiday 8am 8pm Local council or police
Before demolition day Tell neighbours first Share expected dates Neighbours on each side
Strata renovation Agreed start time Agreed finish time Strata manager or committee

Getting Tiles Up and Rubble Out of a Sydney Home

Porcelain is heavy, and a full bathroom of floor and wall tiles may arrive on a pallet that will not fit up a terrace hallway or into a small lift. In apartment buildings the strata manager usually controls lift bookings, lift padding, the protective blankets hung inside the lift, and the loading dock, so book these once the start date is set. Ask who carries the boxes from the kerb to the room, because some quotes assume the materials will be waiting inside. Rubble from a bathroom strip-out fills bags or a skip quickly, and old tiles, sheeting and mortar are heavy to carry by hand. If parking is tight, ask whether the tiler will need a space kept clear on the street for unloading. These details sound minor, but they can decide whether the first day starts on time.

Where a skip will not fit on your own land, councils require approval before it goes on the road. Inner West Council asks for construction skips to sit within the property where possible, and needs a skip bin user permit for the street. Its free permit is emailed within two business days, but the bin must come from an approved provider and stay in front of your own property. Randwick City Council also requires approval for a skip on a road, footpath or nature strip, and breaching the rules is an offence under the Local Government Act 1993. Other Sydney councils run their own permit systems, so check your council's website before the bin is booked. Bins and bags can be priced through skip bin hire, or the tiler may include rubbish removal in the quote.

Rubbish from a bathroom built between 1945 and 1990 may include asbestos sheeting, which must be wrapped and taken to a landfill that accepts it. Have any suspect material tested first, as set out further down this page, and keep it separate until results come back. Ask where the tiler takes each load, and keep the tip receipts with your job file. A tidy plan for rubbish keeps shared corridors, footpaths and driveways clear for neighbours, and it avoids arguments with the strata manager during the job.

Access Checklist for a Sydney Tiling Job

Item
Who arranges it
Lift booking and padding
Owner, through the strata manager
Skip on the street
Approved provider with a council permit
Carrying boxes to the room
Agreed in writing in the quote
Suspect asbestos waste
Tested first, then a licensed removalist
Tip receipts
Tiler, kept in your job file
Never let a crew stack pallets or rubble on common property or the footpath without written approval.

Plumbers, Electricians and Heated Floors in the Right Order

A bathroom retile almost always involves other trades, and the order they arrive in decides whether the tiles go down once or twice. Moving a shower drain outlet (the waste), taps or a toilet must be done by a licensed plumber, who lodges a Notice of Work, a form describing the plumbing job, before starting. At the end the plumber gives a Certificate of Compliance to the person who arranged the work, confirming it meets the Plumbing Code of Australia. In Sydney, plumbing that needs inspection is booked through Building Commission NSW, and Sydney Water holds the sewer service diagrams, the plans showing where the pipes run. Book the plumber through hiring a plumber in Sydney before the walls are sheeted, because pipes cannot move once tiles are on. The floor waste height also sets the fall, the slope that carries water to the drain, so the plumber and tiler should agree it on site.

Underfloor heating and new power points belong to a licensed electrician, who must lodge a Certificate of Compliance for Electrical Work, known as a CCEW, within seven days of finishing. Warmup makes undertile heating elements that sit directly beneath stone or porcelain tiles, with programmable and smart thermostats. Thermogroup makes underfloor heating systems and Thermorail heated towel rails from its base in Leeton, in regional NSW. Either system needs a circuit and thermostat position planned with the electrician, as set out in hiring an electrician in Sydney. Running costs and options for the heating itself are compared in heated bathroom floor installation. Keep the heating layout and thermostat manual with your house records, since a mat or cable cannot be seen once it is tiled over.

Linear drains, long narrow channel drains, and floor wastes also need to be chosen before the screed, the sand and cement bed under the tiles, goes down. Stormtech makes slimline linear drains with grates that hold tiles, which let the floor tile continue across the drain line. James Hardie makes Villaboard, a wall lining sheet made for use under tiles in bathrooms, kitchens and laundries. Agree in writing who supplies each of these items, since a missing drain, grate or sheet can stall the whole job for days while the crew waits.

A Typical Order of Trades in a Sydney Bathroom

Stage
Trade and paperwork
Strip out
Tiler or demolition crew, after any asbestos test
Pipes moved (rough-in)
Plumber lodges a Notice of Work
Wiring
Electrician, CCEW within seven days
Sheeting and membrane
Tiler or waterproofer, with photos taken
Tiling, then fixtures fitted
Tiler, then the plumber and electrician return
Ask for the plumber's Certificate of Compliance and the electrician's CCEW before the final payment.

Retiling a Rented Sydney Home or Investment Unit

Many Sydney homes are rented, and tiling problems often turn up first as a tenant's repair request. A burst water service or serious leak, a blocked or broken toilet and a failed hot water service are all listed as urgent repairs in NSW. If a tenant cannot reach the landlord or agent, they can arrange an urgent repair and be repaid up to $1,000. The landlord can refuse to repay if the tenant used an unlicensed tradesperson, so a licensed tiler or plumber matters here too. Repayment must be made within 14 days of the tenant's notice, so landlords should keep a licensed tradesperson's details on the lease. A cracked tile or worn grout with no active leak is a non-urgent repair, raised in writing with a clear deadline.

Landlords planning a full retile can time it between leases, which avoids working around a household. If work must happen during a tenancy, agree the dates in writing with the tenant and allow for the bathroom being out of use. For an investment unit, the strata approval steps above still apply, whoever lives there. Repair disputes that NSW Fair Trading cannot settle can go to the NSW Civil and Administrative Tribunal, so keep every request and reply in writing. Tenants should report a slow leak early, because water spreading under tiles can turn a small repair into a much bigger one. Leaks that have already soaked a wall are dealt with in shower regrouting and leak repairs.

Problem Urgent or Not Who Can Arrange It Paperwork to Keep
Serious leak from a shower Urgent Landlord, or tenant if unreachable Licensed trade invoice
Blocked or broken toilet Urgent Landlord, or tenant up to $1,000 Licensed plumber invoice
Cracked floor tile, no leak Non-urgent Landlord after a written request Request with a deadline
Worn grout and mould Non-urgent Landlord after a written request Photos and the request
Hot water service failed Urgent Landlord, or tenant if unreachable Licensed trade invoice
Burst water pipe behind tiles Urgent Landlord, or tenant if unreachable Licensed plumber invoice

Testing Pre-1990 Wall Sheeting and Floor Underlay Before a Strip-Out

The NSW Government estimates that one in three NSW houses built or renovated between 1945 and 1990 contain asbestos. Behind tiles is one of the places it can be found, along with flooring underlay and the backing under old floor tiles and vinyl. Breaking tiles off a wall can damage any sheeting behind them, and disturbing asbestos during a renovation can release fibres. If you suspect asbestos, the advice is to stop work, clear the area and get help from a licensed assessor and removalist. Testing costs about $50 to $150 a sample, and removal from a bathroom about $1,500 to $4,000, according to our NSW price guides. A test before demolition day costs far less than a job that stops halfway.

Book asbestos testing and inspection before the strip-out if the house was built or renovated between 1945 and 1990. If the sheeting tests positive, the removal can be handled through asbestos bathroom removal before the tiler arrives. Asbestos removalists are licensed by SafeWork NSW, and friable material, which crumbles by hand, needs a removalist with a Class A licence. The tiler's quote should say what happens if suspect material turns up mid-job, including who pays for testing, who removes it and who covers the delay.

Material Where in the Room What to Do Who Removes It
Sheeting behind wall tiles Bathroom and laundry walls Test before the tiles come off Licensed removalist if positive
Flooring underlay Under old floor coverings Test before lifting Licensed removalist if positive
Backing under vinyl or floor tiles Kitchens and laundries Do not sand or grind it Licensed removalist
Friable material Any room Stop work and clear the area Class A licence only
Unknown sheeting Homes from 1945 to 1990 Treat as asbestos until tested Licensed assessor first
Rubble from a tested bathroom Skip or bags on site Keep separate until results return Tiler, or removalist if positive

Engineered Stone Splashbacks and Cutting Tiles Indoors

Since 1 July 2024, manufacturing, supplying, processing or installing engineered stone has been banned in NSW. The ban covers benchtops, slabs and panels, and SafeWork NSW lists kitchen splashbacks and floor and wall tiles as examples of panels. Ceramic tiles, grout, natural stone such as granite, and porcelain or sintered stone without resin all sit outside the ban. A splashback in ceramic or resin-free porcelain is therefore still allowed, and kitchen splashback installation compares the options. Existing engineered stone, called legacy stone, can be removed, repaired or modified only after notifying SafeWork NSW. If an old benchtop or splashback cannot go back in, it must be replaced with a product that is not banned.

SafeWork NSW says dust capture fitted to the tool itself and using water while cutting are effective ways to reduce exposure to silica dust. Workers must have masks that meet Australian Standards and are fit tested, checked for a tight seal on the face, when work starts and then every 12 months. Where cutting or shaping stone is high risk, the business needs a written silica risk control plan, or a safe work method statement, a written list of task risks and controls, on a construction site. Hilti makes the VC 40M-X, an M-class dust extractor rated to capture very fine dust, which connects to power tools on site. Festool makes M Class dust extractors, including the CTM 26 and the cordless CTMC MIDI. Inside an apartment, ask where cutting will happen and how dust and wet cutting sludge (slurry) will be kept out of shared corridors and drains.

Stone, Tiles and Silica Rules

1 July 2024 the date engineered stone benchtops, slabs and panels were banned in NSW
Product or task
Where it stands
Engineered stone splashback or tile
Banned for new supply and installation
Ceramic and resin-free porcelain
Outside the ban
Repair of legacy engineered stone
Notify SafeWork NSW first
Cutting any tile indoors
Water or dust extraction on the tool, fit-tested masks
High risk work on stone
Written risk control plan or a safe work method statement
A crew dry cutting tiles in a closed room, with no water or extraction, is not following the controls SafeWork NSW describes.

Spare Tiles, Batch Numbers and Papers to Keep

Ask the tiler to leave every unopened box and a few spare tiles from each batch before the job is signed off. Mark the batch or shade code on a box and store it somewhere dry, so a future repair can match the original. Our NSW tile repair figures note that whether matching tiles can be found affects the price of a later fix. Keep a note of the grout colour and product as well, since grout mixed later may not look the same. These few items can turn a difficult repair into a simple one, even years after the original tiler has moved on.

Laticrete makes SpectraLOCK PRO Premium Grout, an epoxy or resin based grout, and the Hydro Ban waterproofing membrane. Mapei makes Keraflex Maxi S1, a flexible cement adhesive that holds tiles without slipping, suited to large format ceramic tiles. Crommelin makes Wetite, which its own guide shows being used to waterproof a shower area before tiling. Selleys makes Wet Area silicone sealant, made to resist mould without shrinking, cracking or peeling away. Writing the product names on the handover note means the next tradesperson can choose compatible products. The same note should name the membrane, its brand and the business that laid it.

Ask for photos of the membrane, the floor slopes (falls) and any pipes in the walls before they were covered. Keep the plumber's Certificate of Compliance and the electrician's CCEW with the contract and invoices. If a buyer's building inspector asks about the bathroom years later, these records answer most questions quickly and show the work was done properly. Routine cleaning later on can be booked through tile and grout cleaning in Sydney, which keeps grout lines in good order.

Item to Keep Reason Supplied By Store It With
Spare tiles from each batch Matching later repairs Tiler or owner Dry storage
Adhesive, grout and silicone names Compatible repairs later Tiler The handover note
Membrane photos and product Evidence for a warranty claim Tiler or waterproofer The contract
Plumbing Certificate of Compliance Shows the plumbing complies Licensed plumber House records
Electrical CCEW Records wiring and heating work Licensed electrician House records
Strata approval Shows the new floor was approved Owners corporation Lot records
Heating layout and manual Locates cables under the tiles Electrician or installer House records

Hollow Tiles, Lippage and a Failed Membrane: Making a Claim

Statutory warranties, the protections set by law, last six years in NSW for a major defect and two years for any other defect, counted from when the work was completed. Waterproofing is listed as a major element, so a failed shower membrane can fall within the longer period. Cracked or hollow tiles, sometimes called drummy tiles, and lippage, where one tile edge sits higher than the next, are more likely to be treated as other defects. Put the problem to the business in writing first, attaching photos, your contract and when the fault first appeared. If that does not fix it, owners can lodge a complaint in person at a Service NSW centre. Building Commission NSW runs a free complaint handling service, and it can send an inspector where work is incomplete or a major defect is alleged.

Inspectors check only the items listed in the complaint, so list every fault you want looked at. Where defects are found, a Rectification Order, a formal written direction, can set out what must be fixed and by when. If the order is ignored, or you are unhappy with the outcome, a claim can be lodged with the NSW Civil and Administrative Tribunal. Meanwhile, stop using a shower that leaks into a wall or the unit below, and tell the strata manager in writing if common property is affected. Keep a list of every call, email and site visit, with dates, while the complaint is open. Dated photos taken as soon as a problem appears make every later step easier.

What to Look Out For Before Booking a Sydney Tiler

Some warning signs appear in the paperwork before a single tile is laid. Any quote above $5,000 that shows no licence number, or shows a licence without wall and floor tiling, needs checking straight away. Asking for over 10 per cent as a deposit breaks NSW home building law, and so does taking any deposit on a job above $20,000 before the insurance certificate is issued. A bathroom quote that never says who lays and photographs the membrane leaves the costliest possible defect without anyone clearly responsible for it.

The list of work included can hide further gaps. Check for removal of old tiles, rubbish disposal, sheeting repairs, silicone and sealing, since each can come back later as an extra charge (a variation). In a unit, a quote that ignores strata approval, lift bookings or an acoustic mat under new floor tiles is incomplete. Prices well below the ranges in bathroom tiling across NSW can mean something has been left out. Leaving out any allowance for levelling an uneven floor can also lead to extra charges once the old tiles are lifted. Be wary too of any tiler who offers to skip the asbestos test on a house built between 1945 and 1990.

Checks Before You Book

What is involved
Licence is current and lists wall and floor tiling on the NSW register.
Deposit capped at 10 per cent or less of the agreed price.
Compensation certificate received before paying on jobs over $20,000.
Membrane, sheeting and floor falls assigned to a named business.
Strata approval, acoustic certificate and lift booking sorted for units.
Tiles, adhesive, grout and silicone each named on the quote.

If rubbish removal is missing, expect the price to grow once demolition starts.

No allowance for an asbestos test on an older home is another gap to watch for.

Pressure to sign on the spot is a reason to slow down, since large contracts carry five clear business days to cool off.

Getting Sydney Tiling Quotes You Can Compare

A fair comparison needs every tiler pricing identical work from an identical brief. Give each of them matching measurements, photos, tile details and a note of whether old tiles must come up. Tell them your suburb, whether the home is a house or a unit, and how materials will get from the street to the room. Mention the age of the home, any heritage listing and any strata approval still to come, since each can change the method and timing. Ask for the price broken into demolition, preparation, membrane, tiling, grout and silicone, and rubbish removal. Laid out like that, the differences between quotes become easy to see.

Find out how many days each quote stays valid and the earliest realistic start date. Ask too whether the tilers on site are employees or subcontractors, and who supervises them each day. Read each quote's exclusions as carefully as its price, since the cheapest total may simply leave out the hardest work. Get each quote in writing, with the tiler's licence number and business name printed on it. Work on the rest of the property is often booked around a retile, such as a new boundary fence through hiring a fencer in Sydney or garden repairs through hiring a gardener in Sydney. If the refit also adds cooling, hiring an air conditioning installer in Sydney explains the separate licences that work needs.

File the contract, approvals, photos, certificates and spare tiles in one place while you own the property. A buyer's building inspector may ask how and when a bathroom was retiled, and those records give a quick and confident answer. Tiled patios and pool surrounds raise their own questions about slip resistance, covered in outdoor tiles and paving. Good records, a written contract and a clear brief are what make a tiling job straightforward from quote to handover.

Tilers Across Sydney

Tiling prices on this page apply across Greater Sydney. Shower repairs are priced higher in the eastern and northern suburbs than in western Sydney and the Hills, according to our NSW tile repair figures.

▶ Sydney 30 areas
Sydney CBD Parramatta Blacktown Penrith Liverpool Bankstown Hurstville Sutherland Cronulla Kogarah Rockdale Marrickville Randwick Bondi Manly Chatswood Hornsby Ryde Epping Castle Hill Baulkham Hills Rouse Hill Kellyville Macquarie Park Strathfield Burwood Auburn Fairfield Campbelltown Camden
▶ Central Coast 24 areas
Gosford Erina Terrigal Wamberal Avoca Beach Kincumber Woy Woy Umina Beach Ettalong Beach Wyong Tuggerah The Entrance Long Jetty Bateau Bay Toukley Budgewoi Lake Munmorah Warnervale Wadalba Kariong Somersby Narara Niagara Park Saratoga
▶ Blue Mountains 22 areas
Katoomba Leura Wentworth Falls Blackheath Mount Victoria Medlow Bath Bullaburra Lawson Hazelbrook Woodford Linden Faulconbridge Springwood Winmalee Valley Heights Warrimoo Blaxland Glenbrook Lapstone Mount Riverview Mount Wilson Megalong Valley
▶ Illawarra 30 areas
Wollongong Fairy Meadow Figtree Mount Keira Mount Ousley Corrimal Bellambi Woonona Bulli Thirroul Austinmer Coledale Helensburgh Port Kembla Warrawong Berkeley Dapto Kembla Grange Albion Park Shellharbour Oak Flats Flinders Kiama Gerringong Minnamurra Jamberoo Shell Cove Stanwell Park Coalcliff Unanderra
▶ Southern Highlands 24 areas
Bowral Mittagong Moss Vale Burradoo Berrima Bundanoon Exeter Sutton Forest Robertson Kangaloon Fitzroy Falls Welby Braemar Willow Vale New Berrima Colo Vale Yerrinbool Hill Top Balmoral Village Bargo Wingello Penrose Marulan Goulburn
▶ South Coast 28 areas
Nowra Bomaderry Berry Kangaroo Valley Shoalhaven Heads Culburra Beach Callala Bay Huskisson Vincentia Sanctuary Point St Georges Basin Sussex Inlet Ulladulla Milton Burrill Lake Batemans Bay Malua Bay Moruya Tuross Head Narooma Bodalla Bermagui Cobargo Bega Tathra Merimbula Pambula Eden

Sydney Tiler FAQ

Do older strata buildings have a by-law about floor coverings?
Schemes that existed before 1996 may still use the old standard by-laws in Schedule 2 of the Strata Schemes Management Regulation 2016. By-law 14 there says an owner must cover or treat floor space enough to stop noise likely to disturb another lot (unit). It does not apply to kitchens, laundries, toilets or bathrooms. Check the registered by-laws for your own building, since a scheme can replace or add to the standard set.
What does Ln,w 62 mean on an apartment acoustic report?
Ln,w is a rating for impact sound, such as footsteps, passing through a floor. A lower number means less noise reaches the unit below. The National Construction Code sets Ln,w 62 or lower for floors between units in new apartment buildings. Ask the strata manager what result the owners corporation expects before you buy tiles and underlay.
Why should I keep spare tiles from the same batch?
A later batch of the same tile can differ slightly in shade, which shows once it sits beside the original. Our NSW tile repair figures note that finding a matching tile affects the price of a later repair. Order extra with the main order, and allow more for herringbone than for a straight layout. Store the spare boxes somewhere dry with the batch code and grout colour written on them.
Do I need a council permit for a skip bin outside my house?
Councils require approval for a skip bin placed on the road, footpath or nature strip. Inner West Council issues a free skip bin user permit within two business days when the bin comes from an approved provider. Randwick City Council treats a skip in a public place without approval as an offence under the Local Government Act 1993. Where there is room, Inner West asks for construction skips to sit inside the property instead.
Can my tenant arrange a tiler for a leaking shower?
A burst water service or serious leak is listed as an urgent repair in NSW. If the tenant cannot reach the landlord or agent, they can arrange the repair and claim back up to $1,000. The landlord can refuse to repay if an unlicensed tradesperson did the work. Worn grout or a cracked tile with no serious leak is a non-urgent repair, requested in writing with a deadline.
Can a tiler trim an old engineered stone splashback to suit new tiles?
Engineered stone installed before the 1 July 2024 ban is called legacy engineered stone. Removing, repairing or making minor changes to it counts as processing that must be notified to SafeWork NSW. Temporary removal and refitting is allowed, but a piece that cannot go back must be replaced with a product that is not banned. Ceramic tiles, and porcelain or sintered stone without resin, are outside the ban.
Is an asbestos test worth paying for before a 1960s bathroom is stripped?
Yes, the NSW Government estimates one in three NSW houses built or renovated between 1945 and 1990 contain asbestos. Behind tiles and in flooring underlay are among the places listed where it may be found. Testing a sample costs roughly $50 to $150, far less than a job stopped halfway through demolition. If tests are positive, a licensed removalist takes the material out before the tiler starts.
Do original verandah tiles on a terrace have to be kept?
City of Sydney guidelines expect original verandahs on listed terraces and in conservation areas to be kept where seen from a street or lane. Randwick City Council says minor maintenance and repair of heritage items generally needs no development consent. Items on the State Heritage Register can need consent under the Heritage Act 1977. Check with your own council before lifting any original tiles.
Who sets the floor waste height when a bathroom floor is retiled?
Moving or raising a floor waste is plumbing work for a licensed plumber, who lodges a Notice of Work first. The waste height decides how much fall the tiler can build into the floor. Where a floor waste is installed, the National Construction Code requires the floor to be sloped towards it. Get the plumber and tiler to agree the height on site before the screed goes down.
Can the NSW licence check show past warnings against a tiler?
Yes, the NSW Government's online licence check lists public warnings, formal cautions and penalty notices against a licence holder. The record also shows each licence category, its expiry date, its current status, any conditions and any suspension. Prosecutions under the Home Building Act that ended in a finding of guilt appear as well. Make sure wall and floor tiling is listed and the name matches the business on your quote.

Sydney Tiling Specialists

For Trades & Contractors - NSW

Tiling in Sydney often depends on other trades for the parts a tiler cannot do. Plumbing changes need a licensed plumber, heated floors and new power need an electrician, and old sheeting may need an asbestos removalist first. These services are booked alongside tiling jobs across Greater Sydney.

Compare Sydney Tiling Quotes

Tell us your suburb, the rooms and areas to tile, the tiles you have chosen and whether old tiles must come up, and compare quotes from local Sydney tilers who are all pricing the same job.

Get Free Tiling Quotes

About This Guide

This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.

Reviewed by The Quote Yard Editorial Team

Published 20 November 2026 ·

How The Quote Yard Works

We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.

All NSW tradies are required to hold appropriate licences. Verify at NSW Fair Trading.
Prices are 2027 estimates based on typical Sydney tiling rates. Your final price will depend on the tile size and pattern, the surface underneath and access to the room, so compare written quotes that list labour, materials, membrane and rubbish removal separately.
Need work done? Get free quotes. Post a Job – It's Free