Looking for a Concreter in Sydney?
Tell us your suburb and council, the area to be concreted in square metres, the finish you want, and how close a concrete truck can get to the work area. We will pass the same description to local concreters across Sydney, so every quote you receive prices the same job.
Sydney Concreting Price Guide
These are estimated Sydney price ranges for 2027, taken from our live NSW concreting cost pages. Your price depends on access for the truck or pump, any rock or old concrete to remove, the thickness and steel specified, and council fees for the footpath crossing.
Hire a Concreter Sydney NSW - Get Local Quotes
Concrete work in Sydney is shaped as much by the street outside, and the council that controls it, as by the slab itself. A driveway in Balmain or Paddington may need a council permit for the footpath crossing, a second permit to stand a pump on the road, and care around old sandstone kerbs. Out in Camden, Penrith or Blacktown, the bigger question is often the ground, where salt and clay that swells when wet can change the concrete mix, the depth of the steel and the drainage. Older homes also hide surprises below the surface, from thick old slabs and buried fibro to tree roots running under the driveway. Each council writes its own crossing rules, so one may insist on an approved contractor and plain grey concrete while another lets your own concreter build it. Overhead power lines, stormwater pits and early morning truck deliveries add limits on how and when concrete can be poured. General concreting is a licensed trade in New South Wales once a job passes $5,000 in labour and materials, including GST, and the licence must match the business quoting. Contracts over $20,000 need home building compensation cover, a form of insurance, before any deposit is paid, and the deposit itself is capped at 10 per cent of the price. The figures on this page are 2027 estimates taken from our live NSW concreting cost pages, assuming normal working hours, reasonable truck access and no rock hidden below the old surface. Post your job on The Quote Yard and we will connect you with local concreters across Sydney who can quote on it.
At a Glance - Sydney Concreter Prices, 2027 Estimates
| Job | Price Range | How It Is Charged | What Drives It In Sydney | Who Can Do It |
|---|---|---|---|---|
| Plain broom finish driveway | $75 - $130 per m² | Per square metre | Thickness, access and old slab removal | Licensed concreter |
| Reinforced residential driveway | $90 - $150 per m² | Per square metre | Mesh, thickness and truck access | Licensed concreter |
| Sloped or stepped driveway | $130 - $220 per m² | Per square metre | Gradient, steps and formwork | Licensed concreter |
| Heavy duty driveway | $130 - $200 per m² | Per square metre | Caravan, boat or truck loads | Licensed concreter |
| Patio or shed slab | $80 - $140 per m² | Per square metre | Size, edge beams and access | Licensed concreter |
| Single garage slab | $130 - $190 per m² | Per square metre | Engineering and steel | Licensed concreter |
| Coloured concrete | $100 - $160 per m² | Per square metre | Oxide colour mixed through | Licensed concreter |
| Exposed aggregate | $120 - $200 per m² | Per square metre | Stone choice and surface washing | Licensed concreter |
| Stamped pattern concrete | $130 - $220 per m² | Per square metre | Pattern and sealing coats | Licensed concreter |
| Repair or resurfacing | $60 - $180 per m² | Per square metre | Damage depth and coating | Concreter or repair specialist |
| Council vehicle crossing | $1,800 - $5,500 | Fixed price per crossing | Council rules and kerb type | Concreter or council-approved contractor |
| Concrete pump | $1,200 - $5,500 set-up, plus $30 - $100 per m³ | Set-up fee plus volume | Pump arm reach and street access | Pump operator |
| Soils report | $1,200 - $3,500 | Fixed fee | Site conditions and slab type | Geotechnical engineer |
What Pushes a Sydney Concreting Bill Up
Hiring a Concreter in Sydney: Scoping the Pour
Most Sydney concreters price driveways, paths and slabs by the square metre after a site visit, with the old slab, the pump and any council work added on top. Our NSW cost pages publish no hourly rate for the trade, so labour is priced on quote and built into those square metre rates. The main finishes, from plain broom (a lightly brushed, non-slip surface) to polished concrete, are compared in our state hub for NSW concreting services. A clear written scope matters more here than in most trades, because concrete cannot be adjusted once it has set. Two quotes for the same driveway can differ by thousands simply because one includes breaking out the old slab and the other does not. Concrete work inside a house, such as patching a slab after a shower drain is moved, is usually organised through hiring a bathroom renovator in Sydney.
Before anyone visits, decide what the concrete has to carry and how you want it to look. A path for wheelie bins, a double driveway for two cars and a slab under a garden shed each call for different thickness and steel. Measure the area roughly, and photograph the street frontage, the kerb, the side access and anything overhead. Mention whether the slab will sit against the house, because the finished surface should slope away from the walls so rain drains off. If an outdoor slab will later be tiled, its heights and slopes should suit the tiles, a point covered in hiring a tiler in Sydney. Sending the same short brief to every business is the simplest way to get quotes that line up.
Driveway and Slab Estimates Across Sydney Suburbs for 2027
The figures here come from our live NSW driveway, slab and concreting cost pages, labelled as 2027 estimates for Sydney work. A plain broom finish driveway runs about $75 to $130 per square metre, and a reinforced residential driveway about $90 to $150. Sloped or stepped driveways cost more, at roughly $130 to $220, because the formwork, the timber or steel edging that holds wet concrete in shape, takes longer on a slope. Full regional figures for driveways sit in concrete driveway costs, and slab figures in concrete slab costs.
Location inside Sydney changes the total for the same 60 square metre driveway. A plain driveway of that size is estimated at $5,800 to $9,400 in the inner west and eastern suburbs, against $4,500 to $7,400 in western Sydney and Parramatta. Reinforced versions of the same driveway run from about $5,400 in the south west to $11,800 at the top of the inner city range. Single garage slabs of 30 square metres sit between about $3,400 and $6,400 across the same areas. Decorative finishes add to these sums, with exposed aggregate at about $120 to $200 per square metre and stamped concrete at $130 to $220. A quote far outside these ranges is worth a closer question about what it includes, such as removal, steel, pumping or the council crossing.
| Sydney Area | Plain Driveway 60 m² | Reinforced Driveway 60 m² | Garage Slab 30 m² |
|---|---|---|---|
| Inner west and eastern suburbs | $5,800 - $9,400 | $7,200 - $11,800 | $4,400 - $6,400 |
| North Shore and northern beaches | $5,500 - $8,800 | $6,800 - $11,200 | $4,200 - $6,200 |
| Hills District and Hornsby | $4,800 - $7,800 | $6,000 - $10,200 | $3,800 - $5,600 |
| Western Sydney and Parramatta | $4,500 - $7,400 | $5,500 - $9,500 | $3,500 - $5,200 |
| South west, Liverpool and Campbelltown | $4,400 - $7,200 | $5,400 - $9,200 | $3,400 - $5,100 |
| Sutherland and St George | $4,800 - $7,800 | $5,900 - $9,800 | $3,700 - $5,500 |
| Central Coast, for comparison | $4,500 - $7,400 | $5,500 - $9,400 | $3,500 - $5,300 |
Pump Hire, Small Loads and Payment Stages
Concrete arrives by truck, and every Sydney job depends on how close that truck can get to the formwork. Where the truck's chute cannot reach, a line pump using hoses or a boom pump with a folding arm moves it, at $1,200 to $5,500 to set up plus $30 to $100 per cubic metre. Terraces in the inner suburbs, rear yard slabs and steep blocks on the North Shore are the usual cases for a pump. Wheelbarrowing is the other choice, but it adds labour, and the concrete keeps stiffening while it is wheeled down a narrow side path. Booking and pump arm sizes are explained under concrete pumping, so you can judge whether the pump named on a quote suits your site.
Small pours bring their own costs, because a truck and driver carry the same overheads whether they deliver one cubic metre or several. Ask whether the concrete supplier adds a charge for a small load or for waiting time, since our cost pages give no figure and these are priced on quote. Check that the quote allows for the truck to wait while the pump sets up or the steel is checked. A path and a shed slab poured on the same day can share one delivery, one pump booking and one crew visit, avoiding a second set of charges.
Payments on a bigger job should follow stages you can see on site. A sensible Sydney schedule links payments to excavation and base, formwork and steel ready for inspection, the pour and finish, and the council crossing signed off. NSW contract rules require each progress payment to reflect work actually completed, so no claim should run ahead of the stage reached. Any change to the area, thickness or finish needs a written variation, a change to the contract that you and the concreter both sign and keep with the contract. A variation note should show the new price and any change to the finish date before the extra work starts. Holding back the final payment until the crossing passes its council inspection gives the concreter a reason to return.
Reading a Concreting Payment Schedule
Every pump charge should show the set-up fee and the rate per cubic metre.
Do not pay for any stage the crew has not reached yet.
Licensed Concreters and the Other Trades on a Pour
General concreting is its own licence category in NSW, and a contractor licence is needed once residential work is valued above $5,000, counting labour and materials including GST. The category covers laying and placing concrete, formwork, fixing reinforcement, stencilled and stamped finishes, repairs, resurfacing and the digging needed before a pour. It does not cover major site preparation to shore up, or prop, the sides of deep excavations, or work that could affect the stability of a neighbouring site. Those jobs need a licensed excavator or builder, which matters on tight Sydney lots where a garage slab is cut into a slope right beside the neighbour's boundary. Licences are managed by Building Commission NSW, which answers licensing questions on 13 27 00.
Search the online register before signing anything, and confirm the licence holder is the same business that issued the quote. An individual's licence does not let that person's company contract, so a company quoting the job needs its own licence. New stormwater pipes and pits are plumbing work, as set out in hiring a plumber in Sydney, and power for lights or a gate motor needs a licensed electrician. Conduit, the plastic pipe that carries the cables, should be laid before the pour, and hiring an electrician in Sydney explains what the electrician signs off. A pad for an outdoor air conditioning unit is often poured early, so agree its size with someone from hiring an air conditioning installer in Sydney. In the Northern Beaches Council area, only a council-approved contractor may build the footpath crossing at all.
| Task | Trade | Licence or Approval | Confirm Beforehand |
|---|---|---|---|
| Driveway, path or slab over $5,000 | Concreter | General concreting licence | Licence name matches the quote |
| Deep cut beside a boundary | Excavator or builder | Licence that covers propping the cut | Engineer's design for the cut |
| Stormwater pits and pipes | Licensed plumber | Plumbing licence | Where the pipes discharge |
| Power for lights or a gate | Licensed electrician | Electrical licence | Conduit laid before the pour |
| Council footpath crossing | Concreter or approved contractor | Council permit to construct | Inspection dates booked |
| Traffic control on the street | Card holder | SafeWork NSW training card | Plan attached to the permit |
| Concrete pump on the road | Pump operator | Council temporary works approval to use the road | Permit number before the pour |
| Engineered garage or house slab | Structural engineer | Design certificate | Soils report used for the design |
When a Driveway Job Needs a Large Contract and Compensation Cover
A written contract is required in NSW whenever residential building work is priced over $5,000, including GST, and that covers most driveways. Jobs from $5,000 to $20,000 use a small jobs contract, while anything above $20,000 needs a large job contract with a progress payment schedule. A double driveway with a new crossing in the inner west can pass that higher mark once removal and a decorative finish are added. Read the scope closely, because a driveway described only by its area tells you nothing about the thickness, the steel, the base depth or where the joints go.
No NSW home building contract may ask for a deposit above a tenth of the contract price. Where the job is valued over $20,000, the contractor must take out home building compensation cover and give you the certificate before asking for any deposit. Asking for a payment before that certificate exists is illegal, whatever reason is given for it. The certificate can be checked through the HBC Check service on the government's licence register before you pay anything. That cover protects you if the business cannot finish the job, so treat it as more important than any verbal assurance.
A large job contract must give you a cooling-off period of five clear business days to cancel, counted from when you are handed your copy. Use that time to read what the contract says about rock, tree roots, old footings (buried concrete bases) and thick slabs found under the surface once digging starts. Check who pays the council fees, the refundable deposits and any extra inspections the council orders. Some councils hold a refundable deposit against damage to the footpath, and Inner West Council lists $2,164 for a light duty crossing built for cars. The contract should say who applies for each permit and who books each inspection, so nothing is missed. Attach the council approval and any engineer's drawings to the contract before you sign it.
NSW Contract Rules for Concrete Work
Driveway Crossings Across Sydney Councils
The part of a driveway between your boundary and the road is council land, so building or changing it needs approval under section 138 of the Roads Act 1993. The City of Sydney says a permit is needed before you build, repair or change a driveway, and that lodging the application is not permission to start. You can use your own contractor or accept the council's quote, but a separate road opening permit, council permission to work on the road, is still needed before work begins. If the council builds the crossing, the work can take up to 28 days after payment. Significant trees, traffic islands and stormwater pits cannot normally be moved to suit a new driveway, so the position may be fixed before design starts. Any heights and slopes changed by the work need their own approval, so the crossing and driveway must be designed together.
Northern Beaches Council lets only its approved crossing contractors build crossings, and its standard is full width plain concrete. Asphalt, pavers, coloured, exposed aggregate, pebblecrete, stencilled and stamped concrete are no longer approved on the road reserve, the council land between boundary and road, there. Inner West Council charges $586.40 for a residential roadworks application, which includes three inspections, and asks contractors to hold $20 million of public liability insurance. In Ku-ring-gai, a residential crossing must be at least 130 millimetres thick with SL72 mesh, a standard welded steel mesh, and coloured concrete needs conditional approval. The Central Coast follows different rules again, as set out in hiring a concreter on the Central Coast.
| Council | Who Builds the Crossing | Finish and Thickness | Inspections and Timing |
|---|---|---|---|
| City of Sydney | Your contractor or the council | Sydney streets technical specification | Council build up to 28 days after payment |
| Northern Beaches | Council-approved contractors only | Full width plain concrete | Formwork and final, booked 3 working days ahead |
| Inner West | Your contractor under a permit | Council specification applies | Three inspections in the $586.40 fee |
| Ku-ring-gai | Owner's contractor for standard sloped kerbs (laybacks) | 130 mm with SL72 mesh | Formwork inspection before the pour |
| Campbelltown | Council quote or a local contractor | Council standards apply | Site visit within 5 business days |
| Ku-ring-gai gutter bridge or pipe crossing | Council only, at the owner's full cost | Council design | About 4 to 5 weeks for council works |
Pumps, Trucks and Traffic Control on Sydney Streets
Parking a pump, a crane truck or a concrete truck on the road can need its own permit, separate from the crossing approval. The City of Sydney lists concrete line pumps standing at street level among the temporary works that need approval to use the public way, meaning the road and footpath. Its application needs a traffic and pedestrian control plan prepared by someone holding a SafeWork NSW training card, showing how people and cars will pass. Allow at least two working days for assessment, and lodge the application well before the pour date and the concrete truck are booked.
The City of Sydney fees show how quickly street space adds up on a pour day. Assessment costs $114 per week or part week, a mobile crane permit costs $218 per standing, and closing a single residential lane costs $251 per day. Occupying a kerb lane, the traffic lane next to the kerb, on a busier street costs $717 per day where no approved works zone, a signposted kerbside space for a building site, exists. Inner West Council asks for a 1.5 metre accessible path for pedestrians at all times during crossing work. Its form adds that works within 50 metres of traffic lights, or on a State road, need a Road Occupancy Licence from Transport for NSW. Ask the concreter which of these permits the quote includes, who will lodge each one, and who pays if the pour date moves.
Street Permits on a Sydney Pour Day
Salt and Reactive Clay Under Western Sydney Slabs
Parts of western and south western Sydney sit on soils where salt can attack concrete, brick and steel over time. Camden Council's published salinity guidelines describe this as the breakdown of concrete, metal or brick caused by salts. Salt can travel in surface water, soil, groundwater, rain or air, so a slab can be exposed from below and along its edges. The council's development control plan, its local building rulebook, asks for a salinity assessment when land is subdivided, and points builders to the concrete and slab standards. Owners in newer estates should check whether their title or approval mentions a salinity management plan before a concreter starts. The same guidelines say the damp proof course, the waterproof layer near the base of a wall, must not be breached by later works such as a path poured against it.
Where those guidelines are followed, house slabs use N32 concrete, a mix designed to reach 32 megapascals of strength, or a sulphate resisting cement made to withstand salt attack. Steel should sit at least 50 millimetres from unprotected ground, and slabs should be vibrated to remove air and cured, kept damp while they harden, for at least three days. Subsoil drainage, slotted pipes buried in gravel, is listed for slabs, footings, retaining walls and driveways, which adds to the price of a long driveway. The guidelines say these measures suit only mildly salty ground and worse ground needs its own management plan, so ask the council which rules apply today. Reactive clay is a separate issue, because it swells when wet and shrinks as it dries, so slab design starts from the site class. A soils report costs about $1,200 to $3,500, and a structural engineer uses it to design the slab and its steel.
| Requirement | Camden Guidelines | Why It Matters | Ask the Concreter |
|---|---|---|---|
| Concrete strength | N32, or sulphate resisting cement | Better resistance to salt attack | Which mix is on the delivery docket |
| Concrete between steel and ground | 50 mm where unprotected | Keeps salt further from the steel | How the steel supports (chairs) are set |
| Concrete between steel and a plastic membrane | 30 mm | Membrane adds a barrier below | Membrane type under the slab |
| Sand layer | At least 50 mm under the slab | Even bedding for the membrane | Depth checked before the pour |
| Curing | Vibrated and cured at least 3 days | Stronger concrete near the surface | How the slab is kept damp |
| Drainage | Subsoil drains for slabs and driveways | Moves water away from concrete | Where the drain outlets go |
| Damp proof course | Not breached by later works | Keeps the barrier continuous | Path levels kept below it |
Early Trucks, Night Pours and Council Site Hours
Concreters like to start early, especially in summer, but the hours set by councils limit when noisy work, pumps and deliveries can begin. City of Parramatta says most sites have approval conditions allowing noisy work from 7am to 5pm on weekdays and 8am to 5pm on Saturdays. No work is allowed on Sundays or public holidays under those usual conditions, unless the council has approved otherwise. Lane Cove Council lists 7am to 5:30pm on weekdays and 7am to 4pm on Saturdays for building work.
Hours can differ under each approval, so the conditions on your consent or permit are what count. Lane Cove notes that materials cannot be delivered outside approved site hours unless a construction site management plan allows it. That rule matters when a concrete truck wants to arrive before 7am to beat the afternoon heat. Inner West Council's crossing permit sets 7am to 5pm on weekdays and 8am to 1pm on Saturdays for work on the road reserve. A concreter who works across several council areas should know which hours apply to your street. Ask them to check the hours on your consent or permit before booking a truck for first light.
Large pours sometimes need special arrangements, and Parramatta notes that night works may be approved for pouring large concrete slabs. In those cases the council usually notifies surrounding properties at least 72 hours before the work. A house driveway rarely reaches that scale, but a long pour on a hot day still needs planning. Sika makes concrete admixtures, chemicals added at the plant to adjust how the mix behaves on site. Holcim makes standard strength mixes from N20 to N50 to the AS 1379 standard, in slumps of 40 to 120 millimetres, slump being a measure of how wet and runny the mix is. Ask which mix and admixture the concreter will order, and keep the delivery docket, the supplier's slip showing the mix, afterwards.
Building Hours in Three Sydney Councils
Overhead Power Lines and Pump Booms
Many Sydney streets still carry overhead power lines, and the folding arm, or boom, of a concrete pump can reach them easily. SafeWork NSW's Code of Practice for work near overhead and underground electric lines commenced on 22 May 2026, replacing the 2006 code. It keeps ordinary workers and the machinery they operate at least 3.0 metres from lines up to 132,000 volts. The distance grows to 6.0 metres above that voltage and 8.0 metres above 330,000 volts. Concrete placing booms working within those distances must follow the safe work systems set out in the code.
Trained workers can work closer to the lines, but only with a safety observer whose sole job is watching the boom and the wires. The observer may watch only one activity, can stop the work at any time, and cannot pass tools or do other jobs. Before any work that could bring plant inside the no-go zone set by those distances, the business must consult the electricity network, the company that owns the lines, and follow its directions. Guidance on the SafeWork NSW website helps anyone planning a pour beside overhead lines.
Point out the lines along your frontage, and the service cable running from the pole to the house, when the concreter visits. A low service cable over a driveway is easy to miss when a boom swings in from the street. The pump operator decides where the truck stands, so the quote should name who supplies the pump and who supervises it. Overhead lines also matter for tipper trucks raising their trays to deliver road base or crushed rock for the compacted layer under the slab. Wacker Neuson makes vibrating plate compactors and rammers for packing down that base before the steel goes in. Digging for a deep base may go to a contractor from excavation and earthmoving, who works under the same rules.
Approach Distances Under the 2026 Code
Breaking Out Old Concrete and the Sydney Waste Levy
Replacing a cracked driveway starts with breaking out the old slab and trucking it away. Sydney sits inside the Metropolitan Levy Area, where certain licensed waste facilities pay a state levy on each tonne of waste they receive. The NSW Environment Protection Authority lists that levy at $180.20 per tonne for 2026-27, up from $174.20 the year before. Our NSW cost pages put tipping fees at metropolitan facilities at about $80 to $180 per tonne. Removal methods and prices for old slabs are compared in concrete removal.
Ask where the broken concrete will go, since clean concrete kept apart from soil and timber is easier to send for recycling. Mixed loads of rubble, soil, timber and rubbish are harder to place with a recycler and can cost more to get rid of. Some owners hire a skip for their own clean-up alongside the job, and sizes are covered in skip bin hire. Old fibro sheeting buried under a driveway or path should be treated as asbestos if anyone is unsure what it is. Leave that spot alone until asbestos testing and inspection has identified the material. Husqvarna makes power cutters and floor saws used to cut old slabs into sections before they are lifted.
| Material | Where It Usually Goes | How It Is Charged | Check on the Quote |
|---|---|---|---|
| Clean broken concrete | Recycling facility | Per tonne or per load | Kept separate from soil |
| Mixed rubble and soil | Licensed waste facility | Per tonne, levy included | Who sorts the load |
| Excavated soil and base | Facility that accepts it | Per load | Whether rock is included |
| Suspected fibro | Landfill licensed for asbestos | Separate disposal | Testing before removal |
| Small household waste | Skip bin | Per bin | Size and placement on your land |
| Old crossing and kerb concrete | Removed under the council permit | Part of the crossing price | Who restores the kerb and gutter |
Runoff, Pits and Detention Tanks Under New Concrete
New concrete stops rain soaking into the ground, so the water running off it has to go somewhere approved rather than onto a neighbour's land. A driveway or path built as exempt development, without a council application, must drain to a system connected to the existing stormwater drainage. Washing slurry, the grey watery waste from concrete work, or soil into the gutter can be an offence of polluting waters under section 120 of the Protection of the Environment Operations Act 1997. The EPA says the local council enforces the law in nearly all such cases outside businesses holding EPA licences, so complaints about slurry in the gutter usually go to the council.
Many newer Sydney homes have an on-site detention system, a tank or pit that stores storm runoff and releases it at a controlled rate. Hornsby Shire Council requires one for single dwellings where a covenant, a legal condition recorded on the property title, calls for it. City of Ryde's standard covenant terms make owners keep the system clean, free of obstructions and working to the approved design. Concreting over a detention pit or changing the levels around it can breach those terms, so check the title first. Sydney Water's detention guide says a single house may not need a system of its own, although council rules can still require one. Pipes, pits and grated drains across a driveway should be laid by a plumber before the pour, as set out in stormwater drainage plumbing.
| Item | Rule or Source | What It Means for the Pour | Check Before Work |
|---|---|---|---|
| Exempt driveway or path | Exempt development drainage rule | Runoff must reach existing stormwater | Fall and outlet shown on the plan |
| Slurry and washout | Section 120 water pollution offence | Nothing washed into the gutter | Washout area set up |
| Detention system on title | Covenant enforced by the council | System kept clear and working | Title searched for covenants |
| Single house in a Sydney Water area | Detention may not be needed | Council rules may still apply | Who confirms the requirement |
| Council stormwater pit at the kerb | Not normally moved for driveways | Crossing designed around the pit | Pit shown on the drawing |
| Detention pit inside the lot | City of Ryde covenant terms | Kept free of obstructions | Lid still reachable after the pour |
Sandstone Kerbs and Brick Footpaths at an Inner Sydney Driveway
Inner Sydney streets often keep their original sandstone kerbs, and councils expect them to survive a new driveway. The City of Sydney's technical specification says existing sandstone is to be reused and retained where possible. For stone kerbing, the kerb continues across the driveway rather than being replaced with a layback, the sloped section of kerb that cars drive over. The stones are cut to the council's standard drawings, with the top face angled to match the driveway. Stone removed from the street goes to the City's stone storage yard, kept free of other excavated material, unless it is approved for reuse on site. Kerb stones with heritage significance must be recorded, numbered and mapped so they return to their original positions.
Inner West Council's form asks for heritage brick footpaths to be lifted carefully and relaid on a 20 millimetre bed of river sand. Front yard paving in these areas also loses the usual exemption from council approval. The NSW Planning Portal says exempt driveways and paving cannot be built in a heritage conservation area, a district protected for its historic character, or on a listed heritage item. That means a new driveway in many terrace suburbs, from Glebe to Paddington, needs an application before any concrete is ordered. Ask whether the concreter has worked under these conditions before, and allow extra time for the approval. The crossing permit from the council is still needed on top of any heritage application for the driveway itself.
Heritage Kerb Work in the City of Sydney
Mesh, Joints, Sealers and the Records to Keep
The finish you pick affects the price, the upkeep and what the council will accept on the crossing at the street. Boral makes standard ready mix for driveways and decorative concrete, including coloured and exposed aggregate finishes. Heidelberg Materials makes ready-mixed concrete in standard and decorative mixes as well as aggregates, and the business was known as Hanson until its change of name. Decorative options, including how often each one needs resealing, are compared in exposed aggregate concrete, but several Sydney councils accept only plain concrete on the crossing.
InfraBuild makes steel reinforcing mesh, including trench mesh and ribbed square mesh, for driveways, paths and slabs. ARC makes reinforcing mesh along with the spacers and chairs that hold it at the right height in the slab. Fosroc makes joint fillers and sealants for the gaps between slabs and against the house. Control joints, straight cuts that make a slab crack along a planned line, are sawn soon after the pour, and SafeWork NSW warns concrete can hold up to 90 per cent silica, a lung hazard. STIHL makes cut-off machines and concrete saws, and the cutting should use a water spray at the blade or a vacuum on the saw to keep the dust down. Ask how and when the joints will be cut, and where the cutting slurry will be collected.
Sealing is usually priced as a separate line, and the right product depends on the finish and how much traffic the surface carries. Crommelin makes clear sealers for concrete and paving, and Sika also offers silane impregnations that soak into concrete rather than forming a film. Cement Australia makes General Purpose Cement and rapid set concrete mixes, which suit small repairs and post holes after the main job. Adbri makes cement along with lower carbon products, which some owners ask about when a large slab is planned. Sealing options and timing are set out in concrete sealing, along with how often each type needs another coat.
| Record | What It Shows | Supplied By | Store It With |
|---|---|---|---|
| Delivery dockets | Show the mix and volume supplied | Concreter | The contract |
| Council final inspection | Confirms the crossing was accepted | Council or concreter | The permit |
| Joint and sealer details | Guide future resealing | Concreter | The handover note |
| Photos of steel and base | Show what sits under the surface | Concreter | House records |
| Pipe and conduit sketch | Locates services under the slab | Plumber and electrician | House records |
| Care instructions | Say when cars can use the driveway | Concreter | The contract |
| Final payment receipt | Shows the contract was settled | Concreter | The contract |
Statutory Warranties and Rectification Orders for Concrete Work
Major defects in residential building work carry a six year statutory warranty, a protection set by law, in NSW, and other defects carry a two year warranty. If a breach appears in the last six months of either period, you get an extra six months to start legal action. Start by putting the problem to the concreter in writing, with photos, the contract and the date you noticed it. If that fails, a complaint can be lodged with Building Commission NSW online or at a Service NSW centre. An inspector may then issue a rectification order listing the work to fix and a date to finish it. The contractor cannot appeal that order, and ignoring it can lead to a tribunal claim and disciplinary action.
Claims that remain unresolved can be taken to the NSW Civil and Administrative Tribunal (NCAT), which expects the parties to try dispute resolution first. It is up to the homeowner to apply before the warranty period ends, so keep a note of the completion date. A crossing that fails its final council inspection is a separate matter, because the council's sign-off is part of the permit and must be sorted out with the council. Water lying against the house after a new pour also needs prompt attention, because trapped water can soak into the subfloor or behind the brickwork.
What to Look Out For on a Concrete Quote Before the Truck Is Booked
Some warning signs show up before anyone starts digging. A quote above $5,000 that shows no licence number, or shows one held under another name, should be checked on the register before anything else. Asking for over a tenth of the price before work starts, or taking any deposit on a large job before you hold the compensation certificate, is against NSW law. A price for a new driveway that says nothing about the council crossing leaves out a step every Sydney council controls. The same goes for a quote that ignores the pump, the street permit or removal of the old slab. Ask too whether the price covers repairing any damage to the footpath, kerb or nature strip.
Other gaps sit in the technical detail of the quote. Look for the slab thickness, the mesh type, the concrete strength, the base depth and the spacing of joints written on the page. In western suburbs with salt or reactive clay, ask whether the specification follows the soils report or the council's salinity rules. A quote for an exposed aggregate crossing in a council area that accepts only plain concrete is likely to fail inspection. Plans to cut joints dry, with no water or dust extraction, ignore the SafeWork NSW controls, and wet cutting methods are set out in concrete cutting. Anything missing from the quote still has to happen, and it usually comes back later as a more expensive variation.
Checks Before Signing a Concreting Quote
A quote that never mentions the pump may grow on the day of the pour.
No allowance for rock or tree roots under the old slab is another gap.
Getting Three Concreting Quotes With the Same Measurements
Quotes compare fairly only when each concreter is working from identical information. Give every business one brief with measurements, photos of the frontage and side access, and the finish you want. Name your council, mention any overhead lines, pits or sandstone kerbs, and say whether the site is in a heritage area. Ask for the price split into removal, base, steel, concrete, pump, finishing, sealing and council work.
Find out how long each price stays valid and how soon the crew could begin, allowing for council approvals still to come. Check whether the business uses its own finishers, who smooth and texture the surface, or subcontracts parts of the job, and who will be on site for the pour. Find out who lodges each permit and books each inspection, since a missed formwork inspection can hold up the whole pour. Request the delivery docket, the council sign-off, the sealer details and photos of the steel and base at handover. Keep heavy trucks off a fresh driveway until the concreter says it can carry them, which matters if hiring a removalist in Sydney is planned soon after. Owners with a long list of outdoor work can price the pieces together and still compare them line by line.
Concrete is often one part of a bigger outdoor plan, and the other trades work best when the slab heights and slopes are fixed first. A new driveway edge may need fence posts or a gate set in footings, which suits hiring a fencer in Sydney. Turf and garden beds disturbed by the work can be put back by someone from hiring a gardener in Sydney. Larger outdoor designs that combine retaining walls, paving and planting are covered in hiring a landscaper in Sydney. Agree the order of trades in writing, so nobody digs up a new path later to lay a forgotten pipe. File the contract, approvals, dockets and photos in one place and keep them while you own the property.
Concreters Across Sydney
Concreting estimates on this page cover Greater Sydney, with differences between areas shown in the price table. Each council sets its own crossing rules, so mention your council when you post the job.
▶ Sydney 30 areas
▶ Central Coast 24 areas
▶ Blue Mountains 22 areas
▶ Illawarra 30 areas
▶ Southern Highlands 24 areas
▶ South Coast 28 areas
Sydney Concreter FAQ
Who builds the footpath crossing for a new driveway in Sydney?
What does Inner West Council charge for a driveway crossing permit?
Does a concrete pump on a City of Sydney street need a permit?
How close can a concrete pump boom work to power lines?
Do salty soils in western Sydney change how a slab is built?
How much does it cost to dump old concrete in Sydney?
Can a concrete truck arrive before 7am to beat the heat?
Can a driveway in a heritage conservation area be built without approval?
Can I concrete over the detention pit in my yard?
How long do I have to claim for a faulty driveway in NSW?
Sydney Concreting Specialists
Related Services
For Trades & Contractors - NSW
Concreting in Sydney often relies on other trades for the parts a concreter cannot do. Stormwater pipes need a licensed plumber, conduit and power need an electrician, and deep cuts can go to an earthmoving contractor. These services are booked alongside concreting jobs across Greater Sydney.
Compare Sydney Concreting Quotes
Tell us your suburb and council, the area and finish you want, and how close a concrete truck can get, and compare quotes from local Sydney concreters who are all pricing the same job.
Get Free Concreting QuotesAbout This Guide
This page provides guidance information only. Details may change, always verify with the relevant authorities and seek independent professional advice where needed.
Looking for more services across New South Wales? View all available trade services.
Reviewed by The Quote Yard Editorial Team
How The Quote Yard Works
We connect you with independent local tradies and service providers, we don't perform any trade work ourselves. Tradies provide their own quotes directly to you. Always confirm licensing, insurance, and scope of work before engaging any provider.